HomeMy WebLinkAboutTRUSS SPECS - 16-00689 - Central Storage - New UnitsScale=1:90.0
3.00 12 5x6 = '
60 14 15 16 17 18 61
4x6 = 58 57 56 55 54 53 52 51 5049 48 47 46 45 44 43 42 M 40 39 3837 36 35 34 33 32 4x6 =
3x6 = 5x6 = 3.6 =
Plate Offsets (X,1)--
f45:0-3-0,0-3-01
LOADING (psf)
SPACING- 2-0-0
CSI-
DEFL
in
(Ice)
Well
L/d
PLATES
GRIP
TCLL 35.0
Plate Grip DOL 1.15
TC 0.04
Vert(LL)
0.00
30
air
120
MT20
220/195
TCDL 8.0
Lumber DOL 1.15
BC 0.03
Vert(TL)
0.00
31
Nr
120
BCLL 0.0
Rep Stress Incr YES
WB 0.14
Horz(TL)
0.00
30
n/a
nta
BCDL 8.0
Code IRC2012/TPI2007
Matrix -R
Weight:317Ib
FT=O%
LUMBER- BRACING -
TOP CHORD 2x6 DF 180OF 1.6E TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins.
BOT CHORD 2x4 DF 180OF 1.6E or 2x4 OF No.1&Btr BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
OTHERS 2x4 DF Stud/Std MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
RFJICTIONS. All bearings 54-8-0. Installation guide.
11b) - Max Horz2=47(LC 10)
Max Uplift All uplift 100 Ib or less at joint(s) 2, 46, 47, 48, 49, 50, 52, 53, 54, 55, 56, 57, 58,44, 43, 42, 41,
40, 38, 37, 36, 35, 34, 33, 32, 30
Max Gmv All reactions 250 lb or less atjoint(s) 45, 46, 47, 48, 49, 50, 52, 53, 54, 55, 56, 57, 44, 43, 42, 41,
40, 38, 37, 36, 35, 34, 33 except 2=251(LC 1), 58=316(LC 21), 32=08(LC 22), 30=251(LC 1)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (Ib) or less except when shown.
WEBS 3-58-263/1136,29-32=263/136
NOTES-
11
OTES1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vuit=115mph (3 -second gust) V(IRC2012)=91mph; TCDL=4.2psh BCDL=4.2psf; h=25ft; 6=45ft; L=55ft; eave_21t
Cat. ll; Exp B; enclosed; MWFRS (directional) and C -C C rmer(3) -1-0-11 to 44-15, Exterior(2) 4-4-15 to 274-0, Comer(3) 2711-0 to
32-9-10 zone; cantilever left and right exposed ; end vertical left and right exposedC-C for members and forces & MWFRS for reactions
shown; Lumbar DOL --1.60 plate grip DOL=1.60
3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (name[ to the face), see Standard Industry
Gable End Details as applicable, or consult qualified building designer as per ANSIRPI 1.
4) All plates are 2x4 MT20 unless otherwise indicated.
5) Gable requires continuous bottom chord bearing.
6) Gable studs spaced at 2-0-0 oc.
7) This two has been designed for a 10.0 Pat bottom chord live load nonconcurrent with any other live loads.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 Ib uplift at joint(s) 2, 46, 47, 48, 49, 50,
52, 53, 54, 55, 56, 57, 58, 44, 43, 42, 41, 40, 38, 37, 36, 35, 34, 33, 32, 30.
9) This truss is designed in accordance with the 2012 International Residential Code sections R502.11.1 and R802.10.2 and referenced
standard ANSI/TPI 1.
LOAD CASE(S) Standar)
1;
19
3x6 =
3. 00 12
4x4
6 21
18 17
5x10 M78SH5=
3x6 =
5x6 =
6
�
\ 4x4
II �� 22 7
16
5x10 M78SH5=
15 14
3x6 =
5x10 M18SH3=
13
3x6 =
Scale- 1:69.6
1112 N
LA
504= c
LOADING (psf) SPACING- 2-0-0
TCLL 35.0 Plate Grip DOL 1.15
CSI.
DEFT4061t=
H Ud
8.0 Lumber DOL 7.75
0.0
TC 0.73
BC 0.93
Vert(LL)0
Ved(iL)7
pl-p7ES GNPTCDL
300 MT20 220/795BCLL
Rep Stress incr YES
8.0 Code IRC2012/TP12---
WB 0-94
Horz(fL)a
2qg M78SHS 220/195BCDL
NaMatdx-R
LUMBER-
Wind(LL)9
240 Weight:2791b FT=O%
TQP CHORD 2x6 DF 1800E 1.6E
BRACING.
BOT CHORD 2x4 DF 2409F 2.0E
TOP CHORD
Structural wood sheathing directly applied 2-2.0
WEBS 2x4 DF Stud/Std
BOTCHORD
or oc pudins.
Rigid ceiling directly applied or 2-2-0 oc bracing.
WEBS
1 Row at midpt 7-1615-16
I 1 recommends that S14bilizere and required cross bracing
bet during tntss erection, in
REAC710NS. (Ib/size) 1=2772/Mechanical, 11-21385/0-5-8
(min. 0-2-14)
accordance with Stabilizer
Installation guide.
Max Horz 1=-47(LC 10)
Max Upliftl=-156(LC 12), 11-190(LC 12)
FORCES. (Ib) - Max. Comp.Hvtax. Ten. -All forces 250 (lb) or less except when shown. a
TOP CHORD 1 -20 -9330111291-"22!5/837,2-3--8856/754,3.4=-87781761,4-5-73791660,
5-21--5724/555, 6-21-5601/567, 6-225601/560, 7-22--5724/548, 7-8--7343/658.
8-9=-8633!714,9-10=-87121707,10-23=9054/775,11-23.-9132/767
BOT CHORD 1-19-766/8953, 18-19=626/7967, 17-18-62617967, 16-17-511/6729, 15-16=-519/6705,
14-15=621/7897, 13-14.-621/7897, 11-13— 700/8746
WEBS 6-16-13012122, 7-16=1620/173 7-15-191926. it -15-111161140,8-113-2(740 ,
10-13=-516/125,5-16=-1647/1761.5-17-2"51, 4-17=-11531150,4-19--29/82b,
2-19-591/152
NOTES -
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; WIWI15mph (3 -second gust) V(IRC2012)=91 mph; TCDL.4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=55ft; eave=Bftt
Cat. Ii; Exp B; enclosed; MWFRS (directional) and C -C Ededor(2) 0-0-12 t0 5-6-6, Intedor(1) 5-6-6 to 27-4-0, Ederior(2) 27-4-0 to
32.9-10 zone. can8lever left and dgM ezp^sed ; end ver8gi left and right exposedC-C for members and forces &MWFRS for reactions
shown; Lumber DOL=1.60 plate gdp DOL=1.60
3) All plates are MT20 plates unless otherwise indicated.
4) This truss has been designed fora 10.0 psf bottom chord live load nonconcument with any other live loads.
5) Peter fo girder(s) for truss to truss connections.
6) Provide mechanical connection (by others) of tmss to bearing plate capable of withstanding 100 Ib upliR at jomf(s) except (jt=1b)1=156,
71=180.
7) This truss is designed in ccendncewiththe2012 International Residential Code sections R502.11.1 and R802.10.2 and referenced
standard ANSI/TPI 1.
LOAD CASE(S) Standard
Scale: Vit"=v
3.00 12 5x6 =
4x4 0 7 4x4
5x6 4x4 = 6 92238
5 44 = 5x6 a
2x4 J 4 9
3 W WS 10 20
21 11
1 2 24
7213
5x10 MIBSHS= 20 19 18 16 15 14 5x10 M185HS=
17
3ffi= 5x10 M78SHS= 5xi0MIBSHS= 316= 3x6=
3x6 — 5x10 M18SHS=
9-10.n I 1&7-0I 27-4-0 I 3&1-0 4410-0 __.1 54$-0
_Plate Offsets (XY)—
12:04A2.Edeel (7.0-3-0,0-2-121 [12-0-1-12 Edoel [77:0-5-0 0-3-01
— 07VA ......
LOADING (pso35.0
TCLL 35.0
SPACING- 2-0-0
Plate Grip DOL 1.15
5 /
DEFL
in
poc)
Wall
Ud
PLATES
GRIP
GRIP
TCLL 8.0
Lumber DOL 1.15
TC 0.68
BC 0.90
Vert(LL)
Vert(TL)
-1.18
17
>582
960
Mi20
5
BCLL 0.0
Rep Stress lncr YES
WB 0.93
Horz(TL)
-2.0117-18
0.56
12
>324
240
M18SHS
220/195
BCDL 8.0
Code IRC2012/TP12007
Matrix -R
Wind(LL)
0.37
17
n1a
>999
Na
240
Weight: 2821b
FT=0%
TOP CHORD 2x6 DF 1800F 1.6E BRACING -
BOT CHORD 2x4 DF 240OF 2.0E TOP CHORD
WEBS 2x4 DF Stud(Std BOT CHORD
WEBS
REACTIONS. (Ib/size) 2=2875/0-5-8 (min. 0-2-14),12--2875/0-5-8 (min. 0-2-14)
Max Horz 2=47(LC 11)
Max Uplitt2=-789(LC 12), 12=-189(LC 12)
FORCES. (lb) - Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. C
TOP CHORD 2 -21= -9096f764,3 -21--9018f771'
3-4= 8675(704, 48=8596!717, 5-6-73041648,
6-22=-5685/545, 7-22=8562/557, 7-23— 5562/557, 8-23=-5685/545, &9= 7304/648,
9-10= 85967717,10-11-8675f704,11-24-90181771, 12-24=-9096/764
BOT CHORD 2-20-698/8711, 19-20= 60977860, 18-19--6090860,1748= 506/6667,16-17=809/6667,
15-16=-61217860,14-15--612f7860, 12-14-695/8711
WEBS 7-17-725/2103, 8-17— 1621/174, &16=19/926, 9-16= 1116/140, 9-14=-2041,
11-14-517/125, 6-77-1627/174, 6-18-19/926, 5-18=-1116/140, 5-20-2/747,
3-20-517/125
Structural wood sheathing directly applied or 23-2 oc pudins.
Rigid ceiling directly applied or 9-11-9 oc bracing.
1 Row at micipt 8-17,6-17
beUK recommends that Stabilizers and required cross bmcing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
NOTES-
1)
OTES1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3 -second gust) V(IRC2012)=91 mph; TCDL=1.2psf; BCDL_-4.2psf; h=25ft; B-_458;1_-55H;,ave=6ft;
Cat. II; Exp B; enclosed; MW FRS (directional) and C -C Exteri0r(2) -1-0-1110 44-15, Interior(7) 4-415 to 27-4-0, Exterior(2) 27-4-0 to
325-10 zone; cantilever left and right exposed; end vertical left and right exposed;C-C for members and forces & MW FRS for reactions
shown; Lumber DOL=1.60 plate grip DOL -i.60
3) All plates are MT20 plates unless otherwise indicated.
4) This truss has been designed for a 10.0 psf bottom chord live load nonconcunent with any other live loads.
5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 Ib uplift at joint(s) except (#=1b) 2=189,
12-189.
6) This truss is designed in accordance with the 2012 International Residential Code sections R502.11.1 and R802.102 and referenced
standard ANSI/TPI 1.
LOAD CASE(S) Standard
N
d
8upporW Gable
Scale =1:66.6
bx6 =
4.00 12 12 13 14
38 37 36 35 34 33 32 31 so
5x6 = 5x6 =
29 28 27 26 4x8 =
LOADING (psf) SPAGNG- 2-0-0 CSI.
TCLL 35.0 Plate Gdp DOL 1.15 TC
EFL in (loc) I'd,APLATES
0.03
TCDL 8.0 Lumber DOL 1.15 BC 0.02
BCLL 0.0
GRIP
Vert(LL) -0.00 24 NrMT20 220/195
Vert(TL) -0.00
Rep Stress Incr YES
8.0 Code IRC2012RPI2007 WB 0.73
24 NrBCDL
Hom(TL) 0.00 24 Na
Matrix -R
LUMBER-
Weight: 235 lb FT = 0
TOP CHORD 2x6 OF 180OF 1.6E
BRACING -
BOT CHORD 2x4 OF 180OF 1.6E or 2x4 OF No.t&B(r
TOP CHORD Structural wood sheathing directly applied or 6.0.0 oc
OTHERS 2x4 OF Stud/Std
puffins.
ROT CHORD Rigid ceiling directly applied or 10-0-0 Oc bracing.
11 i rewmme1 1 that Stabilizers andrequired cross bracing
REACTIONS All bearings 40-0-0.
be installed during truss erection, in accordance with Stabilizer
Installation guide.
(Ib) - Max Horz 2= 67(LC 10)
Max Uplift All uplift 100 lb or less atjoint(s) 2, 36, 37, 38, 39, 40, 41, 42,
27, 26,
43, 44, 34, 33, 32, 31, 30, 29,
24
Max GfTV All reactions 250 Ib or less at joint(s) 2, 35, 36,
28,
37, 38, 39, 40,
29, 28, 27, 26, 24
41, 42, 43,44, 34, 33, 32, 31, 30,
s
FORCES. (Ib) - Max. Comp./Max. Ten. - All forces 250 (Ib) or less except when shown.
NOTES -
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; VUIt=115mph (3 -second gust) V(IRC2012)=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; 8=45ft; L=400; eave,2h;
Cat. 11; Exp B; enclosed; MWFRS (directional) and C -C COmer(3)-1-0-14 to 2-11-2, Exterior(2) 2-11-2 to 20-0-0, Comer(3) 20-0-0 to
24-0-0 zone; cantilever left and fight exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions
shown; Lumber DOL=1.60 plate grip DOL --1.6b
3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal 10 the face), we Standard Industry
Gable End Details as applicable, or consult qualified building designer as per ANSt/TPI 1.
4) All plates are 2x4 MT20 unless otherwise indicated.
5) Gable requires continuous bottom chord bearing.
6) Gable studs spaced at 2-0-0 oc.
7) This truss has been designed for a 10.0 pat bottom chord live load nonconcument with any other live loads.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift atjoint(s) 2, 36, 37, 38, 39, 40,
41, 42, 43, 44, 34, 33, 32, 31, 30, 29, 28, 27, 26, 24.
9) This truss is designed in accordance with the 2012 International Residen8al Code sections R502.11.1 and R802.10.2 and referenced
standard ANSI/TPI 1.
LOAD CASE(S) Standard
Job ;USS mss ypety Storage OnMWO(D)RP
13147-16 Al COMMONGIRDER 1 a
,10b Reference toollonall
Snake R T aC nnpon m, 1600 Fa11s, ID63401,R bMP x ga Run. 8.0205 Aug 12016 Pnm.9A20sAug ianb Srekl�useres,Inc. WeSeP2014:11232016 Paagge2
NOTES ID:i; y Uq eOgEvl3sFgDPZ"Dg-zW5?r87mux9FU0yDneOAo?wiSSJrDiOVuMWzUyb1CI
3) 4-plytmss to be connected togetherwith 10d (0.131'X3") nails as follows:
Top chords connected as follows: 2x6 - 2 rows staggered at 0-4-0 oc.
Bottom chords connected as follows: 1-1/2x11-7/8 - 6 rows staggered at 0-4-0 oc.
Webs connected as follows: 2x4 -2 rows staggered at 0-6-0 oc, Except member 17-7 2x4 -1 row at 0-9-0 oc, member 7-16 2x4 -1 row at 0-8-0 oc, member 16-8 2x4 -1 row at
0-9-0 oc, member 8-14 2x4 -1 row at 0-9-0 ac, member 14-9 2x4 -1 row at 0-9-0 oc, member 9-13 2x4 -1 row at 0-9-0 oc, member 13-10 2x4 -1 row a10-9-0 oc, member
10-12 2x4- 2 rows staggered at 04-0 oc, member 173 2x4 - i row at 0-9-0 M. member 5-18 2x4 - 2 rows staggered at 0-0-0 oc, member 18.42x4 -1 row at 0-9-0 oc, member
4-20 2x4 -1 row at 0.9-0 oc, member 20-3 2x4 -1 row at 0-9-0 oc, member 3-21 2x4 -1 row at 0-9-0 oc, member 21-22x4 -1 row at 0-9-0 oc, member 2-22 2x4 -1 row at 0-9-0
Go.
Attach BC w/ 1/2" diam. bolts (ASTM A307) in the center of the member w/washers at 4-0-0 oc.
4) All loads are considered equally applied to all plies, exempt 0 noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to
distribute only loads noted as (F) or (B), unless otherwise indicated.
5) Unbalanced roof live loads have been considered for this design.
6) Wind: ASCE 7-10; Vult=115mph (3 -second gust) V(IRC2012)=91 mph; TCDL=4.2psG BCDL=4.2psf; h=25ft; 8=45ft; L--40ft save=5ft; Cat. 11; Exp B; enclosed; MW FRS
(directional); cantilever left and right exposed; end vertical left and right exposed; Lumber DOL -1-60 plate grip DOL=1.60
7) All plates are MT20 plates unless otherwise indicated.
8) This truss has been designed for a 10.0 last bottom chord live load nonooncurrent with any other live loads.
9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 1579 lb uplift at joint land 1588 lb uplift atjoint 11.
10) This truss is designed in accordance with the 2012 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSVrP11.
11) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 2732 lb down and 196 Ib up at 2-0-12, 273P lb down and 198 lb up at
4-0-12, 273216 down and 196 lb up at 6-0-12,2732 lb down and 196 lb up at 8-0-12,2732 lb down and 198 lb up at 10-0-12,2732 It, down and 196 lb up at 12-0-12,2732
Ib down and 1981b up et 14-0-12, 27321b down and 1961b up at 16-0-12,2732 Jbdown and 1961b up at 18-0-12, 2732 Ib down and 19616 up et 20-0-12, 27321b down and
1961b up at 22-0-12, 27321b down and 196 lb up at 24-0-12, 27321b down and 1961b up at 26-0-12, 2732lb down and 196 Ib up at 28-0-12.2732 Ib down and 19616 up at
30-0-12, 27321b down and 196 Ib up at 32-0-12, 27321b down and 196 Ib up at 34-0-12, and 27321b down and 1961b up at 36-0-12, and 27321b doom and 1961b up at
38-0-12 on bottom chord. The design/selection of such connection device(s) is the responsibility of others.
LOAD CASE(S) Standard
1) Dead +Roof Live (balanced): Lumber Increase=l.l5, Plate Increase --1.15
Uniform Loads (pit)
Vert: 1-6=-43. 6-11--43.1-11-40
Concentrated Loads (1b)
Vert: 19=-2732(8)17_ 2732(B)15= 2732(8) 23=-2732(6) 24--2732(B) 25-2732(B) 26=-2732(B) 27=-2732(B) 28=-2732(B) 29-2732(6) 30=2732(8) 31=-2732(6)
32=2732(8) 33=2732(6) 34=-2732(8) 35=-2732(8) 36-2732(8) 37=-2732(8) 38-2732(B)
8x16MI88HS=
i Run, 8:20s Au IW16Pdni
12 164-14 20.0-0 ID:poycUgba900EYISSF
3-72 2&7-2 27-2-4
3-7-2 3.7-2 3-7 2
4-00 V2 5x10 M78SHS II
4x6 % 6
7x8 < /mom 46
&100 7x16MT18HS� 4
5x10 M78SHS
5x10 M78SHS 3
2
23 24 22 25 26 21 27
12x18 MT18HS= 1202=
3x6 If
7x8
8
2820 79 18 29 3U --�
17 31 16 32 15 74 33
10x18 M78SHS= 7xl4M78SHSII 12x12=
8x10 =
8x10 = 12x12 = 10x16 M18SHS=
Scale =1:70.1
7x16 MT18HS¢
9
9x10 M78SHS_
10
8x16 M78SHS=
it
3413 ?12 38 37 38 b
12x12= 3x611
12x18 MT18HS=
LOADING SPACING- 1-0-0 1 L
TCLL
- - --"'
`•-•'-..vro-,c zcu-3-120-15
-'
35.0
35.0 Plate Gdp DOL 1.15
TCDL 8.0 Lumber DOL 1 15 TC 0.96
DEFL in
Vert(LL) -0.81
(loo) Well L/d
18 >5B4 360
PLATES GRIP
BCLL 0.0 BC 0.98
BCDL qp,p Rep Stress lncr NO WB 0.76
Code
Vert(TL) -1.39
Horz(TL) 0.29
i8 >3q3 240
MT20 137/130
M78SHS 737/130
IRC2012Rp12007 Matdx.SH
Wind(LL) 0.26
17 Na Na
18 >999
MT18HS 137/130
LUMBER- -
240
Weight: 172816 FT=O%
TOP CHORD 2x6 DF 1800F 1.6E 'Except' BRACING
T7: 2x6 DF 2400F 2.0E TOP CHORD
BOT CHORD 1-1/2x11.7/8 LP-LSL 1.75E BOT CHORD
Structural wood sheathing diway applied or 32-10 oc pudins-
Rigid ceiling directly applied 10-0-0
WEBS 2x4 DF Stud/Std *Except*
or oc bracing.
W9: 2x4 DF 2400E 2.0E
OF I 6E or 2x4 DF No. I&Btr
SLIDER eft 2X4 DF2OOFO20E16-8-1ZRight
2x4 DF 2400F 2.0E 6-8-12
REACTIONS- (lb/size) 1=27524/0-5-8 (min. 0-4-130 1=276 6 3/0-5-8 (min. 0-4-14) �r
Max Ho¢ 1= 31(LC 23)
Max UPIift7-1579(LC 8),11- 1588(LC 8)
FORCES. (Ib) -Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown.
TOP CHORD 1-2=75946/4365, 2.?= -71756/4132, 3-0-
61837/3576, 4-5- 53383/3092, 5-6--47039/2734,
6-7-47039/2734,7-8--53371/3091, 8-9-6188213573,9-10-71697/4129,
10-11-75932/4364
BOT CHORD 1 -23= -4184172963,23-24--4184172963,22-24=-4184/72963
-23=-0184!72963, 23-24=-4184/72963, 22-24=-4184/72963, 22-25=-4184/72963,
25-26-4184/72963,21-26_--4184/72963,21-27=-3843/67180,27-28=
3843/67180
20-28=5643/67180. 19-20= 3339/58532, 19-29-3339/SBW2, 18-29-3339/58532:
1830= 2876/50594, 1750= 2876/50594, 1751= 2875/50502,1651=-2875/50582,
1632-9336/58481, 1532-3336/58481,
14-15=3336158481, Y459-5840/67125,
3354_840/67125,1334=5840/67125, 1335=-4183/72952 3556--4183/7295
12
36= -4183f72952,12 -37=-4783/72952,3738=-4183/72952,71-38_--4183/72952
WEBS 6-17=-1658128777, 7-17-10462/611, 7-16--622/1 1 0 0 6, 8-76= 11-38 11, /728-14-863/117199 ,
9 -14 -10860/633,9 -13-694/12288,10-13-6311/371,10-02=-1963/133,5-17-10484/613,
5-18=-623/11028, 4-18--12246/714, 4-20= 666/11778, 3-20=-10864/634, 3-21= fi9q/12294,
2-21=-62661360,2-22= 1993(135
NOTES.
1) Special connection required to distribute bottom chord loads equally between all plies.
2) Special connection required to distribute web bads equally between all plies.
Continued on page 2
Scale =1:90.0
3.00 12 5x6 =
60 14 15 16 17 18 fit
wxb= ao br 5b bb 54 53 52 51 Qu 49 48 47 46 45 44 43 42 41 40 39 3837 36 35 34 33 32 46=
3x6= 5x6=
3x6 =
U
6
plate Offsets (X,Y)-
BRACING
f45:0-3-0,0-3-01
TOP CHORD 2x6 DF 1800F 1.6E
TOP CHORD
Structural mod sheathing directly applied or 6-0-0 oc pudins.
BOT CHORD 2x4 DF 1800E 1.6E or 2x4 DF No.Y&Btr
BOT CHORD
Rigid ceiling directly 10-0-0
OTHERS 2x4 DF Stud/Std
LOADING (pst)
TCLL
applied or oc bracing.
SPACING 2-M
CSI.
DEFL
in
(fee)
1/def!
L/d
PLATES GWP
35.0
TCDL 8.0
Plate Grip DOL 1.15
Lumber DOL 1.15
TC 0.04
BC
Vert(LL)
0.00
30
ntr
120
MT20 220/195
BCLL 0.0
Rep Stress Incr YES
0.03
WB 0.14
Vert(TL)
Hom(TL)
0.00
0.00
31
30
n/r
n/a
120
n/a
BCDL 8.0
Code IRC2012/TPI2007
Matrix -R
Weight: 31716 FT = 0%
LUMBER-
BRACING
TOP CHORD 2x6 DF 1800F 1.6E
TOP CHORD
Structural mod sheathing directly applied or 6-0-0 oc pudins.
BOT CHORD 2x4 DF 1800E 1.6E or 2x4 DF No.Y&Btr
BOT CHORD
Rigid ceiling directly 10-0-0
OTHERS 2x4 DF Stud/Std
applied or oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
REACTIONS. All bearings 548-0.
Installation guide.
(fb) - Max Ho¢ 2= 47(LC 10)
Max Uplift All uplift 100 lb or less at joint(s) 2, 46, 47, 48, 49, 50, 52, 53, 54, 55, 56, 57, 58, 44, 43, 42, 41,
40, 38, 37, 36, 35, 34, 33, 32, 30
Max Grav All reactions 250 Ib or fess at joint(s) 45, 46, 47, 48, 49, 50, 52, 53, 54, 55, 56, 57, 44, 43, 42, 41,
40, 38, 37, 36, 35, 34, 33 except 2=251(LC 1), 58=316(LC 21), 32=Y76(LC 22), 30=251(LC 1)
FORCES. (lb) - Max. Comp./Max. Ten. - All tomes 250 (lb) or less except when shown.
WEBS "(1-2631136, 29-32-26&136
NOTES-
1)
OTES1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vuft=115mph (3 -second gust) V(IRC2012)=91 mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=55ft; eave=2h;
Cat. II; Exp B; enclosed; MWFRS (directional) and C -C Comer(3) -1-0-11 to 4-4-15, Exterior(2) 4-415 to 2740. Comer(3) 27-4-0 to
32-9-10 zone; cantilever left and right exposed ; end verges[ left and rightexposed;C-C for members and fomes & MWFRS for reactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry
Gable End Details as applicable, or consult qualified building designer as per ANSII TPI 1.
4) All plates are 2x4 MT20 unless otherwise indicated.
5) Gable requires conflnuous bottom chord bearing.
6) Gable studs spaced at 2-0-0 oc.
7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 46, 47, 48, 49, 50,
52, 53, 54, 55, 56, 57, 58, 44, 43, 42, 41, 40, 38, 37, 36, 35, 34, 33, 32, 30.
9) This truss is designed in accordance with the 2012 International Residential Code sections R502.11.1 and R802.10.2 and referenced
standard ANSVFPI 1.
LOAD CASE($) Standard
3.00F1_2 5x6 =
44 6
5 21
Sz6 � 4x4
4
2x4 �� 3 W5 1 3
2 2
1
504 = 19 18 17 16
3x6 = 5x10 M78SHS= Sx10 M18SHS=
3x6 =
Scale =1:89.6
4x4
227
4x4 5x6 x
8
9 2x4
10
23
1112 m
15 14 13
0
3x63x6 = 5x14 =
=
5210 M18SHS=
9-10-0 18-7-0 27-4-0 36-1-0
8-9-0 a_an 44-10-0 Sf-B-O
9-10-0
nate vnsers n r—
1:u -U -u U -U-0 f6:0-3-0,0-2-121,
11:0-0-0
0-04
16:0 5-0,03
0
WEBS
t Row at midpt 7-18,5-16
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
LOADING (psf)
TCLL 35.0
SPACING- 2-0-0
CSL
DEFL
in
(100)
Well
L/d
PLATES
GRIP
TCDL 8.0
Plate Grip DOL 1.15
Lumber DOL
TC
0.73
Vert(LL)
-1.19
16
>550
360
MT20
2201195
BCLL 0.0
1.15
Rep Stress Incr YES
BC
WB
0.93
Vert(TL)
-2.0616-17
>317
240
M18SHS
220/195
BCDL 8.0
Cade IRC2012(rPI2007
0.94
Matrix -R
Hom(TL)
Wind(LL)
0.57
0.38
11
16
We
We
>999
240
WeighC279lb
FT=O%
TOP CHORD 2x6 DF 1800E 1.6E
BOT CHORD 2x4 OF 2400F 2.0E
WEBS 2x4 DF Stud/Std
REACTIONS. (Ib/size) 1=2772/Mechanical,11=2885/0-5-8 (min. 0-2-14)
Max Hom 1=-47(LC 10)
Max UpIiR1= 1568 C 12), 11-190(LC 12)
BRACING-
TOPCHORD
Structural wood sheathing directly applied or 2-2-0 oc pudins.
BOT CHORD
Rigid ceiling directly applied or 2-2-0 oc bracing.
WEBS
t Row at midpt 7-18,5-16
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation ouride.
FORCES. (lb) - Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. a
TOP CHORD 1-20=-9330/829,2-20=92251837,2-3--8856/754,3-4=,8778f761, 45=-7379/660,
5-21-5724/555.6-21-5601/567.6-22---5601/560,7-22=-5724/54s, 7-8= 7343/658,
8-9-8633014,9-10-8712/707, 10-23=-90541775,11-23=-9132r767
BOT CHORD 1-19--766/8953,18-1 "2e/7967,17-18"28/7987. 16-17= 511/6729,15-16=-519/6705,
14-15-621/7897,13-14=-621/7697,11-13=-700/8746
WEBS 6-16=-130/2122,7-16= 1620/173,7-15- 19/926,8-15=-1116/140,8-13=-2(740,
10-13-5161125, 5-16=-16471176, 5-17- 261951, 417= 1153/150, 419= 29/820,
2-19=-591/152
NOTES -
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3 -second gust) V(IRC2012)=91mph; TCDL=4.2psQ BCDL=4.2psf; h=25ft; B-45ft; L=55ft; eave-6ft;
Cat. II; Exp 6; enclosed; MWFRS (directional) and C -C Exterior(2) 0-0-12 to 5-6-6, Interior(1) 5-6-6 to 27-4-0. Exterior(2) 27-4-0 to
32-9-10 zone; cantilever left and right exposed ; end vertical left and right exposed,"" for members and forces & MWFRS for reactions
shown; Lumber DOL --1.60 plate grip DOL -1.60
3) All plates areMT20 plates unless otherwise indicated.
4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5) Refer to girder(s) for truss to truss connections.
6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=Ib) 1=156,
11-190.
7) This truss is designed in accordance with the 2012 International Residential Code sections R502.11.1 and R802.10.2 and referenced
standard ANSViPI 1.
LOAD CASE(S) Standard
Scale: 1/8"=1'
3.00 12
4X4 %
5x6: 4x4: 6 22
5
2X4 O 4
3 W 5
21
u 1 2
BI
5x6 =
7
W
. .
4x4
238
4X4 x 5x6
9
10 2X4 i
11
24
1213
6
5x10 M18SHS= 20 19 1877
16 15
3x6 = 5X10 M16HS=
74
3X6 = 5X10 M18SHS=
3x6 —
5x10 M18SHS=
3X6 =
5x10 M18SHS=
9-10-0 18-7-0 27-40
9-10-0 8-40
36-1-0
4470.0 Sq -g0
Plate Offsets — 294-12 Ed a. 7:0-3-00-2-19, 12:0-1-12 Ed a 17:0-5-0.03-0l&�
eAO 9-t0.O
LOADING (psf) SPACING- 2-0-0 CSL
OEFL
TCLL 35.0 Plate Grip DOL 1.15 TC 0.68
Vert(LL)
in (too) Vdefl L/d PLATES GRIP
TCLL 8.0 Lumber DOL 1ES BC 0.90
-1.16 17 >562 360 MT20 220/195
Vert(TL) -2.0117-18
BCDL 0.0 Rep Stress Inch YES WB 0.93
BCDL
>324 240 M188HS 220/195
Hom(rL) 0.56 12
8.0 Code IRC20127rP12007 Matrix -R
n/a n1a
Wind(LL) 0.37 17
>999 240 Weight: 2821b FT=Oh
LUMBER-
TOP CHORD 2x6 DF 0F 1.6E
BRACING
BOT CHORD 2x4 F 240OF2.0E
24
TOP CHORD
Structural wood sheathing directly applied or 2-3-2 OG pudins.
WEBS 2x4 D
OF Stud/Std
BOTCHORD
Rigid ceiling directly applied or 9-11-9 oc bracing.
WEBS
1Row at midpt 8-17,6-17
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
REACTIONS. (Ib/size) 2=2875/05-8 (min. 0-2-14),12=2875/05-8 (min.0-2-14)
Installation guide,
Max Hoa 2=47(LC 11)
Max Uplift2-189(LC 12), 12>189(LC 12)
FORCES. (Ib) - Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. 0
TOP CHORD 2-21--9096(764, 3-21-9018,771, 3-4=-8675/704, 45= 8596/711, 55=-7304/648,
6-225085/545, 7-22=-5562/557, 7-23=-5562/557, 8-23= 5685/545, 8-9= 7304/648,
9-10-8596/711, 04,111-24=-90118/771 12-24---9096/764
BOT CHORD 2-20"98/8711, 19-20- 608n860, 18-1-"09/7860:17-18-506/6667,16-17-509/6667,
15-16=-612/7860,14-15-612t7860,12,14--695/8711
WEBS 7-17- 125/2103, 847= 1621/174, 8-16= 19!926, 9-16=-1116/140, 9-14= 27741,
11-14= 517/125, 6-17=-1621/174, 6-18-19/926, 5-18=-7116/140, 5-20=-21741,
3-20=5177125
NOTES -
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3 -second gust) V(IRC2012)=91mph; TCDL=4.2psf; 13CDL=4.2psf; h=25ft; B=450; L=55ft; eave=80;
Cat. II; Exp B; enclosed; MWFRS (directional) and C -C Extedor(2)-1-0-11 to 441,15, Interior(1) 4-4-15 to 27-4-0, Extedor(2) 27-4-0 to
32-9-10 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MW FRS for reactions
shown; Lumber DOL -1.60 plate grip DOL=1.60
3) All pfates are MT20 plates unless otherwise indicated.
4) This truss has been designed for a 10.0 psf bottom chard live load nonconcunent with any other live loads.
5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 Ib uplift at joint(s) except 61=1b) 2=188,
12=189.
6) This truss is designed in accordance with the 2012 International Residential Code sections R502.11.1 and R802.102 and referenced
standard ANSUTPI 1.
LOAD CASE(S) Standard
o
mss
mss yps ry
y
310MgeunnsW0fm)RP
8147146
AIG
Cam monsuppore41iable 1
1
LOADING (psf)
SPACING 2-"
CSI.
DEF.
------
Job Reference fopro ep
Scale =1:66.6
bxs =
4.00 12 12 13 14
4x6 = 4xa =
44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26
5x6 = 5x6 =
Plate Offsets (X Y)-
f33:0 -3 -0,0 -3 -OL f37 V-3-0 0-3-01
TOPCHORD 2x6 DF 180OF 1.6E
TOP CHORD Structural wood sheathing directly applied or 6-0-0 cc pudins.
BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Blr
BOT CHORD Rigid ceiling directly applied or 10-0-0 cc bracing.
OTHERS 2x4 DF Stud1Std
MITek recommends that Stabilizers and required cross bracing
LOADING (psf)
SPACING 2-"
CSI.
DEF.
in
(loc)
Well
Ud
PLATES GRIP
TCLL 35.0
Plate Grip DOL 1.15
TC 0.03
Vert(LL)
-0.00
24
rdr
120
MT20 2201195
TCDL 8.0
Lumber DOL 1.15
BC 0.02
Vert(TL)
-0.00
24
nfr
120
BCLL 0.0
Rep Stress lncr YES
WB 0.13
Horz(rL)
0.00
24
nfa
Na
BCDL 8.0
Code IRC2012JTP12007
Matrix -R
Weight235lb FT=O%
LUMBER-
BRACING-
RACINGTOP
TOPCHORD 2x6 DF 180OF 1.6E
TOP CHORD Structural wood sheathing directly applied or 6-0-0 cc pudins.
BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Blr
BOT CHORD Rigid ceiling directly applied or 10-0-0 cc bracing.
OTHERS 2x4 DF Stud1Std
MITek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
REACTIONS. All bearings 40.0-0.
Installation guide.
(Ib) - Max Horz 2=.67(LC 10)
Max Uplift All uplift 100 Ib or less at joint(s) 2, 36, 37, 38,
39, 40, 41, 42, 43, 44, 34, 33, 32, 31, 30, 29, 28,
27, 26, 24
Max Grav All reactions 250 Ib or less atjoint(s) 2, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 34, 33, 32, 31, 30,
29, 28, 27, 26, 24
o
FORCES. (lb) - Max. Comp./Max. Ten. -All fomes 250 (lb) or less except when shown-
NOTES -
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3 -second gust) V(IRC2012)=91 mph; TCDL-1.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=40ft; eave=2h;
Cat. II; Exp B; enclosed; MW FRS (directional) and C -C Comer(3)-1-0-14 to 2-11-2, Exterior(2) 2-11-2 to 20-0-0, Comer(3) 20-0-0 to
24-0-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C.0 for members and fomes & MW FRS for reactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3) Truss designed forwind loads in the plane of the from only. For studs exposed to wind (normal to the face), see Standard Industry
Gable End Details as applicable, or consult qualified building designer as per ANSIrrPI 1.
4) All plates are 2x4 MT20 unless otherwise indicated.
5) Gable requires continuous bottom chord bearing.
6) Gable studs spaced at 2-0-0 cc.
7) This truss has been designed for a 10.0 psf bottom chord live load nonconcunent with any other live loads.
8) Provide mechanical connection (by other:) of truss to bearing plate capable of withstanding 100 Ib uplift at joint(s) 2, 36, 37, 38, 39, 40,
41, 42, 43, 44, 34, 33, 32, 31, 30, 29, 28, 27,26.24. -
9) This truss Is designed in accordance with the 2012 International Residential Code sections R502.11.1 and R802A 0.2 and referenced
standard ANSIrTPI 1.
LOAD CASE(S) Standard
o mss runs lype Uly Fly A swrage unitsel20(M)HP
614TJ-16 Al cOMMONGIRDEfl 1 4 Job Reference o fi0na1
Slake Brver Tmssa Cpmponems, I4abo Fells, ID 83801, Ratan Petttngil Run:8.0205 Au 12m6PrinrH.0205Aug i mui ATekln4us m.1ne Tue5ep2014:112320t6 Pa 2
ID:1; y UgbAoEvt3sFpDpDojDg-z VV57r67mux9FUOyDneOAo7wJ5SJrDiQYUMWzUyolGl
3) 4 -ply tress to be connected togetherwith 10d (0.131"x3") nails as follows:
Top chords connected as follows: 2x6 - 2 rows staggered at 0-4-0 cc.
Bottom chords connected as follows: 1-1/2x11-7/8 - 6 rows staggered at 0-4-0 cc.
Webs connected as follows: 2x4 - 2 rows staggered at 0-6-0 cc, Except member 17-7 2x4 -1 row at 0-9.0 cc, member 7-162x4-1 row at 0-9-0 cc, member 16-8 2x4 -1 row at
0-9-0 cc, member 8-14 2x4 -1 row at 0-9-0 cc, member 14-9 2x4 -1 row at 0-9-0 cc, member 8-13 2x4 -1 row at 0-9-0 cc, member 13-10 2x4 -1 row at 0-9-0 cc, member
10-12 2x4 - 2 rows staggered at 0-40 oc, member 173 2x4 -1 row at 0-9-0oc, member 5-18 2x4 - 2 rows staggered at 0-" cc, member 18-4 2x4 -1 row at 0-9-0 oc, member
4-20 20 -1 row at 0-9-0 oc, member 203 2x4 -1 row at 0-9-0 cc, member 3-21 2x4 -1 row at 0-9-0 cc, member 21-2 2x4 -1 row at 0-9-0 cc, member 2-22 2x4 -1 row, at 0-9.0
00.
Attach BC w/ 1/2" diam. bolts (ASTM A307) in the center of the member w/washers at 4-" cc.
4) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections haw) been provided to
distribute only loads noted as (F) or (B), unless otherwise indicated.
5) Unbalanced roof live foods have been considered for this design.
6) Wind: ASCE 7-10; Vult=115mph (3 -second gust) V(IRC2012)=91mph; TCDL=4.2psf; BCDL=4.2psh h=25ft; B=45ft; L=40ft; eave=51t; Cat. 11; Exp B; enclosed; MW FRS
(directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60plate grip DOL=1.60
7) All plates are MT20 plates unless otherwise indicated.
8) This truss has been designed for a 10.0 Pat bottom chord live load nonconcurrent with any other live loads.
9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 1579 Ib uplift at joint 1 and 1588 lb uplift at joint 11.
10) This truss is designed in accordance with the 2012 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/FPI 1.
11) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(S) 273216 down and 198 lb up at 2-0-12, 273216 down and 19616 up at
40-12, 27321b down and 186 Ib up at 6-0-12,2732 lb down and 1961b up at 8-0-12, 273216 down and 1961b up at 10-0-12, 2732 b down and 196 Ib up at 12-0-12,2732
Ib down and 1961b up at 14-0-12,2732 lb down and 196 Ib up at 16-0-12,2732 Ib down and 196 lb up at 18-0-12,2732 Ib down and 196 lb up at 20-0-12, 273216 down and
1961b up at 22-0-12, 27321b down and 1961b up at 24-0-12, 27321b down and 196lb up at 26-0-12,2732 lb down and 19616 up at 28-0-12, 2732lb down and 196 Ib up at
30-0-12, 2732 lb down and 196 Ib up at 32-0-12, 273216 down and 196 lb up at 340-12, and 273216 down and 196 th up at 36-0-12, and 2732 to down and 196 lb up at
38-0-12 on bottom chord. The design/selection of such connection device(s) is the responsibility of others.
LOAD CASE(S) Standard
1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15
Uniform Loads (pit)
Vert: 1-6=-43, 6-11=-43, 1-11=-40
Concentrated Loads (lb)
Vert: 19=2732(6) 17=2732(13) 15— 2732(8) 23=-2732(8) 24--2732(B) 25=2732(8) 26=-2732(8) 27-2732(B) 28=-2732(8) 29=2732(8) 30=-2732(8) 31=-2732(8)
32-2732(B) 33--2732(B) 34--2732(B) 35=2732(8) 36=2732(8) 37=2732(8) 38-2732(B)
o
mss
toss ype
ry
y
TCLL 35.0
Storme Units9/2011D)RP
0141/-16
At
COMMONGSDER
1
12x12 =
4
Job Reference(optional)
snaxenry imss awm ne=.nanorail,ivawui,noonre gvi
400 12 5x10 M18SHS ll
4x6 S 4x6
7x8 % 7 7x8
8x10 G 7x16 MT18HS� 4 8
5x10 M18SHSi
5xI0M18SHSi 3% I )Ir
2
8x16 M18SHS=
1
7x16 MT18HS�
9
9x10 M18SHS�
10
Scale =1:70.1
8x16 Mi8SHS=
11
63 91
_.
L�J[T] _
DEFL in Poe) I/deb Ud
PLATES GRIP
TCLL 35.0
23 24 22 25
26 21 27
2820 19 18
29 30 t7 31 16 32 15 t4 33 3413 35 12 36 37 38 to 6
1208 MTIBHS=
12x12 =
10x16 M18SHS=
7x14 M18SHS I I 12x12 = 8x10 = 1202 = 3x6 II
3x611
BCLL 0.0
8x10= 12x12=
10x16 M118SHS= 1208 MT18HS=
LOADING (Ps1)
SPACING- 1-0-0
CSI.
DEFL in Poe) I/deb Ud
PLATES GRIP
TCLL 35.0
Plate Grip DOL 1.15
TC 0.96
Vert(LL) -0.81 18 >584 360
MT20 137/130
TCDL 8.0
Lumber DOL 1.15
BC 0.98
Vert(TL) -1.39 18 >343 240
M18SHS 137/130
BCLL 0.0
Rep Stress lncr NO
WB 0.76
Hom(TL) 029 11 n1a n/a
MT18HS 137/130
BCDL 40.0
Code IRC2012/TPI2007
MatdxSH
Wind(LL) 026 18 >999 240
Weight: 17281b FT=O%
LUMBER- BRACING -
TOP CHORD 2x6 OF 1800F 1.6E *Except* TOP CHORD Structural wood sheathing directly applied or 3-2-10 oc purlins.
T7: 2x6 OF 2400E 2.0E BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
BOT CHORD 1-1/2x11-7/8 LP-LSL 1.75E
WEBS 2x4 DF Stud/Std'Except`
W9:2x4 DF 2400F 2.0E
W7,W5,W3: 2x4 DF 1800F 1.6E or 2x4 OF No.18Btr
SLIDER Left 2x4 DF2400F 2.OE6-8-12, Right 2x4 DF 2400E 2.0E 6-8-12
REACTIONS (lb/sin) 1=27524/0-53 (min. 04-13),11=27663/0-5-8 (min. 04-14)
Max Horz 1=-31(LO 23)
Max Upliftl-1 579(LC 8), 11-1588(LC 8)
FORCES. (Ib) - Max. CompJMax. Ten. -All fomes 250 Pb) or less except when shown.
TOP CHORD 1 -2=-7594614365,2-3=-71756/4132,3-4--61937/3576.4-5=5338313092, "-4703W2734,
6-7--47039/2734.7-8=-53371/3091.8-9--6188213573, 9-10=-71697/4129,
10-11-7593214364
BOT CHORD 1-23= 4184/72963, 23-24--4184/72963, 22-24--4184172963, 22-25=-4184/72963,
25-26-4184172963. 21-26= 4184/12963, 21-27-3843/67180, 27-28=3843/67180,
20-28=3843/67180. 19-20— 3339/58532. 19-29--3339/58532, 18-29=3339/58532,
1830= 2876/50594, 1730= 2876/50594, 1731=-2875150582, 16-31= 2675/50582,
16-32--3336/58481, 15-32=-3336/58481,14-15---3336/58481,14-33=-3840/67125,
33-34 840/67125, 1334=3840167125, 1&35=-4183172952, 35-36=4183172952,
1236=-4183172952,1 237=-41 8 31729 5 2, 3 7-3 8=-41 8 31729 5 2, 11-38=-4183/72952
WEBS 6-17=1658/28777, 7-17--10462/611, 7d6=-622/11006, 8-16= 12187/711, 8-14=-663/11719,
9-14-10860/633, 9-13— 694/12288,10-13— 6311/371, 10-12= 1963/133, 5-17-104841613,
5-18= 623/11028, 4-18=-122461714, 4-20=-666/11778, 3-20-10864/634, 3-21-694/12294,
2-21-6266/368,2-22=-1993/135 ..
NOTES-
1)
OTES1) Special connection required to distribute bottom chord loads equally between all plies.
2) Special connection required to distribute web loads equally between all plies.
Continued on page 2
11 � -'
11
_ - -
11�
-- - - _ -
11
11�
- --- - - --- -11
11� _-_ --- -
-- -- -- - -11
11�
- --- II
-
- - II
11�
._
11�
II
11� - __ _
_ - - -_ - -11
11� - - -
11
11! -_ - _ ---
-- - I�
11�
II
ilk
II
11� _ _ -_ -
-- -11
11�
II
11�
--- - II
11�- --- -- -
-- -- -II
IIS -
__ - -------- II
11� - - _ -
- - - I�
.
II
i '.
11� -
- -
11�
-
11�
-- ---
�-
11�
-�
11�
�
11�
�
11� -- __ - �'
-_-
11�__ --_�
- ___
11�
�_
ilk _ _
-�
11�
-�
11�
�
iii
� `•
11� -
11�
! ,:.
11
_ - -- ---1►
11�--------
- - II
11� - - -- -
--- - 11
11�
_ _ II
IIS
-_-- - II
_
11� _
II
ilk
II
11� -
-- - -- II
11� - -
_ II
11� - -
II
iii
II
11�
- _ _ II
i.i
II
Ilr -
--- 1
IIS _ _ _ _ --
- ---II
11�
it
11�
- -_-il
11�
-- __-- II
11�
II
II
_
- II
:_