Loading...
HomeMy WebLinkAboutAPPLICATION -17-00248 - 875 S 5th W - 4-plex RelocationC I TY OF REXBURG ro, Amsrxad Famuly Community PERMIT POLICIES ACKNOWLEDGMENT Building Safety Department City of Rexburg 35 North ist East Rexburg, Idaho 83440 The City of Rexburg Building Safety Department is determined to provide excellent customer service. In an effort to help you understand the City of Rexburg Permit Policies, listed below are several policies which you are required to know prior to proceeding with your project. Any construction within the City of Rexburg which requires a permit shall not begin until an approved permit is obtained. If you do not have a Pink Building Permit signed by the Building Inspector, then you do not have an approved permit. 0 Building without the pink building permit signed by the Building Inspector will result in double fees to be assessed and the project to be red tagged. If your project is red tagged, halting all construction, only a City Initial: Official may remove the red tag. If the red tag is removed by anyone but a City Official, citations may be issued. No building may be occupied without receiving a signed Certificate of Occupancy. � If a building is occupied without receiving a signed Certificate of Occupancy, citations may be issued and the occupants may be evicted. Initials Scheduling inspections is the responsibility of the applicant and their contractor. Inspections need to be called into the hotline and not to the inspector. Inspections called in later than 8 AM will be scheduled for the following business day. o If an inspection is not done, the inspector may require any measures to be taken to allow him to correctly perform the inspection. (Example: If the electrical rough in inspection is not done and the sheetrock has been Initial, put up, the inspector may require the sheetrock to be removed in order to perform the electrical rough in inspection.) Construction on any project can begin ONLY when you have received a Pink Building Permit from the Building Department. Occupancy of any structure can begin ONLY when you have received an official Certificate of Occupancy from the Building Department. These documents must be signed by the appropriate authorities from the City of Rexburg. Any approvals can be verified by calling (208) 372-2341. o Even if you hear from an inspector that'you're good to go', ultimately if you do not have a Building Permit or Certificate of Occupancy, the above policies will be enforced. OIfIdIS It is your responsibility to inform anyone on your project of the above policies. All sub -contractors will be held to this standard with no exceptions. 0 ove policies will be enforced to all, regardless if this information is passed o to them or not. Applicant's Name (print) 5 CignaturA�A Date:L %6 ` fi 1 UI 17 Inspections must be called in before 8 AM on the day the inspection is requested. Inspection requests called in after 8 AM will be scheduled for the next business day. Inspection Hotline -(208)372.2344 www.rexburg.org Permit Technician -(208)372.2341 Revised 10/2016 CITY OF REXBURG OW Americas Family Community PROPERTY LINES Building Safety Department City of Rexburg 35 North 1st East Rexburg, Idaho 83440 Each site plan that is submitted to the City of Rexburg for the Building Permit process requires that property lines are shown accurately. It is the Developer's responsibility to correctly identify on the site plan the location of these lines in reference to the public right-of-way, other adjoining property lines, the street, other structures and all utility lines. The Developer should find property pins that are still available at the lot in question. If these pins do not exist or have become unrecognizable then a new survey should be performed. Accurate property line information is a must for a timely review. In addition to finding existing property pins, legal descriptions should be checked. The best way to identify property line location is with a land survey. The City of Rexburg has aerial photos and a parcel line layer that can be checked, but they are only a tool and are not guaranteed for accuracy. If you want to request a copy of your lot, see the front counter at the Community Development Department. I have read and understand the above requirements. t7 Signature D to �. c -- Printed Name Inspection Hotline -(208)372.2344 w .rexburg.org Permit Technician -(208)372.2341 Revised 10/2016 CITY OF REXBURG BUILDING PERMIT FORM F3 070 N uvdaim mums America's Family Community BUILDING APPLICATION New Multi family Residence Building Safety Department City of Rexburg 35 North Ist East Rexburg, Idaho 83440 For Office Use Permit Number: Zoning Application Fee: D $1000/Building 1. Prop Owner l Address: City: tate: i Code: Phone: ^ Email: 2. Applicant Name: Role: (Owner, Tenant, Contractor, etc.) 6 W4 - Address: City: State: Zip Code: Phone: Email: Contact/Rep. Name: 3. General Contractor Under Idaho Building Code, a r . ter d conttrra-c{I or ust do the work for a Multi family Residence. Name, YZlt) lr ;.is erl -�CI1 U )6 istr�tion #: Exp.: ?41-7 Address: �. city .4,� State: Zip Code- L Phone: Email: Contact/Rep. Name: Phone: Em General Contractor Authorized Signature: Dat A copy ofyour state registration/license is required to be on file. If this is the first time y ave e w kin the City of Re rg,Jase?rovide a photo copy ofyour license. Ifyou are unsure ifyour license is on flle, please check with the Permit Technician by calling (208) 372-2341. 4. Project Description lk Address: /�) Y� -OR- Lot #: _ Block #: _ Subdivision: Project Description: # of Buildings: # of Units: # of Water Meters: Water Meter Size(s): • # of Parking Stalls:' nom, • Estimated Cost: $ S0, l) V v • Proposed Use: 0 Dormitory Housing Non -Dormitory Housing • Construction Type (i.e. V'A, V6, etc.): Building Permit fees for multi family residences are charged based on square footage and the City's estimated valuation. The application fee applies towards the total fee. For details on how fees are calculated, contact the Building Department. There will also be a plan review fee totaling 10% of the building permit fee. APPLICANT'S SIGNATURE, CERTIFICATION AND AUTHORIZATION: Under penalty ofperjury, l hereby certify that l have read this application and state thatthe information herein is correct and I swear that any information which may hereafter be given by me in hearings before the Planning and Zoning Commission or the City Council for the City of Rexburg shall be truthful and correct. I agree to comply with all City regulations and State laws relating to the subject matter of this application and hereby authorized representatives of the City to enter upon the above-mentioned property for inspections purposes. NOTE: The building official may revoke a permit on approval issued under the provisions of the 2012 International Code in cases of any false statement or misrepresentation of fact in the application or on the plans on which the permit or as based. Permit void if not started within 180 days. Permit void if work stops for 180 days. .4 / Applicant's Name (print): Date: 5/1 7 Inspections must be called in before 8 AM on the day the inspection is requested. Inspection requests called in after 8 AM will be scheduled for the next business day. Inspection Hotline -(208)372.2344 1 www.rexburg.org Permit Tech nician-(208)372.2341 O4 HF %B UA.0 ys �y CITY OF V� REXBURG to America's Family Community SUBCONTRACTOR LIST Excavation & Earthwork: Concrete: Masonry: —W Insulation: Roofing: Insulation: Drywall: Painting: FloorCovering�s: iVV Plumbing: Heating: —� Electrical: \ h ( Special Construction (Manufacturer or Supplier) Roof Trusses: Floor/Ceiling Joists: _ Siding/Exterior Trim: Other: Building Safety Department City of Rexburg 35 North 1st East Rexburg, Idaho 83440 Inspection Hotline -(208)372.2344 www.rexburg.org Permit Technician -(208]372.2341 Revised 10/2016