Loading...
HomeMy WebLinkAboutALL DOCS - 13-00199 - The Mountain Lofts Parking GarageFrom: Bret Stoddard Sent: Wednesday, December 11, 2013 9:38 AM To: Amanda Saurey Subject: FW: Mountain Lofts & Parking Struc, 972220003 Bret Stoddard City of Rexburg Chief Electrical-Fire-Building Inspector 35 North 1st East Rexburg, Idaho 83440 (208)372-2332 W (208)716-1332 C From: Bret Stoddard Sent: Tuesday, December 10, 2013 4:57 PM To: 'Frassa, Dante' Subject: RE: Mountain Lofts & Parking Struc, 972220003 Dante, I just met with the fire department and wrote on the “job site” copy of the plans indicating the required locations (4) of the remote annunciators. They are on the northwest corner of the female housing building, middle of the two buildings of male and female on the north end at each building entrance, and at the south entrance on the male building on the east side (Grandview side). Please let me know if you have any questions. Thanks, Bret. Bret Stoddard City of Rexburg Chief Electrical-Fire-Building Inspector 35 North 1st East Rexburg, Idaho 83440 (208)372-2332 W (208)716-1332 C From: Frassa, Dante [mailto:dfrassa@simplexgrinnell.com] Sent: Tuesday, December 10, 2013 3:18 PM To: Bret Stoddard Cc: Jack Packer Subject: RE: Mountain Lofts & Parking Struc, 972220003 Bret, what is the status on this review? Please let me know, thanks. Dante Frassa SimplexGrinnell Direct Phone +1-208-914-2092 dfrassa@simplexgrinnell.com From: Bret Stoddard [mailto:brets@rexburg.org] Sent: Wednesday, November 13, 2013 2:17 PM To: Frassa, Dante Subject: RE: Mountain Lofts & Parking Struc, 972220003 Dante, we will need at least two paper copies and one electronic. You can send the electronic copy to this email address. The paper copies need to come to the address listed below. Please let me know if there is anything else you need. Thank you, Bret Stoddard City of Rexburg Chief Electrical-Fire-Building Inspector 35 North 1st East Rexburg, Idaho 83440 (208)372-2332 W (208)716-1332 C From: Frassa, Dante [mailto:dfrassa@simplexgrinnell.com] Sent: Wednesday, November 13, 2013 1:46 PM To: Bret Stoddard Subject: Mountain Lofts & Parking Struc, 972220003 Bret, we have a Fire Alarm project ready for review. This project is Mountain Lofts & Parking Structure at 555 S 3rd W Rexburg ID 83440. I like to know if you are the one to submit the Fire Alarm drawings and the format to do it (electronic (email PDFs files) or hardcopies (how many and where to mail))? Please let me know. Thanks. Dante Frassa / Designer / NICET Cert#113716 Tel: +1 208 914 2092 / Fax: +1 208 376 2192 8783 W Hackamore Dr / Boise, ID 83709 / USA dfrassa@simplexgrinnell.com / www.simplexgrinnell.com This email (including any attachments) may contain information that is private or business confidential. If you received this email in error, please delete it from your system without copying it and notify sender by reply email so that our records can be corrected. Tyco's vision is Zero Harm to people and the environment. Please consider the environment before printing this message. This e-mail contains privileged and confidential information intended for the use of the addressees named above. If you are not the intended recipient of this e-mail, you are hereby notified that you must not disseminate, copy or take any action in respect of any information contained in it. If you have received this e-mail in error, please notify the sender immediately by e-mail and immediately destroy this e-mail and its attachments. (Continued) Permit Details Permit Number: 13-00199 The Mountain Lofts Parking Garage 538 S 2ND W Building - Commercial Permit Status of (Issue) as of Report Date: 01/20/2017 9:28 am Permit Inspection Summary 08/22/2014FailQuinton OwensCommercial Building Final Handicap parking signs not posted. Portion of guardrail missing on middle stairs at top level. Missing exit signs at SW corner on levels 1, 2, & 3. Handicap maneuvering clearance at doors into building cannot slope more than 2%. Finish painting parking stalls and pedestrian pathways as required. Expansion joints not completed at doors between garage and buildings for proper fire blocking with mineral wool. Exit sign at discharge level in East stairway needs to be on Exterior door, not door to garage. Inspector Comments: 09/03/2014FailQuinton OwensCommercial Building Final Partial Inspection: expansion joint protection at doors to apartment buildings. Mineral wool fire protection incomplete at following doors: Level 1: Bldg 1-West and East doors from hall to parking area. Level 2: Bldg 1-East. Bldg 2-Door from hall to parking area. Level 3: Bldg 1-Southwest, Northwest, and East. Bldg 2 Okay. Level 4: Bldg 1-Northwest. Bldg 2-Both doors. Level 5: Bldg 1-Southwest. Bldg 2-Both doors (door to stairs also not insulated under threshold. 9/10: Additional doors between buildings have insulation displaced from electrical work done. Gap between Electrical box and Bldg 1 (West parking entry) has not been rated as discussed. Signs added to stair enclosures ("exit re-entry at every level") do not comply with IBC 1022.8. Inspector Comments: 12/03/2015FailQuinton OwensCommercial Building Final Partial Inspection: expansion joint protection at doors to apartment buildings. Mineral wool fire protection incomplete at following doors: Level 1: Bldg 1 completed Level 2: Bldg 1-completed Bldg 2-Door from hall to parking area(insulation narrower than gap between walls) Level 3: Bldg 1-completed Bldg 2 completed Level 4: Bldg 1-Northwest (above doorway). Bldg 2- South door (gap at bottom). Level 5: Bldg 1-completed. Bldg 2-North door 9/10: Gap between Electrical box and Bldg 1 (West parking entry) has not been rated as discussed. Signs added to stair enclosures ("exit re-entry at every level") do not comply with IBC 1022.8. Exit sign light not working in southwest corner on 2nd level above grade (labeled "level 1") Inspector Comments: 04/13/2016PassQuinton OwensCommercial Building Final Corrections completed for certificate of occupancy.Inspector Comments: Page 2 of 3 (Continued) Permit Details Permit Number: 13-00199 The Mountain Lofts Parking Garage 538 S 2ND W Building - Commercial Permit Status of (Issue) as of Report Date: 01/20/2017 9:28 am Permit Inspection Summary Electrical Inspection Type 08/15/2014PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection 08/20/2014PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection 08/28/2014PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Fire Inspection Type 08/28/2014PassBret StoddardFire Alarm Final Inspection Plumbing Inspection Type 08/08/2014PassDon AllenPlumbing Final Inspection All good for c/oInspector Comments: Page 3 of 3 Permit Inspection Summary Permit Status of (Issue) as of Report Date: 01/20/2017 9:28 am Permit Details Permit Number: 13-00199 The Mountain Lofts Parking Garage 538 S 2ND W Building - Commercial Permit Issued Date: 12/19/2013 Permit Inspection Statistics 16Total Inspections Completed: 13Total Inspections Passed: Inspection Pass Rate 81.25% Permit Inspection History *Refer to Individual Inspection Report for more Details 08/27/2013PassBret StoddardElectrical Underground Inspection Approved for cover-underground-sump and spare conduits to the east.Inspector Comments: 09/20/2013PassBret StoddardElectrical Underground Inspection Approved for cover-underground/in the concrete piping on level #1 ceiling.Inspector Comments: 10/08/2013PassBret StoddardElectrical Underground Inspection Approved for cover-1st level ceiling and 2nd level floor on the east portion of the structure-fire alarm and electrical. Inspector Comments: Building Inspection Type 7/23/13 TD: Rebar - footing SW corner. 2 tor - base footing with normal footing poured on top[. Rebar good uprights tied in place. OK to pour. Inspector Comments: 7/30/13 TD: Rebar - 2 pads ext. walls on N W half South center exterior footing. Inspector Comments: 08/01/2013PassTed DyeFoundation Inspection 8/01/13 TD: Rebar middle wall - overlays good. verticals 1' centers.Inspector Comments: 10/29/2013PassTed DyeFoundation Inspection Rebar - shear wall north wall west side. barrier walls north side shear wall west columns lvl 3 all west end Barrier wall partial south side - on ramp to 4th level. Inspector Comments: 01/15/2014PassQuinton OwensFoundation Inspection 2 barrier walls on north side 1 barrier wall on west side rebar installation approved. Inspector Comments: 01/24/2014Pass Foundation Inspection Rebar & Barrier Wall - rebar in barrier wall on S and east pass. rebar for final parking pad pass special inspector on site. Inspector Comments: Page 1 of 3