HomeMy WebLinkAboutINSPECTION SUMMARY - 16-00662 - Gravity FactoryPermit Inspection Summary Permit Status of (Open) as of Report Date: 07/07/2017 9:30 am Permit Details Permit Number: 16-00662 Gravity Factory 165 Airport Road Building - Commercial Permit Issued Date: 02/10/2017 Permit Inspection Statistics 48Total Inspections Completed: 29Total Inspections Passed: Inspection Pass Rate 60.42% Permit Inspection History *Refer to Individual Inspection Report for more Details 05/23/2017PassQuinton OwensPlanning and Zoning Final Inspection 06/08/2017PassJoel GrayPublic Works Final Inspection Building Inspection Type 10/31/2016FailTed DyeCommercial Footing Inspection Inspected East, South and West footings. Remainder of footing to be called in for inspection on Tuesday. Inspector Comments: 11/01/2016PassTed DyeCommercial Footing Inspection 11/03/2016PassTed DyeFoundation Inspection 260' of foundation wall. There is 95' on the south wall, all of the East wall and 9' on the north wall foundations. Inspector Comments: 11/04/2016PassQuinton OwensFoundation Inspection PARTIAL FOUNDATION: West half of south foundation and west wall except northwest corner. Piers and grade beam on west wall are also not included. Inspector Comments: 11/07/2016PassTed DyeFoundation Inspection Remainder of North foundationInspector Comments: 11/08/2016FailQuinton OwensFoundation Inspection Piers on west wall (grade beams on north and south ends not ready at this time). Anchor rods not in yet for inspection. Rebar is as per plans. Inspector Comments: 11/09/2016FailQuinton OwensFoundation Inspection Piers on west wall only. Rebar installed as required. No anchor rods installed yet. and grade beams on north and south end are not ready with rebar. Inspector Comments: 11/10/2016PARTPASSQuinton OwensFoundation Inspection West wall piers only. Grade beams at corners are not ready at this time.Inspector Comments: 11/14/2016FailQuinton OwensCommercial Footing Inspection No footings to pour. Interior footings poured Friday without inspection (city offices closed for Veteran's Day). Rebar identification required before covering interior footings. Inspector Comments: Front outer entry vestibule framing only. Sheeting approved to cover Inspector Comments: Page 1 of 4 (Continued) Permit Details Permit Number: 16-00662 Gravity Factory 165 Airport Road Building - Commercial Permit Status of (Open) as of Report Date: 07/07/2017 9:30 am Permit Inspection Summary 02/21/2017PARTPASSQuinton OwensSheeting Note: Add missing screws to hold downs inside. Inspector Comments: Main open area of building insulated and covered without inspection. Inspector Comments: 03/17/2017FailQuinton OwensCommercial Insulation Inspection Fireblocking needed in mezzanine deck penetrations (fire rated at penetrations above fire riser room). Inspector Comments: Screws added to hold downs in vestibule as required from previous inspection (approved) Inspector Comments: Grab bar reinforcement is missing on ground floor restrooms.Inspector Comments: 03/17/2017FailQuinton OwensCommercial Framing/Structure Inspection Missing stud on wall by fire riser. Reminder: Fire riser room is separated from the rest of building with 1 hour minimum fire rating (walls are fire rated up to rated deck above). Openings and penetrations must maintain fire rating. Inspector Comments: Re-inspection of front area exterior walls above & below mezzanine.Inspector Comments: seal mezzanine floor penetrations. Openings above fire riser room shall be fire rated and re-inspected (do not cover). Inspector Comments: 03/21/2017PassQuinton OwensCommercial Insulation Inspection Insulation approved for cover. Rough inspections not all completed above mezzanine (approval required) Inspector Comments: 03/21/2017PARTPASSQuinton OwensCommercial Framing/Structure Inspection Main level framing is approved for cover. Not all rough-in work is done on upper level. Framing re-inspection is needed above mezzanine after rough-in's are done and for stair installation. Inspector Comments: Approved to tape other locations on main level. Upper floor is not ready (fire rated penetration above riser room is approved for drywall cover). Inspector Comments: 04/12/2017FailQuinton OwensCommercial Sheetrock/Drywall Inspection Other areas not noted for corrections are approved for taping. Inspector Comments: 04/17/2017PARTPASSQuinton OwensCommercial Sheetrock/Drywall Inspection Re-inspection of main level & initial inspection of mezzanine level.Inspector Comments: 04/27/2017FailQuinton OwensCommercial Sheetrock/Drywall Inspection No re-inspection called in for mezzanine level drywall or fire rating of riser room. Follow-up call and inspection on 4/27 was after walls were painted. Inspector Comments: 05/04/2017PassQuinton OwensSheeting Floor sheeting for raised platforms. Missing nails added during inspection.Inspector Comments: 05/19/2017PassQuinton OwensCommercial Sheetrock/Drywall Inspection Page 2 of 4 (Continued) Permit Details Permit Number: 16-00662 Gravity Factory 165 Airport Road Building - Commercial Permit Status of (Open) as of Report Date: 07/07/2017 9:30 am Permit Inspection Summary 05/19/2017PassQuinton OwensSuspending Ceiling Inspection 05/19/2017FailQuinton OwensCommercial Building Final Re-inspection scheduled for late Monday morning.Inspector Comments: 05/22/2017FailQuinton OwensCommercial Building Final Building final approved for temporary occupancy pending other final approvals which have not been verified. Inspector Comments: 06/29/2017PassQuinton OwensSidewalk Inspection Approved for C.O. per conversation with Joel.Inspector Comments: 06/29/2017PassQuinton OwensCommercial Building Final Approved for C.O.Inspector Comments: Electrical Inspection Type 02/10/2017PassBret StoddardCOM & MFR Electrical Service Inspection 03/17/2017PARTPASSBret StoddardCommercial Electrical Rough-in 03/22/2017PARTPASSBret StoddardCommercial Electrical Rough-in 03/30/2017PassBret StoddardCommercial Electrical Rough-in 05/17/2017FailBret StoddardCommerical Electrical Final Inspection 05/18/2017PassBret StoddardCommerical Electrical Final Inspection Fire Inspection Type 04/06/2017PassDale PickeringFire Sprinkler Rough-in 04/06/2017PassDale PickeringFire Sprinkler Hydro 05/17/2017PassDale PickeringFire Sprinkler Hydro 05/18/2017PassBret StoddardFire Alarm Final Inspection 05/24/2017PassDale PickeringFire Department Final Inspection 06/05/2017PassDale PickeringFire Department Final Inspection 06/26/2017PassDale PickeringFire Sprinkler Final Inspection 06/26/2017PassDale PickeringFire Department Final Inspection Page 3 of 4 (Continued) Permit Details Permit Number: 16-00662 Gravity Factory 165 Airport Road Building - Commercial Permit Status of (Open) as of Report Date: 07/07/2017 9:30 am Permit Inspection Summary Mechanical Inspection Type 03/20/2017FailDon AllenHVAC Rough-in Need to finish rough in.Inspector Comments: 03/20/2017FailDon AllenGas Pressure Test 03/23/2017PassDon AllenHVAC Rough-in 03/23/2017PassDon AllenGas Pressure Test 05/19/2017PassDon AllenHVAC Final Inspection Good for the C/OInspector Comments: Plumbing Inspection Type 11/16/2016PassDon AllenPlumbing Underground Inspection Good to cover the plumbing undergroundInspector Comments: 05/19/2017PassDon AllenPlumbing Final Inspection 06/08/2017PassDon AllenPlumbing Water 06/08/2017PassDon AllenPlumbing Sewer Page 4 of 4