HomeMy WebLinkAboutPLAN REVIEW PHASE I - 03-00032 - Hyde Park II - Two 4-Plex Buildings #3 & 4l////[// P.O. Box 280
clify (01 (exia/%y 12 North Center Street
Rexburg, Idaho 83440
Phone (208) 359-3020
STATE OF IDAHO Fax (208) 359-3022
e-mail rexbur @ci r b 'd
" Ht� www.drexburg.id.us g . ex urg.i .us
12/5/2002
Kay Prestwich
2555 St. Clair Ave.
Idaho Falls, ID 83404
Dear Kay,
I have reviewed the Hyde Park Phase I drawings that you have provided me and
have identified the following discrepancies:
1. Get with John Millar the City of Rexburg Public Facilities Coordinator for a
Development Agreement_
�2. Please identify a handicapped parking space with a five foot wide access aisle
on site plan. Also, identify a accessible aisle from handicapped parking spaces
to the accessible entrances to all ground floor units.
3. Identify right-of-way on site plan.
/4. The site plan does not show a handicapped corner access at the intersection of
7`h South and 5the West. Please include it on the site plan.
/S. Make sure that the 25' set -backs are measured to eaves and not to the building
walls or foundation.
The plans do not show an accessible entrance to all ground floor units.
Section 1103.1.9.3 of the 1997 Uniform Building Code (UBC) requires that
all units on the ground floor be "Type B Adaptable Units".
-"75. Provide access approach details that identify 6" thick concrete with #4 rebar at
18" o.c. in both directions.
✓g. Provide storm drainage calculations.
The bathroom configuration on the ground floors does not meet Fair Housing
Standards. A 30" by 48" clear space must be provided in front of the bathtub.
From past experience we have found that a 5 foot wide bathroom is too
narrow and the toilet encroaches into the 30" wide space leading to the
.bathtub.
"ease identify grab bar backing in bathroom for the toilet and bathtub.
,K Make a note -on plans to notify electricians that outlets, switches, thermostats
and other controls must be set at the heights mandated by Fair Housing.
/12. Door sizes are not called out plans. The Type B Units are required to have
wider than normal doors throughout. Also Fair Housing requires lever
handles on the exterior doors on the Type B Units.
Al. Please identify on plans that 5/8" Type X drywall must be placed behind
bathtubs for unit separation.
�4. Provide details for plumbing in the 1 -hour firewall between the units. Plastic
pipes may not penetrate this wall without special procedure.
,45. Identify smoke detectors. A smoke detector is required in each bedroom and
one in hall.
,,,K6. Please identify location of furnace, duct type and location. Flexible duct and
,,,,duct thinner than 26 gauge are not allowed to penetrate fire membranes.
7. Please provide structural engineering for footing reinforcement, footing size
and foundation reinforcement. Section 1914.3.5 of the 1997 UBC requires a
minimum of 18" centers both horizontally and vertically for the foundation.
,0 18. Provide details for stairs, landings and ramps. Include handrail heights,
guardrail heights, ramp slope, etc.
D� Please identify all footings as being a minimum of 36" below grade for frost
protection.
✓ 1p� 20. The Fire Department has reviewed the plans. I have attached a copy of there
report to the back of this document. Please provide the necessary information
they have requested.
Get with Schiess & Associates for site plan changes. I am under the impression
that you are the Architect of Record. If not let me know immediately. Please return two
sets of revised plans. Let me know if I can be of any further assistance. If you have any
questions, please give me a call at 359-3020 ext. 324.
Sincerely,
Val Christensen
Building Official
cc John Millar
Chris Huskinson
REXBURG MADISON COUNTY FIRE DEPARTMENT
P.O. Box 280
26 North Center
Rexburg, Idaho 83440
(208) 359-3010
1997 Uniform Fire Code Plan Date: 9-02
Plan Review Review Date: 11-14-02
Building Name: HIDE PARK, PHASE I
Building Address: SEVENTH SOUTH AND FIFTH WEST
Stories: 2.5 Type of Construction: V -N
Occupancy Classification: R-1 Existing Floor Area: NONE
New Construction Floor Area: APPROXIMATELY 3000/UNIT
1).Required Fire Flow (Appendix III -A): 1500 GPM/TWO HOURS
Comments: THE FIRE FLOW REQUIREMENT MAY BE REDUCED IF AN AUTOMATIC
FIRE SPRINKLER SYSTEM IS INSTALLED IN EACH BUILDING.
2).Water Supply (Article 9, Section 903) Required: YES
Fire Hydrant Location: OKAY
Fire Hydrant Flows: EXISTING HYDRANT OKAY
Fire Flow Test Location: 7T" SOUTH AND 5TH WEST
Fire Flow Supplied By: FD
Other Approved Water Source: NONE
Water Supply Acceptable: YES
Fire Hydrant Location Acceptable: YES
Water Supply Comments: NONE
3.)Fire Apparatus Access Roads (Article 9 Section 902)
Required: YES
Acceptable: Width: X Length: X Surface: X
Turning Radius: X Grade: X Vehicle Vertical: X
Clearance: X Turn Arounds: X
Complete Road Acceptable: YES
Comments: NONE
4).Access Roads and Water Supply, Including Fire Hydrants Are
Required To Be Installed And Made Serviceable Prior To And During
Time Of Construction (Article 9 Section 901.3): YES
Comments: IF NOT INSTALLED PRIOR TO CONSTRUCTION A STOP WORK ORDER
WILL BE ISSUED.
5),Installation Of Portable Fire Extinguisher (Article 10 Section
1002) Required: YES Location Acceptable: NOT SHOWN
Type Provided Acceptable: NOT SHOWN
Comments: MINIMUM OF 2A10BC REQUIRED IN EACH UNIT AND COMMON AREAS.
6).Automatic Fire Extinguishing Systems: (Article 10 Section 1003
Required: NO Type Of System Being Installed:
Sprinkler System Monitoring Required (Article 10 Section 1003.3)
Required: NO
Comments:
7).Standpipes (Article 10 Section 1004) Required:
Type Required: NO
Comments:
8).Ventilating Hood And Duct Fire Extinguishing System (Article 10
Section 1006.2) Required: NO
Type Being Provided:
Automatic Fuel Shutoff Shown (Article 10 Section 1006.2.4):
Portable Fire Extinguisher Shown (Article 10 section 1006.2.7):
Comments:
9).Fire Alarm Systems (Article 10 Section 1007)Required: YES
Type Of System Required: Manual: Automatic: X Both:
Type Of System Being Provided: Manual: Automatic: Both:
Components Of System Shown: Smoke Detectors: Heat Detectors:
Manual Pull Station: Sounding Devices: Visual Devices:
Door Holders: Duct Detectors: Flow Alarm:
Sprinkler Valve Monitoring: Fire Alarm System Acceptable: N0,
0
SMOKE DETECTORS REQUIRED IN EACH SLEEPING ROOM AND CORRIDOR
ADJACENT TO SLEEPING ROOMS. HANDICAPPED UNITS REQUIRE HORN/STROBE
UNITS WITH BATTERY BACKUP.
10).Other Corrections That Are Required By Special Occupancy Or
Conditions:
Plans As Submitted Are Acceptable: NO
Plans Checked By: CHRIS HUSKINSON Date: 11-14-02
Please furnish comments back to the plan reviewer in the following
manner: Written Comments: X New Plans: X