Loading...
HomeMy WebLinkAboutALL DOCS - 13-00363 - 525 S Center - BYU-I Kirkham Bldg - Telecom Rm & CablingPermit Inspection Summary Permit Status of (Open) as of Report Date: 01/11/2017 9:31 am Permit Details Permit Number: 13-00363 BYU-I Kirkham Bldg - Telecom Rm & Cabling 525 S Center Commercial Remodel Permit Issued Date: 10/08/2013 Permit Inspection Statistics 3Total Inspections Completed: 2Total Inspections Passed: Inspection Pass Rate 66.67% Permit Inspection History *Refer to Individual Inspection Report for more Details 11/25/2013PassBret StoddardElectrical Final Inspection Approved for a final after they strap the MC cable independently of the line sets for the HVAC unit, called Lon and left a message. Lon installed lights(3), and receptacles for the server room equipment and wired in the ductless HVAC system. Inspector Comments: 11/25/2013PassQuinton OwensHVAC Final Inspection Did not see outside units.Inspector Comments: 11/25/2013FailQuinton OwensBuilding Final Seal around PVC pipe sleeve ends ("water tight" noted on plans).Inspector Comments: Inspections Required Building Final