Loading...
HomeMy WebLinkAboutTEMP CO - 13-00142 - 141 S 1st W - NorthPointe Apts, Bldg B; 69 UnitsCertificate of Occupancy City of Rexburg Department of Community Development 35 N. 1st E. / Rexburg, ID. 83440 Phone (208) 359-3020 / Fax (208) 359-3022 Building Permit No: Applicable Addition of Code: Site Address: Use and Occupancy: Design Occupant Load: Sprinkler System Required: Name and Address of Owner: IBC 2009 13-00142 141 S 1st W NorthPointe Apts, Bldg B; 69 units N/A Yes , Contractor: Headwaters Construction Co. This Certificate, issued persuant to the requirements of Section 109 of the International Building Code, certifies that, at the time of issuance, this building or that portion of the building that was inspected on the date listed was found to be in compliance with the requirements of the code for the group and division of occupancy and the use for which the proposed occupancy was classified. Date C.O. Issued: _____ / _______ / ______ C.O. Issued by: __________________________ Building Inspector: __________________________ There shall be no further change in the existing occupancy classification of the building nor shall any structural changes, modifications or additions be made to the building or any portion thereof until the building Official has reviewed and approved said future changes. Mechanical Inspector: Fire Alarm: Plumbing Inspector: Fire Dept./Sprinkler: Electrical Inspector: P&Z/Public Works: Temporary Certificate of Occupancy expires 09/03/2014. This building is not to be inhabited by tenants due to the lack of back up power to the elevator as an accessible means of egress. Conditions: 08 27 2014 JM TEMPORARY Special Conditions: Steps or part of a structure are not allowed in the public right-of-way To encourage alternative travel options, i.e. bicycling, bike racks and hard surface must be provided at 10% of beds. Location of racks needs to be on hard surface and shown on revised site plan. Lighting shall be low (under 15-feet in height) and not create glare, and as a minimum shall adhere to the City's lighting ordinance. Sidewalk and pathway maintenance to be performed as per the PEZ Ordinance. Parking Contracts to be approved by the City Attorney Requirements of the PEZ Ordinance No.1021 to be applied to this project. Including but not limited to 8-foot wide sidewalks. Snow removal from street parking shall be done in cooperation with the City. Incorporate the use of street lamps, flower planters, benches and other features to enhance pedestrian activity. Maintain sufficient snow storage and remove snow as per weather conditions. Developer to acquire ownership of all properties. Work with City staff to facilitate pedestrian traffic during construction phase. Construct a minimum of 10 percent of the buildings footprint for commercial space. Provide pedestrian access to adjoining properties sujct to property owner cooperation/approval. City Staff to preview Plan B(present at 5.17.12 P&Z meeting) and adopt appropriate modifications. Allow for reduced tenant parking not to be less than 33% and 10% visitor parking. This Certificate, issued persuant to the requirements of Section 109 of the International Building Code, certifies that, at the time of issuance, this building or that portion of the building that was inspected on the date listed was found to be in compliance with the requirements of the code for the group and division of occupancy and the use for which the proposed occupancy was classified. Date C.O. Issued: _____ / _______ / ______ C.O. Issued by: __________________________ Building Inspector: __________________________ There shall be no further change in the existing occupancy classification of the building nor shall any structural changes, modifications or additions be made to the building or any portion thereof until the building Official has reviewed and approved said future changes. Mechanical Inspector: Fire Alarm: Plumbing Inspector: Fire Dept./Sprinkler: Electrical Inspector: P&Z/Public Works: # 16. If any of these conditions as stipulated cannot be met, the developer may appeal to City staff and the P&Z Commission. A fence for screening between the basketball court of Sunrise Village and Northpoint must be installed prior to a C of O being issued. I have spoken to Summer at Sunrise and Kelly McCandless at Northpoint they have agreed to work together on the fence. Thanks, Natalie Temporary Certificate of Occupancy expires 09/03/2014. This building is not to be inhabited by tenants due to the lack of back up power to the elevator as an accessible means of egress. Occupancy: = sq. ft. This Certificate, issued persuant to the requirements of Section 109 of the International Building Code, certifies that, at the time of issuance, this building or that portion of the building that was inspected on the date listed was found to be in compliance with the requirements of the code for the group and division of occupancy and the use for which the proposed occupancy was classified. Date C.O. Issued: _____ / _______ / ______ C.O. Issued by: __________________________ Building Inspector: __________________________ There shall be no further change in the existing occupancy classification of the building nor shall any structural changes, modifications or additions be made to the building or any portion thereof until the building Official has reviewed and approved said future changes. Mechanical Inspector: Fire Alarm: Plumbing Inspector: Fire Dept./Sprinkler: Electrical Inspector: P&Z/Public Works: