HomeMy WebLinkAboutALL DOCS - 16-00472 - 142 E Main Rigby Consultation - Pre-school Classroom - BasementInspection
Ticket
Building Inspector Consultation on 07/08/2016:
Permit Number: 16-00472Permit Details
Consultation case
Permit Issued Date:
Final Inspections Required
142 E Main Rigby
Consultation - Pre-school Classroom - Basement
Inspection Details
quintono@rexburg.org
Inspected By: Quinton Owens
Building Inspector Consultation on 07/08/2016:
D ESCRIPTIO N CO MMEN TS STATUS
Automatic sprinklers are provided or exempted
as per IBC Section 903.2
Sprinkler system required in portions of E
occupancies below the lowest level of exit
discharge (main floor).
REVISIONS
Stories without openings are sprinkled as per
IBC Section 903.2.11.1
Changing the basement to an E occupancy
would also require sprinklers due to a lack of
exterior openings.
For an existing building, only the current use
may continue without adding sprinklers now
required by the current building code.
Sprinklers are also required Where walls are
added in basements with no exterior openings.
REVISIONS
Inspector Comments
Proposed preschool use, occupancy type E, in 1800 sf basement (partial storage).
Number of children would be 12.