HomeMy WebLinkAboutSOIL TEST - 06-00184 - Madison Memorial Hospital - AdditionMarenlRLs
Tesrrua &
lruspecrtoN
ASTM D-2922 Density of Soil and li:.'.fl:,:1,,,,,,.,
Soil-Aggregate in Place by Nuclear []!::'l"SL"":t\E6oo62c
Methods (Shallow Depth)EXP\RPT31 OMD.DOC
E Environmental Services tr Geotechnical Hncineerins tr Construction Materials Testing tr Special lnspecticns
Val Christensen
City of Rexburg Building Department
PO Box 280
Rexburg, ID 83440
Project:
Permit #:
Project Manager:
Inspector:
Inspection Date:
Phone: (208)359-3020
Fax: (208)359-3024
Other:
Madison Memorial Hospital
Expansion, Rexburg
06-00184
Troy Posio
Gary Billman
September 29r2009
As requested, MTI performed density testing in accordance with current applicable standards. Required
compaction is95oh. The results obtained are as follows:
.
Comp.
Test
11t
Location & Depth
*All tests taken using Backscatter method
Floor slab of new purchasing room, top of base: l6' south
and 30' west ofnortheast room corner
Wet Percent Dry Mat'I.
Density Moisture Density Type
Pass/
Fail
I
2
J
l0' west and 15' east of southwest room corner 130.0 2.7
12' eastand 2' south of entry way on west side of room 130.3 3.6
Method of testing: BS is Backscatter; Depth in inches is Direct Transmission
Material Type: 1: l27.0pcf @ 8.0Yo Native - native pit run with silt and sand (P2871)
Gauge Information:
MTI #: 44 Make & Model: Troxler 3430 27576 Standard Counts: DS: 2351
27s1 S. Victory view wayleoG;lD-E3763 208-376-4748 Fax:20ffi
t30.2 3.6 12s.6 I
126.6 I
125.8 I
99 Pass
100 Pass
99 Pass
ASTM D-1557
If you have questions concerning this report (rpt3 lOmd.doc), please contact us immediately.
Respectfully submitted,
MATERIALS TESTING & INSPECTION. INC.
4
Reviewed by: JasonTaylor, E.I.T.
StaffEngineer
CC: Mark Harrison, Madison Memorial Hospital; Mike Buehner, Reaveley Engineers; Jon Erdmann, Architectural Nexus, Inc.; Okland Construction;
Val Christensen, City of Rexburg Building Department
Email: mti@mti-id.com Website: www.mti-id.com