HomeMy WebLinkAboutALL DOCS - 13-00363 - 525 S Center - BYU-I Kirkham Bldg - Telecom Rm & CablingPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 01/11/2017 9:31 am
Permit Details Permit Number: 13-00363
BYU-I Kirkham Bldg - Telecom Rm & Cabling
525 S Center
Commercial Remodel
Permit Issued Date: 10/08/2013
Permit Inspection Statistics
3Total Inspections Completed:
2Total Inspections Passed:
Inspection Pass Rate
66.67%
Permit Inspection History *Refer to Individual Inspection Report for more Details
11/25/2013PassBret StoddardElectrical Final Inspection
Approved for a final after they strap the MC cable independently of the line sets
for the HVAC unit, called Lon and left a message. Lon installed lights(3), and
receptacles for the server room equipment and wired in the ductless HVAC
system.
Inspector Comments:
11/25/2013PassQuinton OwensHVAC Final Inspection
Did not see outside units.Inspector Comments:
11/25/2013FailQuinton OwensBuilding Final
Seal around PVC pipe sleeve ends ("water tight" noted on plans).Inspector Comments:
Inspections Required
Building Final