Loading...
HomeMy WebLinkAboutMoody Sanitary Sewer BidItem No. 501.4.1.A.3 301/306.4.1.A.1 301/306.4.1.A.1 501.4.1.A.1 301/306.4.1.A.1 301/306.4.1.A.1 2030.4.1.A.1 502.4.1.A.1 S.P. pg. 3-20 S.P. pg. 3-20 S.P. pg. 3-20 2030.4.1.C.1 404.4.1.A.1 401.4.1.A.1 Item Description Sanitary Sewer 6" DR 25 (165 psi) C900 pressure sewer pipe 6" Pressure Sewer Thru Native Grounding (Trenching/Bedding/Backfill) 6" Pressure Sewer Thru Ashpalt Street (Trenching/Bedding/Backfill) Gravity Sewer Pipe - 8" SDR 35 8" Gravity Sewer Thru Native Grounding (Trenching/Bedding/Backfill) 8" Gravity Sewer Thru Asphalt Street (Trenching/Bedding/Backfill) Adjust Manholes to Grade 48" Sanitary Sewer Manhole Type A Sanitary Sewer Lift Station Sanitary Sewer Detention Lift Station (3 Pumps, valve vault, pipe connection, etc) Sanitary Sewer Detention Lift Station Mechanical Sanitary Sewer Detention Lift Station Electrical Water Line Adjust Water Valves to Grade Fire Hydrant & 6" Water Valve 14" Ductile Iron Class 50 Water Main Line Unit LF LF LF LF LF LF EA EA LUMP SUM LUMP SUM LUMP SUM EA EA LF Grand Total Bid Quantity 1220 1130 90 150 90 60 1 2 1 1 1 3 1 1280 Unit Bid Price 17.5 27.5 45 17.5 45 65 450 4000 55000 5500 10500 300 4500 75 247900 Bid Amount 21350 31075 4050 2625 4050 3900 450 8000 55000 5500 10500 900 4500 96000 Name Jerome Bowen Const Hill & Son Construction Depatco HK Contractors 3H Construction Landon Excavating Edstrom Construction TMC Knife River Taylor Construction Engineers Estimate Amount Item No. 501.4.1.A.3 301/306.4.1.A.1 301/306.4.1.A.1 501.4.1.A.1 301/306.4.1.A.1 301/306.4.1.A.1 2030.4.1.A.1 502.4.1.A.1 S.P. pg. 3-20 S.P. pg. 3-20 S.P. pg. 3-20 2030.4.1.C.1 404.4.1.A.1 401.4.1.A.1 401.4.1.A.1 402.4.1.A.1 Item No. 501.4.1.A.3 301/306.4.1.A.1 301/306.4.1.A.1 501.4.1.A.1 301/306.4.1.A.1 301/306.4.1.A.1 2030.4.1.A.1 502.4.1.A.1 S.P. pg. 3-20 S.P. pg. 3-20 S.P. pg. 3-20 2030.4.1.C.1 404.4.1.A.1 401.4.1.A.1 401.4.1.A.1 402.4.1.A.1 Item Description Sanitary Sewer 6" DR 25 (165 psi) C900 pressure sewer pipe Pressure Sewer Thru Native Grounding (Trenching/Bedding/Backfill) Pressure Sewer Thru Ashpalt Street (Trenching/Bedding/Backfill) Gravity Sewer Pipe - 8" SDR 35 Gravity Sewer Thru Native Grounding (Trenching/Bedding/Backfill) Gravity Sewer Thru Ashpalt Street (Trenching/Bedding/Backfill) Adjust Manholes to Grade 48" Sanitary Sewer Manhole Type A Sanitary Sewer Lift Station Sanitary Sewer Detention Lift Station (3 Pumps, valve vault, pipe connection, etc) Sanitary Sewer Detention Lift Station Mechanical Sanitary Sewer Detention Lift Station Electrical Water Line Adjust Water Valves to Grade Fire Hydrant & 6" Water Valve 12" Ductile Iron Class 50 Water Main Line 14" Ductile Iron Class 50 Water Main Line 14" Butterfly Valves Item Description Sanitary Sewer 6" DR 25 (165 psi) C900 pressure sewer pipe Pressure Sewer Thru Native Grounding (Trenching/Bedding/Backfill) Pressure Sewer Thru Ashpalt Street (Trenching/Bedding/Backfill) Gravity Sewer Pipe - 8" SDR 35 Gravity Sewer Thru Native Grounding (Trenching/Bedding/Backfill) Gravity Sewer Thru Ashpalt Street (Trenching/Bedding/Backfill) Adjust Manholes to Grade 48" Sanitary Sewer Manhole Type A Sanitary Sewer Lift Station Sanitary Sewer Detention Lift Station (3 Pumps, valve vault, pipe connection, etc) Sanitary Sewer Detention Lift Station Mechanical Sanitary Sewer Detention Lift Station Electrical Water Line Adjust Water Valves to Grade Fire Hydrant & 6" Water Valve 12" Ductile Iron Class 50 Water Main Line 14" Ductile Iron Class 50 Water Main Line 14" Butterfly Valves Unit LF LF LF LF LF LF EA EA LUMP SUM LUMP SUM LUMP SUM EA EA LF LF EA Unit LF LF LF LF LF LF EA EA LUMP SUM LUMP SUM LUMP SUM EA EA LF LF EA Bid Quantity 1220 1130 90 150 90 60 1 2 1 1 1 3 1 1200 80 2 Bid Quantity 1220 1130 90 150 90 60 1 2 1 1 1 3 1 1200 80 2 Engineer Estimate Unit Bid Price 17.5 27.5 45 17.5 45 65 450 4000 55000 5500 10500 300 4500 72 70 2500 Total Edstrom Unit Bid Price 7.6 16.5 74.2 15.1 60.2 125 913 3049 99250 5010 14270 600 4714 72 154 3185 Total Bid Amount 21350 31075 4050 2625 4050 3900 450 8000 55000 5500 10500 900 4500 86400 5600 5000 248900 Bid Amount 9272 18645 6678 2265 5418 7500 913 6098 99250 5010 14270 1800 4714 86400 12320 6370 286923 Landon Excavation Unit Bid Price 5 11.95 17.95 5 30 60 450 3200 80000 15500 13556 275 4135 33 71 2800 Total Taylor Construction Unit Bid Price 4 37 95 3.8 70 95 500 3500 90000 14800 17400 50 4100 63 75 2600 Total Bid Amount 6100 13503.5 1615.5 750 2700 3600 450 6400 80000 15500 13556 825 4135 39600 5680 5600 200015 Bid Amount 4880 41810 8550 570 6300 5700 500 7000 90000 14800 17400 150 4100 75600 6000 5200 288560 Knife River Unit Bid Price 25 5 50 35 5 60 500 3500 27500 44000 22000 250 5000 50 110 5000 Total Depatco Unit Bid Price 37.5 21.5 115.5 4.5 113.5 215 615 3905 44000 46188 26385 250 4616 56.5 99.35 2732 Total Bid Amount 30500 5650 4500 5250 450 3600 500 7000 27500 44000 22000 750 5000 60000 8800 10000 235500 Bid Amount 45750 24295 10395 675 10215 12900 615 7810 44000 46188 26385 750 4616 67800 7948 5464 315806 TMC Unit Bid Price 15 18 93 15 121 186 285 3310 28800 39940 7100 228 7240 50 140 2980 Total Jerome Bowen Unit Bid Price 5.87 37.93 156.25 4.29 56.99 842.76 1552.5 5480.8 67579.7 4140 33159 675.7 7101.25 45.23 117.3 4945 Total Bid Amount 18300 20340 8370 2250 10890 11160 285 6620 28800 39940 7100 684 7240 60000 11200 5960 239139 Bid Amount 7161.4 42860.9 14062.5 643.5 5129.1 50565.6 1552.5 10961.6 67579.7 4140 33159 2027.1 7101.25 54276 9384 9890 320494.15 HK Unit Bid Price 7.5 24 62 7.5 70 160 450 3200 59000 41000 9000 300 5300 57 100 2450 Total Bid Amount 9150 27120 5580 1125 6300 9600 450 6400 59000 41000 9000 900 5300 68400 8000 4900 262225 3H Construction Unit Bid Price 7.5 17 120 20 68 200 600 4500 98345 12720 14000 300 4380 43 78 2755 Total Bid Amount 9150 19210 10800 3000 6120 12000 600 9000 98345 12720 14000 900 4380 51600 6240 5510 263575