Loading...
HomeMy WebLinkAboutSOIL TEST - 06-00184 - Madison Memorial Hospital - AdditionMarenlRLs Tesrrua & lruspecrtoN ASTM D-2922 Density of Soil and li:.'.fl:,:1,,,,,,., Soil-Aggregate in Place by Nuclear []!::'l"SL"":t\E6oo62c Methods (Shallow Depth)EXP\RPT31 OMD.DOC E Environmental Services tr Geotechnical Hncineerins tr Construction Materials Testing tr Special lnspecticns Val Christensen City of Rexburg Building Department PO Box 280 Rexburg, ID 83440 Project: Permit #: Project Manager: Inspector: Inspection Date: Phone: (208)359-3020 Fax: (208)359-3024 Other: Madison Memorial Hospital Expansion, Rexburg 06-00184 Troy Posio Gary Billman September 29r2009 As requested, MTI performed density testing in accordance with current applicable standards. Required compaction is95oh. The results obtained are as follows: . Comp. Test 11t Location & Depth *All tests taken using Backscatter method Floor slab of new purchasing room, top of base: l6' south and 30' west ofnortheast room corner Wet Percent Dry Mat'I. Density Moisture Density Type Pass/ Fail I 2 J l0' west and 15' east of southwest room corner 130.0 2.7 12' eastand 2' south of entry way on west side of room 130.3 3.6 Method of testing: BS is Backscatter; Depth in inches is Direct Transmission Material Type: 1: l27.0pcf @ 8.0Yo Native - native pit run with silt and sand (P2871) Gauge Information: MTI #: 44 Make & Model: Troxler 3430 27576 Standard Counts: DS: 2351 27s1 S. Victory view wayleoG;lD-E3763 208-376-4748 Fax:20ffi t30.2 3.6 12s.6 I 126.6 I 125.8 I 99 Pass 100 Pass 99 Pass ASTM D-1557 If you have questions concerning this report (rpt3 lOmd.doc), please contact us immediately. Respectfully submitted, MATERIALS TESTING & INSPECTION. INC. 4 Reviewed by: JasonTaylor, E.I.T. StaffEngineer CC: Mark Harrison, Madison Memorial Hospital; Mike Buehner, Reaveley Engineers; Jon Erdmann, Architectural Nexus, Inc.; Okland Construction; Val Christensen, City of Rexburg Building Department Email: mti@mti-id.com Website: www.mti-id.com