HomeMy WebLinkAboutCOMCHECK - 17-00335 - 1069 Summers Dr - OfficesCOMcheck Software Version 4.0.3.0
Envelope Compliance Certificate
Project Information
Energy Code:
2012 ECC
Project Title:
Building 3
Location:
Rexburg, Idaho
Climate Zone:
6b
Project Type:
New Construction
Vertical Glazing/ Wall Area:
20%
Construction Site: Owner/Agent:
Lot 13 Valley Wide Subdivision
Rexburg, ID
Building Area
Floor Area
1 -Office : Nonresidential 3300
Designer/Contractor:
Design Intelligence LLC
Rexburg, ID
Additional Efficiency Package
High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist
report.
Envelope Assemblies
Assembly
Gross Area
Cavity
Cont.
Proposed
Budget U.
or
R -Value
R -Value
Ll -Factor
Factor(.)
Perimeter
Roof 1: All -Wood Joist/Rafter/Truss, [Bldg. Use 1 - Office]
3300
38.0
0.0
0.027
0.021
Exterior Wall 1: Wood Frame, Any Spacing, [Bldg. Use 1 - Office]
2394
21.0
0.0
0.062
0.051
Window 1: Vinyl Frame:Double Pane with Low -E, Perf. Specs.: Product
372
---
---
0.320
0.360
ID Window, SHGC 0.63, [Bldg. Use 1 - Office] (b)
Window 2: Metal Frame:Fixed, Perf. Specs.: Product ID Window, SHGC
78
---
---
0.320
0.360
0.63, [Bldg. Use 1 - Office] (b)
Door 1: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf.
40
---
---
0.320
0.770
Specs.: Product ID Door, SHGC 0.70, [Bldg. Use 1 - Office] (b)
Basement Wall 1: Solid Concrete:8" Thickness, Medium Density,
1440
13.0
0.0
0.077
0.108
Furring: Wood, Wall Ht 9.0, Depth B.G. 8.5, [Bldg. Use 1 - Office]
Floor 1: Slab-On-Grade:Unheated, [Bldg. Use 1 - Office] (c)
160
---
---
0.730
0.550
Floor 2: Wood -Framed, [Bldg. Use 1 - Office]
1714
38.0
0.0
0.026
0.033
(a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements.
(b) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
(c) Slab -On -Grade proposed and budget U -factors shown in table are F -factors.
Envelope Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed envelope systems have been
designed to meet the 2012 IECC requirements in COMcheck Version 4.0.3.0 and to comply with the mandatory requirements
listed in the Inspection Checklist.
Project Title: Building 3 Report date: 06/21/17
Data filename: S:\Kris\Year 2017\2017-106 Building 3 (Boise)\Building3.cck Page 1 of 9
ame-
Date
Project Title: Building 3 Report date: 06/21/17
Data filename: S:\Kris\Year 2017\2017-106 Building 3 (Boice)\Building3.cck Page 2 of 9
1s( COMcheck Software Version 4.0.3.0
Inspection Checklist
Energy Code: 2012 IECC
Requirements: 0.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
#
Plan Review
Complies? Comments/Assumptions
& Req.ID
C103.2
'Plans and/or specifications provide all':❑Complies
'..
[PR111
-information with which compliance
-;❑Does Not
'can be determined for the building
Observable'..
:envelope and document where
-❑Not
❑Not Applicable
exceptions to the standard are
claimed.
C402.3.1
The vertical fenestration area <= 30
❑Complies
[PR10]1
percent of the gross above -grade wall
❑Does Not
area.
'❑Not Observable'..
❑Not Applicable
0402.3.1
The skylight area <= 3 percent of the
'.❑Complies '..
[PR11]1 'gross
roof area.
❑Does Not
'..❑Not Observable'..
:.❑Not Applicable -.
C402.3.2.Skylights
in office, storage,
_.❑Complies
2
automotive service, manufacturing,
❑Does Not
[PR15]1
non -refrigerated warehouse, retail
Observable
store, and distribution/sorting area
-❑Not
❑Not '..
have a measured haze value > 90
Applicable
;percent
unless designed to exclude
'.direct
sunlight.
Additional Comments/Assumptions:
-- -)
1W h Impact (Tier 1) 2 Medium Impact (Tier 2) : 3 Low Impact (Tier 3)
-- .......-- ... ---- ............. _l.__...
Project Title: Building 3 Report date: 06/21/17
Data filename: S:\Kris\Year 2017\2017-106 Building 3 (Boice)\Building3.cck Page 3 of 9
# I Footing / Foundation Inspection
C402.2.4 Below -grade wall insulation R -value.
[FO 112
C303.2 : Below -grade wall insulation installed
[FO2]2 iper manufacturer's instructions.
C402.2.6 ;Slab edge insulation R -value.
[FO3]2
C303.2 Slab edge insulation installed per
[FO4]2 manufacturer's instructions.
Complies? I Comments/Assumptions
See the Envelope Assemblies table for values.
❑Does Not
❑Not Observable
❑Not Applicable
--.LJDoes Not
❑Not Observable'.
❑Not Applicable
❑Complies See the Envelope Assemblies table for values.
❑Does Not '..
❑Not Observable --.
❑Not Applicable
!❑Complies -
❑Does Not
❑Not Observable'
'..❑Not Applicable
_2.6 Slab edge insulation depth/length. ❑Complies 'See the Envelope Assemblies table for values.
]2 Slab insulation extending away from❑Does Not
building is covered by pavement or ❑Not Observable'-
>= 10 inches of soil.
C403.2.8. Exterior insulation protected against '.LJComplies
1 'damage, sunlight, moisture, wind, -'.❑Does Not
[FO6]1 'landscaping and equipment
maintenance activities. ❑Not Observable
[:]Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1) L27Medium Impact (Tier 2) 3 ILow Impact (Tier 3)
....t... .---- .. .--- ----.
Project Title: Building 3 Report date: 06/21/17
Data filename: S:\Kris\Year 2017\2017-106 Building 3 (Boice)\Building3.cck Page 4 of 9
Section
#
Framing / Rough -in Inspection
[
Complies?
_ - I I
... ......... . . 11 ............. . .. ........ I--.—.--- — -------
C402.4.1,
The building envelope contains a
OComplies
------- — - - --- ------ -- - ---------
C402.4.2
continuous air barrier that is sealed in
DDoes Not
(FR16)1
an approved manner and either
C]Not Observable
constructed or tested in an approved
EINot Applicable
manner. Air barrier penetrations are
sealed in an approved manner.
C402.4.3,
Factory -built fenestration and doors
ElComplies
C402.4.4
are labeled as meeting air leakage
ElDoes Not
FR18 ]3
requirements.
FlNot Observable
ONot Applicable
C402.4.7
Vestibules are installed on all building
ElComplies
FRI7 ]3
:entrances. Doors have self-closing
ElDoes Not
devices.
E]Not Observable
EINot Applicable
C402.3.3,
Vertical fenestration U -Factor.
ElComplies
See the Envelope Assemblies table for values.
C402.3.4
ElDoes Not
EINot Applicable
C402.3.3
Vertical fenestration SHGC value.
ElComplies
See the Envelope Assemblies table for values.
[-]Not Observable
EINot Applicable
C303.1.3
Fenestration products rated in
ElComplies
RNot Observable
EJNot Applicable
C303.1.3
Fenestration products are certified as
ElComplies
[FR13]1
to performance labels or certificates
ElDoes Not
provided.
E]Not Observable
EINot Applicable
C402.2.7
LI -factor of opaque doors associated
ElComplies
See the Envelope Assemblies table for values.
[FR14]2
with the building thermal envelope
ElDoes Not
meets requirements.
[_-]Not Observable
EINot Applicable
Additional Comments/Assumptions:
Ll_' High Impact (Tier 1) 2 Medium Impact (Tier 2) ow mpact T, Z
Project Title: Building Report date: 06/1/I7
Data filename: S:\Kri$YearI0l7\20l7'l06Building ](8oice)\8ui|Uing3.cck Page 5vf 9
#
Mechanical Rough -In Inspection
Complies? ' Comments/Assumptions
& Req.ID
0402.4.5.
;Stair and elevator shaft vents have
❑Complies
1
motorized dampers that automatically
❑Does Not
[ME3]3
close.
❑Not Observable
-_:_
--------
❑Not Applicable
C402.4.5.
........------
Outdoor air and exhaust systems have
-- ---- -..- ........------------ ---- -------- .
❑Complies '..
2
motorized dampers that automatically❑Does
Not
[ME58]3
shut when not in use and meet❑Not
Observable
maximum leakage rates. Check
'..❑Not Applicable '..
gravity dampers where allowed.
Additional Comments/Assumptions:
_. —. -
ii 1 ;High Impact (Tier 1) �2 �Medwm Impact (Tier 2)--T—_3TLow Impact _(_T]- e --r 3)
Project Title: Building 3 Report date: 06/21/17
Data filename: S:\Kris\Year 2017\2017-106 Building 3 (Boice)\Building3.cck Page 6 of 9
section
#Insulation
Inspection
Complies? Comments/Assumptions
& Req .ID
C402.4.1.
All sources of air leakage in the
.❑Complies
1
'building thermal envelope are sealed,❑Does
Not
[IN1]1
caulked, gasketed, weather stripped
❑Not Observable
or wrapped with moisture vapor-
❑Not Applicable
-permeable wrapping material to
'minimize air leakage.
C402.4.2.
'Roof R -value. For some ceiling❑Complies
'See the envelope Assemblies table for values.
1
:systems, verification may need to
[]Does Not
[IN2]1
;occur during Framing Inspection.
-
'..❑Not Observable'
❑Not Applicable
C303.2
Roof insulation Installed per❑Complies
[IN3]1
manufacturer's instructions. Blown or❑Does
Not
poured loose -fill insulation is installed
Observable'.
only where the roof slope is <=3 in'❑Not
❑Not Applicable '..
12.
C303.2
.Above -grade wall insulation installed❑Complies
[IN7]1
per manufacturer's instructions.❑Does
Not
❑Not Observable'
_
____ _
-'❑Not Applicable
C402.2.5
Floor insulation R -value
-.❑Complies See the envelope Assemblies table for values.
[IN8]2
❑Does Not
❑Not Observable'.
❑Not Applicable
C303.2
.Floor insulation installed per❑Complies
[IN9]2
manufacturer's instructions.❑Does
Not
'..❑Not Observable'..
❑Not Applicable
C303.1
Building envelope insulation is labeled❑Complies
'..
[IN10]2
with R -value or insulation certificate❑Does
Not
providing R -value and other relevant❑
Not Observable'..
data.
❑Not Applicable
0303.2.1
Exterior insulation is protected from❑Complies
[IN14]2
damage with a protective material.
❑Does Not
Verification for exposed foundation
Observable
insulation may need to occur during
-❑Not
Applicable -..
Foundation Inspection.❑Not
C402.2.1
. Insulation intended to meet the roof
❑Complies
[IN17]3
'insulation requirements cannot be
❑Does Not
installed on top of a suspended
Observable'.
ceiling. Mark this requirement❑Not
compliant if insulation is installed❑Not
Applicable
I.
accordingly.
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) r3 Low Impact (Tier 3)11
Project Title: Building 3 Report date: 06/21/17
Data filename: 5:\Kris\Year 2017\2017-106 Building 3 (Boise)\Building3.cck Page 7 of 9
# I Final Inspection
.4.6 Weatherseals installed on all loading
1' dock cargo doors.
2.4.8 Recessed luminaires in thermal
6]3 envelope to limit infiltration and be IC
rated and labeled. Seal between
interior finish and luminaire housing.
Additional Comments/Assumptions:
Complies?
❑Does Not
❑Not Observable
L❑Not Applicable
s Not
Observable'
Comments/Assumptions
— - --- High Impact (Tier 1) 2 Medium Impact (Tier 2) ! 3 Low Impact (Tier 3)
_..—.__. ... ------ --- — — ---.. ......__._.... --------. _....---------�
Project Title: Building 3 Report date: 06/21/17
Data filename: S:\Kris\Year 2017\2017-106 Building 3 (Boise)\Building3.cck Page 8 of 9
Project Title: Building 3 Report date: 06/21/17
Data filename: 5:\Kris\Year 2017\2017-106 Building 3 (Boice)\Building3.cck Page 9 of 9