HomeMy WebLinkAboutJHS ARCHITECTS LETTER - 03-00015 - BYUI - Studnet Housing 16 Buildings (160 units)gv�
c�O Qv P.O. Box 280
edy olexlu F 12 North Center Street
a Rexburg, Idaho 83440
F ° Phone (208) 359-3020
STATE OF IDAHO Fax (208) 359-3022
e<ISM www.d.rexburg.id.us e-mail rexburg®ci.rexburg.id.us
8/26/2003
Randy Hayes
JHS Architects
125 North Garfield
Pocatello, ID 83204
Dear Randy,
I received your Architect's Supplemental Instruction No: ASI -16, dated 22
August 2003 (copy attached). The configuration of the brick portion on the fence
combined with the location will create a sight impediment for traffic both entering and
leaving the complex. If it was constructed so that you could see through it then it would
meet our requirements. Our zoning ordinance will allow a maximum 3' high fence
within the first 15' from the right-of-way. The fence may be higher if it is built in a
manner to be 50% open. Your plan also identifies a concrete walk at the edge of the
road. There must be a minimum 7' landscape strip between the curb and the sidewalk. If
you have any questions, please give me a call at 359-3020 ext. 324.
Sincerely
Val Christensen
Building Official
C.C. John Millar
Kurt Rowland
ARCHITECT'S
SUPPLEMENTAL INSTRUCTIONS
PROJECT: BYU-Idaho
Student Family Housing
OWNER: BYU-Idaho
Rexburg, Idaho
TO CONTRACTOR: Bateman -Hall, Inc.
P.O. Box 1464
Idaho Falls, Idaho 83403
ARCHITECT'S SUPPLEMENTAL
INSTRUCTION NO: ASI -16
DATE: 22 August 2003
ARCHITECT: JHS Architects, P.A.
125 No. Garfield Ave.
Pocatello, Idaho 83201
ARCHITECT'S PROJECT NO: 7200-35
CONTRACT FOR: General Construction CONTRACT DATED: 19 February 2003
The Work shall be carried out in accordance with the following supplemental instructions issued in accordance with the
Contract Documents without change in contract Sum or Contract Time. Prior to proceeding in accordance with these
instructions, indicate your acceptance of these instructions for minor change to the Work as consistent with the
Contract Documents and return a copy to the Architect.
Description:
1. The attached drawing gives the elevations for the fence posts at the extreme east end of the site
The elevations for the balance of the fence along the north side of the site will follow as soon as possible.
Attachments: ASI -16-1
ARCHITECT: en • Hayes • Shropshire Architects, P.A. ACCEPTED: Bateman -Hall, Inc.
BY: _ _ BY: _
Architect Contractor Date
0p�p
�4
�K
z
�0
91
q
z
9
LO
O
z
J
z
lu
t -
i!1
in
�v�idu
W
y;1
GP3'ri NI.L wow
o
J
J
�
�
i
I1.
IOJ
i
i
Qa