HomeMy WebLinkAbout2nd E Bid ResultsOPTION #1 Depatco, Inc Item No. S.P. Page 5 810.4.1.A.1 2030.4.1.A.1 2030.4.1.C.1 OPTION #2 Item No. S.P. Page 2 810.4.1.A.1 2030.4.1.A.1 2030.4.1.C.1 Proposal 2a Item Description CRABS 3" Asphalt Surface Course Plant Mix (145 pcf) Adjust Manholes to Grade Adjust Water Valves to Grade Item Description Pulverize Existing Material 3" Asphalt Surface Course Plant Mix (145 pcf) Adjust Manholes to Grade Adjust Water Valves to Grade Unit SY TON EA EA Unit SY TON EA EA Bid Quantity 8400 1400 22 3 Bid Quantity 8400 1400 22 3 Unit Bid Price 5.9 75 1000 570 TOTAL Unit Bid Price 3.75 75 1000 570 TOTAL Bid Amount 49560 105000 22000 1710 178270 Bid Amount 31500 105000 22000 1710 160210 OPTION #1 HK Contractors Item No. S.P. Page 5 810.4.1.A.1 2030.4.1.A.1 2030.4.1.C.1 OPTION #2 Item No. S.P. Page 2 810.4.1.A.1 2030.4.1.A.1 2030.4.1.C.1 Item Description CRABS 3" Asphalt Surface Course Plant Mix (145 pcf) Adjust Manholes to Grade Adjust Water Valves to Grade Item Description Pulverize Existing Material 3" Asphalt Surface Course Plant Mix (145 pcf) Adjust Manholes to Grade Adjust Water Valves to Grade Unit SY TON EA EA Unit SY TON EA EA Bid Quantity 8400 1400 22 3 Bid Quantity 8400 1400 22 3 Unit Bid Price 7.5 110 1300 1250 TOTAL Unit Bid Price 4.5 110 1300 1250 TOTAL Bid Amount 63000 154000 28600 3750 249350 Bid Amount 37800 154000 28600 3750 224150 2nd East Reconstruction Final Costs DESCRIPTION Item No. 202.4.6.A.1 802.4.1.A.1 S.P. Page 8 S.P. Page 3 810.4.1.A.1 Note 1. Enough granular borrow was available from other locations on the project to meet most of the material needs. 2. Eliminated an inch of material to use the pulverized material more effectively. 3. Was able to match the existing driveways with new street elevation so item was eliminated. 4. Overage due to the thicker asphalt from Moody Road to south end of project. 5. Tonage came in less than what was estimated due to unit weight of material. Item Description Clearing and Grubbing Granular Borrow For Street Section 3/4" Minus Crushed Aggr. Base Removal and Installation of Asphalt Driveway Approach CRABS 3" Asphalt Surface Course Plant Mix (145 pcf) Total Unit SY CY CY EA SY TON Bid Quantity 8400 1400 Engineers Estimate Unit Bid Price 5.5 16 25 750 8 83 Total Bid Amount 67200 116200 HK Contractors Unit Bid Price 2.1 18.5 32 750 3.15 81 Total Bid Amount 26460 113400 Depatco Unit Bid Price 1.23 13.6 21.63 2021 6.52 76.7 Total Bid Amount 54768 107380 TMC Contractors Unit Bid Price 0.29 26 41 1345 6.5 106 Total Bid Amount 54600 148400 Actual Quantities 6500 60 600 0 14733 2350 HK Contractors Unit Bid Price 2.1 18.5 32 750 5.35 81 Amount Paid 13650 1110 19200 0 78821.55 190350 303131.55 (Savings) / Overage 52361.55 76950 Notes 1 2 3 4 5