Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
APPLICATIONS, CO, MULT DOCS - 13-00228 & 13-00229 - BYUI Central Heating Plant
Registration #: 010041 - sent by Sharon Anderson in Email DRAWINGS Drawings CG001 1. ADD the following notes to the “Road & Street” general notes”: a. “5. Concrete mix design for concrete curb & gutter, and sidewalks within the City of Rexburg Right-of-Ways shall include Lithium add mix as per City of Rexburg Standards. Coordinate locations of use with the City of Rexburg and BYU-Idaho. b. “6. As per City of Rexburg Standards, aggregate base within the City of Rexburg Right- of-Ways for curb & gutter shall be 12” and for sidewalk 6”. Coordinate locations of use with the City of Rexburg and BYU-Idaho. Drawings CD101.A – Civil Demolition Plan 1. Add the following note to the end of Keynote #17; “ Remove existing sewer line to 2’-0” behind back of new sidewalk and cap.” Drawings C102.A and C102.B – Civil Utility Plan 1. Change Sheet Keynote 36 to read “Trench Backfill Within the City of Rexburg Street Right-Of-Way, RE: D4/C505” 2. Add Sheet Keynote 38 and the associated wording, “Contractor to coordinate asphalt patch for gas line and underground power bank to ensure it is one continuous patch and not two separate patches.” See attached CSD-011 & CSD-012. 3. Add Sheet Keynote 80 and the associated wording, ”Water Service & Fire Line, 8” Class 50 DI (Within City of Rexburg Right-of-Way). RE: A1/C505”. See attached CSD-011. Drawing C501 –Civil Site Utility Details 1. Add the following note to detail B3 “Concrete Sidewalk”: a. “4. Concrete mix design for concrete sidewalks within the city of Rexburg right-of-way shall be a 6 bag Portland cement with lithium for ASR mitigation and 3% to 5% entrained air as Per City of Rexburg. b. “5. Aggregate base within the City of Rexburg Right-of-Ways for sidewalks shall be 6” as per City of Rexburg.” 2. Add the following note to detail B1 “30” Vertical Cut Curb & Gutter”. a. “5. Concrete mix design for concrete curb & gutter within the city of Rexburg right-of-way shall be a 6 bag Portland cement with lithium for ASR mitigation and 3% to 5% entrained air as Per City of Rexburg. b. “6. Aggregate base within the City of Rexburg Right-of-Ways for curb & gutter shall be 12” as per City of Rexburg.” Drawing C505 –Civil Site Utility Details 3. Refer to the attached revised Drawing CSD-010 for addition of the “Typical Trench Section W/ Flowable Fill” detail. Turbomachinery Package Specification Taurus 60 Generator Set © 2013 Solar Turbines Incorporated. All rights reserved. TPS50GS/913 Caterpillar Confidential Green: Information contained herein is to be treated as Confidential and Proprietary to Caterpillar. 8 Table 1. Package Specifications Dimensions Approximate Package Measurements Height, Enclosed 3.16 m (10 ft 4.5 in.) Width (base only) 2.59 m (8 ft 6in.) Width at Lift Points 2.72 m (8 ft 11 in.) Length 9.83 m (32 ft 3 in.) Approximate Package Weights Gearbox 1491 kg (3287 lb) AC Start Motor Assembly 467 kg (1030 lb) Generator (Typical Open Drip Proof) 17 545 kg (38,680 lb) Gas Turbine Assembly 2300 kg (5070 lb), See Note a Total Dry Weight 37 921 kg (83,600 lb), See Note b Lube Oil 1161 kg (2560 lb) Total Wet Weight 39 0535 kg (87,160 lb) Piping and Tubing Thickness Piping > 76.2 mm (3 in.) Nominal Pipe Size (NPS) Schedule 40 (Unless Otherwise Specified) Piping < 50.8 mm (2 in.) NPS Schedule 80 (Unless Otherwise Specified) Tubing 6.35 mm (0.25 in.) NTS 1.2446 mm (0.049 in.) Minimum Wall Thickness Tubing 9.53 mm (.375 in.) NTS 1.2446 mm (0.049 in.) Minimum Wall Thickness Tubing 12.7 mm (0.500 in.) NTS 1.651 mm (0.065 in.) Minimum Wall Thickness Tubing 19.05 mm (0.75 in.) NTS 1.651 mm (0.065 in.) Minimum Wall Thickness Tubing 25.40 mm (1.00 in.) NTS 2.108 mm (0.083 in.) Minimum Wall Thickness Tubing 31.75 mm (1.25 in.) NTS 2.768 mm (0.109 in.) Minimum Wall Thickness Construction Materials Piping, Manifolds, and Tubing < 10.2 cm (4 in.) 316L Stainless Steel (Unless Otherwise Specified), See Note c Piping Interface Connections 316L Stainless Steel (Unless Otherwise Specified) See Note c Flange Assembly Hardware 316L Stainless Steel Pipe Support Brackets 316 L Stainless Steel Pipe Flexible Couplings Carbon Steel Tubing Dual Ferrule Compression Fittings 316L Stainless Steel Lube Oil Vent Flame Arrestor with Weatherhood Carbon Steel Electrical System Certifications NEC Class 1, Group D, Division 2 CENELEC Zone 2, Group II CE, ATEX Zone 2, Group II Three-Phase Package Motors Optional Motor Voltage Ratings 380, 400, or 415 VAC, 50 Hz 460 VAC, 60 Hz Single-Phase Battery Charger Optional Battery Charger Voltage Ratings, CE 220, 230, or 240 VAC, 50 Hz or 60 Hz Optional Battery Charger Voltage Ratings, NEC 220, 230, 240, 380, 400, 415, 440, 460 or 480 VAC, 50 Hz or 60 Hz Single-Phase Lighting And Space Heater Voltage Optional Package Lighting and Space Heater Voltage Ratings 120, 220, 230, or 240 VAC, 50 Hz or 60 Hz Port Opened 07-May-15 10:09 Session Started 07-May-15 10:09 10:09:58 05/07/15 Local: East Main Riser Tamper Switch OFF-NORMAL Supervisory Sw L1M002 10:11:48 05/07/15 Local: East Main Riser Tamper Switch OFF-NORMAL RSTRD Supervisory Sw L1M002 10:12:30 05/07/15 Local: East Main Riser Tamper Switch OFF-NORMAL Supervisory Sw L1M003 10:12:30 05/07/15 Local: East Main Riser Tamper Switch OFF-NORMAL RSTRD Supervisory Sw L1M003 10:13:12 05/07/15 Local: East Main Riser FIRST ALARM Waterflow Sil L1M004 10:14:08 05/07/15 Local: Southeast Electrical Room Above FACP FIRST ALARM Photo Detector L1S001 10:22:14 05/07/15 Local: L1M012 TURBINE FIRE ALARM N.O. Contacts L1M012 10:33:40 05/07/15 Local: L1M011 SUPRESSION SYSTEM TROUBLE FAULT Supervisory Sw L1M011 10:36:48 05/07/15 Local: L1M013 GAS DETECTION FAULT Supervisory Sw L1M013 10:44:16 05/07/15 Local: Sprinkler Riser Pull Station FIRST ALARM Manual Station L1M001 10:48:18 05/07/15 Local: L1M013 GAS DETECTION FAULT Supervisory Sw L1M013 10:50:26 05/07/15 FIRST ALARM Photo Duct Det L1S002 11:08:32 05/07/15 Local: DIRTY Photo Duct Det L1S002 11:09:14 05/07/15 Local: DIRTY Photo Duct Det L1S002 11:11:34 05/07/15 Local: FIRST ALARM Photo Duct Det L1S008 11:15:04 05/07/15 Local: WALK TEST Silent 11:15:40 05/07/15 Local: ALARM TEST Photo Duct Det L1S007 11:16:20 05/07/15 Local: ALARM TEST Photo Duct Det L1S005 11:19:16 05/07/15 Local: ALARM TEST Photo Duct Det L1S006 11:19:34 05/07/15 Local: ALARM TEST Photo Duct Det L1S004 11:24:08 05/07/15 Local: DIRTY RSTRD Photo Duct Det L1S002 11:25:38 05/07/15 Local: Sprinkler Riser Pull Station FIRST ALARM Manual Station L1M001 11:29:14 05/07/15 Permit Inspection Summary Permit Status of (Issue) as of Report Date: 01/17/2017 2:15 pm Permit Details Permit Number: 13-00228 BYUI Central Heating Plant 525 South Center Building - Commercial Permit Issued Date: Permit Inspection Statistics 125Total Inspections Completed: 116Total Inspections Passed: Inspection Pass Rate 92.80% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 12/6/13 TD: Rebar for footings - rebar as per plans.Inspector Comments: 12/11/13 TD: Rebar for footing - footing and beam pads rebar as per plans.Inspector Comments: 1/27/14 TD: Footing/foundation - approved.Inspector Comments: 02/05/2014PassTed DyeFooting Inspection 2/5/14 TD: Rebar (footings and walls) - footing starting at grid g and grid 5. Main electrical room. Exterior grid to 5.37 Found DB pm 3 tonel counter clockwise to D & 3.8. Inspector Comments: Inspection scheduled for 1pm on small section on south end. Arrived early, but already started pour (about 50% filled). Jacob, with Forsgren, was on site and had inspected and found reinforcement to be good. Inspector Comments: 02/26/2014PassQuinton OwensFooting Inspection Previous rebar inspections approved on 1/7/14 and 1/13/14.Inspector Comments: 03/05/2014PassTed DyeFoundation Inspection all rebar sized and spaced properly and held away from formInspector Comments: 03/14/2014PassQuinton OwensFooting Inspection Footings on west side of building. Also partial Grade Beam and footings on south east of existing heat plant. Inspector Comments: 03/25/2014PassQuinton OwensFoundation Inspection all rebar tied and correctly sized. pushed away from forms when there OK to pour Inspector Comments: 03/31/2014PassQuinton OwensFoundation Inspection Middle section of west wall.Inspector Comments: 03/31/2014PassQuinton OwensFooting Inspection Footing for stairs on South end.Inspector Comments: 04/04/2014PassQuinton OwensFoundation Inspection Missed due to scheduling error (requested for 4/3, not 4/4). Previous observations at slab during other inspections showed no issues with insulation. Special Inspector on site for pour said it all looked "good" Inspector Comments: Page 1 of 9 (Continued) Permit Details Permit Number: 13-00228 BYUI Central Heating Plant 525 South Center Building - Commercial Permit Status of (Issue) as of Report Date: 01/17/2017 2:15 pm Permit Inspection Summary 04/28/2014PassQuinton OwensFoundation Inspection First four foot of interior masonry wall reinforcement bars in place and approved for grout pour. Special Inspector on site. Inspector Comments: 04/28/2014PassQuinton OwensFooting Inspection Grade beam on north end of west wall and 2 spread footings on west end of north wall. Approved for pour. Inspector Comments: 04/29/2014PassQuinton OwensFoundation Inspection Trench exterior Foundation on west end of North wall approved for pour.Inspector Comments: 05/07/2014PassQuinton OwensFoundation Inspection Masonry grout pour. Inspection not scheduled at requested time. Special Inspector verified compliance of work done. Inspector Comments: 05/21/2014PassQuinton OwensFoundation Inspection Masonry Grout for interior wall along grid D and grid C2 (between D1 & G), and grid 4 between A & C). Also Exterior East wall at top from C to G (included single #5 bar and embeds for connection to steel). Also viewed by special inspector. Inspector Comments: 05/22/2014PassQuinton OwensFoundation Inspection Grout pour on east half of south wall and some interior walls. Special Inspector on site. Horizontal rebar in place. Inspector Comments: 05/30/2014PassQuinton OwensFoundation Inspection Slab on grade-2nd levelInspector Comments: 06/12/2014PassTed DyeFoundation Inspection footing, floor combo on south end of building.Inspector Comments: 06/27/2014PassTed DyeFooting Inspection Slab on grade. Rebar is the correct size and spacing. Approved to pour. Inspector Comments: 06/27/2014PassTed DyeFoundation Inspection Grout pour. Horz.and vertical in place. Special inspector on site. Inspector Comments: 07/07/2014PassQuinton OwensFoundation Inspection Block wall grout pour, west and north side exterior wall.Inspector Comments: 07/15/2014PassQuinton OwensFoundation Inspection Masonry rebar & grout: Not completely ready at inspection. Special Inspector will be checking just prior to pour. Inspector Comments: 08/26/2014PassQuinton OwensCommercial Insulation Inspection wall between upper and lower roof on East Side insulated with vapor barrier approved to cover. Inspector Comments: Page 2 of 9 (Continued) Permit Details Permit Number: 13-00228 BYUI Central Heating Plant 525 South Center Building - Commercial Permit Status of (Issue) as of Report Date: 01/17/2017 2:15 pm Permit Inspection Summary 06/26/2015PassQuinton OwensCommercial Footing Inspection Footings between grid 3 and C1.2 and between H1 & CF (exlcluding spot footings on grid 3.5 between J & H1). Column pier rebar not in yet. Special Inspector to arrive for pour and will also inspect rebar. Inspector Comments: 07/10/2015PassQuinton OwensFoundation Inspection Foundation between grids 3 and C1.2.Inspector Comments: 07/30/2015PassQuinton OwensCommercial Footing Inspection Exterior footing from SW corner (grid H/2) to grid K/3, and foundation wall along grid 3.6. Inspector Comments: 08/04/2015PassQuinton OwensFoundation Inspection Exterior foundation from SW corner (grid H/2) to grid K/3, and foundation wall along grid 3.6. Inspector Comments: 10/15/2015PassQuinton OwensCommercial Framing/Structure Inspection Exterior overhang framing approved for cover.Inspector Comments: 10/20/2015PassQuinton OwensFoundation Inspection Structural Masonry wall (west side of stairs to roof). Inspection of rebar at 4' level. Complete special inspections as required. Inspector Comments: 10/21/2015PassQuinton OwensFoundation Inspection Masonry bond beam about 8' a.f.f.Inspector Comments: 10/22/2015PassQuinton OwensFoundation Inspection Masonry bond beam at roof level.Inspector Comments: 11/09/2015FailQuinton OwensCommercial Framing/Structure Inspection Steel stud framing approved, except for backing to be added for grab bars in restrooms. Be sure toilet is centered 16" min. to 18" max. off side wall when finished. Inspector Comments: 12/09/2015PassQuinton OwensCommercial Sheetrock/Drywall Inspection Missing screws in a few locations. Add as indicated to subcontractor. Hard ceilings not hung yet. Inspector Comments: Inspected on 2/10: No areas over 1,000 sf. Tie wires at 4' o.c. and lights with 2 wires each. Inspector Comments: 02/10/2016PassQuinton OwensSuspending Ceiling Inspection Note prior to requesting final inspection: Fire rated glass not installed as noted on plans, where is door fire rating label, remember to complete handrails and guardrails in tunnel and at stairway "S03". Inspector Comments: Page 3 of 9 (Continued) Permit Details Permit Number: 13-00228 BYUI Central Heating Plant 525 South Center Building - Commercial Permit Status of (Issue) as of Report Date: 01/17/2017 2:15 pm Permit Inspection Summary 03/03/2016FailQuinton OwensCommercial Building Final Restroom signage not installed. Sprinkler heads still have covers. 1 hour window assembly does not have rated glass. No label on rated doors (104B, 112, 113C)- Pre-Existing rated doors? Missing 2nd handrail and guardrail on stairs in tunnel per plans. Exterior wall not finished around door to roof (door is also rated without closer). Interior light in exit sign above door 113A is not working. Multiple exterior doors are missing hardware. unprotected penetrations through rated wall between boiler area and administrative area. Inspector Comments: 03/03/2016PassQuinton OwensCommercial Framing/Structure Inspection Re-inspectionInspector Comments: 03/11/2016FailQuinton OwensCommercial Building Final ** Approved for Temporary Occupancy only. ** Temporary non-ADA restroom signage installed. Missing 2nd handrail and guardrail on stairs in tunnel per plans. Exterior wall not finished around door to roof. Multiple exterior doors are missing hardware. Protect penetrations between occupancies to resist the passage of smoke. Inspector Comments: 05/17/2016PassQuinton OwensCommercial Building Final Page 4 of 9 (Continued) Permit Details Permit Number: 13-00228 BYUI Central Heating Plant 525 South Center Building - Commercial Permit Status of (Issue) as of Report Date: 01/17/2017 2:15 pm Permit Inspection Summary Electrical Inspection Type 01/13/2014Pass Electrical Underground Inspection Approved for cover-underground conduit on SE corner of project for emergency and control circuits to building on south end of project. Inspector Comments: 01/14/2014PassBret StoddardElectrical Underground Inspection 01/14/2014PassBret StoddardElectrical Underground Inspection Approved for cover for the next(middle) portion of conduit for the emergency and control circuits on the east side of the project. This is the same inspection as the other line with no notes-didn't save the first time. Inspector Comments: 01/16/2014PassBret StoddardElectrical Underground Inspection Approved for cover-underground conduit for emergency and control circuits-red concrete installed because of shallow depth-16". Inspector Comments: 02/05/2014PassBret StoddardElectrical Underground Inspection Approved to place concrete-ufer-22' copper, concrete encased electrode.Inspector Comments: 02/20/2014PassBret StoddardElectrical Underground Inspection 02/24/2014PassBret StoddardElectrical Underground Inspection 03/07/2014PassBret StoddardElectrical Underground Inspection 03/12/2014PassBret StoddardElectrical Underground Inspection 03/19/2014PassBret StoddardElectrical Underground Inspection 04/01/2014PassBret StoddardElectrical Underground Inspection 04/07/2014PassBret StoddardElectrical Underground Inspection 04/08/2014PassBret StoddardElectrical Underground Inspection 04/10/2014PassBret StoddardElectrical Underground Inspection 04/11/2014PassBret StoddardElectrical Underground Inspection 04/14/2014PassBret StoddardElectrical Underground Inspection 05/05/2014PassBret StoddardElectrical Underground Inspection 05/07/2014PassBret StoddardElectrical Underground Inspection 05/19/2014PassBret StoddardElectrical Underground Inspection 05/28/2014PassBret StoddardElectrical Underground Inspection 05/30/2014PassBret StoddardElectrical Underground Inspection 06/03/2014PassBret StoddardElectrical Underground Inspection 06/10/2014PassBret StoddardElectrical Underground Inspection Partial approval - grounding grid okay for cover, per Gabe Madrid.Inspector Comments: Page 5 of 9 (Continued) Permit Details Permit Number: 13-00228 BYUI Central Heating Plant 525 South Center Building - Commercial Permit Status of (Issue) as of Report Date: 01/17/2017 2:15 pm Permit Inspection Summary 06/12/2014PassBret StoddardElectrical Underground Inspection 100' N of vault #1 250' S of vault #2 to vault #1 South side suspended slab an co-gen All okay for cover partial approval, per Gabe Madrid. Inspector Comments: 06/16/2014PassBret StoddardCommercial Electrical Rough-in 06/17/2014PassBret StoddardElectrical Underground Inspection 06/20/2014PassBret StoddardElectrical Underground Inspection 06/24/2014PassBret StoddardElectrical Underground Inspection 06/26/2014PassBret StoddardElectrical Underground Inspection 06/27/2014PassBret StoddardElectrical Underground Inspection 07/02/2014PassBret StoddardElectrical Underground Inspection 07/07/2014PassBret StoddardElectrical Underground Inspection 07/09/2014PassBret StoddardElectrical Underground Inspection 07/15/2014PassBret StoddardElectrical Underground Inspection 08/05/2014PassBret StoddardElectrical Underground Inspection 08/26/2014PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in 08/28/2014PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in 09/02/2014PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in 09/04/2014PassBret StoddardCommercial Electrical Rough-in 09/19/2014PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in 09/24/2014PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in 10/06/2014PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in 10/16/2014N/ABret StoddardElectrical Underground Inspection 10/21/2014PassBret StoddardCommercial Electrical Rough-in 11/07/2014PassBret StoddardElectrical Underground Inspection 11/17/2014PassBret StoddardCOM & MFR Electrical Service Inspection 12/04/2014PassBret StoddardElectrical Underground Inspection 12/09/2014PassBret StoddardElectrical Underground Inspection 12/10/2014PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in Page 6 of 9 (Continued) Permit Details Permit Number: 13-00228 BYUI Central Heating Plant 525 South Center Building - Commercial Permit Status of (Issue) as of Report Date: 01/17/2017 2:15 pm Permit Inspection Summary 02/27/2015PassBret StoddardElectrical Underground Inspection underground at substation **Completed by Jane Allred** Inspector Comments: 03/10/2015N/ABret StoddardElectrical Underground Inspection 05/13/2015PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection 06/18/2015PassBret StoddardElectrical Underground Inspection 06/23/2015PassBret StoddardElectrical Underground Inspection 07/21/2015PassBret StoddardElectrical Underground Inspection 08/13/2015PassBret StoddardElectrical Underground Inspection 08/20/2015PassBret StoddardElectrical Underground Inspection 08/24/2015PassBret StoddardElectrical Underground Inspection 08/25/2015PassBret StoddardElectrical Underground Inspection 09/24/2015PassBret StoddardElectrical Underground Inspection 10/12/2015PassBret StoddardElectrical Underground Inspection 10/22/2015PassBret StoddardElectrical Underground Inspection 11/10/2015PassBret StoddardCommercial Electrical Rough-in 11/30/2015PassBret StoddardCommercial Electrical Rough-in 12/07/2015PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in 02/04/2016PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in 03/02/2016PassBret StoddardElectrical Final Inspection COM-A,R,T Fire Inspection Type 04/07/2015PassBret StoddardFire Sprinkler Rough-in 04/09/2015PassDale PickeringFire Sprinkler Rough-in 05/07/2015FailBret StoddardFire Alarm Final Inspection 02/03/2016PassDale PickeringFire Sprinkler Final Inspection 02/03/2016PassDale PickeringFire Sprinkler Hydro 02/18/2016PassBret StoddardFire Alarm Final Inspection Page 7 of 9 (Continued) Permit Details Permit Number: 13-00228 BYUI Central Heating Plant 525 South Center Building - Commercial Permit Status of (Issue) as of Report Date: 01/17/2017 2:15 pm Permit Inspection Summary Mechanical Inspection Type 10/07/2014PassDon AllenGas Pressure Test the low presser side (32 lb) held at 82 lbInspector Comments: 10/14/2014PassDon AllenGas Pressure Test The return water line held at 160 lbInspector Comments: 11/03/2014PassDon AllenHVAC Rough-in The exhaust for the generator looks goodInspector Comments: 02/13/2015PassDon AllenGas Pressure Test 4 inch gas line held at 400 psi for 30 min.Inspector Comments: 02/20/2015PassDon AllenHVAC Rough-in duct work for the generator looks good.Inspector Comments: 03/03/2016FailDon AllenHVAC Final Inspection THE GAS OUTLET FOR THE STOVE NEEDS A PLUG INSTALLED OR THE GAS DTOVE HOOKED UP. Inspector Comments: 05/18/2016PassDon AllenHVAC Final Inspection Page 8 of 9 (Continued) Permit Details Permit Number: 13-00228 BYUI Central Heating Plant 525 South Center Building - Commercial Permit Status of (Issue) as of Report Date: 01/17/2017 2:15 pm Permit Inspection Summary Plumbing Inspection Type 03/20/2014PassDon AllenPlumbing Underground Inspection good to cover 2nd ground workInspector Comments: 03/25/2014PassDon AllenPlumbing Underground Inspection all good to cover storm lineInspector Comments: 04/11/2014PassDon AllenPlumbing Underground Inspection ground work all good to coverInspector Comments: 07/31/2014PassDon AllenPlumbing Water Water test started at 200 lb at 10:12 am and 12:10 was at 198 lbInspector Comments: 10/09/2014PassDon AllenPlumbing Rough-in The low presser steam line held presser at 160 lbInspector Comments: 10/10/2014PassDon AllenPlumbing Rough-in water for the boilers held at 160 lbInspector Comments: 02/13/2015PassDon AllenPlumbing Final Inspection plumbingg good for the c/oInspector Comments: 08/24/2015PassDon AllenPlumbing Underground Inspection GOOD TO COVER GROUND WORK IN THE BATHROOM.Inspector Comments: 11/25/2015PassDon AllenPlumbing Rough-in central administration part of the building. dwv and the water are good to coverInspector Comments: 03/03/2016PassDon AllenPlumbing Final Inspection GOOD FOR THE C/OInspector Comments: Page 9 of 9