Loading...
HomeMy WebLinkAboutPARKING LOT PLANS - 00-00033 - 320 W 5th S - 4-Plex - Apartments,- FENCED SIDEYARD 165 -- SEWER ------------- --- -- —: STUB ---------------------->X 5 TH SOUTI-bAVID BIGELOW 3927 E. 100 N, PRELIMINARY SITE PLAN - - - - RIGBY, IDAHO 83442 745-0881 N O C -I 2 3rd WES a F 2 65' a IT D m r L290 -OL ZVK2 OHVGl IA291a N 006 3 tMZ MO]9018 OIAV4 %OL• im ON1lIn8099'9b 3030V83A0030V38nS 08VH JO IGOd 0-S LZ6'ZE N33MOS 30N3d Stl st X dVl 31VM ll ZL Cl bt Sl 91 Ll 9l 6t OZ 1S3M -- o8f L I L I£ I b I s 19 1 L l 9 1 6 1 OL V38V NOISN313lJ ONV 3dVOSONVI XL 9t Ll 9t 6l OZ LZ ZZ CL 1VO1dA1 Zf X 9t 5 1lNn nv .Off .£OZ Sl bl fl ZL Ll Ol 6 HlnOS Hldid .S Zb ES Lt, ZS Ob tS 6£ OS 9f 60 L£ 9b 9£ Lb S£ 97 bE Sb ,bt zl N m u 9L VMJV NOISN3138 MY 3dVOSON VI X N01103NN0083M3S m N PROJECT NO. STR-99-02 - LID#31 - STREET IMPROVEMENTS -1999 ZOLLINGER CONSTRUCTION UNIT DEPATCO CO, INC. UNIT EDSTROM CONSTRUCTION UNIT TMC CONSTRUCTION UNIT ITEM NO, ITEM DESCRIPTION UNIT ESTIMATED UNIT ENGINEERS QUANiTY PRICE ESTIMATE PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL 209.03A Rem, Cone. Curb & Gutter Ln. Ft. 2600 $2.50 $6,500.00 $3.00 $7,800.00 $1.15 $2,990.00 $4.00 $10,400.00 )�209.03B Rem. Cone Sdwk & Drvwys Sq, Yd. 940 $5.00 $4,700.00 $3.00 $2,820.00 BID DETERMINED TO BE $1.80 $1,692.00 $5.50 $5,170.00 M9.03C Rem. Asph. Pvmt.'--- Sq. Yd. 20,800 $2.00 $41,600.00 $2.60 $54,080.00 $0.50 $10,400.00 $1.30 $27,040.00 209.030 Rem. Cone. Cross Drain Ln. Ft. 10 $5.00 $50.00 $2.50 $25.00 A "NON-RESPONSIVE BID" $10.00 $100.00 $11.00 $110.00 209.03E Rem. Inlet Box Each 4 $200.00 $800.00 $150.00 $600.00 $209.00 - $836.00 $150.00 $600.00 ZC209.05ARoadway F� caya6on Cu. Yd. 17,950 $6.00 $107,700.00 $3.60 $64,620.00 AS THE REVISED PROPOSAL $4.50 $80,775.00 $6.00 $107,700.00 209.05C' G ote�Nle Fabric Sq. Yd. 21,300 $1.50 $31,950.00 $1.43 $30,459.00 $1.50 $31,950.00 $1.15 $24,495.00 , gig Szran Borrow Cu. Yd. 13,950 $9.00 $125,550.00 $6.50 $90,675.00 SHEETS SENT OUT WITH $12.20 $170,190.00 $8.60 $119,970.00 209.09A 3//4" Ag- g�. Base Cu. Yd. 3,580 $15.00 $53,700.00 $13.75 $49,225.00 $13.00 $46,540.00 $16.00 $57,280.00 309.05A 4" Thick Asp Plmx. Surf. Course Sq. Yd. 100 $8.20 $820.00 $8.25 $825.00 ADDENDUM #3 WERE NOT $5.70 $570.00 $9.00 $900.00 309.05B 3 Y2" Thick Asph. Pfmx. Surf. Course Sq. Yd. 12,600 $7.20 $90,720.00 $6.50 $81,900.00 $5.45 $68,670.00 $6.30 $79,380.00 309.05C 3" Thick Asph.Plmx. Surf.Course Sq. Yd. 5,500 $6.20 $34,100.00 $5.60 $30,800.00 USED IN THE BIDDING $4.90 $26,950.00 $5.50 $30,250.00 309.05D 2 %" Thick Asph. Plmx.Surf.Course Sq. Yd. 3,600 $5.80 $20,880.00 $4.25 $15,300.00 $4.10 $14,760.00 $4.70 $16,920.00 409.01A Adjust Manhole to Grade Each 12 $300.00 $3,600.00 $200.00 $2,400.00 WHICH RESULTED IN A BID $115.00 $1,380.00 $290.00 $3,480.00 409.02A Adjust Water Valve Box Each 7 $150.00 $1,050.00 $200.00 $1,400.00 $112.00 $784.00 $220.00 $1,540.00 409.11A Street Monument Each 10 $200.00 $2,000.00 $100.00 $1,000.00 WITH ERRONEOUS OR $120.00 $1,200.00 $150.00 $1,500.00 509.02A Cone. Curb & Gutter Ln. R. 3700 $9.40 $34,780.00 $9.00 $33,300.00 $8.05 $29,785.00 $10.25 $37,925.00 509.028 Cone. Curb & Gutter w/Reinf. Steel Ln. Ft. 1120 $12.00 $13,440.00 $13.00 $14,560.00 NON-EXISTENT BID $12.60 $14,112.00 $14.00 $15,680.00 509.02C Eft. Wide Valley Gutter Ln. Ft. 170 $20.00 $3,400.00 $29.00 $4,930.00 $29.90 $5,083.00 $33.00 $5,610.00 509.02D Lip Down Cone. Curb & Gutter Ln. Ft. 260 $10.00 $2,600.00 $11.00 $2,860.00 QUANTITIES - $10.35 $2,691.00 $11.75 $3,055.00 �509.03A 4"_ - ' c. Sidewalk Sq. Yd. 3300 $20.00 $66,000.00 $20.00 $66,000.00 $20.70 $88,310.00 $23.00 $75,900A0 509.03C 6" Thick Cone. Sdw & Drwy w/Reinf. S0. Sq. Yd. 770 $31.00 $26,970.00 $29.00 $22,330.00 $29.90 $23,023.00 $33.00 $25,410.00 709.02L 8" Storm Drain Line Ln. Ft. 25 $10.00 $250.00 $10.00. $250.00 $19.80 $495.00 $8.10 $202.50 709.02N 12" Storm Drain Line Ln. Ft. 370 $11.00 $4,070.00 $12.00 $4,440.00 $13.50 $4,995.00 $8.40 $3,108.00 709.038 Storm Drain Manhole Each 3 $1,600.00 $4,800.00 $1,200.00 $3,600.00 $1,485.00 $4,455.00 $1,250.00 $3,750.00 709.03C Additional Manhole Depth Ln. Ft. 10 $100.00 $1,000.00 $100.00 $1,000.00 $95.00 $950.00 $110.00 $1,100.00 709.030 French Drain Manhole Each 5 $2,600.00 $13,000.00 $2,500.00 $12,500.00 $2,990.00 $14,950.00 $2,800.00 $14,000.00 709.04A 8" Field Tap into Storm Drain Each 2 $200.00 $400.00 $700.00 $1,400.00 $655.00 $1,310.00 $400.00 $800.00 709.05A Inlet Box, Type 1 Each 6 $700.00 $4,200.00 $750.00 $4,500.00 $1,040.00 $6,240.00 $650.00 $3,900.00 709.058 Inlet Box, Type 2 Each 3 $600.00 $1,800.00 $600.00 $1,800.00 $980.00 $2,940.00 $650.00 $1,950.00 709.05C Inlet Box, Type 3 Each 1 $800.00 $800.00 $900.00 $900.00 $980.00 $980.00 $780.00 $780.00 809.01A Class I Exc. & Cl. A Bk8 Ln. Ft. 270 $9.00 $2,430.00 $8.00 $2,160.00 $10.60 $2,862.00 $10.00 $2,700.00 809.018 Class II Exc. & Cl. Bk8 Ln. Ft. 100 $12.00 $1,200.00 $10.00 $1,000.00 $10.60 $1,060.00 $14.00 $1,400.00 SP-1 Saw Cul Asph. or Cone. Surface Ln. Ft. 4,820 $1.50 $7,230.00 $1.00 $4,820.00 $1.15 $5,543.00 $1.40 $6,748.00 SP-2 Asphalt Plantmix for Slope Paving Sq. Yd. 540 $7.70 $4,158.00 $7.25 $3,915.00 $16.00 $8,640.00 $8.00 $4,320.00 SP-3 Traffic Signal Conduit, Jct. Boxes & Cone Sig. Pole found @ Old Hwy 191 & 7th LumpSu 1 $8,500.00 $8,500.00 $9,000.00 $9,000.00 $6,550.00 $6,550.00 $10,010.00 $10,010.00 SP-4 Street Light Sys. & Tr Signal Conduit at LumpSu 1 $45,000.00 $45,000.00 $36,000.00 $36,000.00 $30,492.00 $30,492.00 $36,000.00 $36,000.00 Old Hwy 191 & 5th West St. SP-5 Concrete Pavers at Comers Sq.Yd. 33 $62.00 $2,046.00 $68.00 $2,244.00 $85.00 $2,145.00 $58.00 $1,914.00 SP-6 Change Inlet Box to Manhole Each 2 $600.00 $1,200.00 $800.00 $1,600.00 $1,495.00 $2,990.00 $880.00 $1,760.00 SP-7 Furnish & Install 6" Water Valve Each 1 $500.00 $500.00 $1,234.00 $1,234.00 $1,745.00 $1,745.00 $1,200.00 $1,200.00 SP-8 Furnish & Install Fire Hydrant & Valve Each 1 $2,500.00 $2,500.00 $2,700.00 $2,700.00 $3,400.00 $3,400.00 $2,800.00 $2,800.00 SP-9A Rock Wall, Property No. 29 Sq. R. 280 $12.50 $3,500.00 $15.00 $4,200.00 $40.00 $11,200.00 $12.85 $3,598.00 SP-9B Conc. Retaining Wall, Property No. 29 Cu. Yd. 17 $150.00 $2,550.00 $626.00 $10,642.00 $745.00 $12,665.00 $625.00 $10,625.00 SP-9C Rem. & Rep. Lawn Sod, Tree & Sprinkling System at Property No. 29 Sq. Yd. 77 $20.00 $1,540.00 $18.00 $1,386.00 $18.00 $1,386.00 $20.00 $1,540.00 SP-16A Rock Wall, Property No. 30 Sq. Ft. 90 $12.50 $1,125.00 $15.00 $1,350.00 $40.00 $3,600.00 $13.00 $1,170.00 SP-108 Conc. Retaining Wall, Property No. 30 Cu. Yd. 7 $150.00 $1,050.00 $626.00 $4,382.00 $745.00 $5,215.00 $625.00 $4,375.00 SP-10C Rem.&Rep. Lawn Sod, Tree & Sprinkling System at Property No, 30 Sq.Yd. 192 $20.00 $3,840.00 $18.00 $3,456.00 $18.00 $3,456.00 $20.00 $3,840.00 (Including SP-9A & SP-10A but excluding SP-9B & SP 10B) TOTAL $787,999.00 $683,364.00 $0.00 $725,175.00 $758,905.50 ' (Including SP-98 & SP-10B but excluding SP-9A & SP 10A) TOTAL $786,974.00 $692,838.00 $0.00 $728,255.00 $769,137.50 Future or Exist. S.W. 3 In m Q Transition Slope _ _Transition Slope 1/2' Preformed - --1/2" Preformed Expansion Joint Fgler Sidewalk Expansion Joint Filler i Beek of Wolk n 2� 1/2' Preformed k' w o Utility Strip z Expansion Joint Filler YI �; p! Fully Section Transition See Note e5 DRIVEWAY (SIDEWALK) Line 3' on Center Both Ways SECTION A COMMERCIAL DRIVEWAY Line J1 SECTION A RESIDENTIAL DRIVEWAY it A-7 Fully Section DRIVEWAY (UTILITY STRIP) R/W Line 3 J4 Rebars Evenly Spaced Ver Sidewalk In Non–Exlrutl=d Curb Ulhly Strip See Nots 3 SI 'oe As Required See Nole a K SECTION eB B COMMERCIAL DRIVEWAY Note /1 �1/2" Preformed Expansion Joint Filler LgIn Back of 'Walk uidewalkt All Sidewalkes 0 ren \ Utility Strip J4 Rebar 18' on Center Both Ways SECTION ee 8 RESIDENTIAL DRIVEWAY NOTES: 1. 12" of Granular Borrow (see Standard Specifications Section 201.03) shell be required under all concrete unless naturally occuring granular bose material is encountered and approved by the City Engineer. 2. All concrete shall be cured with a curing compound as specified in the Standard Specifications or as directed by the City Engineer. (Materials Section is 501.07) 3. Standard sidewalk width is 5 foot in new construction. Standard slope is 1/4' per foot to street. 4. Place preformed expansion joint filler at driveway construction and at maximum spacing of 50 feel for new sidewalk construction. 5. 1:12 slope maximum 6. Elevation at back of walk based upon a slope rote of 1/4' per fool from the theoretical top of curb to bock of walk. Driveway slope will then be variable matching the bock of sidewalk elevation and the top of depressed curb elevation. R/W Line Var f UlililY Strip Sidewalk See Nole 3 Silo As Re cared —See Note /6 II 1:1 See Note JI SECTION ee 8 RESIDENTIAL DRIVEWAY NOTES: 1. 12" of Granular Borrow (see Standard Specifications Section 201.03) shell be required under all concrete unless naturally occuring granular bose material is encountered and approved by the City Engineer. 2. All concrete shall be cured with a curing compound as specified in the Standard Specifications or as directed by the City Engineer. (Materials Section is 501.07) 3. Standard sidewalk width is 5 foot in new construction. Standard slope is 1/4' per foot to street. 4. Place preformed expansion joint filler at driveway construction and at maximum spacing of 50 feel for new sidewalk construction. 5. 1:12 slope maximum 6. Elevation at back of walk based upon a slope rote of 1/4' per fool from the theoretical top of curb to bock of walk. Driveway slope will then be variable matching the bock of sidewalk elevation and the top of depressed curb elevation. F E'. DRIVEWAY (SIDEWALK) 3 /4 Reba, In Non—Exlr Line /1 .B' on Center Both Ways SECTION e A COMMERCIAL DRIVEWAY I (m) 1/2' Preformed Y Expansion Joint Filler Transition Slope Back of Walk 50' Maximum 'n 1/2' Preformed i Spaeing In Sidewalk 9 Sidewalk Expansion Joint filler I Regwred Al NI Sidewalk i Approaches ;M1 1/2" Bock of Walk d ;M 1 1/2' Preformed Utility Strip Utility Strip u Expansion Joint Filler e 85 3 /4 Rebar. In Non—Exln ironsioon Fully Depressed Seaton DRIVEWAY (UTILITY STRIP) SECTION e 8 COMMERCIAL DRIVEWAY Line )1 .8' on Center Both Ways DRIVEWAYS Line I NOTES: 1. 12' of Granular Borrow (see Standard Specifications Section 201.03) shall be required under all concrete unless naturally occuring granular base material is encountered and approved by the City Engineer. 2. All concrete shall be cured with o curing compound as specified in the Standard Specifications or as directed by the City Engineer. (Materials Section is 501.07) 3. Standard sidewalk width is 5 fool in new construction. Standard slope is 1/4' per foot to street. 4. Place preformed expansion joint filler at driveway construction and of maximum spacing of 50 feel for new sidewalk construction. 5. 1:12 slope maximum / $j Vol i . 00� s c� 0 N V'1 "I d-V7s c+u-V 7 _ _____----------___.. _ _garn� J-5 -3 u� 5