Loading...
HomeMy WebLinkAboutTEST REPORT - 12-00158 & 12-00159 - Burton Elementary Addition & Site Plani^-cD t5t-1 s-rFraTa G€O'E{}XNIGAL EN6III€ERING & MATERIAIS 1E9IING !**agn?7 €rm +ka Qrutld U7 Client:Madison School District PO Box 830 Project: Project Address: Contractor: Placement Location: Reported by: Mix No.: Cement: Admixtures: SPEC/F/CAIIONS Slump, inches: Air Content, %: Report No.: Date: Client No.: 04t17t09 MADDISRexburg, lD 83440 South Side of Bus lype l& ll Project No.: PO8053A Pdrmit No.: NR Supplier:Walters 192 Method of Mixing: Aggregate Source:Stock Pile Transit 46r Agg. Correction Factor:N/R REQUIRED STRENGTH, PSI 3000 @ 28 days GONCRETE CYLINDER TEST REPORT MATERIALS AND MIX DATA Slump, inches: Air Content, %: Unit Weight, pcf: Conc. Temp. 'F: Air Temp, "F: Date Cast: Time: Sample No.: Cylinder ID 21t2 5€- ltlR -- 71 5S--Wffiv--sy: (ASTM C-143) (ASTM C-231) (ASTM C-138) (ASTM C-1064) GA - STRATA Truck No.: Ticket No.: Time Batched: No. CY represented: Water Added, gal.: Weather: Date Received: 94 10513 1:17 PM 2.5 NR NR 04t18t09 P09092 Cylinder Diameter 'Total Load Fracture Type Date Tested Age Tested Comp.' Strength 28 Day Average: Reviewed By: IDAHO MONTANA NEVADA OREGON UTAH WAsHINGTON 4540 in accordance with ASTM C 172 were cast and cured in accordance with ASTM C 31 LABORATORY TEST DATA NR = NOT RECORDED www.stratageotech.com 2Str$ Garrett lffa}, - $te. C Focatellxr, ldaho &32*1 ?.?,0*"Zg?.34$0 F" 2{8"2A?"9449