Loading...
HomeMy WebLinkAboutCOMCHECK - 17-00335 - 1069 Summers Dr - OfficesCOMcheck Software Version 4.0.3.0 Envelope Compliance Certificate Project Information Energy Code: 2012 ECC Project Title: Building 3 Location: Rexburg, Idaho Climate Zone: 6b Project Type: New Construction Vertical Glazing/ Wall Area: 20% Construction Site: Owner/Agent: Lot 13 Valley Wide Subdivision Rexburg, ID Building Area Floor Area 1 -Office : Nonresidential 3300 Designer/Contractor: Design Intelligence LLC Rexburg, ID Additional Efficiency Package High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist report. Envelope Assemblies Assembly Gross Area Cavity Cont. Proposed Budget U. or R -Value R -Value Ll -Factor Factor(.) Perimeter Roof 1: All -Wood Joist/Rafter/Truss, [Bldg. Use 1 - Office] 3300 38.0 0.0 0.027 0.021 Exterior Wall 1: Wood Frame, Any Spacing, [Bldg. Use 1 - Office] 2394 21.0 0.0 0.062 0.051 Window 1: Vinyl Frame:Double Pane with Low -E, Perf. Specs.: Product 372 --- --- 0.320 0.360 ID Window, SHGC 0.63, [Bldg. Use 1 - Office] (b) Window 2: Metal Frame:Fixed, Perf. Specs.: Product ID Window, SHGC 78 --- --- 0.320 0.360 0.63, [Bldg. Use 1 - Office] (b) Door 1: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. 40 --- --- 0.320 0.770 Specs.: Product ID Door, SHGC 0.70, [Bldg. Use 1 - Office] (b) Basement Wall 1: Solid Concrete:8" Thickness, Medium Density, 1440 13.0 0.0 0.077 0.108 Furring: Wood, Wall Ht 9.0, Depth B.G. 8.5, [Bldg. Use 1 - Office] Floor 1: Slab-On-Grade:Unheated, [Bldg. Use 1 - Office] (c) 160 --- --- 0.730 0.550 Floor 2: Wood -Framed, [Bldg. Use 1 - Office] 1714 38.0 0.0 0.026 0.033 (a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements. (b) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. (c) Slab -On -Grade proposed and budget U -factors shown in table are F -factors. Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.0.3.0 and to comply with the mandatory requirements listed in the Inspection Checklist. Project Title: Building 3 Report date: 06/21/17 Data filename: S:\Kris\Year 2017\2017-106 Building 3 (Boise)\Building3.cck Page 1 of 9 ame- Date Project Title: Building 3 Report date: 06/21/17 Data filename: S:\Kris\Year 2017\2017-106 Building 3 (Boice)\Building3.cck Page 2 of 9 1s( COMcheck Software Version 4.0.3.0 Inspection Checklist Energy Code: 2012 IECC Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Req.ID C103.2 'Plans and/or specifications provide all':❑Complies '.. [PR111 -information with which compliance -;❑Does Not 'can be determined for the building Observable'.. :envelope and document where -❑Not ❑Not Applicable exceptions to the standard are claimed. C402.3.1 The vertical fenestration area <= 30 ❑Complies [PR10]1 percent of the gross above -grade wall ❑Does Not area. '❑Not Observable'.. ❑Not Applicable 0402.3.1 The skylight area <= 3 percent of the '.❑Complies '.. [PR11]1 'gross roof area. ❑Does Not '..❑Not Observable'.. :.❑Not Applicable -. C402.3.2.Skylights in office, storage, _.❑Complies 2 automotive service, manufacturing, ❑Does Not [PR15]1 non -refrigerated warehouse, retail Observable store, and distribution/sorting area -❑Not ❑Not '.. have a measured haze value > 90 Applicable ;percent unless designed to exclude '.direct sunlight. Additional Comments/Assumptions: -- -) 1W h Impact (Tier 1) 2 Medium Impact (Tier 2) : 3 Low Impact (Tier 3) -- .......-- ... ---- ............. _l.__... Project Title: Building 3 Report date: 06/21/17 Data filename: S:\Kris\Year 2017\2017-106 Building 3 (Boice)\Building3.cck Page 3 of 9 # I Footing / Foundation Inspection C402.2.4 Below -grade wall insulation R -value. [FO 112 C303.2 : Below -grade wall insulation installed [FO2]2 iper manufacturer's instructions. C402.2.6 ;Slab edge insulation R -value. [FO3]2 C303.2 Slab edge insulation installed per [FO4]2 manufacturer's instructions. Complies? I Comments/Assumptions See the Envelope Assemblies table for values. ❑Does Not ❑Not Observable ❑Not Applicable --.LJDoes Not ❑Not Observable'. ❑Not Applicable ❑Complies See the Envelope Assemblies table for values. ❑Does Not '.. ❑Not Observable --. ❑Not Applicable !❑Complies - ❑Does Not ❑Not Observable' '..❑Not Applicable _2.6 Slab edge insulation depth/length. ❑Complies 'See the Envelope Assemblies table for values. ]2 Slab insulation extending away from❑Does Not building is covered by pavement or ❑Not Observable'- >= 10 inches of soil. C403.2.8. Exterior insulation protected against '.LJComplies 1 'damage, sunlight, moisture, wind, -'.❑Does Not [FO6]1 'landscaping and equipment maintenance activities. ❑Not Observable [:]Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) L27Medium Impact (Tier 2) 3 ILow Impact (Tier 3) ....t... .---- .. .--- ----. Project Title: Building 3 Report date: 06/21/17 Data filename: S:\Kris\Year 2017\2017-106 Building 3 (Boice)\Building3.cck Page 4 of 9 Section # Framing / Rough -in Inspection [­­ Complies? ­_ - I I ... ......... . . 11 ............. . .. ........ I--.—.--- — ------- C402.4.1, The building envelope contains a OComplies ------- — - - --- ------ -- - --------- C402.4.2 continuous air barrier that is sealed in DDoes Not (FR16)1 an approved manner and either C]Not Observable constructed or tested in an approved EINot Applicable manner. Air barrier penetrations are sealed in an approved manner. C402.4.3, Factory -built fenestration and doors ElComplies C402.4.4 are labeled as meeting air leakage ElDoes Not FR18 ]3 requirements. FlNot Observable ONot Applicable C402.4.7 Vestibules are installed on all building ElComplies FRI7 ]3 :entrances. Doors have self-closing ElDoes Not devices. E]Not Observable EINot Applicable C402.3.3, Vertical fenestration U -Factor. ElComplies See the Envelope Assemblies table for values. C402.3.4 ElDoes Not EINot Applicable C402.3.3 Vertical fenestration SHGC value. ElComplies See the Envelope Assemblies table for values. [-]Not Observable EINot Applicable C303.1.3 Fenestration products rated in ElComplies RNot Observable EJNot Applicable C303.1.3 Fenestration products are certified as ElComplies [FR13]1 to performance labels or certificates ElDoes Not provided. E]Not Observable EINot Applicable C402.2.7 LI -factor of opaque doors associated ElComplies See the Envelope Assemblies table for values. [FR14]2 with the building thermal envelope ElDoes Not meets requirements. [_-]Not Observable EINot Applicable Additional Comments/Assumptions: Ll_' High Impact (Tier 1) 2 Medium Impact (Tier 2) ow mpact T, Z Project Title: Building Report date: 06/1/I7 Data filename: S:\Kri$YearI0l7\20l7'l06Building ](8oice)\8ui|Uing3.cck Page 5vf 9 # Mechanical Rough -In Inspection Complies? ' Comments/Assumptions & Req.ID 0402.4.5. ;Stair and elevator shaft vents have ❑Complies 1 motorized dampers that automatically ❑Does Not [ME3]3 close. ❑Not Observable -_:_ -------- ❑Not Applicable C402.4.5. ........------ Outdoor air and exhaust systems have -- ---- -..- ........------------ ---- -------- . ❑Complies '.. 2 motorized dampers that automatically❑Does Not [ME58]3 shut when not in use and meet❑Not Observable maximum leakage rates. Check '..❑Not Applicable '.. gravity dampers where allowed. Additional Comments/Assumptions: _. —. - ii 1 ;High Impact (Tier 1) �2 �Medwm Impact (Tier 2)--T—_3TLow Impact _(_T]- e --r 3) Project Title: Building 3 Report date: 06/21/17 Data filename: S:\Kris\Year 2017\2017-106 Building 3 (Boice)\Building3.cck Page 6 of 9 section #Insulation Inspection Complies? Comments/Assumptions & Req .ID C402.4.1. All sources of air leakage in the .❑Complies 1 'building thermal envelope are sealed,❑Does Not [IN1]1 caulked, gasketed, weather stripped ❑Not Observable or wrapped with moisture vapor- ❑Not Applicable -permeable wrapping material to 'minimize air leakage. C402.4.2. 'Roof R -value. For some ceiling❑Complies 'See the envelope Assemblies table for values. 1 :systems, verification may need to []Does Not [IN2]1 ;occur during Framing Inspection. - '..❑Not Observable' ❑Not Applicable C303.2 Roof insulation Installed per❑Complies [IN3]1 manufacturer's instructions. Blown or❑Does Not poured loose -fill insulation is installed Observable'. only where the roof slope is <=3 in'❑Not ❑Not Applicable '.. 12. C303.2 .Above -grade wall insulation installed❑Complies [IN7]1 per manufacturer's instructions.❑Does Not ❑Not Observable' _ ____ _ -'❑Not Applicable C402.2.5 Floor insulation R -value -.❑Complies See the envelope Assemblies table for values. [IN8]2 ❑Does Not ❑Not Observable'. ❑Not Applicable C303.2 .Floor insulation installed per❑Complies [IN9]2 manufacturer's instructions.❑Does Not '..❑Not Observable'.. ❑Not Applicable C303.1 Building envelope insulation is labeled❑Complies '.. [IN10]2 with R -value or insulation certificate❑Does Not providing R -value and other relevant❑ Not Observable'.. data. ❑Not Applicable 0303.2.1 Exterior insulation is protected from❑Complies [IN14]2 damage with a protective material. ❑Does Not Verification for exposed foundation Observable insulation may need to occur during -❑Not Applicable -.. Foundation Inspection.❑Not C402.2.1 . Insulation intended to meet the roof ❑Complies [IN17]3 'insulation requirements cannot be ❑Does Not installed on top of a suspended Observable'. ceiling. Mark this requirement❑Not compliant if insulation is installed❑Not Applicable I. accordingly. Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) r3 Low Impact (Tier 3)11 Project Title: Building 3 Report date: 06/21/17 Data filename: 5:\Kris\Year 2017\2017-106 Building 3 (Boise)\Building3.cck Page 7 of 9 # I Final Inspection .4.6 Weatherseals installed on all loading 1' dock cargo doors. 2.4.8 Recessed luminaires in thermal 6]3 envelope to limit infiltration and be IC rated and labeled. Seal between interior finish and luminaire housing. Additional Comments/Assumptions: Complies? ❑Does Not ❑Not Observable L❑Not Applicable s Not Observable' Comments/Assumptions — - --- High Impact (Tier 1) 2 Medium Impact (Tier 2) ! 3 Low Impact (Tier 3) _..—.__. ... ------ --- — — ---.. ......__._.... --------. _....---------� Project Title: Building 3 Report date: 06/21/17 Data filename: S:\Kris\Year 2017\2017-106 Building 3 (Boise)\Building3.cck Page 8 of 9 Project Title: Building 3 Report date: 06/21/17 Data filename: 5:\Kris\Year 2017\2017-106 Building 3 (Boice)\Building3.cck Page 9 of 9