Loading...
HomeMy WebLinkAboutALL DOCS - 16-00672 - 16 S 1st E - Ele Service ChangeoutFrom:Porter Wilkins To:"nephiselectric@yahoo.com" Cc:Colton Murdock; Natalie Powell Subject:Service Inspection on 10/5/2016 Date:Wednesday, February 1, 2017 7:21:00 AM Attachments:Form 420 Miscellaneous Electrical Application.pdfimage001.png Nephi,   I was going through old permits and it came to my attention that Permit # 16-00672 has not been paid for, nor have I received an application for it. The job was at 16 South 1st East and it was an emergency service change-out. The inspection has been completed and passed, but we will need further documentation.   We understand it was an emergency scenario, however we still need to collect the $65 inspection fee and an application stating that your business did the work. For your convenience, I have attached an electrical application. Please send this back to me at your earliest convenience and I will call for payment.   Feel free to contact me with any questions or concerns,   Porter Wilkins (208) 372-2341  Permit Technician City of Rexburg     35 N. 1st E. P.O. Box 280 Rexburg, ID 83440     Inspection Ticket Residential Electrical Service Inspection on 10/05/2016: PASS Permit Number: 16-00672Permit Details Electrical Only Residential Permit Issued Date: 03/06/2017 Final Inspections Required 16 S 1st E 16 S 1st E - Ele Service Changeout Inspection Details bret.stoddard@rexburg.org Inspected By: Bret Stoddard Residential Electrical Service Inspection on 10/05/2016: PASS D ESCRIPTIO N CO MMEN TS STATUS Overhead service conductors have proper clearances. 230.24(A)&(B) COMPLETED Service disconnects and overcurrent devices are located outside or inside nearest the point of entrance of the service conductors. 230.70(A) (1), 230.91 COMPLETED The point of attachment is adequate and will provide required support and clearances above roofs and grade. 230.24, 230.26, 230.54(C) COMPLETED Panelboards are grounded by an appropriate and properly sized equipment grounding conductor (or conductors). 408.40, 215.6, 250.118, 250.122 COMPLETED Unused openings have been effectively closed (K.O. seals, etc.) 110.12(A), 408.7 COMPLETED Securely mounted gear-panels, meter base, etc. 110.13 COMPLETED Temperature ratings of equipment-lugs, breakers, splices, etc. 110.14(A), (B), (C) COMPLETED Proper clearances about electrical equipment indoors and outdoors. 110.26 (A), (E),(E)(2) and (F) COMPLETED Grounding electrode system installed-ufer, ground rods, metal water piping, etc. 250.52(A) (4-7) Existing grounding electrode system utilized-large plate in the ground as per James with Nephi's Electric. COMPLETED Grounding electrode system conductors sized and protected appropriately. 250.66, 250.64(F), 250.64(A)(B) COMPLETED Grounding electrode conductor is either un-spliced or spliced using approved methods. 250.64(C)(F) COMPLETED Any associated wiring with service meets article 300 wiring methods. COMPLETED Page 1 of 2 (Continued) Permit Number: 16-00672 D ESCRIPTIO N CO MMEN TS STATUS Identify wet and damp locations for panels-NEMA 3R, etc. 408.16, 408.37, 312.12 COMPLETED Proper wiring bending space in panel & associated enclosures, gutters, etc. 408.3(G), 312.6, 408.55(A)(B)&(C) COMPLETED Panel or switchgear service rated. 408.3(C)COMPLETED Main bonding jumper sized to 250.28(D), and all panels bonded together using an equipment bonding conductor sized in accordance with 250.122 or 250.66 as appropriate. COMPLETED Service conductors are adequate size and rating. 230.23, 230.31, 230.42 COMPLETED Approved to be energized for permanent power (will send permit to utility). To be re-energized for permanent power-changed out the electrical service for the apartments above and water heater for lower space. Went from a 100A to a 200A meter main. COMPLETED Page 2 of 2