HomeMy WebLinkAboutTEMP CO - 13-00142 - 141 S 1st W - NorthPointe Apts, Bldg B; 69 UnitsCertificate of Occupancy
City of Rexburg
Department of Community Development
35 N. 1st E. / Rexburg, ID. 83440
Phone (208) 359-3020 / Fax (208) 359-3022
Building Permit No:
Applicable Addition of Code:
Site Address:
Use and Occupancy:
Design Occupant Load:
Sprinkler System Required:
Name and Address of Owner:
IBC 2009
13-00142
141 S 1st W
NorthPointe Apts, Bldg B; 69 units
N/A
Yes
,
Contractor: Headwaters Construction Co.
This Certificate, issued persuant to the requirements of Section 109 of the International Building
Code, certifies that, at the time of issuance, this building or that portion of the building that was
inspected on the date listed was found to be in compliance with the requirements of the code for the
group and division of occupancy and the use for which the proposed occupancy was classified.
Date C.O. Issued: _____ / _______ / ______
C.O. Issued by: __________________________ Building Inspector: __________________________
There shall be no further change in the existing occupancy classification of the building nor shall any structural changes,
modifications or additions be made to the building or any portion thereof until the building Official has reviewed and
approved said future changes.
Mechanical Inspector: Fire Alarm:
Plumbing Inspector: Fire Dept./Sprinkler:
Electrical Inspector: P&Z/Public Works:
Temporary Certificate of Occupancy expires 09/03/2014.
This building is not to be inhabited by tenants due to the lack
of back up power to the elevator as an accessible means of
egress.
Conditions:
08 27 2014
JM
TEMPORARY
Special Conditions: Steps or part of a structure are not allowed in the public
right-of-way
To encourage alternative travel options, i.e. bicycling,
bike racks and hard surface must be provided at 10% of
beds. Location of racks needs to be on hard surface and
shown on revised site plan.
Lighting shall be low (under 15-feet in height) and not
create glare, and as a minimum shall adhere to the
City's lighting ordinance.
Sidewalk and pathway maintenance to be performed as
per the PEZ Ordinance.
Parking Contracts to be approved by the City Attorney
Requirements of the PEZ Ordinance No.1021 to be
applied to this project. Including but not limited to 8-foot
wide sidewalks.
Snow removal from street parking shall be done in
cooperation with the City.
Incorporate the use of street lamps, flower planters,
benches and other features to enhance pedestrian
activity.
Maintain sufficient snow storage and remove snow as
per weather conditions.
Developer to acquire ownership of all properties.
Work with City staff to facilitate pedestrian traffic during
construction phase.
Construct a minimum of 10 percent of the buildings
footprint for commercial space.
Provide pedestrian access to adjoining properties sujct
to property owner cooperation/approval.
City Staff to preview Plan B(present at 5.17.12 P&Z
meeting) and adopt appropriate modifications.
Allow for reduced tenant parking not to be less than
33% and 10% visitor parking.
This Certificate, issued persuant to the requirements of Section 109 of the International Building
Code, certifies that, at the time of issuance, this building or that portion of the building that was
inspected on the date listed was found to be in compliance with the requirements of the code for the
group and division of occupancy and the use for which the proposed occupancy was classified.
Date C.O. Issued: _____ / _______ / ______
C.O. Issued by: __________________________ Building Inspector: __________________________
There shall be no further change in the existing occupancy classification of the building nor shall any structural changes,
modifications or additions be made to the building or any portion thereof until the building Official has reviewed and
approved said future changes.
Mechanical Inspector: Fire Alarm:
Plumbing Inspector: Fire Dept./Sprinkler:
Electrical Inspector: P&Z/Public Works:
# 16. If any of these conditions as stipulated cannot be
met, the developer may appeal to City staff and the P&Z
Commission.
A fence for screening between the basketball court of
Sunrise Village and Northpoint must be installed prior to
a C of O being issued. I have spoken to Summer at
Sunrise and Kelly McCandless at Northpoint they have
agreed to work together on the fence. Thanks, Natalie
Temporary Certificate of Occupancy expires
09/03/2014. This building is not to be inhabited by
tenants due to the lack of back up power to the elevator
as an accessible means of egress.
Occupancy: = sq. ft.
This Certificate, issued persuant to the requirements of Section 109 of the International Building
Code, certifies that, at the time of issuance, this building or that portion of the building that was
inspected on the date listed was found to be in compliance with the requirements of the code for the
group and division of occupancy and the use for which the proposed occupancy was classified.
Date C.O. Issued: _____ / _______ / ______
C.O. Issued by: __________________________ Building Inspector: __________________________
There shall be no further change in the existing occupancy classification of the building nor shall any structural changes,
modifications or additions be made to the building or any portion thereof until the building Official has reviewed and
approved said future changes.
Mechanical Inspector: Fire Alarm:
Plumbing Inspector: Fire Dept./Sprinkler:
Electrical Inspector: P&Z/Public Works: