HomeMy WebLinkAboutPLAN REVIEWS - 03-00051 - Teton River Village Building #2 - 3 Units�RFXBUgC
edy
P.O. Box 280
o 01exI(//l/�/o, Ury 12 North Center Street
a - » Rexburg, Idaho 83440
° e Phone (208) 359-3020
�T9e<ISHEO 1$ STATE OF IDAHO e-mail Fax (208) 3 9-3022g.id.us
www.d. rexbu rg. id. us
8/18/2003
Ken Harris
3520 North University Avenue
Suite #200
Provo, Utah 84604
Dear Ken,
I have reviewed the drawings for building #2 of the Teton River Village and have
identified the following deficiencies:
1. Provide a handicap parking space adjacent to building #2. The closest handicap
parking spaces are located across a vehicle access aisle.
2. Please provide a Flood Elevation Certificate as required in the 2000 International
Building Code (IBC) Section 1612.5.
3. A soil investigation report that was conducted for the Jack -In -The Box restaurant
(located on the same piece of property) identified a layer of fill mixed with garbage
covering the building lot. Please provide us with a soils report for any areas where
new footings are to be placed. Will you be excavating to remove these materials?
Where footings are to be placed on structural fill, please provide a report as per the
2000 IBC Section 1803.4.
4. The plans identify that the mechanical, plumbing and electrical shall be "design
build". Will the mechanical system require roof top units? If so, the mechanical
roof unit weights need to be included in the structural design. Mechanical and
electrical component placement must meet the design criteria of the 2000 IBC
Section 1621. When components are identified, please supply the necessary
information as per the 2000 IBC Section 1621.3.5.
5. The plans and specifications identify special inspections required for masonry, field
welding, bolting and structural fill. The concrete is identified as 3000 psi and
therefore should also be inspected by special inspectors. We need to meet with the
inspection company representative to go over special inspections prior to
construction.
6. The energy calculations that have been provided are for the Idaho Falls area. Our
climate zone is different than Idaho Falls. The energy calculations should be for
climate zone 16 of the 2000 International Energy Conservation Code. When the
mechanical and electrical design is complete, another set of calculations will be
required for the systems. We need envelope compliance plans a.s.a.p.
7. The Fire Department has reviewed the plans. I have attached a copy of the report.
Please provide the necessary information they have requested.
These items need to be addressed before issuance of a building permit. Please let me know
if you have any questions. I can be reached during the day at 359-3020 Ext. 324.
Sincerely,
Val Christensen
Building Official
C.C. John Millar
Chris Huskinson
OF UPC
�C oQ
c`— o Ql�y
a A
��T4eUSHE� 1�
STATE OF IDAHO
REXBURG-MADISON COUNTY
EMERGENCY SERVICES
26 NORTH CENTER STREET
P.O. Box 280
12 North Center Street
Rexburg, Idaho 83440
Phone (208) 359.3020
Fax(208)359-3022
e-mail rexburg@srv.net
REXBURG, IDAHO 83440
208-359-3010
208-359-3006 FAX
2000 International Fire Code Plan Date: 7-8-03
Plan Review Review Date: 8-6-03
Building Name: TETON RIVER VILLAGE, BUILDING #2
Building Address: SECOND EAST, REXBURG, IDAHO
Stories: ONE Type of Construction: V-A
Occupancy Classification: M Existing Floor Area: N/A
New Construction Floor Area: APPROXIMATELY 4797 TOTAL SQ. FEET
1. Required Fire Flow (Appendix B): 1,500 GPM/TWO HOURS
Comments: REQUIRED FIRE FLOW MAY BE REDUCED WHEN BUILDING IS
EQUIPPED WITH AUTOMATIC FIRE SPRINKLER SYSTEMS.
2. Water Supply (Section 508, Appendix C) Required: YES
Fire Hydrant Location: EXISTING ON 2vn EAST (O"DELL'S)
Fire Hydrant Flows: EXISTING OK, PROPOSED UNKNOWN
Fire Flow Test Location: SECOND EAST
Fire Flow Supplied By: FD
8. Ventilating hood and duct fire extinguisher system (Section 609) required:
Type being provided:
Automatic fuel shut-off required:
Portable fire extinguisher shown:
Comments:
9. Fire alarm systems (Section 907) required: YES
Type of system required: Manual: Automatic: Both: X
Type of system being provided: Manual: Automatic: Both:
Components of system shown: Smoke Detectors: Heat Detectors:
Manual Pull Station: Sounding Devices: Visual Devices:
Door Holders: Duct Detectors: Flow Alarm:
Sprinkler Valve Monitoring:
Fire Alarm System Acceptable:
1. NO, PLANS NOT SUBMITTED FOR ALARM SYSTEM. SUBMITTALS
SHALL INCLUDE LOCATIONS OF ALARM -INITIATING AND
NOTIFICATION APPLIANCES; ALARM CONTROL AND TROUBLE
SIGNALING EQUIPMENT, ANNUNCIATION, POWER CONNECTION,
BATTERY CALCULATIONS, CONDUCTOR TYPE AND SIZES,
VOLTAGE DROP CALCULATIONS, MANUFACTURERS, MODEL
NUMBERS AND LISTING INFORMATION FOR EQUIPMENT,
DEVICES AND MATIERIALS, AND INTERFACE OF FIRE SAFETY
CONTROL FUNCTIONS.
2. NO PLANS SUBMITTED FOR FIRE SPRINKLER SYSTEM.
3. SITE PLAN FOR THIS PROJECT STILL NOT ADEQUATE, PLEASE
SUBMIT A NEW SITE PLAN.
10. Other corrections that are required by special occupancy or conditions: SEE ALL
PREVIOUS COMMENTS
Plans as submitted are acceptable: NO
Plans checked by: CHRIS HUSKINSON Date: 8-6-03
Please furnish comments back to the plan reviewer in the following manner:
Written Comments: X New Plans: X
8. Ventilating hood and duct fire extinguisher system (Section 609) required:
Type being provided:
Automatic fuel shut-off required:
Portable fire extinguisher shown:
Comments:
9. Fire alarm systems (Section 907) required: YES
Type of system required: Manual: Automatic: Both: X
Type of system being provided: Manual: Automatic: Both:
Components of system shown: Smoke Detectors: Heat Detectors:
Manual Pull Station: Sounding Devices: Visual Devices:
Door Holders: Duct Detectors: Flow Alarm:
Sprinkler Valve Monitoring:
Fire Alarm System Acceptable:
1. NO, PLANS NOT SUBMITTED FOR ALARM SYSTEM. SUBMITTALS
SHALL INCLUDE LOCATIONS OF ALARM -INITIATING AND
NOTIFICATION APPLIANCES, ALARM CONTROL AND TROUBLE
SIGNALING EQUIPMENT, ANNUNCIATION, POWER CONNECTION,
BATIERY CALCULATIONS, CONDUCTOR TYPE AND SIZES,
VOLTAGE DROP CALCULATIONS, MANUFACTURERS, MODEL
NUMBERS AND LISTING INFORMATION FOR EQUIPMENT,
DEVICES AND MATIERIALS, AND INTERFACE OF FIRE SAFETY
CONTROL FUNCTIONS.
2. NO PLANS SUBMITTED FOR FIRE SPRINKLER SYSTEM.
3. SITE PLAN FOR THIS PROJECT STILL NOT ADEQUATE, PLEASE
SUBMIT A NEW SITE PLAN.
10. Other corrections that are required by special occupancy or conditions: SEE ALL
PREVIOUS COMMENTS
Plans as submitted are acceptable: NO
Plans checked by: CHRIS HUSKINSON Date: 8-6-03
Please furnish comments back to the plan reviewer in the following manner:
Written Comments: X New Plans: X
FpEXeU/�C //
,�jq ////� ��//pp P.O. Box 280
o
Cly O/ iG°A','fdar 12 North Center Street
« „ Rexburg, Idaho 83440
F� .y Phone (208) 359-3020
Tq �$ STATE OF IDAHO Fax (208) 359-3022
/SHE www.cLrexburgJd.us e-mail rexburg@d.rexburg.id.us
8/8/2003
Ken Harris
3520 North University Avenue
Suite #200
Provo, Utah 84604
Dear Ken,
I have reviewed the drawings for building #1 of the Teton River Village and have
identified the following deficiencies:
UNC 1.
Provide a handicap parking space adjacent to building #2. The closest handicap
parking spaces are located across a vehicle access aisle.
2.
The trash dumpster located on the south side of the parking lot will not be
accessible by our trash trucks. Our trucks are side loading and require asphalt on
both sides of the dumpster.
3.
Please provide a Flood Elevation Certificate as required in the 2000 International
Building Code (IBC) Section 1612.5.
4.
A soil investigation report that was conducted for the Jack -In -The Box restaurant
(located on the same piece of property) identified a layer of fill mixed with garbage
covering the building lot. Please provide us with a soils report for any areas where
new footings are to be placed. Will you be excavating to remove these materials?
Where footings are to be placed on structural fill, please provide a report as per the
2000 IBC Section 1803.4.
5.
The plans identify that the mechanical, plumbing and electrical shall be "design
build". Will the mechanical system require roof top units? If so, the mechanical
roof unit weights need to be included in the structural design. Mechanical and
electrical component placement must meet the design criteria of the 2000 IBC
Section 1621. When components are identified, please supply the necessary
information as per the 2000 IBC Section 1621.3.5.
6.
The plans and specifications identify special inspections required for masonry, field
welding, bolting and structural fill. The concrete is identified as 3000 psi and
therefore should also be inspected by special inspectors. We need to meet with the
inspection company representative to go over special inspections prior to
construction.
7.
The energy calculations that have been provided are for the Idaho Falls area. Our
climate zone is different than Idaho Falls. The energy calculations should be for
climate zone 16 of the 2000 International Energy Conservation Code. When the
mechanical and electrical design is complete, another set of calculations will be
required for the systems.
8. The City Engineer is out of town until Monday, August 1 Ph and the P&Z official
will not be back until August 15`h. They have not reviewed the finished site plan
and may have additional comments.
9. The Fire Department has reviewed the plans. I have attached a copy of the report.
Please provide the necessary information they have requested.
These items need to be addressed before issuance of a building permit. Please let me know
if you have any questions. I can be reached during the day at 359-3020 Ext. 324.
Sincerely,
Val Christensen
Building Official
C.C. John Millar
Chris Huskinson
Allen Washburn
P.O. Box 280
Qny (0/ jfx1m1y 12 North Center S
treet
Rezhurn Idahn A3ddn
STATE OF IDAHO Phone (208) 359-3020
Fax (208) 359-3022
e-mail rexburg@srv.net
RE"URG-MADISON COUNTY
EMERGENCYSER VICES
26 NORTH CENTER STREET
REXB URG, IDAHO 83440
208-359-3010
208-359-3006 FAX
2000 International Fire Code Plan Date: 5-30-03
Plan Review Review Date: 8-6-03
Building Name: TETON RIVER VILLAGE, BUILDING #1
Building Address: SECOND EAST, REXBURG, IDAHO
Stories: ONE Type of Construction: V-A
Occupancy Classification: M Existing Floor Area: 12,811 SQ. FEET
New Construction Floor Area: APPROXIMATELY 19,741 TOTAL SQ. FEET
1. Required Fire Flow (Appendix B): 2,500 GPM/TWO HOURS
Comments: REQUIRED FIRE FLOW MAY BE REDUCED WHEN BUILDING IS
EQUIPPED WITH AUTOMATIC FIRE SPRINKLER SYSTEMS.
2. Water Supply (Section 508, Appendix C) Required: YES
Fire Hydrant Location: EXISTING ON 2" EAST (O"DELL'S), PROPOSED NEAR
BUILDING
Fire Hydrant Flows: EXISTING OK, PROPOSED UNKNOWN
Fire Flow Test Location: SECOND EAST
Fire Flow Supplied By: FD
Other Approved Water Source: NONE
Water Supply Acceptable: NO
Fire Hydrant Location Acceptable: SEE COMMENTS
Water Supply Comments: FOR BUILDING #1 PROPSED HYDRANT LOCATION
ADEQUATE BUT NOT FOR ENTIRE PROJECT. ALL PROPOSED HYDRANTS
REQUIRE AN ENGINEERS CALCULATION OF AVAILABLE WATER PRIOR
TO APPROVAL. HYDRANTS ADJACENT TO BUILDING #1 MUST BE
INSTALLED AND IN OPERATING ORDER PRIOR TO CONSTRUCTION.
3. Fire Apparatus Access Roads (Section 503, Appendix D) Required: YES
Acceptable Width: U/% Length: YES Surface: YES
Complete Road Acceptable: NO, SEE COMMENTS
Comments: BUILDER HAS NOT SUBMITTED ADEQUATE SITE PLAN FOR
REQUIRED ACCESS TO BUILDINGS.
4. Access Roads and Water Supply, including fire hydrants are required to be installed
and made serviceable prior to and during time of construction (Section 501):
Comments: IF NOT INSTALLED PRIOR TO CONSTRUCTION AND MADE
OPERATIONAL, A STOP WORK ORDER WILL BE ISSUED.
5. installation of portable fire extinguishers (Section 906) Required: YES
Location shown: NO Type provided acceptable: NOT SHOWN
Comments: MINIMUM SIZE OF 2A10BC REQUIRED WITHIN TRAVEL
DISTANCES IN ALL SPACES.
6. Automatic fire extinguishing systems (Section 903) Required: YES
Type of system being installed: UNKNOWN
Sprinkler system monitoring (Section 907) required: YES
Comments: SEE SECTION #9 COMMENTS.
7. Standpipes (Section 905) required: NO
Type required:
Comments:
8. Ventilating hood and duct fire extinguisher system (Section 609) required:
Type being provided:
Automatic fuel shut-off required:
Portable fire extinguisher shown:
Comments:
9. Fire alarm systems (Section 907) required: YES
Type of system required: Manual: Automatic: Both: X
Type of system being provided: Manual: Automatic: Both:
Components of system shown: Smoke Detectors: Heat Detectors:
Manual Pull Station: Sounding Devices: Visual Devices:
Door Holders: Duct Detectors: Flow Alarm:
Sprinkler Valve Monitoring:
Fire Alarm System Acceptable:
1. NO, PLANS NOT SUBMITTED FOR ALARM SYSTEM. SUBMITTALS
SHALL INCLUDE LOCATIONS OF ALARM -INITIATING AND
NOTIFICATION APPLIANCES, ALARM CONTROL AND TROUBLE
SIGNALING EQUIPMENT, ANNUNCIATION, POWER CONNECTION,
BATTERY CALCULATIONS, CONDUCTOR TYPE AND SIZES,
VOLTAGE DROP CALCULATIONS, MANUFACTURERS, MODEL
NUMBERS AND LISTING INFORMATION FOR EQUH'MENT,
DEVICES AND MATIERIALS, AND INTERFACE OF FIRE SAFETY
CONTROL FUNCTIONS.
2. NO PLANS SUBMITTED FOR FIRE SPRINKLER SYSTEM.
3. SITE PLAN FOR THIS PROJECT STILL NOT ADEQUATE, PLEASE
SUBMIT A NEW SITE PLAN.
10. Other corrections that are required by special occupancy or conditions: SEE ALL
PREVIOUS COMMENTS
Plans as submitted are acceptable: NO
�uRG P.O. Box 280orth Center Street
�� �aQ�l°Q%J 12 N
a a o �/ Rexburg, Idaho 83440
Phone (208) 359-3020
STATE OF IDAHO Fax (208) 359-3022
4e�rSHEp
e-mail rexburg@srv.net
MEMO:
TO: TO WHOM IT MAY CONCERN
FROM: CHRIS HUSKINSON, FIRE INSPECTOR
DATE: JUNE 07, 2003
RE: TETON RIVER VILLAGE
TO WHOM IT MAY CONCERN:
Upon review of the site plan drawings submitted the following items need to be
addressed:
1. WATER SUPPLY: This proposed project shows two large square footage
structures spaced approximately 350 feet apart with several smaller buildings on
the site. Based on conversations with the developers both of the larger structures
are to be sprinklered. Plans do not show what construction type the new building
shall be. Please indicate the type of construction for a more accurate review. The
number of hydrants required may change depending upon type of construction.
Currently, the size of structures and space between buildings require the west
building to have a minimum of four hydrants within 300 feet. Currently it has one.
The existing building has the correct number of hydrants.
-Additionally, a six-inch main line to the hydrants will not be capable of
supplying the required amount of water.
2. ACCESS: Areas adjacent to buildings shall have curbs painted red, maintained,
and signed "No Parking Fire Lane".
Additional plans are required to complete an accurate plan review of this project. If
there are an questions please feel free to contact me.
r
Chris Huskinson
Fire Inspector