Loading...
HomeMy WebLinkAboutSTAFF REVIEWS - 03-00048 - Deseret Industries - New Commercial6/10/2003 John Watson JRW 49 Professional Plaza Rexburg, Idaho 83440 Dear John, STATE OF IDAHO www.ci.rexburq.Id.us P.O. Box 280 12 North Center Street Rexburg. Idaho 83440 Phone (208) 359-3020 Fax (208) 359-3022 e-mail rexburg@ci.rexburg.id.us I have reviewed the drawings for the Deseret Industries building and have identified the following deficiencies: 1. The handicapped parking spaces do not have the 5' aisle as required. Also a van accessible space with a 9' wide aisle adjacent to it is required. 2. Please provide a Flood Elevation Certificate as required in the 2000 International Building Code (IBC) Section 1612.5. 3. A soil investigation report must be provided. The structural calculations use the soil conditions of Site Class "C". Without an engineered site study, the default Site Classification is "D". Please provide a soil investigation study or revise the structural calculations using Site Class "D". 4. The structural calculations are not consistent. Part of the document references the IBC and part the 1997 Uniform Building Code. At the front of the document, the snow load (live load) is accurately identified as 35 lb/ft, while in the roof calculations the snow load used is 30 lb/ft. The document identifies the seismic use group as group I. The IBC Table 1604.5 lists "buildings or structures where more than 300 people congregate in one area" as seismic use group II. The retail area of the store has an occupancy of 487. 5. On page 2 of the roof section of the structural calculations, the engineer makes the statement that the mechanical roof unit weights have not been included in the structural design and that roof joist manufacturer should provide the design. Please provide me with the necessary engineering document 6. On page G1.2 an "as is" area is identified at the rear of the building as having an exit serving 120 occupants. Two exits are required with exit lights. Sheet E1.1 identifies an exit sign in the "as is" area leading back into the building. Please remove this symbol. 7. The exit signs on page E1.2 are not the same as on page FD1.1. Please add where missing. 8. The exiting thru the vestibule does not meet the requirements set forth in the IBC Section 1006.1 and Table 1004.2.1. 9. Submit manufacturer's certificate of compliance for all components as per IBC Section 1621.3.5. Page 50.1 identifies that equipment seismic bracing will be provided by the equipment manufacturer. Please supply this information. 10. IBC Table 601 identifies the roof construction of Type II -B buildings as being required to have a 0 hr. fire -resistance rating. Footnote "c" makes an exception for F-1 occupancies. Section 302.3.2 of the IBC requires that "the most restrictive type of construction, so determined, shall apply to the entire building" in order for Section 302.3.2 - "Non -separated Uses" to apply. The roof construction must be 1 -hr rated. 11. The plans and specifications identify special inspections required for concrete, masonry, reinforcing steel, steel roof deck and all structural welding. Please provide us with information and certifications of the people and firm that will be performing these inspections. We need to meet with the inspection company representative to go over special inspections prior to construction. 12. Structural observation by the Engineer is a requirement of your Quality Assurance Program that is detailed on page 50.2. Please provide a list of projected visits. 13. Page S0.2 identifies IBC Sections 1505.2 thru 1505.4 to be followed for concrete testing. These sections deal with roof assemblies. Please make the necessary changes. 14. The Fire Department has reviewed the plans. I have attached a copy of the report. Please provide the necessary information they have requested. These items need to be addressed before issuance of a building permit. Please let me know if you have any questions. I can be reached during the day at 359-3020 Ext. 324. Sincerely Val Christensen Building Official C.C. John Millar Chris Huskinson Jon Berry STATE OF IDAHO P0. Box 280 12 North Center Street Rexburg, Idaho 83440 Phone (208) 359-3020 Fax (208) 359-3022 e-mail rexburg@srv.net REXBURG-MADISON COUNTY EMERGENCYSERVICES 26 NORTH CENTER STREET REXBURG, IDAHO 83440 208-359-3010 208-359-3006 FAX 2000 International Fire Code Plan Review Plan Date: 4-03 Review Date: 5-29-03 Building Name: DESERET INDUSTRIES AND DISTRIBUTION CENTER Building Address: NORTH SECOND EAST, REXBURG Stories: 1 Type of Construction: H -B Occupancy Classification: M, B, F-1 Existing Floor Area: N/A New Construction Floor Area: APPROXIMATELY 39,133 SQUARE FEET 1. Required Fire Flow (Appendix B): 4,250 GPM/THREE HOURS Comments: FIRE FLOW MAY BE REDUCED IF EACH BUILDING HAS A FIRE SUPPRESSION SYSTEM THROUGHOUT. 2. Water Supply (Section 508, Appendix C) Required: YES Fire Hydrant Location: OKAY Fire Hydrant Flows: UNKNOWN Fire Flow Test Location: N/A Fire Flow Supplied By: N/A Other Approved Water Source: NONE Water Supply Acceptable: SEE COMMENTS Fire Hydrant Location Acceptable: YES Water Supply Comments: PLEASE PROVIDE AN ENGINEER'S ASSESSMENT OF WATER FLOWS PRIOR TO CONSTRUCTION. 3. Fire Apparatus Access Roads (Section 503, Appendix D) Required: YES Acceptable Width: X Length: X Surface: X Complete Road Acceptable: YES Comments: NONE 4. Access Roads and Water Supply, including fire hydrants are required to be installed and made serviceable prior to and during time of construction (Section 501): Comments: IF NOT INSTALLED PRIOR TO CONSTRUCTION AND MADE OPERATIONAL, A STOP WORK ORDER WILL BE ISSUED. 5. Installation of portable fire extinguishers (Section 906) Required: YES Location shown: NOT SHOWN Type provided acceptable: NOT SHOWN Comments: MINIMUM SIZE OF 2A10BC REQUIRED TO BE MOUNTED THROUGHOUT FACILITY WITHIN TRAVEL DISTANCES. 6. Automatic fire extinguishing systems (Section 903) Required: YES Type of system being installed: NOT SHOWN Sprinkler system monitoring (Section 907) required: YES Comments: PLANS REQUIRED TO BE SUBMITTED TO STATE PRIOR TO ISSUANCE OF A BUILDING PERMIT. 7. Standpipes (Section 905) required: NO Type required: Comments: 8. Ventilating hood and duct fire extinguisher system (Section 609) required: NO Type being provided: Automatic fuel shut-off required: Portable fire extinguisher shown: Comments: 9. Fire alarm systems (Section 907) required: YES Type of system required: Manual: Automatic: Both: X Type of system being provided: Manual: Automatic: Both: X Components of system shown: Smoke Detectors: X Heat Detectors: Manual Pull Station: X Sounding Devices: X Visual Devices: X Door Holders: Duct Detectors: Flow Alarm: Sprinkler Valve Monitoring: REQUIRED Fire Alarm System Acceptable: NO, SEE COMMENTS BELOW 10. Other corrections that are required by special occupancy or conditions: FIRE ALARM SYSTEM: PLEASE SUBMIT PLANS IN ADDITION TO THE FOLLOWING SUBMITTALS: ALARM CONTROL AND TROUBLE SIGNALING EQUIPMENT, ANNUNCIATION, POWER CONNECTION, BATTERY CALCULATIONS, CONDUCTOR TYPE AND SIZES, VOLTAGE DROP CALCULATIONS, MANUFACTURERS MODEL NUMBERS, AND LISTING INFORMATION FOR EQUIPMENT, EVICES AND MATERIALS AND INTERFACE CONNECTIONS. ADA UNITS SHALL HAVE ALL HORN/STROBE UNITS. PLEASE INDICATE WHERE FACP WILL BE LOCATED. PLANS MUST BE SUBMITTED PRIOR TO CONSTRUCTION OR A STOP WORK ORDER WILL BE ISSUED. ADDITIONAL ALARM SYSTEM COMMENTS: DISTRIBUTION CENTER- 1. ENTER1. ADD PULL STATION TO FRONT VESTIBLE EXIT 2. ADD HORN/STROBE UNIT WITHIN 15 FEET OF FRONT VESTIBLE EXIT MAIN COMPLEX - 1. ADD HORN/STROBE UNITS IN HALLWAY LEADING TO OFFICES ON NORTH SIDE. 2. ADD HORN/STROBE TO MENS BATHROOM 3. ADD HORN/STROBE TO SOUTH END OF HALLWAY 202 4. ADD PULL STATION AT REAR EXIT FROM PROCESSING 5. ADD PULL STATION AT REAR EXIT FROM RETAIL 6. MOVE PULL STATIONS WITHIN FIVE FEET OF EXIT 7. ADD HORN/STROBE UNITS TO WAITING AREA OFFICES ON NORTH SIDE. Plans as submitted are acceptable: NO Plans checked by: CHRIS HUSIONSON Date: 5-29-03 Please furnish comments back to the plan reviewer in the following manner: Written Comments: X New Plans: X