HomeMy WebLinkAboutRESCHECK - 16-00478-482 - Campus Courtyard 26 COMcheck Software Version 4.3.4
�( Envelope Compliance Certificate
Project Information
Energy Code:
2012 ECC
Project Title:
Campus Courtyard Apartments
Location:
Rexburg, Idaho
Climate Zone:
61b
Project Type:
New Construction
Vertical Glazing / Wall Area:
20%
Construction Site:
Owner/Agent:
Designer/Contractor:
273 S 5th W
Jared Sommer
Thane Sommer
Rexburg, Idaho 83440
Sommer Masonry and Construction
Sommer Masonry and Construction
Inc
Inc
3614 N 3000 W
3887 N 3000 W
Rexburg, Idaho 83440
Rexburg, Idaho 83440
2087094184
2083518232
jarsommer@gmail.com
Building Area
Floor Area
1 -Multifamily: Nonresidential
13000
Additional Efficiency Package
High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist
report.
Envelope Assemblies
Assembly Gross Area Cavity Cont. Proposed Budget U -
or R -Value R -Value U -Factor Facton.)
Perimeter
Roof: Attic Roof, Wood Joists, [Bldg. Use 1 - Multifamily] 4000 38.0 38.0 0.013 0.021
Floor: Wood -Framed, [Bldg. Use 1 - Multifamily] 4000 30.0 30.0 0.016 0.033
NORTH
EM. Wall: Wood -Framed, 16in. o.c., [Bldg. Use 1 - Multifamily] 4000 22.0 22.0 0.024 0.051
Window: Vinyl Frame: Operable, Pert. Type: Energy code default, 800 -- --- 0.550 0.430
Double Pane with Low -E, Clear, SHGC 0.70, [Bldg. Use 1 - Multifamily]
Door: Insulated Metal, Swinging, [Bldg. Use 1 - Multifamily] 440 --- --- 0.140 0.370
(a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements
Doe PASSES: Desian 10°% better than nndr
Envelope Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed envelope systems have been
designed to meet the 2012 IECC requirements in COMcheck Version 4.3.4 and to comply with the mandatory requirements listed
in the Inspection Checklist.
Project Title: Campus Courtyard Apartments Report date: 07/07/16
Data filename: Page 1 of 17
Signature Date
Project Title: Campus Courtyard Apartments Report date: 07/07/16
Data filename: Page 2 of 17
COMcheck Software Version 4.3.4
Interior Lighting Compliance Certificate
Project Information
Energy Code: 2012 IECC
Project Title: Campus Courtyard Apartments
Project Type: New Construction
Construction Site: Owner/Agent:
Designer/Contractor:
273 S 5th W Jared Sommer
Thane Sommer
Rexburg, Idaho 83440 Sommer Masonry and Construction
Sommer Masonry and Construction
Inc
Inc
3614 N 3000 W
3887 N 3000 W
Rexburg, Idaho 83440
Rexburg, Idaho 83440
2087094184
2083518232
jarsommer@gmail.com
Additional Efficiency Package
High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist
report.
Allowed Interior Lighting Power
A
B
C
D
Area Category
Floor Area
Allowed Allowed Watts
(112)
Watts / ft2
1 -Multifamily
13000
0.70
9100
Total Allowed Watts =
9100
Proposed Interior Lighting Power
A
B
C D
E
Fixture ID : Description / Lamp I Wattage Per Lamp / Ballast
Lamps/
# of Fixture
(C X D)
Fixture
Fixture Watt.
1 -Multifamily
Compact Fluorescent: Spiral 13W: Electronic:
2
111 26
2886
Compact Fluorescent: Spiral 13W: Electronic:
4
21 52
1092
Total Proposed Watts =
3978
Interior Lighting Compliance
Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been
designed to meet the 2012 IECC requirements in COMcheck Version 4.3.4 and to comply with the mandatory requirements listed
in the Inspection Checklist.
Project Title: Campus Courtyard Apartments
Data filename:
Report date: 07/07/16
Page 3 of 17
COMcheck Software Version 4.3.4
Exterior Lighting Compliance Certificate
Project Information
Energy Code:
Project Title:
Project Type:
Exterior Lighting Zone
Construction Site:
273 S 5th W
Rexburg, Idaho 83440
Allowed Exterior Lighting Power
A
Area/Surface Category
2012 IECC
Campus Courtyard Apartments
New Construction
2 (Residentially zoned area)
Owner/Agent:
Jared Sommer
Sommer Masonry and Construction
Inc
3614 N 3000 W
Rexburg, Idaho 83440
2087094184
jarsommer@gmail.com
B
Quantity
Designer/Contractor:
Thane Sommer
Sommer Masonry and Construction
Inc
3887 N 3000 W
Rexburg, Idaho 83440
2083518232
C D E
Allowed Tradable Allowed Watts
Watts / Wattage (B X C)
Main entry 21 ft of 20 Yes 420
Stairway 88 ft2 1 Yes 88
Total Tradable Watts (a) = 508
Total Allowed Watts = 508
Total Allowed Supplemental Watts (b) = 600
(a) Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b) A supplemental allowance equal to 600 watts may be applied toward compliance of both non -tradable and tradable areas/surfaces.
Proposed Exterior Lighting Power
A B C D E
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D)
Fixture Fixture Watt.
Main entry (21 ft of door width) Tradable Wattage
LED: LED A Lamp 8W:
Stairway (88 ft2): Tradable Wattage
LED: LED A Lamp 8W:
Exterior
21 8 168
1 4 8 32
Total Tradable Proposed Watts = 200
Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed exterior lighting systems have been
designed to meet the 2012 IECC requirements in COMcheck Version 4.3.4 and to comply with the mandatory requirements listed
In the Inspection Checklist.
Project Title: Campus Courtyard Apartments Report date: 07/07/16
Data filename: Page 4 of 17
n�(
COMcheck Software Version 4.3.4
Mechanical Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Construction Site:
273 S 5th W
Rexburg, Idaho 83440
2012 IECC
Campus Courtyard Apartments
Rexburg, Idaho
6b
New Construction
Owner/Agent:
Jared Sommer
Sommer Masonry and Construction
Inc
3614 N 3000 W
Rexburg, Idaho 83440
2087094184
jarsommer@gmail.com
Designer/Contractor:
Thane Sommer
Sommer Masonry and Construction
Inc
3887 N 3000 W
Rexburg, Idaho 83440
2083518232
Additional Efficiency Package
High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist
report.
Mechanical Systems List
Quantity System Type & Description
Water Heater:
Gas Storage Water Heater, Capacity: 1000 gallons, Input Rating: 400 Btu/h w/ Circulation Pump
Proposed Efficiency: 80.00 % Et, Required Efficiency: 80.00 % Et
Mechanical Compliance Statement
Compliance Statement., The proposed mechanical design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 2012 IECC requirements in COMcheck Version 4.3.4 and to comply with the mandatory requirements listed
in the Inspection Checklist.
Project Title: Campus Courtyard Apartments
Data filename:
Report date: 07/07/16
Page 5 of 17
COMcheck Software Version 4.3.4
Inspection Checklist
Energy Code: 2012 IECC
Requirements: 100.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
#
Plan ReviewComplies?
Comments/Assumptions
& Re .ID
C103.2 '..
Plans and/or specifications provide all
❑Complies
Requirement will be met.
[PR111 'information
with which compliance
❑Does Not
,can
be determined forthe building
[_]Not Observable
envelope and document where
❑Not Applicable
'exceptions
to the standard are
claimed.
C103.2
Plans, specifications, and/or
❑Complies
Requirement will be met.
[PR3]1
calculations provide all information
❑Does Not
,with
(determined
which compliance can be
forthe service water
[]Not Observable
heating systems and equipment and
[]Not Applicable
..document
where exceptions to the
:standard
are claimed. Hot water
;system
sized per manufacturer's
sizing guide.
C103.2
Plans, specifications, and/or
❑Complies
Requirement will be met.
[PR4]1
calculations provide all information
❑Does Not
(determined
with which compliance can be
for the interior lighting
❑Not Observable
',and
electrical systems and equipment
❑Not Applicable
':and
document where exceptions to
the standard are claimed. Information
,provided
should Include interior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
'control
devices.
C103.2
Plans, specifications, and/or
❑Complies
:Requirement will be met.
[PR811 'calculations
provide all information
❑Does Not
;with
;determined
which compliance can be
for the exterior lighting
❑Not Observable'
:and
electrical systems and equipment
❑Not Applicable
and document where exceptions to
the standard are claimed. Information
provided should Include exterior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
'control devices.
C406 'Plans,
specifications, and/or
❑Complies
Requirement will be met.
[PR9]1 'calculations
provide all information -❑Does
Not
:with
which compliance can be
determined for the additional energy
❑Not Observable
efficiency package options.
❑Not Applicable
C4023.1
The vertical fenestration area <= 30
❑Complies
Requirement will be met.
[PR10]1
percent of the gross above -grade wall
❑Does Not
area.
❑Not Observable
'
❑Not Applicable
C402.3.1
The skylight area <= 3 percent of the
❑Complies
Requirement will be met.
[PRll]1
gross roof area.
❑Does Not
❑Not Observable
❑Not Applicable
1 I High Impact (Tier 1) 11 '^` Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: Campus Courtyard Apartments Report date: 07/07/16
Data filename: Page 6 of 17
#
& Re .ID
Plan Review
Complies?
Comments/Assumptions
C402.3.2.
(Skylights in office, storage,
-.❑Complies ..Exception: Requirement does not apply.
2
automotive service, manufacturing,
❑Does Not
[PR15]1
non -refrigerated warehouse, retail
:
❑Not Observable
store, and distribution/sorting area
❑Not
have a measured haze value > 90
Applicable
percent unless designed to exclude
direct sunlight.
Additional Comments/Assumptions:
111 High Impact (Tier 1) 2:1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Campus Courtyard Apartments Report date: 07/07/16
Data filename: Page 7 of 17
section
#
I Footing / Foundation Inspection
Complies?
Comments/Assumptions
& Re .ID
C403.2.8.
Exterior insulation protected against
❑Complies
Requirement will be met.
1
damage, sunlight, moisture, wind,
❑Does Not
[FO611
landscaping and equipment
❑Not Observable
maintenance activities.
❑Not Applicable
C402.2.8'.
Bottom surface of floor structures
❑Complies
Requirement will be met.
[FO12)3
incorporating radiant heating
❑Does Not
insulated to >=R-3.5.
❑Not Observable
See the Envelope Assemblies table for values.
❑Not Applicable
Additional Comments/Assumptions:
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: Campus Courtyard Apartments Report date: 07/07/16
Data filename: Page 8 of 17
Section
#
Framing / Rough -In Inspection
Compiles?
Comments/Assumptions
& Re .ID
C402.4.1,
!The building envelope contains a
❑Complies
Requirement will be met.
C402.4.2
:continuous air barrier that is sealed in
❑Does Not
[FR16]1
an approved manner and either
'..constructed
❑No[ Observable
or tested in an approved
❑Not Applicable
manner. Air barrier penetrations are
.sealed in an approved manner.
C402.4.3,
: Factory -built fenestration and doors❑Complies
Requirement will be met.
C402.4.4
are labeled as meeting air leakage❑Does
Not
[FR18]3
requirements.
❑Not Observable
❑Not Applicable
C402.4.7
Vestibules are installed on all building
❑Complies
Exception: Doors opening directly from a sleeping unit or
[FR17]3 'entrances.
Doors have self-closing
❑Does Not
dwelling unit.
'.
devices.
'..❑Not Observable
'..❑Not Applicable
C402.3.3, '..
Vertical fenestration U -Factor.
❑Complies
See the Envelope Assemblies table for values.
C402.3.4
❑Does Not
[FR8]1
[]Not Observable
❑Not Applicable
0402.3.3
Vertical fenestration SHGC value.
❑Complies
See the Envelope Assemblies table for values.
[FR10]1
❑Does Not
❑Not Observable
❑Not Applicable
C303.1.3
Fenestration products rated in
❑Complies
Requirement will be met.
[FR12]2
accordance with NFRC.
❑Does Not
❑Not Observable
❑Not Applicable
C303.1.3
Fenestration products are certified as
❑Complies
Requirement will be met.
[FR13]1
to performance labels or certificates
❑Does Not
provided.
❑Not Observable,
'
❑Not Applicable,
C402.2.7.
U -factor of opaque doors associated
❑Complies
',See the Envelope Assemblies table for values.
[FR14]=
with the building thermal envelope
❑Does Not
meets requirements.
❑Not Observable)
❑Not Applicable
Additional Comments/Assumptions:
1 I High Impact (Tier 1) 111 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: Campus Courtyard Apartments Report date: 07/07/16
Data filename: Page 9 of 17
# I Plumbing Rough -in Inspection I complies? I comments/Assumptions
C404.3
Temperature controls installed on
UComplies Requirement will be met.
[PL5]3
service water heating systems (110 F
[]Does Not
for dwelling units and lavatories in
[]Not Observable
public restrooms and 90 F for other
❑Not Applicable
occupancies.)
C404.4
Automatic time switches installed to
❑Complies Requirement will be met.
[PL3]1
automatically switch off the
❑Does Not
recirculating hot-water system or heat
[]Not Observable
trace.
❑Not Applicable,
Additional Comments/Assumptions:
1 JHigh Impact (Tier 1) ,,�JlMedium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Campus Courtyard Apartments Report date: 07/07/16
Data filename: Page 10 of 17
Section
#
Mechanical Rough -In Inspection
Complies?
Comments/Assumptions
& Re .ID
C402.4.5.
Stair and elevator shaft vents have❑Complies
Exception: Requirement does not apply.
1
motorized dampers that automatically❑Does Not
[ME313
close. []Not Observable
[]Not Applicable
C402.4.5.
Outdoor air and exhaust systems have ❑Complies
Exception: Requirement does not apply.
2
motorized dampers that automatically ❑Does Not
[ME58]3
shut when not in use and meet ❑Not Observable
,gravity
maximum leakage rates. Check
dampers where allowed. ❑Not Applicable
C403.2.8 ;Thermally
ineffective panel surfaces of ❑Complies
Requirement will be met.
[ME41]3 'sensible
heating panels have ❑Does Not
insulation >= R-3.5. ❑Not Observable
❑Not Applicable
C408.2.2. IAir
outlets and zone terminal devices❑Complies
Exception: Requirement does not apply.
1 -.
have means for air balancing. Not
[ME5313❑Not
Observable
❑Not Applicable
C403.4.2 :VAV
fan motors >=7.5 hp to be driven ❑Complies
Exception: Requirement does not apply.
[ME66]2 '.
by variable speed drive, have a vane -❑Does Not
;axial
fan with variable pitch blades, or❑Not Observable
have controls to Ilmit fan motor
demand. ❑Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Campus Courtyard Apartments Report date: 07/07/16
Data filename: Page 11 of 17
Section
#
Rough -In Electrical Inspection
Compiles?
Comments/Assumptions
& Re .ID
C405.2.2.
Automatic controls to shut off all❑Complies
'..
Requirement will be met.
1
building lighting installed in all
❑Does Not
[EL22]2
buildings.
[]Not Observable'.
❑Not Applicable
C405.2.1.
Independent lighting controls installed
❑Complies
Requirement will be met.
1
per approved lighting plans and all
❑Does Not
[EL23]2
manual controls readily accessible and
❑Not Observable
visible to occupants.
❑Not Applicable
C405.2.1.
Lighting controls installed to uniformly
❑Complies
Exception: Sleeping units.
2
reduce the lighting load by at least
❑Does Not
[EL15]1
50%.
❑Not Observable'
❑Not Applicable
C405.2.2.
Daylight zones provided with❑Complies
Exception: Requirement does not apply.
3
individual controls that control the,❑Does
Not
[EL16]2
lights independent of general area❑
Not Observable'
.
lighting.
❑Not Applicable
C405.2.3
Sleeping units have at least one
❑Complies
Requirement will be met.
[EL17]3
master switch at the main entry door
❑Does Not
that controls wired luminaires and
❑Not Observable
:switched
receptacles.
❑Not Applicable
C405.2.2.
Occupancy sensors installed in
❑Complies
Requirement will be met.
2
required spaces.
[]Does Not
[EL1811
[]Not Observable
❑Not Applicable
C405.2.2.
Primary sidelighted areas are -❑Complies
Requirement will be met.
3!equipped
with required lighting
❑Does Not
[EL20]1 ;controls.
❑Not Observable
❑Not Applicable
C405.2.2. (Enclosed
spaces with daylight area❑Complies
Exception: Requirement does not apply.
3
under skylights and rooftop monitors❑Does
Not
[EL21]1,controls.
'
are equipped with required lighting❑Not
Observable
❑Not Applicable
C405.2.4 ',Automatic
lighting controls for exterior
❑Complies'Requirement
will be met.
[EL25]2 :lighting
installed.
❑Does Not
❑Not Observable!
❑Not Applicable
C405.2.3 '..Separate
lighting control devices for
❑Complies
Requirement will be met.
[EL4]1 'specific
uses installed per approved
❑Does Not
,lighting
plans.
❑Not Observable
❑Not Applicable
C405.3
Fluorescent luminaires with odd '..❑Compiles
Requirement will be met.
[EL1913
numbered lamp configurations that❑Does
Not
are within 10 feet center to center (if❑Not
Observable
recess mounted) or are within 1 foot
edge to edge (if pendant or surface '..❑Not
Applicable
mounted) shall be tandem wired.
C405.4
Exit signs do not exceed 5 watts per❑Complies
Exception: Requirement does not apply.
[EL6]1 'face.
❑Does Not
'..❑Not
Observable:
❑Not Applicable
11 High Impact (Tier 1) `^. Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Campus Courtyard Apartments Report date: 07/07/16
Data filename: Page 12 of 17
#
Rough -in Electrical Inspection
Complies?
Comments/Assumptions
& Re .ID
C405.6
'Exterior grounds lighting over 100 W
❑Complies Requirement will be met.
[EL2411
provides >60 Im/W unless on motion
❑Does Not
sensor or fixture is exempt from scope,
,,❑Not Observable
of code or from external LPD.
:❑Not Applicable
C405.2.3
(Additional interior lighting power..❑Complies
Requirement will be met.
[EL811
allowed for special functions per the❑Does
Not
,approved lighting plans and is❑Not
Observable'.
lautomatically controlled and
separated from general lighting.
'..❑Not Applicable
Additional Comments/Assumptions:
111 High Impact (Tier 1) 1 Z-1 Medium Impact (Tier 2) 11(..1 Low Impact (Tier 3)
Project Title: Campus Courtyard Apartments Report date: 07/07/16
Data filename: Page 13 of 17
Section
#
Insulation InspectionComplies?
Comments/Assumptions
& Re .ID
C402.4.1.
All sources of air leakage in the
❑Complies
Requirement will be met.
1
building thermal envelope are sealed,
❑Does Not
[IN111
caulked, gasketed, weather stripped
❑Not Observable:
or wrapped with moisture vapor-
permeable wrapping material to
[]Not Applicable
minimize air leakage.
0402.4.2.
Roof R -value. For some ceiling❑Complies
See the Envelope Assemblies table forvalues.
1
verification may need to
❑Does Not
.systems,
[IN211
occur during Framing Inspection.
'.❑Not
Observable
❑Not Applicable
C303.2
Roof insulation Installed per❑Complies
Requirement will be met.
[IN311
manufacturer's instructions. Blown or -.❑Does
Not
poured loose -fill insulation is installed❑Not
Observable
only where the roof slope is <=3 in
12.
❑Not Applicable
C303.2 (Above
-grade wall insulation installed
❑Complies
Requirement will be met.
[IN711
per manufacturer's instructions.
❑Does Not
❑Not Observable
❑Not Applicable
C402.2.5
Floor insulation R -value.
❑Compiles
See the Envelope Assemblies table for values.
[IN8]2
❑Does Not
❑Not Observable
❑Not Applicable
C303.2 'Floor
insulation installed per❑Complies
Requirement will be met.
[IN912 'manufacturer's
instructions. -',❑Does
Not
❑Not Observable
❑Not Applicable
C303.1
Building envelope insulation is labeled
[Complies
Requirement will be met.
[IN10]'
with R -value or insulation certificate❑Does
Not
providing R -value and other relevant
❑Not Observable.
data.
❑Not Applicable
C303.2.1
Exterior insulation is protected from
❑Complies
Requirement will be met.
[IN1412 !damage
with a protective material.
❑Does Not
'Verification
for exposed foundation
rvabl
❑Not Observable
;
insulation may need to occur during
❑Not Applicable
Foundation Inspection.
C402.2.1 :Insulation
intended to meet the roof
❑Complies
Requirement will be met.
[IN17]3
insulation requirements cannot be
❑Does Not
installed on top of a suspended
❑Not Observable
ceiling. Mark this requirement
compliant if insulation is Installed❑Not
Applicable
accordingly,
Additional Comments/Assumptions:
1 IHigh Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: Campus Courtyard Apartments Report date: 07/07/16
Data filename: Page 14 of 17
Section
#
Final InspectionCompiles?
Comments/Assumptions
& Re .ID
C402.4.6',
Weatherseals installed on all loading
❑Complies
Exception: Requirement does not apply.
[FI3711
.dock cargo doors.
[]Does Not
❑Not Observable
❑Not Applicable
C404.3
Public lavatory faucet water '..❑Complies
Requirement will be met.
(FI 11]3
temperature <=110°F.❑Does
Not
'❑Not
Observable
❑Not Applicable
C404.5 ;All
piping in circulating system
❑Complies
.Exception: Requirement does not apply.
[FI25]2
insulated
❑Does Not
[]Not Observable
❑Not Applicable
C404.6
Controls are installed that limit the '..❑Complies
Requirement will be met.
[F]12]3
operation of a recirculation pump
❑Does Not
!installed
to maintain temperature of a❑Not
storage tank.
Observable
[]Not Applicable
C402.4.8 'Recessed
luminaires in thermal
❑Complies
:Requirement will be met.
[F126]3
envelope to limit infiltration and be IC
❑Does Not
rated and labeled. Seal between
Not Observable
interior finish and luminaire housing
❑Not Applicable
C408.2.5.
Furnished as -built drawings for
❑Complies'.
Requirement will be met.
1
electric power systems within 30 days
❑Does Not
[FI1613
of system acceptance.
❑Not Observable
❑Not Applicable
C303.3,
Furnished 0&M Instructions for❑Complies
'..
Requirement will be met.
C408.2.5. 'systems
and equipment to the
❑Does Not
2;
[FI17]3
building owner or designated
representative.
❑Not Observable
❑Not Applicable.
C405.5.2
Interior installed lamp and fixture
❑Complies
see the Interior Lighting fixture schedule for values.
[F]18]1
lighting power is consistent with what
❑Does Not
is shown on the approved lighting ',..❑Not
plans, demonstrating proposed watts
Observable
are less than or equal to allowed '..❑Not
Applicable',
watts.
C405.6.2
Exterior lighting power is consistent
❑Complies
See the Interior Lighting fixture schedule for values.
[FI19]1 ;with
what is shown on the approved
❑Does Not
,lighting
'proposed
plans, demonstrating
watts are less than or equal
ervabl
❑Not Observable
rvabl
to allowed watts.
❑Not Applicable
C408.3
Lighting systems have been tested to
❑Complies
Requirement will be met.
[FI3311
ensure proper calibration, adjustment,
❑Does Not
programming, and operation,
[]Not Observable
❑Not Applicable
C408.3 :Lighting
systems have been tested to
❑Complies
Requirement will be met.
[F148]1 :ensure
proper calibration, adjustment,❑Does
Not
,;programming,
and operation.,❑Not
Observable
❑Not Applicable
C406 :,Efficient
HVAC performance, efficient
❑Complies
Requirement will be met.
[FI3411
lighting system, or on-site supply of ',.❑Does
Not
..
!what
renewable energy consistent with❑Not
is shown the approved plans. '..❑Not
Observable
Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 1,$-'ILow Impact (Tier 3)
Project Title: Campus Courtyard Apartments Report date: 07/07/16
Data filename: Page 15 of 17
11 High Impact (Tier 1) ` «: Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Campus Courtyard Apartments Report date: 07/07/16
Data filename: Page 16 of 17
Project Title: Campus Courtyard Apartments Report date: 07/07/16
Data filename: Page 17 of 17