Loading...
HomeMy WebLinkAboutRESCHECK - 16-00478-482 - Campus Courtyard 26 COMcheck Software Version 4.3.4 �( Envelope Compliance Certificate Project Information Energy Code: 2012 ECC Project Title: Campus Courtyard Apartments Location: Rexburg, Idaho Climate Zone: 61b Project Type: New Construction Vertical Glazing / Wall Area: 20% Construction Site: Owner/Agent: Designer/Contractor: 273 S 5th W Jared Sommer Thane Sommer Rexburg, Idaho 83440 Sommer Masonry and Construction Sommer Masonry and Construction Inc Inc 3614 N 3000 W 3887 N 3000 W Rexburg, Idaho 83440 Rexburg, Idaho 83440 2087094184 2083518232 jarsommer@gmail.com Building Area Floor Area 1 -Multifamily: Nonresidential 13000 Additional Efficiency Package High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist report. Envelope Assemblies Assembly Gross Area Cavity Cont. Proposed Budget U - or R -Value R -Value U -Factor Facton.) Perimeter Roof: Attic Roof, Wood Joists, [Bldg. Use 1 - Multifamily] 4000 38.0 38.0 0.013 0.021 Floor: Wood -Framed, [Bldg. Use 1 - Multifamily] 4000 30.0 30.0 0.016 0.033 NORTH EM. Wall: Wood -Framed, 16in. o.c., [Bldg. Use 1 - Multifamily] 4000 22.0 22.0 0.024 0.051 Window: Vinyl Frame: Operable, Pert. Type: Energy code default, 800 -- --- 0.550 0.430 Double Pane with Low -E, Clear, SHGC 0.70, [Bldg. Use 1 - Multifamily] Door: Insulated Metal, Swinging, [Bldg. Use 1 - Multifamily] 440 --- --- 0.140 0.370 (a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements Doe PASSES: Desian 10°% better than nndr Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.3.4 and to comply with the mandatory requirements listed in the Inspection Checklist. Project Title: Campus Courtyard Apartments Report date: 07/07/16 Data filename: Page 1 of 17 Signature Date Project Title: Campus Courtyard Apartments Report date: 07/07/16 Data filename: Page 2 of 17 COMcheck Software Version 4.3.4 Interior Lighting Compliance Certificate Project Information Energy Code: 2012 IECC Project Title: Campus Courtyard Apartments Project Type: New Construction Construction Site: Owner/Agent: Designer/Contractor: 273 S 5th W Jared Sommer Thane Sommer Rexburg, Idaho 83440 Sommer Masonry and Construction Sommer Masonry and Construction Inc Inc 3614 N 3000 W 3887 N 3000 W Rexburg, Idaho 83440 Rexburg, Idaho 83440 2087094184 2083518232 jarsommer@gmail.com Additional Efficiency Package High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist report. Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts (112) Watts / ft2 1 -Multifamily 13000 0.70 9100 Total Allowed Watts = 9100 Proposed Interior Lighting Power A B C D E Fixture ID : Description / Lamp I Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixture Watt. 1 -Multifamily Compact Fluorescent: Spiral 13W: Electronic: 2 111 26 2886 Compact Fluorescent: Spiral 13W: Electronic: 4 21 52 1092 Total Proposed Watts = 3978 Interior Lighting Compliance Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.3.4 and to comply with the mandatory requirements listed in the Inspection Checklist. Project Title: Campus Courtyard Apartments Data filename: Report date: 07/07/16 Page 3 of 17 COMcheck Software Version 4.3.4 Exterior Lighting Compliance Certificate Project Information Energy Code: Project Title: Project Type: Exterior Lighting Zone Construction Site: 273 S 5th W Rexburg, Idaho 83440 Allowed Exterior Lighting Power A Area/Surface Category 2012 IECC Campus Courtyard Apartments New Construction 2 (Residentially zoned area) Owner/Agent: Jared Sommer Sommer Masonry and Construction Inc 3614 N 3000 W Rexburg, Idaho 83440 2087094184 jarsommer@gmail.com B Quantity Designer/Contractor: Thane Sommer Sommer Masonry and Construction Inc 3887 N 3000 W Rexburg, Idaho 83440 2083518232 C D E Allowed Tradable Allowed Watts Watts / Wattage (B X C) Main entry 21 ft of 20 Yes 420 Stairway 88 ft2 1 Yes 88 Total Tradable Watts (a) = 508 Total Allowed Watts = 508 Total Allowed Supplemental Watts (b) = 600 (a) Wattage tradeoffs are only allowed between tradable areas/surfaces. (b) A supplemental allowance equal to 600 watts may be applied toward compliance of both non -tradable and tradable areas/surfaces. Proposed Exterior Lighting Power A B C D E Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixture Watt. Main entry (21 ft of door width) Tradable Wattage LED: LED A Lamp 8W: Stairway (88 ft2): Tradable Wattage LED: LED A Lamp 8W: Exterior 21 8 168 1 4 8 32 Total Tradable Proposed Watts = 200 Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed exterior lighting systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.3.4 and to comply with the mandatory requirements listed In the Inspection Checklist. Project Title: Campus Courtyard Apartments Report date: 07/07/16 Data filename: Page 4 of 17 n�( COMcheck Software Version 4.3.4 Mechanical Compliance Certificate Project Information Energy Code: Project Title: Location: Climate Zone: Project Type: Construction Site: 273 S 5th W Rexburg, Idaho 83440 2012 IECC Campus Courtyard Apartments Rexburg, Idaho 6b New Construction Owner/Agent: Jared Sommer Sommer Masonry and Construction Inc 3614 N 3000 W Rexburg, Idaho 83440 2087094184 jarsommer@gmail.com Designer/Contractor: Thane Sommer Sommer Masonry and Construction Inc 3887 N 3000 W Rexburg, Idaho 83440 2083518232 Additional Efficiency Package High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist report. Mechanical Systems List Quantity System Type & Description Water Heater: Gas Storage Water Heater, Capacity: 1000 gallons, Input Rating: 400 Btu/h w/ Circulation Pump Proposed Efficiency: 80.00 % Et, Required Efficiency: 80.00 % Et Mechanical Compliance Statement Compliance Statement., The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.3.4 and to comply with the mandatory requirements listed in the Inspection Checklist. Project Title: Campus Courtyard Apartments Data filename: Report date: 07/07/16 Page 5 of 17 COMcheck Software Version 4.3.4 Inspection Checklist Energy Code: 2012 IECC Requirements: 100.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan ReviewComplies? Comments/Assumptions & Re .ID C103.2 '.. Plans and/or specifications provide all ❑Complies Requirement will be met. [PR111 'information with which compliance ❑Does Not ,can be determined forthe building [_]Not Observable envelope and document where ❑Not Applicable 'exceptions to the standard are claimed. C103.2 Plans, specifications, and/or ❑Complies Requirement will be met. [PR3]1 calculations provide all information ❑Does Not ,with (determined which compliance can be forthe service water []Not Observable heating systems and equipment and []Not Applicable ..document where exceptions to the :standard are claimed. Hot water ;system sized per manufacturer's sizing guide. C103.2 Plans, specifications, and/or ❑Complies Requirement will be met. [PR4]1 calculations provide all information ❑Does Not (determined with which compliance can be for the interior lighting ❑Not Observable ',and electrical systems and equipment ❑Not Applicable ':and document where exceptions to the standard are claimed. Information ,provided should Include interior lighting power calculations, wattage of bulbs and ballasts, transformers and 'control devices. C103.2 Plans, specifications, and/or ❑Complies :Requirement will be met. [PR811 'calculations provide all information ❑Does Not ;with ;determined which compliance can be for the exterior lighting ❑Not Observable' :and electrical systems and equipment ❑Not Applicable and document where exceptions to the standard are claimed. Information provided should Include exterior lighting power calculations, wattage of bulbs and ballasts, transformers and 'control devices. C406 'Plans, specifications, and/or ❑Complies Requirement will be met. [PR9]1 'calculations provide all information -❑Does Not :with which compliance can be determined for the additional energy ❑Not Observable efficiency package options. ❑Not Applicable C4023.1 The vertical fenestration area <= 30 ❑Complies Requirement will be met. [PR10]1 percent of the gross above -grade wall ❑Does Not area. ❑Not Observable ' ❑Not Applicable C402.3.1 The skylight area <= 3 percent of the ❑Complies Requirement will be met. [PRll]1 gross roof area. ❑Does Not ❑Not Observable ❑Not Applicable 1 I High Impact (Tier 1) 11 '^` Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: Campus Courtyard Apartments Report date: 07/07/16 Data filename: Page 6 of 17 # & Re .ID Plan Review Complies? Comments/Assumptions C402.3.2. (Skylights in office, storage, -.❑Complies ..Exception: Requirement does not apply. 2 automotive service, manufacturing, ❑Does Not [PR15]1 non -refrigerated warehouse, retail : ❑Not Observable store, and distribution/sorting area ❑Not have a measured haze value > 90 Applicable percent unless designed to exclude direct sunlight. Additional Comments/Assumptions: 111 High Impact (Tier 1) 2:1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Campus Courtyard Apartments Report date: 07/07/16 Data filename: Page 7 of 17 section # I Footing / Foundation Inspection Complies? Comments/Assumptions & Re .ID C403.2.8. Exterior insulation protected against ❑Complies Requirement will be met. 1 damage, sunlight, moisture, wind, ❑Does Not [FO611 landscaping and equipment ❑Not Observable maintenance activities. ❑Not Applicable C402.2.8'. Bottom surface of floor structures ❑Complies Requirement will be met. [FO12)3 incorporating radiant heating ❑Does Not insulated to >=R-3.5. ❑Not Observable See the Envelope Assemblies table for values. ❑Not Applicable Additional Comments/Assumptions: 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: Campus Courtyard Apartments Report date: 07/07/16 Data filename: Page 8 of 17 Section # Framing / Rough -In Inspection Compiles? Comments/Assumptions & Re .ID C402.4.1, !The building envelope contains a ❑Complies Requirement will be met. C402.4.2 :continuous air barrier that is sealed in ❑Does Not [FR16]1 an approved manner and either '..constructed ❑No[ Observable or tested in an approved ❑Not Applicable manner. Air barrier penetrations are .sealed in an approved manner. C402.4.3, : Factory -built fenestration and doors❑Complies Requirement will be met. C402.4.4 are labeled as meeting air leakage❑Does Not [FR18]3 requirements. ❑Not Observable ❑Not Applicable C402.4.7 Vestibules are installed on all building ❑Complies Exception: Doors opening directly from a sleeping unit or [FR17]3 'entrances. Doors have self-closing ❑Does Not dwelling unit. '. devices. '..❑Not Observable '..❑Not Applicable C402.3.3, '.. Vertical fenestration U -Factor. ❑Complies See the Envelope Assemblies table for values. C402.3.4 ❑Does Not [FR8]1 []Not Observable ❑Not Applicable 0402.3.3 Vertical fenestration SHGC value. ❑Complies See the Envelope Assemblies table for values. [FR10]1 ❑Does Not ❑Not Observable ❑Not Applicable C303.1.3 Fenestration products rated in ❑Complies Requirement will be met. [FR12]2 accordance with NFRC. ❑Does Not ❑Not Observable ❑Not Applicable C303.1.3 Fenestration products are certified as ❑Complies Requirement will be met. [FR13]1 to performance labels or certificates ❑Does Not provided. ❑Not Observable, ' ❑Not Applicable, C402.2.7. U -factor of opaque doors associated ❑Complies ',See the Envelope Assemblies table for values. [FR14]= with the building thermal envelope ❑Does Not meets requirements. ❑Not Observable) ❑Not Applicable Additional Comments/Assumptions: 1 I High Impact (Tier 1) 111 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: Campus Courtyard Apartments Report date: 07/07/16 Data filename: Page 9 of 17 # I Plumbing Rough -in Inspection I complies? I comments/Assumptions C404.3 Temperature controls installed on UComplies Requirement will be met. [PL5]3 service water heating systems (110 F []Does Not for dwelling units and lavatories in []Not Observable public restrooms and 90 F for other ❑Not Applicable occupancies.) C404.4 Automatic time switches installed to ❑Complies Requirement will be met. [PL3]1 automatically switch off the ❑Does Not recirculating hot-water system or heat []Not Observable trace. ❑Not Applicable, Additional Comments/Assumptions: 1 JHigh Impact (Tier 1) ,,�JlMedium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Campus Courtyard Apartments Report date: 07/07/16 Data filename: Page 10 of 17 Section # Mechanical Rough -In Inspection Complies? Comments/Assumptions & Re .ID C402.4.5. Stair and elevator shaft vents have❑Complies Exception: Requirement does not apply. 1 motorized dampers that automatically❑Does Not [ME313 close. []Not Observable []Not Applicable C402.4.5. Outdoor air and exhaust systems have ❑Complies Exception: Requirement does not apply. 2 motorized dampers that automatically ❑Does Not [ME58]3 shut when not in use and meet ❑Not Observable ,gravity maximum leakage rates. Check dampers where allowed. ❑Not Applicable C403.2.8 ;Thermally ineffective panel surfaces of ❑Complies Requirement will be met. [ME41]3 'sensible heating panels have ❑Does Not insulation >= R-3.5. ❑Not Observable ❑Not Applicable C408.2.2. IAir outlets and zone terminal devices❑Complies Exception: Requirement does not apply. 1 -. have means for air balancing. Not [ME5313❑Not Observable ❑Not Applicable C403.4.2 :VAV fan motors >=7.5 hp to be driven ❑Complies Exception: Requirement does not apply. [ME66]2 '. by variable speed drive, have a vane -❑Does Not ;axial fan with variable pitch blades, or❑Not Observable have controls to Ilmit fan motor demand. ❑Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Campus Courtyard Apartments Report date: 07/07/16 Data filename: Page 11 of 17 Section # Rough -In Electrical Inspection Compiles? Comments/Assumptions & Re .ID C405.2.2. Automatic controls to shut off all❑Complies '.. Requirement will be met. 1 building lighting installed in all ❑Does Not [EL22]2 buildings. []Not Observable'. ❑Not Applicable C405.2.1. Independent lighting controls installed ❑Complies Requirement will be met. 1 per approved lighting plans and all ❑Does Not [EL23]2 manual controls readily accessible and ❑Not Observable visible to occupants. ❑Not Applicable C405.2.1. Lighting controls installed to uniformly ❑Complies Exception: Sleeping units. 2 reduce the lighting load by at least ❑Does Not [EL15]1 50%. ❑Not Observable' ❑Not Applicable C405.2.2. Daylight zones provided with❑Complies Exception: Requirement does not apply. 3 individual controls that control the,❑Does Not [EL16]2 lights independent of general area❑ Not Observable' . lighting. ❑Not Applicable C405.2.3 Sleeping units have at least one ❑Complies Requirement will be met. [EL17]3 master switch at the main entry door ❑Does Not that controls wired luminaires and ❑Not Observable :switched receptacles. ❑Not Applicable C405.2.2. Occupancy sensors installed in ❑Complies Requirement will be met. 2 required spaces. []Does Not [EL1811 []Not Observable ❑Not Applicable C405.2.2. Primary sidelighted areas are -❑Complies Requirement will be met. 3!equipped with required lighting ❑Does Not [EL20]1 ;controls. ❑Not Observable ❑Not Applicable C405.2.2. (Enclosed spaces with daylight area❑Complies Exception: Requirement does not apply. 3 under skylights and rooftop monitors❑Does Not [EL21]1,controls. ' are equipped with required lighting❑Not Observable ❑Not Applicable C405.2.4 ',Automatic lighting controls for exterior ❑Complies'Requirement will be met. [EL25]2 :lighting installed. ❑Does Not ❑Not Observable! ❑Not Applicable C405.2.3 '..Separate lighting control devices for ❑Complies Requirement will be met. [EL4]1 'specific uses installed per approved ❑Does Not ,lighting plans. ❑Not Observable ❑Not Applicable C405.3 Fluorescent luminaires with odd '..❑Compiles Requirement will be met. [EL1913 numbered lamp configurations that❑Does Not are within 10 feet center to center (if❑Not Observable recess mounted) or are within 1 foot edge to edge (if pendant or surface '..❑Not Applicable mounted) shall be tandem wired. C405.4 Exit signs do not exceed 5 watts per❑Complies Exception: Requirement does not apply. [EL6]1 'face. ❑Does Not '..❑Not Observable: ❑Not Applicable 11 High Impact (Tier 1) `^. Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Campus Courtyard Apartments Report date: 07/07/16 Data filename: Page 12 of 17 # Rough -in Electrical Inspection Complies? Comments/Assumptions & Re .ID C405.6 'Exterior grounds lighting over 100 W ❑Complies Requirement will be met. [EL2411 provides >60 Im/W unless on motion ❑Does Not sensor or fixture is exempt from scope, ,,❑Not Observable of code or from external LPD. :❑Not Applicable C405.2.3 (Additional interior lighting power..❑Complies Requirement will be met. [EL811 allowed for special functions per the❑Does Not ,approved lighting plans and is❑Not Observable'. lautomatically controlled and separated from general lighting. '..❑Not Applicable Additional Comments/Assumptions: 111 High Impact (Tier 1) 1 Z-1 Medium Impact (Tier 2) 11(..1 Low Impact (Tier 3) Project Title: Campus Courtyard Apartments Report date: 07/07/16 Data filename: Page 13 of 17 Section # Insulation InspectionComplies? Comments/Assumptions & Re .ID C402.4.1. All sources of air leakage in the ❑Complies Requirement will be met. 1 building thermal envelope are sealed, ❑Does Not [IN111 caulked, gasketed, weather stripped ❑Not Observable: or wrapped with moisture vapor- permeable wrapping material to []Not Applicable minimize air leakage. 0402.4.2. Roof R -value. For some ceiling❑Complies See the Envelope Assemblies table forvalues. 1 verification may need to ❑Does Not .systems, [IN211 occur during Framing Inspection. '.❑Not Observable ❑Not Applicable C303.2 Roof insulation Installed per❑Complies Requirement will be met. [IN311 manufacturer's instructions. Blown or -.❑Does Not poured loose -fill insulation is installed❑Not Observable only where the roof slope is <=3 in 12. ❑Not Applicable C303.2 (Above -grade wall insulation installed ❑Complies Requirement will be met. [IN711 per manufacturer's instructions. ❑Does Not ❑Not Observable ❑Not Applicable C402.2.5 Floor insulation R -value. ❑Compiles See the Envelope Assemblies table for values. [IN8]2 ❑Does Not ❑Not Observable ❑Not Applicable C303.2 'Floor insulation installed per❑Complies Requirement will be met. [IN912 'manufacturer's instructions. -',❑Does Not ❑Not Observable ❑Not Applicable C303.1 Building envelope insulation is labeled [Complies Requirement will be met. [IN10]' with R -value or insulation certificate❑Does Not providing R -value and other relevant ❑Not Observable. data. ❑Not Applicable C303.2.1 Exterior insulation is protected from ❑Complies Requirement will be met. [IN1412 !damage with a protective material. ❑Does Not 'Verification for exposed foundation rvabl ❑Not Observable ; insulation may need to occur during ❑Not Applicable Foundation Inspection. C402.2.1 :Insulation intended to meet the roof ❑Complies Requirement will be met. [IN17]3 insulation requirements cannot be ❑Does Not installed on top of a suspended ❑Not Observable ceiling. Mark this requirement compliant if insulation is Installed❑Not Applicable accordingly, Additional Comments/Assumptions: 1 IHigh Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: Campus Courtyard Apartments Report date: 07/07/16 Data filename: Page 14 of 17 Section # Final InspectionCompiles? Comments/Assumptions & Re .ID C402.4.6', Weatherseals installed on all loading ❑Complies Exception: Requirement does not apply. [FI3711 .dock cargo doors. []Does Not ❑Not Observable ❑Not Applicable C404.3 Public lavatory faucet water '..❑Complies Requirement will be met. (FI 11]3 temperature <=110°F.❑Does Not '❑Not Observable ❑Not Applicable C404.5 ;All piping in circulating system ❑Complies .Exception: Requirement does not apply. [FI25]2 insulated ❑Does Not []Not Observable ❑Not Applicable C404.6 Controls are installed that limit the '..❑Complies Requirement will be met. [F]12]3 operation of a recirculation pump ❑Does Not !installed to maintain temperature of a❑Not storage tank. Observable []Not Applicable C402.4.8 'Recessed luminaires in thermal ❑Complies :Requirement will be met. [F126]3 envelope to limit infiltration and be IC ❑Does Not rated and labeled. Seal between Not Observable interior finish and luminaire housing ❑Not Applicable C408.2.5. Furnished as -built drawings for ❑Complies'. Requirement will be met. 1 electric power systems within 30 days ❑Does Not [FI1613 of system acceptance. ❑Not Observable ❑Not Applicable C303.3, Furnished 0&M Instructions for❑Complies '.. Requirement will be met. C408.2.5. 'systems and equipment to the ❑Does Not 2; [FI17]3 building owner or designated representative. ❑Not Observable ❑Not Applicable. C405.5.2 Interior installed lamp and fixture ❑Complies see the Interior Lighting fixture schedule for values. [F]18]1 lighting power is consistent with what ❑Does Not is shown on the approved lighting ',..❑Not plans, demonstrating proposed watts Observable are less than or equal to allowed '..❑Not Applicable', watts. C405.6.2 Exterior lighting power is consistent ❑Complies See the Interior Lighting fixture schedule for values. [FI19]1 ;with what is shown on the approved ❑Does Not ,lighting 'proposed plans, demonstrating watts are less than or equal ervabl ❑Not Observable rvabl to allowed watts. ❑Not Applicable C408.3 Lighting systems have been tested to ❑Complies Requirement will be met. [FI3311 ensure proper calibration, adjustment, ❑Does Not programming, and operation, []Not Observable ❑Not Applicable C408.3 :Lighting systems have been tested to ❑Complies Requirement will be met. [F148]1 :ensure proper calibration, adjustment,❑Does Not ,;programming, and operation.,❑Not Observable ❑Not Applicable C406 :,Efficient HVAC performance, efficient ❑Complies Requirement will be met. [FI3411 lighting system, or on-site supply of ',.❑Does Not .. !what renewable energy consistent with❑Not is shown the approved plans. '..❑Not Observable Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 1,$-'ILow Impact (Tier 3) Project Title: Campus Courtyard Apartments Report date: 07/07/16 Data filename: Page 15 of 17 11 High Impact (Tier 1) ` «: Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Campus Courtyard Apartments Report date: 07/07/16 Data filename: Page 16 of 17 Project Title: Campus Courtyard Apartments Report date: 07/07/16 Data filename: Page 17 of 17