Nephi,
I was going through old permits and it came to my attention that Permit # 16-00672 has not been
paid for, nor have I received an application for it. The job was at 16 South 1st East and it was an
emergency service change-out. The inspection has been completed and passed, but we will need
further documentation.
We understand it was an emergency scenario, however we still need to collect the $65 inspection
fee and an application stating that your business did the work. For your convenience, I have attached
an electrical application. Please send this back to me at your earliest convenience and I will call for
payment.
Feel free to contact me with any questions or concerns,
Porter Wilkins
(208) 372-2341
Permit Technician
City of Rexburg
35 N. 1st E.
P.O. Box 280
Rexburg, ID 83440
Inspection
Ticket
Residential Electrical Service Inspection on 10/05/2016: PASS
Permit Number: 16-00672Permit Details
Electrical Only Residential
Permit Issued Date: 03/06/2017
Final Inspections Required
16 S 1st E
16 S 1st E - Ele Service Changeout
Inspection Details
bret.stoddard@rexburg.org
Inspected By: Bret Stoddard
Residential Electrical Service Inspection on 10/05/2016: PASS
D ESCRIPTIO N CO MMEN TS STATUS
Overhead service conductors have proper
clearances. 230.24(A)&(B)
COMPLETED
Service disconnects and overcurrent devices
are located outside or inside nearest the point of
entrance of the service conductors. 230.70(A)
(1), 230.91
COMPLETED
The point of attachment is adequate and will
provide required support and clearances above
roofs
and grade. 230.24, 230.26, 230.54(C)
COMPLETED
Panelboards are grounded by an appropriate
and properly sized equipment grounding
conductor (or
conductors). 408.40, 215.6, 250.118, 250.122
COMPLETED
Unused openings have been effectively closed
(K.O. seals, etc.) 110.12(A), 408.7
COMPLETED
Securely mounted gear-panels, meter base, etc.
110.13
COMPLETED
Temperature ratings of equipment-lugs,
breakers, splices, etc. 110.14(A), (B), (C)
COMPLETED
Proper clearances about electrical equipment
indoors and outdoors. 110.26 (A), (E),(E)(2) and
(F)
COMPLETED
Grounding electrode system installed-ufer,
ground rods, metal water piping, etc. 250.52(A)
(4-7)
Existing grounding electrode system
utilized-large plate in the ground as per James
with Nephi's Electric.
COMPLETED
Grounding electrode system conductors sized
and protected appropriately. 250.66, 250.64(F),
250.64(A)(B)
COMPLETED
Grounding electrode conductor is either
un-spliced or spliced using approved methods.
250.64(C)(F)
COMPLETED
Any associated wiring with service meets article
300 wiring methods.
COMPLETED
Page 1 of 2
(Continued)
Permit Number: 16-00672
D ESCRIPTIO N CO MMEN TS STATUS
Identify wet and damp locations for
panels-NEMA 3R, etc. 408.16, 408.37, 312.12
COMPLETED
Proper wiring bending space in panel &
associated enclosures, gutters, etc. 408.3(G),
312.6, 408.55(A)(B)&(C)
COMPLETED
Panel or switchgear service rated. 408.3(C)COMPLETED
Main bonding jumper sized to 250.28(D), and all
panels bonded together using an equipment
bonding conductor sized in accordance with
250.122 or 250.66 as appropriate.
COMPLETED
Service conductors are adequate size and rating.
230.23, 230.31, 230.42
COMPLETED
Approved to be energized for permanent power
(will send permit to utility).
To be re-energized for permanent
power-changed out the electrical service for the
apartments above and water heater for lower
space. Went from a 100A to a 200A meter
main.
COMPLETED
Page 2 of 2