HomeMy WebLinkAboutFlood Related Areas of ConcernFlood Related Areas of Concern
Area of Concern
Short Term - modifications
Long Term - Improvements
Ricks-Palmer Subdivision
Raise electrical Equip.
New Lift Station with fixed stand-by power
Install Manhole Pans where needed
New Pressure Line
Home owners to install backflow devices
Pipe Ditch along the east side of the school property
Monthly check on ditch and remove debris and record
Record any maintenance on the ditch
Check and fix access door gaskets on lift station access
Hidden Valley Subdivision
Acquire land where ditch is located
(Done August 21, 2014)
Fix wall at Leishman’s
Construct detention basin @ 7th S.
Change culvert at Berntsen’s
Scheduled maintenance on ditch and keep record of conditions
Change berm at North Hill Rd.
Construct additional storm basins above Hidden Valley
5th S. 2nd E.
Modify existing storm water detention basin in Eagle Wood
Work with Aspen Village on the construction of a storm water detention basin
Howe owners to raise window wells
Relocate shed at Kusch’s
Repair fence along North property line for Aspen Village
4th W. 6th S.
Purchase additional portable pumps for handling storm water
New 48” sewer drain line
Check all existing up-stream detention basins for functionally
BYU-I University
Review of all catch and storm basins
Detention systems?