Loading...
HomeMy WebLinkAbout2014 CITY COUNCIL PACKETSFlood Related Areas of Concern Area of Concern Short Term - modifications Long Term - Improvements  Ricks-Palmer Subdivision Raise electrical Equip. New Lift Station with fixed stand-by power   Install Manhole Pans where needed New Pressure Line   Home owners to install backflow devices Pipe Ditch along the east side of the school property   Monthly check on ditch and remove debris and record    Record any maintenance on the ditch    Check and fix access door gaskets on lift station access       Hidden Valley Subdivision Acquire land where ditch is located (Done August 21, 2014) Fix wall at Leishman’s   Construct detention basin @ 7th S. Change culvert at Berntsen’s   Scheduled maintenance on ditch and keep record of conditions Change berm at North Hill Rd.    Construct additional storm basins above Hidden Valley      5th S. 2nd E. Modify existing storm water detention basin in Eagle Wood Work with Aspen Village on the construction of a storm water detention basin   Howe owners to raise window wells    Relocate shed at Kusch’s    Repair fence along North property line for Aspen Village       4th W. 6th S. Purchase additional portable pumps for handling storm water New 48” sewer drain line   Check all existing up-stream detention basins for functionally   BYU-I University Review of all catch and storm basins    Detention systems?