Loading...
HomeMy WebLinkAboutALL DOCS - 16-00472 - 142 E Main Rigby Consultation - Pre-school Classroom - BasementInspection Ticket Building Inspector Consultation on 07/08/2016: Permit Number: 16-00472Permit Details Consultation case Permit Issued Date: Final Inspections Required 142 E Main Rigby Consultation - Pre-school Classroom - Basement Inspection Details quintono@rexburg.org Inspected By: Quinton Owens Building Inspector Consultation on 07/08/2016: D ESCRIPTIO N CO MMEN TS STATUS Automatic sprinklers are provided or exempted as per IBC Section 903.2 Sprinkler system required in portions of E occupancies below the lowest level of exit discharge (main floor). REVISIONS Stories without openings are sprinkled as per IBC Section 903.2.11.1 Changing the basement to an E occupancy would also require sprinklers due to a lack of exterior openings. For an existing building, only the current use may continue without adding sprinklers now required by the current building code. Sprinklers are also required Where walls are added in basements with no exterior openings. REVISIONS Inspector Comments Proposed preschool use, occupancy type E, in 1800 sf basement (partial storage). Number of children would be 12.