HomeMy WebLinkAbout2nd E Bid ResultsOPTION #1 Depatco, Inc
Item No.
S.P. Page 5
810.4.1.A.1
2030.4.1.A.1
2030.4.1.C.1
OPTION #2
Item No.
S.P. Page 2
810.4.1.A.1
2030.4.1.A.1
2030.4.1.C.1
Proposal 2a
Item Description
CRABS
3" Asphalt Surface Course Plant Mix (145 pcf)
Adjust Manholes to Grade
Adjust Water Valves to Grade
Item Description
Pulverize Existing Material
3" Asphalt Surface Course Plant Mix (145 pcf)
Adjust Manholes to Grade
Adjust Water Valves to Grade
Unit
SY
TON
EA
EA
Unit
SY
TON
EA
EA
Bid Quantity
8400
1400
22
3
Bid Quantity
8400
1400
22
3
Unit Bid Price
5.9
75
1000
570
TOTAL
Unit Bid Price
3.75
75
1000
570
TOTAL
Bid Amount
49560
105000
22000
1710
178270
Bid Amount
31500
105000
22000
1710
160210
OPTION #1 HK Contractors
Item No.
S.P. Page 5
810.4.1.A.1
2030.4.1.A.1
2030.4.1.C.1
OPTION #2
Item No.
S.P. Page 2
810.4.1.A.1
2030.4.1.A.1
2030.4.1.C.1
Item Description
CRABS
3" Asphalt Surface Course Plant Mix (145 pcf)
Adjust Manholes to Grade
Adjust Water Valves to Grade
Item Description
Pulverize Existing Material
3" Asphalt Surface Course Plant Mix (145 pcf)
Adjust Manholes to Grade
Adjust Water Valves to Grade
Unit
SY
TON
EA
EA
Unit
SY
TON
EA
EA
Bid Quantity
8400
1400
22
3
Bid Quantity
8400
1400
22
3
Unit Bid Price
7.5
110
1300
1250
TOTAL
Unit Bid Price
4.5
110
1300
1250
TOTAL
Bid Amount
63000
154000
28600
3750
249350
Bid Amount
37800
154000
28600
3750
224150
2nd East Reconstruction Final Costs
DESCRIPTION
Item No.
202.4.6.A.1
802.4.1.A.1
S.P. Page 8
S.P. Page 3
810.4.1.A.1
Note
1. Enough granular borrow was available from other locations on the project to meet most of the material needs.
2. Eliminated an inch of material to use the pulverized material more effectively.
3. Was able to match the existing driveways with new street elevation so item was eliminated.
4. Overage due to the thicker asphalt from Moody Road to south end of project.
5. Tonage came in less than what was estimated due to unit weight of material.
Item Description
Clearing and Grubbing
Granular Borrow For Street Section
3/4" Minus Crushed Aggr. Base
Removal and Installation of Asphalt Driveway Approach
CRABS
3" Asphalt Surface Course Plant Mix (145 pcf)
Total
Unit
SY
CY
CY
EA
SY
TON
Bid Quantity
8400
1400
Engineers Estimate
Unit Bid Price
5.5
16
25
750
8
83
Total
Bid Amount
67200
116200
HK Contractors
Unit Bid Price
2.1
18.5
32
750
3.15
81
Total
Bid Amount
26460
113400
Depatco
Unit Bid Price
1.23
13.6
21.63
2021
6.52
76.7
Total
Bid Amount
54768
107380
TMC Contractors
Unit Bid Price
0.29
26
41
1345
6.5
106
Total
Bid Amount
54600
148400
Actual Quantities
6500
60
600
0
14733
2350
HK Contractors
Unit Bid Price
2.1
18.5
32
750
5.35
81
Amount Paid
13650
1110
19200
0
78821.55
190350
303131.55
(Savings) / Overage
52361.55
76950
Notes
1
2
3
4
5