Loading...
HomeMy WebLinkAboutSITE & BLDG PLANS - 04-00093 - Eagle Rock Dental_ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , ,. ,,. .. � ,, .. ,� :. _. ,. ,, ...... .i, �,. F. ' _ _ _ _ _ _ , �� __. __� 1 IM COVER CATCH BASIN G-1 INDEX/ABBREVIATIONS/CONTACTS P -1 MASTER PLAN P- T UTILITY PLAN P -3 UTILITY P LAN P-4 UTILITY PLAN D-1 WATER DETAI LS D -2 WATER DETAILS D -3 WATER & SEWER DETAILS -4 STREET SEWER DETAILS D-5 STORM DETAILS _ CATCH BASIN i INSIDE IA R IA. DIAMETER E EAST EL_ . ELEVATION FF FINISHED FL FT FEET -10 FRONT OF WALK INV INVERT L.F. LINEAR FEET ,. -_ NTS MAXIMUM MIN. MINIMUM mi MECHANICAL JOINT N NORTH PE POLYETHYLENE R RADIUS RE ' REQ'D REQUIRED S SLOTH SH SCHEDULE STD STANDARD TBC TOP BACK OF CURB TEMP TEMPORARY TYP TYPICAL EST y PHONE # WATER NOTES: CITE' OF REXBURG ENGINEERING DEPARTMENT , , .. .. . ®,.... .. ..... ., ......... . ... „,, . „,,,,,,, ... , . ..., ....... . JOHN MILLAR ................. .............................................. ) 3--0 DE ...................................................................................... ....I.......................... WILLIE TEUSCHR .......................... ............................... 208 528-2650 "Y� ............................... ........ ............................ . ... .. ..... ..._ . �I�LiN BALL BEFORE l„1 ICI . . ..... .,.......... .. .., ......... .... ., ..,, ....,,,...,.,.,...... .� E 342 1 OWNER.................. ,,,.,..,,....,.,............... .............................,. ..,.,,,..,....,..._.,..,..TERRA BAGLEY ....,.,........................ .,....,.,...,.......,...,...... 208 313-1999 SHIESS & ASSOCIATES ENGINEER ............ ..........................................®..,,,,....,....,,.. ............................... ` ........................... ............................... PAUL S�C�RES� —1 PROJECT MANAGER ............................................................ ............................... LIGHTING MOTES: 1. PROPOSED PARKING LOT LIGHTING 50+ RADIUS FOR THE LIGHT B 25' GALVANIZED LE WITH A 6' ARM WITH A FLAT LENS AND A 150 WATT HIGH PRESSURE SODIUM LIGHT BULB. 2. EACH BUILDING IS TO BE EQUIPPED WITH TWO EXTERIOR LIGHTS IN THE REAR AND A PORCH LIGHT ABOVE EACH ENTRY IN THE FRONT. STORM STREET TES: 1. GRAVITY STORM DRAIN PIPE IS TO BE PVC RIBBE D ,'SST -794. 46PSI. 2. USE CURB AND GUTTER TYPES SHOWN N THE PLANS. 3. ALL CONCRETE SHALL BE CURED WITH A CURING O P UN MEETING REQUIREMENTS OF AST -1315. SEWER _ NOTES 1. ALL SEWER MAIN LINE PIPING IS TO BE AST --3034 SDR SD( 35. 2. ALL SEWER SERVICES TO EACH BUILDING ARE TO BE 4 INCH DIAMETER. . 3. GRADE ALL FINISH SURFACES AWAY FROM MANHOLE LIDS. m . 5. f. 7. Im m WT i.1,, Hill ALL FIRE HYDRANTS TO BE WATEROUS OR CLOW BRAND. FIRE HYDRANTS SHALL HAVE TWO 2-1/2- DIAMETER HOSE NOZZLES, AN ONE 4-1/2” DIAMETER HOSE NOZZLE. COORDINATE ALL METER INSTALLATIONS 1TH THE CITY OF RED UR. PROPOSED MANHOLE EXIST. MANHOLE CHECKED: EXISTING CURB & GUTTER : i Teton , PROPOSED CURB & GUTTER _ ss_8 PROPOSED SANITARY SEWER - PROPOSED STORM D I N. PROPOSED WATERLINE -10 EXISTING STORM DRAIN SEWER SIB EXISTING STORM IN ' -8 EXISTING WATERLINE ,. -_ NTS PROPOSED FIRE HYDRANT PROPOSED WATER VALVE EXIST, FIRE HYDRANT EXIST. WATER VALVE PROPOSED CATCH BASIN DIRECTION OF DRAINAGE FLOW PROPOSED LIGHT POLE -- EASEMENT RIGHT-OF-WAY EXISTING PROPOSED THIS PROJECT ................ FUTURE LANDSCAPE CONCRETE DU STER y PHONE # WATER NOTES: CITE' OF REXBURG ENGINEERING DEPARTMENT , , .. .. . ®,.... .. ..... ., ......... . ... „,, . „,,,,,,, ... , . ..., ....... . JOHN MILLAR ................. .............................................. ) 3--0 DE ...................................................................................... ....I.......................... WILLIE TEUSCHR .......................... ............................... 208 528-2650 "Y� ............................... ........ ............................ . ... .. ..... ..._ . �I�LiN BALL BEFORE l„1 ICI . . ..... .,.......... .. .., ......... .... ., ..,, ....,,,...,.,.,...... .� E 342 1 OWNER.................. ,,,.,..,,....,.,............... .............................,. ..,.,,,..,....,..._.,..,..TERRA BAGLEY ....,.,........................ .,....,.,...,.......,...,...... 208 313-1999 SHIESS & ASSOCIATES ENGINEER ............ ..........................................®..,,,,....,....,,.. ............................... ` ........................... ............................... PAUL S�C�RES� —1 PROJECT MANAGER ............................................................ ............................... LIGHTING MOTES: 1. PROPOSED PARKING LOT LIGHTING 50+ RADIUS FOR THE LIGHT B 25' GALVANIZED LE WITH A 6' ARM WITH A FLAT LENS AND A 150 WATT HIGH PRESSURE SODIUM LIGHT BULB. 2. EACH BUILDING IS TO BE EQUIPPED WITH TWO EXTERIOR LIGHTS IN THE REAR AND A PORCH LIGHT ABOVE EACH ENTRY IN THE FRONT. STORM STREET TES: 1. GRAVITY STORM DRAIN PIPE IS TO BE PVC RIBBE D ,'SST -794. 46PSI. 2. USE CURB AND GUTTER TYPES SHOWN N THE PLANS. 3. ALL CONCRETE SHALL BE CURED WITH A CURING O P UN MEETING REQUIREMENTS OF AST -1315. SEWER _ NOTES 1. ALL SEWER MAIN LINE PIPING IS TO BE AST --3034 SDR SD( 35. 2. ALL SEWER SERVICES TO EACH BUILDING ARE TO BE 4 INCH DIAMETER. . 3. GRADE ALL FINISH SURFACES AWAY FROM MANHOLE LIDS. m . 5. f. 7. Im m WT i.1,, Hill ALL FIRE HYDRANTS TO BE WATEROUS OR CLOW BRAND. FIRE HYDRANTS SHALL HAVE TWO 2-1/2- DIAMETER HOSE NOZZLES, AN ONE 4-1/2” DIAMETER HOSE NOZZLE. COORDINATE ALL METER INSTALLATIONS 1TH THE CITY OF RED UR. .DRAWN: CHECKED: 1 it achiess ,ssoiciates ENGINEERING- PLANNING -LAN�D SURVEYING Maho Falls 522-1244 Rexburg 358—SM : i Teton , „ D si: PROJECT NO. r I r r PHS REVISIONS r , r H or dasign This document or 'Ony concept is the property of Schiess & Associates and lw. 8, a4l not be copied in ony fiorm without the written �i GENERAL r HDRZ. SCALE: NTS ,. -_ NTS FUTURE _ TB = . !HJ !L6[3j IIiEt I! C t l t F t t l a[ 1 tat 6 3 { t H 6. i 1 ! }961 B PFFIB6f 3I P t a 41 995 /J4 @ /JBLtBH @@iH8 @1f1 I@ 1 8 f A fFl t ' 'y`' ••�• JJJfpF " "•x ® ISJ111341JlIIHCtIHxil@&1 tiHxlllSFiv ;I LS sFtIFt HJ5tlAl tl 111J1{ i@ H1110B1{ 5HIl H@{ IJ@@ 115tIJl@ ItJ@{ iJStl i5l111J3111f IJ11ix11Jt1tItltlillIHSi13it34itaFI36i1J tIJJi1l1IB@ 1104t IJf115{ Ii1611@ fililitE [Ft;t1lSlFx+teltlxtxldtv:ttHkt IiEit11 { HItJ111 ti te.. 11 -I t.... 5@1' 1 J... .......... ..... .........,............................................._..........._............ ..............................° .......... ............,............ .........e...................., ,... - STUB OUT 1 FUTURE STORM E t MH RATE= m B _g INSTRUMENT # 239546 BAGLEY ENTERPRISES EXISTING BUILDING li TBC=61 M LIP DOWN CURB TBC=61.00 TBC=59.90 H I i TBC=59.60 T �_.�... .0 f RIM=59.90 + N&S INV-=5J.95 /-4" SANITARY C1r_M%11r%r" TBC=59.80 -J C B 1-_CB GRATE=59.50 _j CN a DRAT E:9'59.50 INV= 6.33 -6 0. 0 BLOCK LOT IN . =55° CB TBC fO. 00 GRATE=59.59---- --- LO 0.40 ac. 0 6.5 INV. 7-_56-13 0 LO @ TBC=6 EXISTING S, HIGH POINT 8" WATER T 60.38 HIGH POINT TBC=60.38 PHONE BOX 00 TIC 9.20 I 0 GRAT .70 TBC=59° 25 G RAT 5 C) < M L TRANSFORMER 60 q q4 NOTE: SINCE THE WATERLINE AND SEWER CROSSINGS EXISTING FIRE HYDRANT ARE AT APPROXIMATELY THE SAME ELEVATION 124' THE WATER LINE MUST BE LOWERED AND PLACED T \N LO FF=61.20 TBC=59-50 BLOCK 2 BENEATH THE SEWER LINE. FOLLOW ALL \N REMOVE EXISTING SIDE W ALK, LOT 7 REQUIREMENTS OF DETAIL 2 ON SHEET D-1. CURB AND GUTTER .1 C ac. USE FLEXIBLE COUPLER TO SS-5 EXISTING 8" SEWER TRANSITION FROM D.I. PIPE MIS M IN CITY ROW TO PVC PIPE i WATER METER INV.=52.36 IN PRIVATE PROPERTY INSTRUMENT # 239546 BAGLEY ENTERPRISES EXISTING BUILDING li TBC=61 M LIP DOWN CURB TBC=61.00 TBC=59.90 H I i TBC=59.60 T �_.�... .0 f RIM=59.90 + N&S INV-=5J.95 /-4" SANITARY C1r_M%11r%r" PROJECT NO. 03110 SHEET NO. P — 3 TBC=59.80 -J C B 1-_CB GRATE=59.50 a DRAT E:9'59.50 INV= 6.33 TBC=59.50 BLOCK LOT IN . =55° CB TBC fO. 00 GRATE=59.59---- --- 0.40 ac. 0 6.5 INV. 7-_56-13 0 @ TBC=6 EXISTING S, 8" WATER PHONE BOX 00 TIC 9.20 I 0 GRAT .70 TBC=59° 25 G RAT 5 REMOVE EXISTING SIDEWALK, CURB AND GUTTER TRANSFORMER q4 NOTE: SINCE THE WATERLINE AND SEWER CROSSINGS EXISTING FIRE HYDRANT ARE AT APPROXIMATELY THE SAME ELEVATION THE WATER LINE MUST BE LOWERED AND PLACED \N TBC=59-50 BLOCK 2 BENEATH THE SEWER LINE. FOLLOW ALL \N REMOVE EXISTING SIDE W ALK, LOT 7 REQUIREMENTS OF DETAIL 2 ON SHEET D-1. CURB AND GUTTER .1 C ac. SS-5 EXISTING 8" SEWER MIS M INV.=52.36 DRAWN: KJR CHECKED: KJR Schiess & Associates UTI LITY P LAN 1 KJR KAM! .... ........... r ! NO. REVISIONS BY E DESIGNED: K JR APPROVED: H Tet-on Professional Park This document or any part thereof in detail or design" ENGINEERING- PLANNING -LAND SURVEYING concept is the property of Schiess & Associates and CAD NAME: shall not be copied in any form without the written HORZ. SCALE: 1 50 Idaho Falls 522-1244 Rexburg WS-U*2 CIVIL SITE WOR'K authorization of Schiess & Associates. SITEPLAN 'VENT. SCALE: ki /A COPYRIGHT02003 PROJECT NO. 03110 SHEET NO. P — 3 MH RIM=58.00 t It . =54.10 C4 V :36# ------ 32® -4 11rFUTURE TBC=58-88 TBC=59.90 FUTURE CB RADIUS--20 (TYP.) TBC=58.20 TBC=59.60 0 GRATE -_ 57.50 Fdd ............... ...... ......... .... .. ...................................... .......................... ....... ........... ..... .................................... ......... ......................... ............. .... .. cdsF 010, ........................... I .................. ....................................... ......................... ............................. . .... ................ . ...... ........ ..46 W4E9/ dl 1 n, M F TlI E F T RE -)-_L- END INV.=53.25�,��9L.F. @ 0.22 M Ing M1 47 1 a, IN SS-8 --j SD -12 M• RIM=MATCH EXISTING SURFACE W W W W W SS-8 .... ...... ... -.- SS-8 SS-8 SS-8 --�- SS-8 SS-8 -�- SS-8 SS--8 SD-12 SD- 12 d9shk 0 Jr,v Ass AM AM I A-% 1; Nchie%,ss & uu, ates 16, -LA,ND SURVEYING :ENGI EERING*PLAN�NING Idaho Falls 522-1244 :Rexburg 356—W92 COPYRIGHT (D 2003 -1p",-TBC= 9,20 G RAT .70 `°-PHONE BOXES K I UTILITY LAIN CIVIL SITE WORK ICU MH EXISTING 8" SEWER INV.=52,36 :'CHECKED, KJR a] W■M DESIGNED. KJR APPROVM PHS REVJSIONS This document or an part thereof in detail or design:!! y concept is the property of Schiiess & Associates and shall not be copied in any form without the written!J authorization of Schiess & Associates. 'CAD NAME: SITEPLAN VERT. SCA N/A d9shk 0 Jr,v Ass AM AM I A-% 1; Nchie%,ss & uu, ates 16, -LA,ND SURVEYING :ENGI EERING*PLAN�NING Idaho Falls 522-1244 :Rexburg 356—W92 COPYRIGHT (D 2003 -1p",-TBC= 9,20 G RAT .70 `°-PHONE BOXES K I UTILITY LAIN CIVIL SITE WORK ICU MH EXISTING 8" SEWER INV.=52,36 LOCATE AS SHOD ON THE PLANS . o VALVE VE TO FINISHED GRADE FINISHED 2f D PLACE SAFETY FLANGE OR < f, 2 \ ±\GI NTH BREAK 3W±d BOLTS ?° MIN 8" MAX. ±##2\ GRADE #a on \ #2 \f #f \\\ 2 #\ \\ ROINSWITM [Kolow-.Imi VALVE BOX SET TO FITTING SIZES TEES PLUGS U U DIA. AS REVD BY 1/2" BELOW n ;D -D: SIGNED: �APPROVE A B SPRINKLER SYSTEM FINISHED GRADE A B. A DESIGN BY OTHERS) FINISHED GRADE C-4 ly-2pt 1'—q" -is 1p-8pt JL 1'— 7" 0'— may W ATTS SERIES Me Fr- it-11 2 5 5 —11 21 2 V-10" 009 RPZ 9" VALVE NUT EXTENSION TO 8)9 20-8" 21-600 BACKFLOW 31— 01P WITHIN 6" OF SURFACE -.1 " i qvp PREVENTOR OR 3?— 4" 31-3" L207% 31 —10#1 3$-01% EQUIVALENT I NOTES THIS SHEET: 1'-11 tH 12" ti S-10" 4P-8pt 1. SIZE BACKIFLOW PREVENTOR PER THREADED GATE VALVE ' -3" j 2J " —3 14" IRRIGATION SYSTEM DESIGN (BY (3" AND LARGER ONLY) 6'— 691 4' -11'A 4P-9'p 3— 5"' OTHERS). '_5" 2. IRRIGATION SERVICES ARE TO Ap BE PLACED PER IRRIGATION THREADED DESIGN (BY OTHERS). THRUST BLOCK GALV. PIPE 3. USE METER BOX DETAILS AND SIZES IN ACCORDANCE WITH CITY OF REXBURG REQUIREMENTS AND USE RESTRAINED JOINT TEE FOR : ;: IN ACCORDANCE NTH IRRIGATION 3" AND LARGER IRRIGATION SYSTEM DESIGN NEEDS BY SERVICE, USE A CORP STOP FOR i OTHERS). 2" OR SMALLER INSTALLATIONS RESTRAINED JOINT L----------- j WATER METER IN BOX 4 PIPE PER IRRIGATION SEE NOTE 3 DESIGNER RESILIENT SEAT GATE VALVE FOR 3" AID TYPICAL IRRIGATION SERVICE LARGER SERVICES. USE CURB STOP FOR 2 OR SMALLER INSTALLATIONS DIMENSION FOR THRUST BLOCKING FITTING SIZES TEES PLUGS 90'BEND 45* BEND ,'YES REDUCERS & 22* BEND n ;D -D: SIGNED: �APPROVE A B A B A B. A B 4 11-7*0 ly-2pt 1'—q" 1p-8pt 01 -1. 0" 1'— 7" 0'— may 6" 2'— 0 it-11 2 5 5 —11 21 2 V-10" 1 7" 9" 0'-10" 8)9 20-8" 21-600 -7 31— 01P 2P-5p' -.1 " i qvp 10"' 3?— 4" 31-3" L207% 31 —10#1 3$-01% 2'— 9 " 2F-2v' 1'-11 tH 12" 4'— 0 S-10" 4P-8pt 41— 8 1V " 3P—B ' -3" " 2 7 2J " —3 14" 5'— 5" S— 10" 6'— 691 4' -11'A 4P-9'p 3— 5"' 30-5 1; '_5" b. 4 1�t N' Nv \A V/ A TEE 3 � THRUST BLOCKING DETAIL REDUCER 0 CY U-1 CL Uj 0 I y. a TOUCH READ BUTTON-\,, 1" METER-\ n 1 12" BARREL EXTENSION----___, C ;: HECKED: P"ff,v KJR A01b Schiess: Associates 1 " S 40 n ;D -D: SIGNED: �APPROVE REVISIONS KJR P'HS This document or any part thereof in detail or design S/W CAPS ENGI�NEERING* PLANNING -LAND SURVEYING ME: H�ORZ. SCALE: NTS concept is the piroperty of Schiess & Associod-1- sholl not be copied in any form without the written tdoho Faft, 622-1244 Rexburg W6-6092 authorization of Schiess & Associates. DETAILS ERT. SCALE COPYRIGHT02003 0 CY U-1 CL Uj 0 I y. a TOUCH READ BUTTON-\,, 1" METER-\ n 1 12" BARREL EXTENSION----___, U0j 1 " S 40 PVC PIPE WITH S/W CAPS CL LU 0 uj z STRAP SERVICE LINE TO 1" PIPE WITH Uj > bj 0 ELECTRICAL TIE 0 > C) iy- 2" MIN. bj V) STD SIZE POLYTUF 0 < METER BOX OR EQUAL U-) 0 LL M 1" IPS SDR-7 HIGH 0 I MOLECULKK-)ENSITY POLYETHYLENE PIPE, CONNECT TO METER & ANGLE METER VALVE W/APPROXIMATE FITTINGS --- HOUSE SIDE — TOUCH READ BUTTON RING 12" BARREL EXTENSION—, 1 1/2" OR 2" METER 1 1/2" OR 2" PE SERVICE LINE AS REQD ,--LID & COVER XfSIDEWALK, STREET OR LAWN LEVEL ,-2fi' POLYETHYLENE INSULATION PAD FOR 1 1/2" & 2" METERS rNAML & UUVLK-\ (2) #4 DEBAR HOOPS fi ®p FINISHED GRADE I CONCRETE COLLAR PRECAST MONOLITHIC CONCENTRIC CONE SECTION ``�— GASKET ALL JOINTS PRECAST CONCRETE MANHOLE- BARREL SECTIONS AS RE'D 4 0 COMPACT 1" M.X. BAC FILL IN 6r LAVERS TO 95% OF ASTIR D- 698 --. l COMPACT APPROVED f of l ��. BEDDING MATERIAL r t - TO 95% OF A�STP� D-698 9 MAX MAX ...- -� � . ;-- `'�,s1 � err ,` :• t n f .. ` •. if SHAPED UNDISTURBED SOIL. EXCAVATE FOR BELL HOLES. SHAPED SUB'CRADE GRANULAR FOUNDATION PIPE BEDDING FOR RIGID PIP RUBBER BOOT PIPE BEDDING DETAILS 4NISH GRADE -- FINISH GRADE CAP OR PLUG AND INSTALL SERVICE LIFE MARKER PER SD -512 (TYP. ) p MIN- GRADE 1/4 /FT. 2 1 4 �` FT.�2 �� SIN, GRADE 4"-1/8 OR 1/16 1 BEND AS NEEDED 2 -5' BENDS ABSOLUTE MIN. GRADE 1 /8 " /FT. 1 % > ON NOT E6 MIN. GRADE 1 /4 -/FT, (2%) I 1. ALL SERVICE LINES TO BE 4" _ y INSIDE DIAMETER UNLESS OTHERWISE NOTED. r 2. TYPE "C" SERVICE WILL ONLY BE ALLOWED IF SPECIFICALLY APPROVED ' BY THE ENGINEER. 3. TYPE "E" ALLO'C'ABLE FOR TRENCHES 15 FT. DEEP OR GREATER NTH n PPE— APPROVAL BY THE ENGINEER. f. -no 4. USE " OF TYPE I BEDDING ALL AROUND EACH SERVICE. 3 SANITARY SEWER - SERVICE LINES fig, s� j /o ti.�.Jti •• `� �s,�ri TEE OR APPF CGNNECTIn TYPE (SEE NOTE 2) Teton -Professional Prark CONNECTION TYPE A TYPE x.� SIDEWALK 4' TOP BACK OF CURB PROFILE GRADE SEMINARY STREET-,- LIP OF GUTTER 2 SCORE LINE PLAN 1 )FLARED DRIVEWAY DETAIL CRUSHED ;GRAVEL BASE I I 2 psi T low SLOPE LOPE A 44 8" I 11-6" 6 � LIP DOWN CURB & GUTTER DETAIL ME N,chiess & Associates ENGINEERI;NG*P'LANN�lNG�,PLA,N;D SURVEYING Who Fdlm $22-1244 Rexburg 358—W92 44S COPYRI(W92DO3 STREET & SEWER DETAILS 03110 NO. CIVIL SITE WORK I SHEET D:-4 ;CHECKED: ........................... KJR DESIGNED- I APPROVED: REVISION5� KJR PHS This docuim;enit or any part thereof in detail :or desiqn�'i concept Is the property of Schiess & Associates and AD NAME: HORZ. SCALE- N Tz tte shall not be copied In any form without the wrli n authorization of Schloss & Associate&. 11 DETAILS : VERT. SCALE. N,chiess & Associates ENGINEERI;NG*P'LANN�lNG�,PLA,N;D SURVEYING Who Fdlm $22-1244 Rexburg 358—W92 44S COPYRI(W92DO3 STREET & SEWER DETAILS 03110 NO. CIVIL SITE WORK I SHEET D:-4 M/ cl ADJUSTING BOLTS - C3 #4 REBAR BY MANUFACTURER- KNOCKOUTS TYPICAL (4) SIDES 18" DIA. TO RECEIVE UP TO 15" DIA. PIPE - GASKET FOR PLASTIC PIPE Aoft m 3chiess & Associates ASL AM ENGINEERING-PLANNING -LAND SURVEYING kfoh(L- COPMGHT02003 I GRATE A 9P INLET BOO 1 —0 I 'd Cl CURB & CUTTER SEE DETAIL - TBC ,-- SIDEWALK sLoPE ('B-- SECTION B 31-0"x6"x3/8" STEEL PLATE 3 1/2" 2" STORM DETAILS CIVIL SITE WORK MARK LOCATION SIZE LENGTH QUANTITY C3 CURB AND BOX 4 ,_o,9 4 cl ADJUSTING BOLTS - C3 #4 REBAR BY MANUFACTURER- KNOCKOUTS TYPICAL (4) SIDES 18" DIA. TO RECEIVE UP TO 15" DIA. PIPE - GASKET FOR PLASTIC PIPE Aoft m 3chiess & Associates ASL AM ENGINEERING-PLANNING -LAND SURVEYING kfoh(L- COPMGHT02003 I GRATE A 9P INLET BOO 1 —0 I 'd Cl CURB & CUTTER SEE DETAIL - TBC ,-- SIDEWALK sLoPE ('B-- SECTION B 31-0"x6"x3/8" STEEL PLATE 3 1/2" 2" STORM DETAILS CIVIL SITE WORK CN Non-Std Secondary Part Schedule Part Thick. Depth Lap 002C2107217 040590 8 1/21, 4 0 T —011 25 1 -2tv SECONDARY ELEVATION AT D RN VP Buildings, Inc. 3200 Players Club Circle Memphis TN 38125 SECONDARY ELEVATION AT D ZEVI DATE I BY 1- DESCRIPTION BUILDER AnRa VP Ref: Shy Name = Main 1. Wall = 7 THE VP ENGINEER'S SEAL APPLIES s Building OOIBC HE DRAWING, INCLUDING THE INFORMATION HEREON, ONLY TO THE WORK PRODUCT OF Code: REMAINS THE PROPERTYOF VP 8UILDING.S. VP AND DESIGN AND PERFORMANCE Live Load: (Reducible) 20.00 psf rr IS PROVIDED SOLELY FOR ERECTING THE BUILDING D REQUIREMENTS SPECIFIE BY VP. THE VP ENGINEER'S SEAL DOES Coll. Load: Gravity 1.00, Uplift 0.00 psf DESCRIBED IN THE APPLICABLE PURCHASE ORDER AND SHALL NOT BE MODIFIED REPRODUCED OR USED FOR NOT APPLY TO THE PERFORMANCE Wind Speed: 90.00 mph ANYOTHER PURPOSE WfrHOUT PRIOR WRffTEN APPROVAL OF VP BUILDINGS. OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP Wind Exposure: C THE GENERAL CONTRACTOR ANDIOR ERECTOR IS SOLELY EXCEPT TO ANY DESIGN OR PER- Roof Snow: 35.00 psf RESPONSIBLE FOR ACCURATE, GOOD QUALrTYWORKMANSHIP FORMA 'CE REQUIREMENTS SPECIFIED BY VP. Snow Exposure Category: 1. Fully Exposed IN ERECTING THIS BUILDING IN CONFORMANCE WITH THIS DRAWING, DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP ERECTION GUIDES, Seismic Hazard / Use Group: Group 1 AND INDUSTRY STANDARDS PERTAINING TO PROPER ,BLj_jjdjp_a' Use:a:L_aL�jar� Qcgj;gg1pgy StL�LQL1'j=_j E RECTION, INCLUDING THE CORRECT USE OF TEMPORARY BRACING, RN VP Buildings, Inc. 3200 Players Club Circle Memphis TN 38125 SECONDARY ELEVATION AT D ZEVI DATE I BY 1- DESCRIPTION BUILDER AnRa OPart Mark Key I 03CO611417 I T-i I ;61 -011 0 IF 9141114�111111 VP Ref: Shape THE VP ENGINEER'S SEAL APPLIES Building Code: OOIBC ONLY TO THE WORK PRODUCT OF VP AND DESIGN AND PERFORMANCE Live Load: (Reducible) 20,00 p REQUIREMENTS SPECIFIED BY VP. Coll. Load:Gravity 1.00, Uplift 0.00 psf THE VP ENGINEER'S SEAL DOES NOT APPLY TO THE PERFORMANCE Wind Speed: 90.00 mph OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP Wind Exposure: C EXCEPT TO ANY DESIGN OR PER- Roof Snow: 35.00 psf FORMANCE REQUIREMENTS SPECIFIED BY VP. Snow Exposure Category: I Fully Exposed .Seismic Hazard / Use Group: Group 1 Main 1, Wall = 8 THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTYOF VP BUILDINGS. IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRiBED IN THE APPLICABLE PURCHASE ORDER AND SHALL NOTBE MODIFIED REPRODUCEDOR USED FOR ANY OTHER PURPOSE WNOUT PRIOR WRITTEN APPROVAL OF VP BUILDINGS. THE GENERAL CONTRACTOR ANDJOR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE, GOOD QUALITYWORKMANSHIP IN ERECTING THIS BUILDING IN CONFORMANCE WITH THIS DRAWING, DETAILS REFERENCED IN THS DRAWING, ALL APPLICABLE VP ERECTION GUIDES, AND INDUSTRYSTANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OF TEMPORARY BRACING, VP Buildings, Inc. 3200 Players Club Circle Memphis TN 38125 :NO'S 12/10/2003 5:53:32 XNAME: 4091 aale Rock Den:i­.al 48xl24x1.0 12-8-01.VPC 15 UNLESS NOTED, USE 1/2 DIAMETER A-325 BOLTS FOR GIRT LAP, GIRT TO FRAME, FLANGE BRACE TO FRAME, FLANGE BRACE TO GIRT, JAMB AND HEADER CONNECTIONS. SEE JOB DETAILS FOR BOLT LENGTHS, 2. WIND AND FLANGE BRACING ARE AN INTEGRAL PART OF THE WALL STRUCTURAL SYSTEM AND SHOULD BE PROPERLY INSTALLED PRIOR TO ERECTION OF WALL AND ROOF SHEETS. REMOVAL OR ALTERATION OF WALL BRACING WITHOUT PRIOR AUTHORIZATION IS PROHIBITED. ve Her: ,jnape THE VP ENGINEER'S SEAL APPLIES Building Code: OOIBC ONLY TO THE WORK PRODUCT OF VP AND DESIGN AND PERFORMANCE Live Load: (Reducible) 20.00 psf REQUIREMENTS SPECIFIED BY VP. Coll. Load:Gravity 1.00, Uplift 0.00 psf THE VP ENGINEER'S SEAL DOES NOT APPLY TO THE PERFORMANCE Wind Speed: 90.00 mph OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP Wind Exposure: C EXCEPT TO ANY DESIGN OR PER- Roof Snowa 35.00 psf FORMANCE REQUIREMENTS SPECIFIED BY VP, Snow Exposure -Catecrory: 1 Fully Exposed Seismic Hazard / Use Group: Group I QggU2an 10 41-011 Main 1, Wall = 9 THE DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTYOFVP BUILDINGS. IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASE ORDER AND SHALL NOT BE MODIFIED REPRODUCED OR USED FOR ANYOTHER PURPOSE W*HOUT PRIOR WRITTEN APPROVAL OF VP BUILDINGS. THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE, GOOD QUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN CONFORMANCE WITH THIS DRA DF-TAL8 F ERENrED IN THE DRAWING, 'a W"'G 1 1' 10 .LL APPL ABLE VPj RECT N GUIDES, AND INDUSTRY STANDARDS PERTANNGTO PROPER ERECTION, INCLUDING THE CORRECT USE OF TEMPORARY BRACING, VP Buildings, Inc. 3200 Players Club Circle Memphis TN 38125 NTS'_'*____`___­_____ - 12/10/2003 5 o 53 : .3.3 CD XNAME: 40 91, Eaale Rock Df:mt.al 48x1.24x1.O 12-8-03.VPC SMIC 7 • STEEL Plf"JE COLD FORMED LIGHT GAGE SHAPES BRACE k ROLLED STRUCTURAL CABLES HOT SHAPES HOLLOW STRUCTURAL SECTION (HSS) ROOF AND WALL SHEETS BOLT GRADE 0 GRADE GRADE 55 GRADE E r O GRADE T GRADE GRADE 0 a� NOTED 7` ICI30 APPROVAL ISO 9001 CER C" OF LOS ANGELES TYPE 1 FABRICATOR BUREAU CITY OF SEATTLE CANADIAN WELDING D - DRAW NG RELEASE HISTORY - - TYPE DATE DESCRIPTION GENERAL NOTES 1. MATERIALS ASTM - STRUCTURAL STEEL PLATE A529 OR A572 OR A 1011 SS GRADE50 COLD FORMED LIGHT GAGE SHAPES A1011 SS GRADE55 BRACE RODS A572 GRADE UNLESS NOTED -_ - STRUCTURAL CABLES A475 GRADE EH HOT ROLLED MILL SHAPES A36 OR A72 F= 36 KSI OR GRADE H L TRU TU L SECTION (H SS) A500 GRADE B ROOF AND WALL SLEETS A653 OR A792 GRADE50 T A7 AND A325 A2, UNLESS DOTED 2. STRUCTURAL PRIMER AINT IS A DEIST INHIBITIVE PRIMER ND IS VP BUILDINGS THIS PAINT IS NOT INTENDED FOR LONG TERM EXPOSURE TO THE ELEMENTS, - 3. A325 BOLT TIGHTENING REQUIREMENTS DRAWING INDEX - _ - ALL HIGH STRENGTH BOLTED CONNECTIONS EXCEPT AS RIOTED OTHERVMSE ON THE DRAVMNGS AND DETAILS ARE SUBJECT TO AXIAL TENSION AND OR SLIP CRITICAL. AS SUCH THE BOLTS MUST BE FULLY PRE-TENSIONED AND - DRAWING TITLE PAGES INSPECTED IN ACCORDANCE VMTH THE LATEST EDITION THE AISCfiRCSC " SPECIFICATION FOR STRUCTURAL JOINTS USING ASTM A325 A490 T "' AND THE APPLICABLE BUILDING E. WASHERS HEF ARE NOT REQUIRED WIEN Cover, THE'7URN-OF-NUT'TIGHTENING PROCEDURE IS USED. IF OTHER BOLT TIGHTENING IN PROCEDURES ARE USED, LONGER BOLT AND WASHERS AS REQUIRED BY THE SPECIFICATION WILL BE REQUIRED. IT IS THE RESPONSIBILITY Notes OF THE CONTRACTOR TO ENSURE PROPER BOLT TIGHTNESS. Anchor Bolt Plan 4. BUILDER / CONTR ACTOR RESPONSIBILITIES Primary Structural VP BUILDINGS STANDARD PRODUCT SPECIFICATIONS APPLY AND UNLESS STIPULATED OTHERVV1SE IN THE - _ CONTRACT DOCUMENTS, VP BUILDINGS DESIGN, FABRICATION, QUALITY CRITERIA STANDARDS AND Secondary Structural TOLERANCES WILL GOVERN THE MRK A VP BUILDINGS spEcinCATION BOOKLET IS AVAILABLE UPON REQUEST) - - - IN E - DISCREPANCIES B EN �P UILDIN TUTU L AND PLANS TRADES, Coved ng THE VP BUILDINGS PLANS SHALL GOVERN, Drawings Special IT IS THE RESPONSIBILITY OF THE BUILDER / CONTRACTOR TO OBTAIN APPROPRIATE APPROVALS AND NECESSARY PERMITS FROM CITE", COUNTY, STATE, OR FEDERAL AGENCIES, A REQUIRED. Standard Erection Mails APPROVAL OF 'P BUILDINGS \/MN TITUTE THE BUILDER f T T ORS ACCEPTAN THE P BUILDINGS INTERPRETATION THE CONTRACT PURCHASE ORDER. ONCE THE HEAL t CONTRACTOR OR A/E FIRM HAS SIGNEDVP BUILDINGS APPROVAL PACKAGE, CHANGES - FROM THE PURCHASE ORDER BY THE BUILDER VVILL BE BILLED TO THE BUILDER l CONTRACTOR FOR MATERIAL, ENGINEERING, AND HANDLING FEES. SUCH NNE USE THE PROJECT T E MOVED FROM THE FABRICATION AND / OR SHIPPING SCHEDULE, A PENALTY FEE'MAY BE CHARGED IF THE PROJECT UST BE MOVED FROM THE FABRICATION AND/ OR SHIPPING SCHEDULE, AS LONG AS VP BUILDINGS DESIGN AND DETAILING APPROACH PLIE TH THE PURCHASE THE BUILDER f CONTRACTOR OR AIE FIRM ARE RESPONSIBLE FOR THE OVERALL PROJECT DITI ALL INTERFACE AND COMPATIBILITY CONCERNING ANY MATERIALS NOT FURNISHED BY VP BUILDINGS ARE TO BE CONSIDERED AND COORDINATED THE BUILDER/ CONTRACTOR FIRM, UNLE SPECIFIC DESIGN CRITERIA CONCERNING THIS INTERFACE BETWEEN MATERIALS IS FURNISHED AT PART OF THE PURCHASE ASE DER, VP BUILDINGS ASSUMPTIONS ALL GOVERN, THE BUILDER / CONTRACTOR IS RESPONSIBLE TO INSURE THAT ALL OTHER PROJECT PLANS ARID SPECIFICATIONS COMPLY VMTH THE APPLICABLE REQUIREMENTS OF ANY GOVERNING BUILDING AUTHORITY, SUPPLYING SEALED ENGINEERING DESIGN DATA AND DRAWINGS FOR THE VP BUILDINGS BUILDING NOT IMPLY OR CONSTITUTE AN AGREEMENT THAT VP BUILDINGS OR ITS DESIGN ENGINEER EER I ACTINIC AS THE ENGINEER EE OF RECORD OR DESIGN PROFESSIONAL FOR THE CONSTRUCTION PROJECT, THE BUILDER / CONTRACTOR IS RESPONSIBLE FOR SETTING OF ANCHOR T AND ERECTION STEEL BUILDING EDITS IN ACCORDANCE TH VP BUILDINGS "FCR CONSTRUCTION" DRAWNGS. TEMPORARY SUPPORTS - BRACING REQUIRED FOR THE BUILDING ERECTION TI LL BE THE RESPONSIBILITY OF THE ERECTOR TO DETERMINE, FURNISH, AND INSTALL. 5. VP BUILDINGS IS AN APPROVED FABRICATOR WITH THE FOLLOWING CERTIFICATIONS,,, ICBOAPPROVALS LOCATUT CA C AID APPROVAL # FA -240 FA -376 FA -377 FA -378 FA,- FA -401 ISO 9001 CERTIFIED �- CITY OF LOS ANGELES TYPE I FABRICATOR CITE OF SEATTLE CANADIAN ADIAN LDIN UR U DIVISION 1 CERTIFICATION VP Buildings, Inc. 3200 Players lab Circle Memphis TN 38125 THE VP ENGINEER'S SEAL APPLIES ONLY TO THE WORK PRODUCT OF VP Building Code: OOIBC THIS DRAWING. INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS. : � COVER SHEET AND DESIGN AND PERFORMANCE REQUIREMENTS SPECIFIED B VP. THE T, ve Load: (Reducible) 20.00 psf r VP ENGINEER'S SEAL DOES NOT APPLE` TO THE PERFORMANCE O �. DESIGN � � GN n Coll. %Oad &Giavit 1.00 Uplift 0.00 sf � a p � IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED N THE APPLICABLE PURCHASE ORDER AND � �, BUILDER J0 6 Teton West OF ANY OTHER PRODUCT OR COMPONENT FURNISHED �,r % P EXCEPT E P O Wind Speed: 90.00 mph p SHALLNC�TgI I�c�Di�IED ,�EI���t�UCEDc�RUSEDFaR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN CUSTOMER - ANY DESIGN OR PERFORMANCE REQUIREMENTS SPECIFIED BY VP. Wind Exposure: C APPROVAL OF VP BUILDINGS. DATE Roof Snow: 4 f p y THE GENERAL CONTRACTOR AND/OR ERECTOR _ SOLELY � LOCATION Snow Exposure Category: 1 Fully Exposed RESPONSIBLE FOR ACCURATE, GOOD QUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN CONFORMANCE WITH THIS BUILDINGS, INC. Idaho - PROJECT _ BUILDING A�'NICHECK Seismic Hazard / Use Gr ou Gr ou 1 ALLY PLI� B E VPBU LDINGS ECTION GUIIDE ' � qE 4091 Eagle Rock De'ntal 48x224 lO 12- �? VA9CO� PRUDEN - a Building Use :Standard Standard. c�ccu S ' � ��� �'.�U � tli r a' AND INDUSTRY STANDARDS P A �+IG TO ROPER ERECTION, INCLUDING THE CORRECT USE OF TEtu1PC7RA4R`f � BRACING. -_ - , BUIL(�ERS P(1�1 VPC VERSION: 4 m Ob _ - E: .19 /1n/9no -1 m `A -1�1 FILENANtd�1�1 Additions to Existing Structures: VP assumes no liability for snow accumulation loads that may be imposed on existing structures due to the proximity of this building. Bracing: Metal building brace rods and cables work in pairs to balance the forces caused by initial tensioning. Care must be taken when tightening brace rods or cables so as not to cause accidental damage or misalignment of building components. All rods/cables must be installed loose and then tightened sequentially and equally to maintain proper alignment of components. When properly tightened, rods and cables should not exhibit excessive sag. For long or large rod bracing it may be necessary to support the rod at mid-bay by suspending it from a purlin at the appropriate elevation. Bracing for seismic or wind loading of suspended objects that are not partof the VP structure must be designed by a qualified professional engineer. The design must meet code requirements anA safely deliver the lateral loads to one of the VP primary bracing systems. Inaddition, the bracing must be designed and erected in a manner that will not impose torsional or minor aAs loads, or cause IF failures in any VP structural components. No material may be cut, drilled, orotherwise removed from any part of this VP building without the consent of VP, The engineer (CAN / CANNOT) rely on the VP roof deck to act as a diaphragm. VP accepts no responsibility for the design and installation of bracing for objects; that are not fumished or specified by VP. Field Welding-, All field welding shaill be done in compliance with AWS procedures by welders qualified to perform the weld as directed by the associated welding procedure specification ('WPS). A WPS sh be prepared by the contractor for each welding variation specified, as required by code. Unless noted otherwise, use E70XX electrodes. The contractor shall provide for any code specified special inspections. Wall Openings Unless specifically noted otherwise on these drawingsor the VP Buildings contract documents, all closeable wall openings such as windows and doors must be designed to resist the same code prescribed wind loads as applicable to the building. VP Buildings will notconsider these as openings for the purpose of determining the building enclosure category unless specifically instructed in writing to do so. Field Modifications- OF Do not add loads to or otherwise modify this,VP Biu Iding structure in any way. Any additions r modifications to this VP Building structure, including removal o , of cladding, must be performed under the supervision of a qualified licensed professional engineer who accepts all responsibility for the adequacy and conseq' uences, of the additions or modifications. VP Buildings, Inc. accepts no resiponsiti for the consequences of any additions or alterations to-t;his structure. I he governing code may require roof snow If snow retention devices are required on this building, t loads to be increased. Requirements for snow retention de\Aces and the actual roof snow loading, must be specified in the contract documents. It is the responsibility of the Builder to verify with the Building Official and owner the required snow loading and whether or not snow retention devices will be used. VP Buildings, Inc. accepts no responsibility for the performance or consequences of these snow retention devices. Removal of wall or roof:cladding or segments thereof may seriously reduce the ability of the building to resist design loads, and must not be done except under the supervision of a qualified licensed professional, engineer who accepts all responsibility for the adequacy and consequencesof the modifications. Continuous girts and purlins must not be cut without the advance written consent of VP, This includes but is not limited to cuts made for installation of field located framed openings for doors, louvers, windows, mechanical systems, and similar devices. I I • The engineer responsible for the design of the masonry wall is also responsible for ensunin that the design of the wall (including its base detail) is compatible with the deflection criteria f] this building. VP accepts no responsibility for the design of masonry walls. The VP eave purlins and rake channels are not designed to support lateral loads from masonry or other walls not by VP;. Walls not by VP must not be attached to VP eave purlins or rake beams, other support material must be included. Independent Mezzanines: Independent mezzanines must be designed by a qualified professional engineer to meet all code requirements. The engi::: eer must also ensure that proper isolation from the VP building has been M rovided to avoid impact due to differential movement, VP accepts no responsibility for the design of independent mezzanines. Panels: Oil Canning is an inherent characteristic of cold formed roof and wall panels, It is the result of several factors that include, but are not limited to, induced stresses in the base material, fabrication methods, installation procedures, and post installation thermal forces. Oil Canning does not affect the structural integrity or overall performance of the metal panels. Oil Canning is an aesthetic issue only and is not grounds for rejection of the panels. Pa rapets: i Buildings with parapet walls and internal gutters must e misle Wt rainwater overflow mechanisms (such as scuppers) to prevent the accumulation of water in the event of a gutter blockage. It is the responsibility of the contractor to make sure that the scuppers are of the appropriate size, quantity, location, and design to prevent water accumulation on the roof, Failure to do so can result in building collapse, VP accepts no responsibility for the design and installation of overflow mechanisms. Butyl - Service Temperature Range: -40 degrees F to 220 degrees F (-40 degrees C to 104 degrees C) Tape - Service Temperature Range -60 degrees F to 212degrees degrees C to 100 degrees G) THIS DRAWING, INCLUDING THE INFORMATION HEREON, THE VP ENGINEER'S SEAL APPLIES Building Code: OOIBC REMAINS THE PROPERTY OF VP BUILDINGS, ONLY TO THE WORK PRODUCT OF IT IS PROVIDED SOLELY FOR ERECTINGTHE BUILDING VP AND DESIGN AND PERFORMANCE Live Load: (Reducible) 20.00psf DESCRIBED IN THE APPLICABLE PURCHASE ORDER AND REQUIREMENTS SPECIFIED BY VP. Coll. Load:Gravity 1.00, Uplift 0.00 psf SHALL NOT BE MODFIED REPRODUCED OR USED FOR THE VP ENGINEER'S SEAL DOES ANYOTHER PURPOSE WNOLIT PRIOR WRITTEN NOT APPLY TO THE PERFORMANCE Wind Speed, 90.00 mph APPROVAL OF VP BUILO NGS. OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP Wind Exposure: C THE GENERAL CONTRACTOR ANDIOR ERECTOR 6 SOLELY RESPONSIBLE FOR ACCURATE, GOOD QUALn-YWORKMANSHP EXCEPT TO ANY DESIGN OR PER- Roof Snow: 35.00 psf IN ERECTING THIS BUILDING IN CONFORMANCE WITH THIS FORMANCE REQUIREMENTS DRAWING L09TALS REFERENCED IN THIS DRAWING, ABLE VP EJQr SPECIFIED BY VP. Snow Exposure Category: 1 Fully Exposed ALLAPP 'TIONGUIDES, AND INDUSTRY STANDARDS PERTAININGTO PROPER Seismic Hazard Use Group, Group 1 ERECTION, INCLUDING THE CORRECT USE OF TEMPORARY '0— 4 1 A 4. -- T7--. C4- rry A - ­4 r"' —.-,1 Tv- n " ^, m , Q 4- -, , .­ +-, i -,- BRACING, C) CX001 CX003 251-21 201-811 —20 9-8 - if PRIMARY AND ROOF BRACING PLAN 2 611 1 01_017 F_]Dimension Key VP Ref: Shave Name = Main 1, Shape = Main 2 1. USE 1/2 DIA. A325 BOLTS FOR PURLIN TO FRAME, GIRT TO FRAME, THE VP ENGINEER'S SEAL APPLIES Building Code: OOIBC 0 AND GIRT TO CLIP CONNECTIONS UNLESS NOTED OTHERWISE. ONLY TO THE WORK PRODUCT OF VP AND DESIGN AND PERFORMANCE Live Load: (Reducible) 20.00 psf C) 41-011 51-411 SEE c �.EGX001 REQUIREMENTS SPECIFIED BY VP. THE VP ENGINEER'S SEAL DOES Coll. Load:Gravity 1.00, Uplift 0.00 psf SHALL NOT BE MODIFIED REPRODUCED OR USED FOR ANYOTHER PURPOSE WtHOUTPRIOR WRITTEN CN C-D REINFORCEMENT PLATES NEED NOT BE LOCATED ON THE SAME r5 CD "I' CD CD C) C:) r 0 �BGX003- GX004 10, Wind Exposure: C . I X'NX0030o 00 t 0 19 19 THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY �Jo U 1 EXCEPT TO ANY DESIGN OR PER- 251-21 201-811 —20 9-8 - if PRIMARY AND ROOF BRACING PLAN 2 611 1 01_017 F_]Dimension Key VP Ref: Shave Name = Main 1, Shape = Main 2 1. USE 1/2 DIA. A325 BOLTS FOR PURLIN TO FRAME, GIRT TO FRAME, THE VP ENGINEER'S SEAL APPLIES Building Code: OOIBC ...... AND GIRT TO CLIP CONNECTIONS UNLESS NOTED OTHERWISE. ONLY TO THE WORK PRODUCT OF VP AND DESIGN AND PERFORMANCE Live Load: (Reducible) 20.00 psf rr IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASE ORDER AND SEE JOB DETAILS FOR BOLT LENGTHS. REQUIREMENTS SPECIFIED BY VP. THE VP ENGINEER'S SEAL DOES Coll. Load:Gravity 1.00, Uplift 0.00 psf SHALL NOT BE MODIFIED REPRODUCED OR USED FOR ANYOTHER PURPOSE WtHOUTPRIOR WRITTEN 2. SLOT REINFORCEMENT PLATES NEED NOT BE LOCATED ON THE SAME NOT APPLY TO THE PERFORMANCE Wind Speed: 90.00 mph, APPROVAL OF VP BUILDINGS. SIDE OF THE WEB AS THE HILLSIDE WASHER. OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP Wind Exposure: C THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY EXCEPT TO ANY DESIGN OR PER- Roof Snow: 35.00 psf RESPONSIBLE FOR ACCURATE, GOOD QUALITYWORKMANSHIP IN ERECTING THIS BUILDING IN CONFORMANCE WrrH THIS F ORMANCE REQUIREMENTS SPECIFIED BY VP. Snow Exposure Category: 1 Fully Exposed DRAWING, DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP ERECTION GUiDES, Seismic Hazard Use Group: Group 1 AND INDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OF TEMPORARY 0 [Biallding—Us KUr BRACING, VP Buildings, Inc. 3200 Players Club Circle Memphlis TN 38125 �l� 1�.� NTS 12/10/2003 5:53:05 co Teton West Idaho BU21LEDINGS 4091 Eagle Rock Dental 48x124 1 -8 -03 4091 Ea.cTl(-- RLOck Dental 48x.1,24xlO 2 -0--0. VPC 12/5/2003 0 Frame Member Schedule O le Part Mem. Width Thick. Webthk Depthl Depth2 Approx. Lgth Id Qty Bolt Bolt plate Rows Rows Tension Washer CX001 1 51, .2500 .1345 1 1-011 2 81-0 15/1611 Dia. Length Thick. Out In Bolt RBX001 2 5 .2500 .1345 21-01f 9 259-3 1/411 A 12 3/411 2 1/4 5/8 3 3 3 519 .1875 .1345 911 9 if B 4 3/4" 21, 3/8 if 1 1 RBX002 4 511 .1875 .1345 911 911 251-3 1/411 C 2 3/411 1 1/211 5 5 11 .2500 .1345 9 if 2 1-011 CX002 6 511 .2500 .1345 11-011 V-111 81-0 15/1611 EGX001 7 5 11 .0590 2@.0590 8 1/211 8 1/2 if 121-6 1/1611 EGX001 8 511 .0590 2@.0590 8 1/291 8 1/211 121-6 1/1611 0 0 Ln Ln 0 0 Frame Clearances Horiz. Clearance between members 1 (CX001) and 6 (CX002) 42 1-511 Vert. Clearance at member I (CX001) .- 8 1 -0 15/1611 Vert. Clearance at a bler 6=002): 81-0 15/1611 Finished Floor Elevation = 1001-01, (Unless Noted Otherwise) 11 -0 -6 21-611 1 3 12 1 11 Y 81-011 FRAME CROSS SECTION AT FRAME LINE (S) 6 VP Ref: Spa THE VP ENGINEER'S SEAL APPLIES Building Code: OOIBC ONLY TO THE WORK PRODUCT OF VP AND DESIGN AND PERFORMANCE Live Load® (Reducible) 20.00 psf REQUIREMENTS SPECIFIED BY VP. Coll. Load-Gravity 1.00, Uplift 0.00 psf THE VP ENGINEER'S SEAL DOES NOT APPLY TO THE PERFORMANCE Wind Speed: 0' 00 mph OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP Wind Exposure: C EXCEPT TO ANY DESIGN OR PER- Roof Snow: 35.00 psf FORMANCE REQUIREMENTS SPECIFIED BY VP. Snow Exposure Category: 1 Fully Exposed Seismic Hazard / Use Group: Group 1 = Main 1 Wall 2, Frame 1 VP Buildings, Inc. 3200 Players Club Circle Memphis TN 38125 NI"S 07 12/10/20 03 5: - 531 T T 9: FRAME CROSS SECTION AT FRAME LINE (S) 6 BUILDER JOB # Teton West CUSTOM O- DATE LOCATON Idaho 12/5/2003 BUILDINGS DRAWWCHECK PROJECT 4091 Eagle Rock Dental 48x1 24x1 1, -8-033,Pwm � 9 1: PAGE BUILbEffs VPC_VER81ON: 4 , Ob 4091 Eagle Rock Dental 4Ax1.24xl0 12-8-03.V'Prl 0 Frame Member Schedule 0 A325 Bolt Connection & Plate Schedule Part Mem. Width Thick. Webthk Depthl Depth2 Approx. Lgth Id Qty Bolt Bolt Plate Rows Rows Tension Washer ICX003 1 511 .2500 .1345 if-oil 21-311 71-11 7/1611 Dia. Length Thick. Out In Bolt RBX003 2 511 .2500 .1345 21-211 jjfl 251-3 1/411 A 12 3/411 2 1/411 5/811 3 3 3 519 .1875 .1345 1111 911 B 4 3/4" 2 111 3/891 1 1 RBX004 4 511 .1875 .1345 911 11 TV 251-3 1/411 5 511 .2500 .1345 11 11 21-2" CX004 6 511 .2500 .1_ 21-311 7v-11 7/1671 CD r-H C\j 0 0 LIB U-) 0 0 44 44 Frame Clearances Horiz. Clearance between members I(CX003) and 6(CX004),., 421-111 Vert, Clearance at member 1(CX003): 71-11 7/1611 Vert. Clearance at member 6(CX004)-. 71-11 7/161, Finished Floor Elevation = 1001-01, (Unless Noted Otherwise) 1. USE 112 DIA. A325 BOLTS FOR PURLIN TO FRAME, GIRT TO FRAME, AND GIRT TO CLIP CONNECTIONS UNLESS NOTED OTHERWISE. SEE JOB DETAILS FOR BOLT LENGTHS. 2. SLOT REINFORCEMENT PLATES NEED NOT BE LOCATED ON THE SAME SIDE OF THE WEB AS THE HILLSIDE WASHER. .481-011 FRAME CROSS SECTION AT FRAME LINE (S) 5 THE VP ENGINEER'S SEAL APPLIES Building Code, OOIBC ONLY TO THE WORK PRODUCT OF VP AND DESIGN AND PERFORMANCE Live Load: (Reducible) 20-00 psf REQUIREMENTS SPECIFIED BY VP. Coll. Load:Gravity 1.00, Uplift 0.00 psf THE VP ENGINEER'S SEAL DOES NOT APPLY TO THE PERFORMANCE Wind Speed: 90.00 mph oR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP Wind Exposure: C EXCEPT TO ANY DESIGN OR PER- Roof Snow: 35.00 p FORMANCE REQUIREMENTS SPECIFIED BY VP. Snow Exposure Category- 1 Fully Exposed Seismic Hazard / Use Group* Group 1 = Main 1 Wall 2, Frame 2 THIS DRAWING, INCLUDING THE INFORMATION HEREON, RE MAIN$ THE PROPEMOF VP BUILDINGS. IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASE ORDER AND SHALL NOT BE MODIFIED REPRODUCED OR USED FOR ANY OTHER PURPOSE W(rHOUT PRIOR WRITTEN APPROVAL OF VP BUILDINGS. THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE, GOOD QUALITYWORKMANSHIP IN ERECTING THIS BUILDING IN CONFORMANCE WITH THE DRAWING, DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP ERECTION GUIDES, AND INDUSTRY STANDARDS PERTAININGTO PROPER ERECTION, INCLUDINGTHE CORRECTUSE OF TEMPORARY BRACING. VP Buildings, Inc. r0- Club Circle Memphis TN 38125 NTS 1,2/1.0/2003 5!534.09 T r. XNAME: 40 91 Eaale Rock D(,nmtal 48x124xl,.O 12-8-09.VP(', 0 Frame Member Schedule OA325 Bolt Connection & Plate Schedule Part Mem. Width Thick. Webthk Depthl Depth2 Approx. Lgth Id Qty Bolt Bolt Plate Rows Rows Tension Washer _CX003 1 511 .2500 .1345 1 1 _01T 21-311 71-11 7/1611 Dia. Length Thick. Out In Bolt RBX005 2 511 .2500 . 1114 25'1-3 1/411 A 12 3/411 2 1/411 5/811 3 3 3 511 .1875 .1345 1111 911 B 4 3/411 291 3/891 1 1 RBX004 4 511 .1875 .1345 911 1111 251-3 1/411 5 511 . 1111 21-2f' CX004 6 511 .2500 .1345 1;_011 21-311 71-11 7/1611 Ln 0 44 Frame Clearances Horiz. Clearance between members I (CX003) and 6(CX004) 42 T -1 Vert, Clearance at member 1 (CX003) 71-11 7/1611 Vert. Clearance at member ;6 (CX004) 71-11 7/1611 Finished Floor Elevation = 1001-011 (Unless Noted Otherwise) 1. USE 1/2 DIA• A325 BOLTS FOR PURLIN TO FRAME, GIRT TO FRAME, AND GIRT TO CLIP CONNECTIONS UNLESS NOTED OTHERWISE. SEE JOB DETAILS FOR BOLT LENGTHS. 2• SLOT REINFORCEMENT PLATES NEED NOT BE LOCATED ON THE SAME SIDE OF THE WEB AS THE HILLSIDE WASHER. 81-011 liq VP Ref: Sh��pe THE VP ENGINEER'S SEAL APPLIES Building Code- OOIBC ONLY TO THE WORK PRODUCT OF VP AND DESIGN AND PERFORMANCE Live Load: (Reducible) 20.00 psf REQUIREMENTS SPECIFIED BY VP. Coll. Load: Gravity 1.00, Uplift O,00 psf THE VP ENGINEER'S SEAL DOES NOT APPLY TO THE PERFORMANCE Wind Speed: 90.00 mph OR DESIGN OF ANY OTHER PRODUCT I OR COMPONENT FURNISHED BY VP Wind Exposure: C EXCEPT TO ANY DESIGN OR PER- Roof Snow: 35.00 psf FORMANCE REQUIREMENTS SPECIFIED BY VP. Snow Exposure Category: 1 Fully Exposed Seismic Hazard / Use Group: Group 1 = Main 1 Wall 2, Frame 3 THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTYOF VP SULDNG-%S- ITO PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED THE APPLICABLE PURCHASE ORDER AND SHALL NOT BE MODIFIED REPRODUCED OR USED FOR ANY OTHER PURPOSE WIV ZUT PRIOR WRrI'TEN APPROVAL OF VP BUILDINGS. THE GENERAL CONTRACTOR ANDIOR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE, GOOD QUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN CONFORMANCE WITH THIS DRAWING TAILS REFERENCED IN THE DRAWING, ALL APPLOBLE VP ERECTION GUIDES, AND INDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OF TEMPORARY BRACING. VP Buildings, Inc. 3200 Players Club Circle Memphis TN 38125 NTS 12/10/200--1 5:53:10 0 Frame member Schedule Building Code: OOIBC ONLY TO THE WORK PRODUCT OF VP AND DESIGN AND PERFORMANCE Horiz. Clearance between members I (CGX001) and 8 (CGX001) 451-2 11 Vert. (-)A325 Bolt Connection & Plate Schedule Part ® Width Thick. Webthk Depthl Depth2 Approx. Lgth Id Qty Bolt Bolt Plate Rows Rows Tension Washer _CGX00l 1 511 .0590 2@.0590 8 1/211 8 1/211 71-8 7/811 Dia. Length Thick. Out In Bolt BGX001 2-4 5 If .0820 2@.0820 8 1/211 8 1/211 251-3 1/411 A 4 1/211 1 1/21, 3/811 1 1 BGX002 5-7 519 .0820 2@.0820 8 1/211 8 1/211 251-3 1/411 B 6 3/411 211 3/811 1 2 CGX001 8 511 .0590 2@.0590 8 1/211 8 1/211 71-8 7/811 EGX002 9 519 . 0590 2@.0590 8 1/211 8 1/29V 111-8 15/161, EGX003 10 511 $ 8 1/211 8 1/211 111-8 15/16T, T c:�T M -P CD T-1 Oq Frame Clearances THE VP ENGINEER'S SEAL APPLIES Building Code: OOIBC ONLY TO THE WORK PRODUCT OF VP AND DESIGN AND PERFORMANCE Horiz. Clearance between members I (CGX001) and 8 (CGX001) 451-2 11 Vert. Clearance at member 1 (CGX001) 8 1-11 3/41, Vert. Clearance at member 8 (CGXO 0 1) 8 1 - 11 Vert. Clearance at member 9 (EGX002) 121-8 1/161, Vert. Clearance at member 10 (EGX003) 121-8 1/161, Fin'Ished Floor Elevation = 1001-01, (Unless Noted Otherwise) 121-699 —2 31 ®011 121-699 ....... . .. .... 48 1 -011 FRAME CROSS SECTION AT FRAME LINE (S) 1 = Main 1 Wall 2, Frame 4 THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS. IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASE ORDER AND SHALL NOT BE MODIFIED REPRODUCED OR USED FOR ANYOTHE R PURPOSE Wffi-ibUT PRIOR WRITTEN APPROVAL OF VP BUILDINGS. THE GENERAL CONTRACTOR ANDJOR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE, GOOD QUALITY WORKMANS HIP IN ERECTING THIS BUILDING IN CONFORMANCE WITH THIS DRAWING, DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP ERECTION GUIDES, AND INDUSTRYSTANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING, VP Buildings, inc. 3200 Players Club Circle Memphis TN 38125 NTS 12/1-0/2003 5:53-12 N FRAME CROSS SECTION AT FRAME LINE (S) 1 BUILDER Teton,West JOB# CUSTOMER DATE LOCATION Idaho 12/5/2003 1: N 0, CHECK PROJECT 4091. Eagle Rock Dental 48x124x1 ') 1 -8-03DPRxaq =O# VPC VERSION; 4 . Ob RAGE 4091 Eaalp Rock Dental 48x124x10 12-8-03�VPC VP Ref: Sha2e_ THE VP ENGINEER'S SEAL APPLIES Building Code: OOIBC ONLY TO THE WORK PRODUCT OF VP AND DESIGN AND PERFORMANCE Live Load: (Reducible) 20.00 p REQUIREMENTS SPECIFIED BY VP, THE VP ENGINEER'S SEAL DOES Coll. Load:Gravity 1.00, Uplift 0.00 pSf NOT APPLY TO THE PERFORMANCE Wind Speed: 90.00 mph OR DESIGN OF ANY OTHER PRODUCT Wind Exposure: C OR COMPONENT FURNISHED BY VP EXCEPT TO ANY DESIGN OR PER- Roof Snow: 35.00 psf FORMAN CE REQUIREMENTS SPECIFIED BY VPw Snow Exposure Category: 1 Fully Exposed Seismic Hazard / Use Group: Group 1 = Main 1 Wall 2, Frame 4 THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS. IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASE ORDER AND SHALL NOT BE MODIFIED REPRODUCED OR USED FOR ANYOTHE R PURPOSE Wffi-ibUT PRIOR WRITTEN APPROVAL OF VP BUILDINGS. THE GENERAL CONTRACTOR ANDJOR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE, GOOD QUALITY WORKMANS HIP IN ERECTING THIS BUILDING IN CONFORMANCE WITH THIS DRAWING, DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP ERECTION GUIDES, AND INDUSTRYSTANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING, VP Buildings, inc. 3200 Players Club Circle Memphis TN 38125 NTS 12/1-0/2003 5:53-12 N FRAME CROSS SECTION AT FRAME LINE (S) 1 BUILDER Teton,West JOB# CUSTOMER DATE LOCATION Idaho 12/5/2003 1: N 0, CHECK PROJECT 4091. Eagle Rock Dental 48x124x1 ') 1 -8-03DPRxaq =O# VPC VERSION; 4 . Ob RAGE 4091 Eaalp Rock Dental 48x124x10 12-8-03�VPC 0 Frame Member Schedule Rows Rows Tension Washer Dia. Length Thick. Out Part Mem. Width Thick. Webthk Depthl Depth2 Approx. Lgth -CGX002 1 511 .0590 2@.0590 8 1/2" 8 1/211 61-8 7/811 seismic Hazard / Use Group: Group 1 BGX003 2-3 511 .0590 2@.0590 8 1/211 8 1/211 101-10 3/811 BGX004 4-5 511 .0590 2@.0590 8 1/2" 8 1/211 101-10 3/81, _CGX002 6 51, . 8 1/211 8 1/21111 61-8 7/811 nr_�VM�M_ W�IM Lut &A325 Bolt Connection & Plate Schedule Id Qty Bolt Bolt Plate Rows Rows Tension Washer Dia. Length Thick. Out In Bolt A 4 1/211 1 1 / 2`1 3/811 1 1 B 4 3/411 211 3/811 1 1 20"10 4.000. Ef I 0 1 -811 L FRAME CROSS SECTION AT FRAME LINE (S) D Frame Clearances Horiz. Clearance between members l(CGX002) and 6(CGX002,)- 171- 11 10 Vert. Clearance at member I (CGX002) : 7 1-11 3/41, Vert. Clearance at member 6(CGX002) : 71-11 3/411 Finished to Elevation = 1001-01, (Unless Noted Otherwise) CN VP Buildings, Inc. 3200 Players Club Circle Memphis TN 38125 IEVI - DATE By DESCRIPTION NTS 12/10/2003 5:53:14 FRAME CROSS SECTION AT FRAME LINE (S) D JILDER Teon West JOB# t JSTOMER DATE CATION Idaho 12/5/2003 W-82UILIDINGS DRAMICHECK tOJECT 8 9� P 7,4 4091 Eagle Rock Dental 48xl24x-1 1 '-03D-Pmm ILDE'RRB �Poi PAGE VPC'VERSION: 4 , Ob .ENAM': 4091 Ea le Rock Dental 48x!.24x]-O 12-8-0.3-VPC VP Ref: Shape Name = Main 1 Wall 8, Frame 1 THE VP ENGINEER'S SEAL APPLIES Building Code; OOIBC THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTYOF VP BULDII4& ONLY TO THE WORK PRODUCT OF VP AND DESIGN AND PERFORMANCE Live Load: (Reducible) 20.00 psf IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING REQUIREMENTS SPECIFIED BY VP. -Gravity 1.00, Uplift 0.00 Coll. Load. DESCRIBED IN THE APPLICABLE PURCHASE ORDER AND SHALL NOT BE MODIFIED REPRODUCED OR USED FOR THE VP ENGINEER'S SEAL DOES PSf ANYOTHER PURPOSE W&Hout PRIORWRITTEN NOT APPLY TO THE PERFORMANCE Wind Speed: 90.00 mph APPROVAL OF VP BUILDINGS. OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP Wind Exposure *. C THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY EXCEPT TO ANY DESIGN OR PER- Roof Snow: 35.00 psf RESPONSIBLE FOR ACCURATE, GOOD QUALrTYWORKMANSHP IN ERECTING THIS BUILDING IN CONFORMANCE WITH THIS FORMANCE REQUIREMENTS SPECIFIED BY VP. Snow Exposure Category- I Fully Exposed RAW 'IETAL-SREIER NCEDiNTHS DRAWING, ADL L AP"PLlbABLE VP EREC_L N GUIDES, seismic Hazard / Use Group: Group 1 AND INDUSTRY STANDARDS PERTAININGTO PROPER SRECTIDN, INCLUDING THE CORRECT USE OF TEMPORARY ID11jILlina Use.:Standar-d----OcglW_4LQI_�trIlCturgg BRACING, Frame Clearances Horiz. Clearance between members l(CGX002) and 6(CGX002,)- 171- 11 10 Vert. Clearance at member I (CGX002) : 7 1-11 3/41, Vert. Clearance at member 6(CGX002) : 71-11 3/411 Finished to Elevation = 1001-01, (Unless Noted Otherwise) CN VP Buildings, Inc. 3200 Players Club Circle Memphis TN 38125 IEVI - DATE By DESCRIPTION NTS 12/10/2003 5:53:14 FRAME CROSS SECTION AT FRAME LINE (S) D JILDER Teon West JOB# t JSTOMER DATE CATION Idaho 12/5/2003 W-82UILIDINGS DRAMICHECK tOJECT 8 9� P 7,4 4091 Eagle Rock Dental 48xl24x-1 1 '-03D-Pmm ILDE'RRB �Poi PAGE VPC'VERSION: 4 , Ob .ENAM': 4091 Ea le Rock Dental 48x!.24x]-O 12-8-0.3-VPC (D V-4 USE 1/2 DIA. A325 BOLTS FOR PURLIN TO FRAME, GIRT TO FRAME, AND GIRT TO CLIP CONNECTIONS UNLESS NOTED OTHERWISE. SEE JOB DETAILS FOR BOLT LENGTHS. SLOT REINFORCEMENT PLATES NEED NOT BE LOCATED ON THE SAME SIDE OF THE WEB AS THE HILLSIDE WASHER. C�D 0 CN ,0� f 4 N 60" 4.000. 01-811 THE VP ENGINEER'S SEAL APPLIES Building Code: OOIBC ONLY TO THE WORK PRODUCT OF VP AND DESIGN AND PERFORMANCE Live Load: (Reducible) 20-00 psf REQUIREMENTS SPECIFIED BY VP. Coll. Load:Gravity 1.00, Uplift 0.00 psf THE VP ENGINEER'S SEAL DOES NOT APPLY To THE PERFORMANCE Wind Speed: 90.00 mph OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP Wind Exposure: C EXCEPT TO ANY DESIGN OR PER- Roof Snow. 35.00 p3f FORMANCE REQUIREMENTS SPECIFIED BY VP. Snow Exposure Category- 1 Fully Exposed ,Seismic Hazard / Use Group- Group 1 ni, , I A A ",-f T Tinza - Q +- m -n ri = -rrl ni- ti i n:;� Ti r, N r q i- ri 1 e- i- i i r N N VP Buildings, Inc. 3200 Players Club Circle Memphis TN 38125 NTS 12/10/2003 5:53:15 XNAME: 4091. Ea,ale Rock Dental 48x124x20 12-8-01�VPC Schedule OA325 Bolt Connection & Plate Schedule Frame Clearances Frame Member :t Mem. Width Thick. Webthk Depthl Depth2 Approx. Lgth Id I Qty Bolt Bolt Plate Rows Rows Tension Washer Horiz. Clearance between members 1 (CGX004) and 6 (CG,X004) 17 1 -10 C004 1 511 .0590 2@.0590 8 1/211 8 1/211 61-8 7/811 Dia. Length Thick. Out In Bolt Vert. Clearance at member 1 (CGX004) -. 71-11 3/411 C005 2-3 511 .0590 2@.0590 8 1/211 8 1/211 101-10 3/811 A 4 1/2" 1 1/21, 3/BVT Vert. Clearance at member 6(CGX004): 71-11 3/411 C006 4-5 511 .0590 2@.0590 8 1/211 8 1/211 101-10 3/811 B 4 3/4" 2 3/811 Finished Floor Elevation = 1001-011 (Unless Noted Otherwise) C004 6 511 .0590 2@.0590 8 1/211 8 1/211 61-8 7/811 (D V-4 USE 1/2 DIA. A325 BOLTS FOR PURLIN TO FRAME, GIRT TO FRAME, AND GIRT TO CLIP CONNECTIONS UNLESS NOTED OTHERWISE. SEE JOB DETAILS FOR BOLT LENGTHS. SLOT REINFORCEMENT PLATES NEED NOT BE LOCATED ON THE SAME SIDE OF THE WEB AS THE HILLSIDE WASHER. C�D 0 CN ,0� f 4 N 60" 4.000. 01-811 THE VP ENGINEER'S SEAL APPLIES Building Code: OOIBC ONLY TO THE WORK PRODUCT OF VP AND DESIGN AND PERFORMANCE Live Load: (Reducible) 20-00 psf REQUIREMENTS SPECIFIED BY VP. Coll. Load:Gravity 1.00, Uplift 0.00 psf THE VP ENGINEER'S SEAL DOES NOT APPLY To THE PERFORMANCE Wind Speed: 90.00 mph OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP Wind Exposure: C EXCEPT TO ANY DESIGN OR PER- Roof Snow. 35.00 p3f FORMANCE REQUIREMENTS SPECIFIED BY VP. Snow Exposure Category- 1 Fully Exposed ,Seismic Hazard / Use Group- Group 1 ni, , I A A ",-f T Tinza - Q +- m -n ri = -rrl ni- ti i n:;� Ti r, N r q i- ri 1 e- i- i i r N N VP Buildings, Inc. 3200 Players Club Circle Memphis TN 38125 NTS 12/10/2003 5:53:15 XNAME: 4091. Ea,ale Rock Dental 48x124x20 12-8-01�VPC D le (-)A325 Bolt Connection & Plate Schedule Frame Clearances ,art Mem. Width Thick. Webthk Depthl Depth2 Approx. Lgth Id Qty Bolt Bolt Plate Rows Rows Tension Washer Horiz. Clearance between members 1 (CGX003) and 8 (CGX003) 451-211 GX003 1 511 .0590 2@.0590 8 1/211 8 1/211 71-8 7/8" Dia. Length Thick. Out In Bolt Vert. Clearance at member 1 (CGX003) -0 81-11 3/4" ,GX007 2-4 5 TV .0820 2@.0820 8 1/211 8 1/21, 251-3 1/411 A 4 1/2" 1 1/211 3/811 1 1 Vert. Clearance at member 8(CGX: 81-11 3/41, GX007 5-7 511 .0820 2@.0820 8 1/211 8 1/211 251-3 IT B 4 3/4TV 2 IT 1/2 IT I I Vert. Clearance at member 9 (EGX004) -0 12 1-8 1/16,, GX003 8 5 TV .0590 2@.0590 8 1/211 8 1/21V 71-8 7/811 Vert. Clearance at member 10(EGX005): 121-8 1/1611 GX004 9 5 1' .0590 2@.0590 8 1/211 8 1/211 111-8 15/1611 Finished Floor Elevation = 100'-011 (Unless Noted Otherwise) GX005 10 5 TV .0590 2@.0590 8 1/29V 8 1/2 IT 111-8 15/161, 01f, IF CD 0 0 U-) LO C 0 N 44 44 USE 1/2 DIA. A325 BOLTS FOR PURLIN TO FRAME, GIRT TO FRAME, AND GIRT TO CLIP CONNECTIONS UNLESS NOTED OTHERWISE. SEE JOB DETAILS FOR BOLT LENGTHS. SLOT REINFORCEMENT PLATES NEED NOT BE LOCATED ON THE SAME SIDE OF THE WEB AS THE HILLSIDE WASHER. 21-611 123'-Otv 121-611 81-011 PRIM CROSS SECTION AT FRAME LINE (S) 10 V& set: Anape_ THE VP ENGINEER'S SEAL APPLIES Building Code: OOIBC ONLY TO THE WORK PRODUCT OF VP AND DES10-N AND PERFORMANCE Live Load: (Reducible) 20.00 psf REQUIREMENTS SPECIFIED BY VP- Coll. Load:Gravity 1.00, Uplift 0,00 psf THE VP ENGINEER'S SEAL DOES NOT APPLY TO THE PERFORMANCE Wind Speed: 90.00 mph OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP Wind Exposure: C EXCEPT TO ANY DESIGN OR PER- Roof Snow: 35.00 psf FORMANC'B REQUIREMENTS SPECIFIED BY VP. Snow Exposure Category: 1 Fully Exposed Seismic Hazard / Use Group: Group 1 ,= Main 2 Wall 2, Frame 1 THE DRAWING, INCLUDING THE INFORMATION HEREON, REMAM THE PROPERTYCIF VP BUILDINGS. rrIS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASE ORDER AND SHALL NOT BE MODIFIED REPRODUCED OR USED FOR ANYOTHER PURPOSE Wk&jt PRIOR WRITTEN APPROVAL OF VP BUILDINGS, THE GENERAL CONTRACTOR ANDIOR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE, GOOD QUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN CONFORMANCE WITH THE DRAWING, DETAILS REFERENCED IN THE DRAWING, ALL APPLICABLE VP ERECTION GUIDES, AND INDUSTRYSTANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OF TEMPORARY BRACING, VP Buildings, Inc. 3200 Players Club Circle Memphis TN 38125 FRAME CROSS SECTION AT FRAME LINE (S) 10 Teton West 1-/2003 LOCATION _ 112 /5 BUILDINGS DRAWNICHECK -8-03 PRO" OT 4091 Eagle Rock Dental 48x124x1 ) I ffw )�Pwm PAGE NTS BUILDER'S PON VPCVERS1ON: 4 . Ob 12110/2003 5 -.5.1 -17 "-NAME: 4091 Rork Dpntal 48x1 24x10 12-8-03.VPC 0 Frame Member Schedule OA325 Bolt Connection & Plate Schedule Part Mem. Width Thick. Webthk Depthl Depth2 Approx. Lgth Id Qty Bolt Bolt Plate Rows Rows Tension Washer CX003 1 511 .2500 .1345 IV_ofl 21-311 71-11 7/1611 Dia. Length Thick. Out In Bolt RBX006 2 511 .2500 .1345 21-211 1111 251-3 1/4" A 12 3/411 2 1/411 5/811 3 3 3 5 1V 6 1875 .1345 ill, 9 IV B 4 3/411 219 3/811 1 1 RBX007 4 511 .1875 .1345 911 1111 251-3 1/411 5 511 .2500 .1345 1111 21-211 CX004 6 511 .2500 .1345 if-off 21-31, 71-11 7/1611 0 0 Ln LO CD CN Frame Clearances Horiz Clearance between members 1 (CX003) and 6 (CX004) 42 1 -1 if Vert. Clearance at member I (CX003) 7 1-11 7/1611 Vert. Clearance at member 6 (CX004) 7/1611 Finished Floor Elevation = 1001-01, (Unless, Noted Otherwise) 0 0.0 489-011 FRAME CROSS SECTION AT FRAME 'LINE, (S) 9 VP Ref: Spa THE VP ENGINEER'S SEAL APPLIES Building Code: OOIBC ONLY TO THE WORK PRODUCT OF VP AND DESIGN AND PERFORMANCE Live Load: (Reducible) 20.00 psf REQUIREMENTS SPECIFIED BY VP. Coll. Load:Gravity 1.00, Uplift 0.00 psf T149 VP ENGINEER'S SEAL DOES NOT hPPLY TO THE PERFORMANCE Wind Speed.- 90.00 mph OR DZ51GN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED 13Y VP Wind EXP03ure, C EXCEPT TO ANY DESIGN OR PER- Roof Snow: 35.00 psf FORMANCE REQUIREMENTS SPECIFIED BY VP. Snow Exposure Category: 1 Fully Exposed Seismic Hazard / Use Group: Group 1 = Main 2 Wall 2, Frame 2 THE GENERAL CONTRACTOR AND/OR ERECTOR 15 SOLELY RESPONSIBLE FOR ACCURATE, GOOD QUALITYVVORKMANSHIP IN ERECTING THIS BUILDING IN CONFORMANCE WITH THIS DRA=11 DETAIL' REFERENCED IN THIS DRAVVING, ALL L r _ABLE VP ERECTION GUIDES, AND INDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OF TEMPORARY BRACING. VP Buildings, Inc. r. 3200 Players Club Circle Memphis TN 38125 NTS 12/10/2003 5:53:18 T T 9: N 0 Frame Member Schedule OA325 Bolt Connection & Plate Schedule Part Mem. Width Thick. Webthk Depthl Depth2 Approx. Lgth Id Qty Bolt Bolt Plate Rows Rows Tension Washer CX003 1 511 .2500 .1345 1 1 -OTT 21-391 71-11 7/1611 Dia. Length Thick. Out In Bolt RBXOO8 2 511 .2500 .1345 21-211 1111 251-3 1/411 A 12 3/411 2 1/4 TV 5/811 3 3 3 511 .1875 .1345 1111 911 B 4 3/411 211 3/811 1 1 RBX009 4 511 .1875 .1345 9 IT 1111 1® 1/411 5 511 .2500 .1345 liff 2 1 - 2 91 CX003 6 511 . 2500 1345 11-OT1 2v-311 71-11 7/1611 Vigo- T C�l L81', Dimension Key Frame Clearances Horiz. Clearance between members I (CX003) and 6 (CX003) 42 1 TV Vert. Clearance at member 1 (CX003) 7 7 -11 7/1611 Vert. Clearance at member 6 =003) 71-11 7/1611 Finished Floor Elevation = 1001-011 (Unless Noted Otherwise) 1. USE 1/2 DIA. A325 BOLTS FOR PURLIN TO FRAME, GIRT TO FRAME, AND GIRT TO CLIP CONNECTIONS UNLESS NOTED OTHERWISE. SEE JOB DETAILS FOR BOLT LENGTHS. 2. SLOT REINFORCEMENT PLATES NEED NOT BE LOCATED ON THE SAME SIDE OF THE WEB AS THE HILLSIDE WASHER. 48 1-011 THE VP ENGINEER'S SEAL APPLIES Building Code: OOIBC ONLY TO THE WORK PRODUCT OF VP AND DESIGN AND PERFORMANCE Live Load; (Reducible) 20.00 psf REQUIREMENTS SPECIFIED BY VP. Coll. Load:Gravity 1.00, Uplift 0.00 psf THE VP ENGINEER'S SEAL DOES NOT APPLY TO THE PERFORMANCE Wind Speed* 90.00 mph OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED 13Y VP Wind Exposure: C EXCEPT TO ANY DESIGN OR PER- Roof Snow: 35.00 psf FORMANCE REQUIREMENTS SPECIFIED BY VP, Snow Exposure Category: 1 Fully Exposed seismic Hazard / Use Group: Group 1 = Main 2 Wall 2, ,___Frame_.3 THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPEMOF VP BUILDINGS. ITS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASE ORDER AND SHALL NOT BE MODIFIED, REPRODUCED OR USED FOR ANY OTHER PURPOSE WrrHOUT PRIOR WRITTEN APPROVAL OF VP BUILDINGS, THE GENERAL CONTRACTOR ANDJOR ERECTOR 6 SOLELY RESPOI FOR ACCURATE, GOOD QUALFrYWORKMANSHP IN ERECTING THIS BUILDING IN CONFORMANCE WITH THIS DRAWING DETAILS REFERENCED IN THIS DRAWING, ALL APPL16ABLE VP ERECTION GUIDES, AND INDUSTRYSTANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OF TEMPORARY BRACING, VP Buildings, Inc. 3200 Players Club Circle Memphis TN 38125 NTS 1,2/10/2003 5:53:20 FRAME CROSS SECTION AT FRAME LINE (S) 7 AME: 4091, Eaalc::,, Rock Dental 48x,124 1.O 12-8-03.VPC 0 Frame Member Schedule REMAINS THE PROPERTY OF VP BUILDINGS, IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASE ORDER AND Part Mem. Width Thick. Webthk Depthl Depth2 Approx. Lgth CGX002 1 519 .0590 2@.0590 8 1/291 8 1/211 61-8 7/817 BGX003 2-3 511 .0590 2@.0590 8 1/211 8 1/211 101-10 3/811 BGX004 4-5 5 Tv .0590 2@.0,590 8 1/211 8 1/211 101-10 3/811 CGX002 6 511 .0590 2@.0590 8 1/291 8 1/211 61-8 7/811 L01 It Connection & Plate Schedule Id Qty Bolt Bolt Plate Rows Rows Tension Washer Dia. Length Thick. Out In Bolt A 4 1/211 1 1/21, 3/811 1 1 B 4 3/491 291 3/811 1 1 4.000. Ln 0 0 f -8 11 L I FRJUM CROSS SECTION AT FRAME LINE (S) D Sha e Name = Main 2 Wall 8, Frame 1 THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS, IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASE ORDER AND SHALL NOT BE MODIFIED REPRODUCED OR USED FOR ANYOTHER PURPOSE Wff�OLFT PRIOR MITTEN APPROVAL OF VP BUILDINGS. THE GENERAL CONTRACTOR ANDIOR ERECTOR IS SOLELY RESPONSIBLE FORACCURATE, GOOD QUALRYWORKMANSHIP IN ERECTING THIS BUILDING IN CONFORMANCE irk THE DRAWING, DETAILS REFERENCED IN THE DRAWING, ALL APPLICABLE VP ERECTION GUIDES, AND INDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OF TEMPORARY BRACING. THE VP ENGINEER'S SEAL APPLIES Building Code: OOIBC ONLY TO THE WORK PRODUCT OF VP AND DESIGN AND PERFORMANCE Live Load: (Reducible) 20.00 psf REQUIREMENTS SPECIFIED BY VP. Coll. Load:Gravity 1.00, Uplift 0.00 psf THE VP ENGINEER'S SEAL DOES NOT APPLY TO THE PERFORMANCE Wind Speed: 90.00 mph OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP Wind Exposure: C EXCEPT TO ANY DESIGN OR PER- Roof Snow: 35.00 psf FORMANCE REQUIREMENTS SPECIFIED BY VP. now Exposure Category: 1 Fully Exposed Seismic Hazard / Use Group: Group 1 n,i 41 A, —,v Tles--x . 04- -n,-Nein -,­A 4Z+- -riii-+-ii OA325 Frame Clearances Horiz. Clearance between members I(CGX002) and 6(CGX002): 171-101, Vert. Clearance at member l(CGX002)-. 71-11 3/411 Vert. Clearance at member 6 (CGX002) - 7 1-11 3/4 11 Finished Floor Elevation = 1001-011 (Unless Noted Otherwise) VP Buildings, Inc. 320G Players Club Circle Memphis TN 38125 NTS 12/10/2003 5:53-21 J ROIEcT 4091 Eagle Rock Dental 48x124x1P 1j24-03)-PwDm LEN E. 4091 Ea,alp Rock Demtal 48xl.24x1,.O 1-2-8-03.VPC' 0 Frame Member Schedule Rows Rows Tension Washer Dia. Length Thick. Part Mem. Width Thick. Webthk Depthl Depth2 Approx. Lgth CGX004 1 511 0 0590 2@.0590 8 1/211 8 1/211 61-8 7/811 BGX005 2-3 511 .0590 2@.0590 8 1/211 8 1/211 io1 -10 3/8" BGX006 4-5 it .0590 2@.0590 8 1/211 8 1/211 101-10 3/811 CGX004 6 5 if . 8 1/211 8 1/211 61-8 7/811 CN C:) or-PIZI-0m L01 ,F-\A325 Bolt Connection & Plate Schedul�� Id Qty Bolt Bolt Plate Rows Rows Tension Washer Dia. Length Thick. Out In Bolt A 4 1/211 1 1/211 3/811 1 1 B 4 3/4" 211 3/811 1 1 6#p 4.000. 201-811 FRAME CROSS SECTION AT FRAME LINE (S) E Frame Clearances Horiz. Clearance between members 1 (CGX004) and 6 (CGX004) 17 1 ® IV Vert. Clearance at member l(CGX004): 71-11 3/411 Vert. Clearance at member 6(CGX004)-. 7,-11 3/4,, Finished Floor Elevation = 1001-011 (Unless Noted Otherwise) (N N VP Buildings, Inc. 3200 Players Club Circle Memphis TN 38125 NTS 12/10/2003 5t53:23 VP Ref: Sha2e Name = Main 2 Wall 8_,_Frame 2 THE DRAWING, INCLUDING THE INFOR N H THE VP ENGINEER'S SEAL APPLIES Building Code: OOIBC REMAINS THE PROPERTYOFVP BUILDINGS. ONLY TO THE WORK PRODUCT OF vp AND DESIGN AND PERFORMANCE Live Load., (Reducible) 20-00 p fTIS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASE ORDER AND REQUIREMENTS SPECIFIED BY VP. Coll. Load: .00, Uplift 0.00 psf 1 SHALL NOT BE MODFIED, REPRODUCED OR USED FOR THE VP ENGINEER'S SEAL DOES NOT APPLY TO THE PERFORMANCE Wind Speed: 90.00 mph ANYOTHER PURPOSE WITHOUTPRIORWRITTEN APPROVAL OF VP BUILDINGS. :OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP I Wind Exposure, C THE GENERAL CONTRACTOR ANDJOR ERECTOR IS SOLELY EXCEPT TO ANY DESIGN OR PER- Roof Snow: 35.00 p RESPONSIBLE FOR ACCURATE, GOOD QUAUTYWORKMANSHIP IN EREC11NG THIS BUILDING IN CONFORMANCE WITH TH93 FORMANCE REQUIREMENTS SPECIFIED BY VP. Snow Exposure Category.- 1 Fully Exposed DRAWING, DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP ERECTION GUIDES, Seismic Hazard Use Group: Group 1 AND INDUSTRYSTANDARDS PE RTAINING TO PROPER 1 ERECTION, INCLUDING THE CORRECT USE OF TEMPORARY pill"" reg I BRACING. Frame Clearances Horiz. Clearance between members 1 (CGX004) and 6 (CGX004) 17 1 ® IV Vert. Clearance at member l(CGX004): 71-11 3/411 Vert. Clearance at member 6(CGX004)-. 7,-11 3/4,, Finished Floor Elevation = 1001-011 (Unless Noted Otherwise) (N N VP Buildings, Inc. 3200 Players Club Circle Memphis TN 38125 NTS 12/10/2003 5t53:23 Ron-Std Secondary Part Schedul,,- -20 1 -off _____23 v -011 621-011 191_011 0 01P2004014 W -0 1-811 Main 1, Shape =_Main_jL_Shape THH-S DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS. rT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASE ORDER AND SHALL NOT BE MODIFIED REPRODUCED OR USED FOR ANYOTHER PURPOSE WIYHOUT PRIOR WRITTEN APPROVAL OF VP BUILDINGS. THE GENERAL CONTRACTOR ANIXOR ERECTOR 15 SOLELY RESPONSIBLE FOR ACCURATE, GOOD QUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN CONFORMANCE WITH THIS DRAWING, DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP ERECTION GUIDES, AND INDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OF TEMPORARY BRACING. Lt. ha pq_ VP Buildings, Inc. 3200 Players Club Circle Memphis TN 38125 DESCRIPTION NTS 12/10/2003 5:53.424 CD co C:) CD At 4 21-611 23 1 -0 121-6 111 148 1 -0 1. UNLESS NOTED, USE 1/2 DIAMETER A-325 BOLTS FOR GIRT LAP, GIRT TO FRAME, FLANGE BRACE TO FRAME, FLANGE BRACE TO GIRT, JAMB AND HEADER CONNECTIONS. SEE JOB DETAILS FOR BOLT LENGTHS. 2. WIND AND FLANGE BRACING ARE AN INTEGRAL PART OF THE WALL STRUCTURAL SYSTEM AND SHOULD BE PROPERLY INSTALLED PRIOR TO ERECTION OF WALL AND ROOF SHEETS. REMOVAL OR ALTERATION OF WALL BRACING WITHOUT PRIOR AUTHORIZATION IS PROHIBITED. VP Ref: Spa Name = Main 1, Wall = 1 THE VP ENGINEER'S SEAL APPLIES Building Code: OOIBC THE DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS, ONLY TO THE WORK PRODUCT OF VP AND DESIGN AND PERFORMANCE Live Load: (Reducible) 20.00 psf IT a PROVIDED SOLELY FOR ERECTING THE BUILDING REQUIREMENTS SPECIFIED BY VP THE VP ENGINEER'S SEAL DOES Coll. Load:Gravity 1.00, Uplift 0.00 psf DESCRIBED IN THE APPLIC-ABLE PURCHASE ORDER AND SHALL NOT BE MODIFIED, REPRODUCED OR USED FOR ANYOTHER PURPOS E WITHOUt PRIOR WRIrTEN NOT APPLY TO THE PERFORMANCE Wind Speed: 90.00 mph APPROVAL OF VP BUILDINGS, OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP I Wind Exposure: C THE GENERAL CON TRACTOR ANDIOR ERECTOR IS SOLELY EXCEPT TO ANY DESIGN OR PER- Roof Snow: 35.00 psf RESPONSIBLE FOR ACCURATE, GOOD QUALITYWORKMANSHIP IN ERECTING THE BUILDING IN CONFORMANCE WITH THIS FORMANCE REQUIREMENTS SPECIFIED BY VP, Snow Exposure Category: 1 Fully Exposed DRAWING DETAILS REFERENCED IN THE DRAWING, ALL APPLR�ABLE VP ERECTION GUIDES, Seismic Hazard / Use Group: Group 1 AND INDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUD114G THE CORRECT USE OF TEMPORARY '­ 4 1 A 4 — — TT-- , 04- ­4 ­A C4--^, r 4 ­ vehc5 BRACING. 4 Q 0 1-011 1— 11 ­-20 91-011 3 621-011 21-9 3/4-1' VP Buildings, Inc. 3200 Players Club Circle Memphis TN 38125 NTS 12/3,0/2003 5:53:26 VP Ref: Sha2e Name _= Main 1, Wal,l= 2 THIS DRAWING, INCLUDING THE INFORMATION HEREON, T VP ENGINEER'S SEAL APPLIES Building Code: OOIBC REMAINS THE PROPERTYOFVP BUILDINGS. ONLY TO THE WORK PRODUCT OF vp AND DESIGN AND PERFORMANCE Live Load: (Reducible) 20-00 psf IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLCABLE PURCHASE ORDER AND REQUIREMENTS SPECIFIED BY VP. Coll. Load:Gravity 1�00, Uplift 0.00 Psf SHALL NOT BE MODIFIED REPRODUCED OR USED FOR ANYOTHER PURPOSE WkHOUT PRIOR WRITTEN THE VP ENGINEER'S SEAL DOES NOT APPLY TO THE PERFORMANCE Wind Speed: 90.00 inph APPROVAL OF VP BUILDINGS. OR DESIGN OF ANY OTHER PRODUCT Wind Exposure: C THE GENERAL CONTRACTOR ANDJOR ERECTOR S SOLELY OR COMPONENT FURNISHED BY VP EXCEPT TO ANY DESIGN OR PER- Roof Snow: 35.00 psf RESPONSIBLE FOR ACCURATE, GOOD QUALITYWORKMANSHIP IN ERECTING THIS BUILDING IN CONFORMANCE WrrH THIS FORMANCE REQUIREMENTS Snow Exposure Category: 1 Fully Exposed DRAWING, DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP E RECTION GUIDES, SPECIFIED BY VP, Seismic Hazard / Use Group: Group 1 AND INDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OF TEMPORARY n­ 1 A, -- TT,a,n - C!4- nriAm Yri Or"rsiin::intw qt- riini-nrcZ.A I BRACING, VP Buildings, Inc. 3200 Players Club Circle Memphis TN 38125 NTS 12/3,0/2003 5:53:26 CD CD 4 4 21-611 -231-011 T -611 1 -011 1. UNLESS NO'T'ED, USE 1/2 DIAMETER A-325 BOLTS FOR GIRT LAP, GIRT TO FRAME, FLANGE BRACE TO FRAME, FLANGE BRACE TO GIRT, JAMB AND HEADER CONNECTIONS. SEE JOB DETAILS FOR BOLT LENGTHS. 2. WIND AND FLANGE BRACING ARE AN INTEGRAL PART OF THE WALL STRUCTURAL SYSTEM AND SHOULD BE PROPERLY INSTALLED PRIOR TO ERECTION OF WALL AND ROOF SHEETS. REMOVAL OR ALTERATION OF WALL BRACING WITHOUT PRIOR AUTHORIZATION IS PROHIBITED. WIN Fill VP Ref- Sha e Name = Main 1 Wall = 3 THE VP ENGINEER'S SEAL APPLIES Building Code: OOIBC THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPE97YOFVP BUILDINGS. ONLY TO THE WORK PRODUCT OF VP AND DESIGN AND PERFORMANCE Live Load: (Reducible) 20.00psf IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING REQUIREMENTS SPECIFIED BY VP. Coll. Load 1.00, Uplift 0.00 DESCRIBED IN THE APPLICABLE PURCHASE ORDER AND SHALL NOT BE MODIFIED REPRODUCED OR USED FOR THE VP ENGINEER'S SEAL DOES :Gravity psf ANYOTHER PURPOSE WtRour PRIOR WRITTEN NOT APPLY TO THE PERFORMANCE Wind Speed: 90.00 mph APPROVAL OF VP BULDINGS. OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP Wind Exposure., C THE GENERAL CONTRACTOR ANDIOR ERECTOR IS SOLELY EXCEPT TO A-NY DESIGN OR PER- Roof Snow. 35.00 psf RESPONSIBLE FOR ACCURATE, GOOD QUALrrYWORKMANSHP IN ERECTING THIS BUILDING IN CONFORMANCE WIN THIS FORMANCE REQUIREMENTS SPECIFIED BY VP. Snow Exposure Category: 1 Fully Exposed DRAWR ,4G ETAILSRE ERENCEDINTHIS DRAWING, ALLAP ECTIOM GUIDES, ABLE ,LlbD :VPeR! seismic Hazard / Use Group: Group 1 ANC INDUSTRY STANDARDS PERTAININGTO PROPER ERECTION, INCLUDINGTHE CORRECT USE OF TEMPORARY n— 41 A, - — TT-- . C4- ­4 --/4 0:Z4- -,-ii e,*ii BRACING, 00, CD (N Non-Std Secondary Part Schedule Part Thick. Depth Lap 001C2007217 0.0590 8 1/211 /I 1 6 61-611 1_ V1 25 1 -6TT y am. VP Buildings, Inc. 3200 Players Club Circle Memphis TN 38125 NITS 12/10/2003 5:53:28 SECONDARY ELEVATION ATD 1ILDER T'e�ton West JOB# JSTOMER DATE CATON Idaho 12/5/2003 BUILDINGS DRAWNICHECK 0JECT ce 4091 Eagle Rock Dental 48xl24xl) -03 N-, uoEN VPC VERSION: 4. Ob PACE 8NAME: 4 091 Eaalp Rock Dental 48x1.24x1_0 12-8-01zCPC" VP Ref: Shape Name = Main 1, Wall = 4 11 HE VP ENGINEER'S SEAL APPLIES Building Code-, OOIBC THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS. ONLY TO THE WORK PRODUCT OF VP AND DESIGN AND PERFORMANCE Live Load: (Reducible) 20.00 psf IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING I A EQUIREMENTS SPECIFIED BY VP. C Load:Gravity 1.00, Uplift 0.00 DESCRIBED IN THE APPLCASLE PURCHASE ORDER AND SHALL NOT BE MODIFIED REPRODUCED OR USED FOR THE VP ENGINEER'S SEAL DOES oll. psf ANYOTHER PURPOSE WIVH6UT PRIOR wRrrrF-N NOT APPLY TO THE PERFORMANCE Wind Speed: 90.00 mph APPROVAL OF VP BUILDINGS. ()A DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP Wind Exposure: C THE GENE RAL CONTRACTOR ANDIOR ERECTOR IS SOLELY EXCEPT TO ANY DESIGN OR PER Roof Snow: 35.00 psf RESPONSIBLE FOR ACCURATE, GOOD QUALff"YWORKMANSHIP IN ERECTING THIS BUILDING IN CONFORMANCE WITH THIS FORMANCE REQUIREMENTS SPECIFIED BY VP, Snow Exposure Category: 1 Fully Exposed DRAWING DETAILS REFERENCED IN THIS DRAWING, ALL APPLidABLE VP ERECTION GUIII Seismic Hazard / Use Group: Group 1 AND INDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OF TEMPORARY I Bui.ldina.- UseIII; l7 BRACING. VP Buildings, Inc. 3200 Players Club Circle Memphis TN 38125 NITS 12/10/2003 5:53:28 SECONDARY ELEVATION ATD 1ILDER T'e�ton West JOB# JSTOMER DATE CATON Idaho 12/5/2003 BUILDINGS DRAWNICHECK 0JECT ce 4091 Eagle Rock Dental 48xl24xl) -03 N-, uoEN VPC VERSION: 4. Ob PACE 8NAME: 4 091 Eaalp Rock Dental 48x1.24x1_0 12-8-01zCPC" 1. UNLESS NOTED, USE 1/2 DIAMETER A-325 BOLTS FOR GIRT LAP GIRT TO FRAME, FLANGE BRACE TO FRAME, FLANGE BRACE TO GIRT, JAMB AND HEADER CONNECTIONS. SEE JOB DETAILS FOR BOLT LENGTHS. 2. WIND AND FLANGE BRACING ARE AN INTEGRAL PART OF THE WALL STRUCTURAL SYSTEM AND SHOULD BE PROPERLY INSTALLED PRIOR TO ERECTION' OF WALL AND ROOF SHEETS. REMOVAL OR ALTERATION OF WALL BRACING WITHOUT PRIOR AUTHORIZATION IS PROHIBITED, TJ� D ­61-11 1/411 A WALL SECONDARY ELEVATION WALL 5 C:) C> VP Buildings, Inc. 3200 Players Club Circle Memphis TN 38125 REV DATE By DESCRIPTION T— NTS 12/10/2003 5:53:29 ROJECT 4091 Eagle Rock Dental 48x124x1i) 3AwcEN ADER'S PON VPC VERSION: 4 'ENAM':4091 Eagle Rock Dental 48x1.24x10 12-8-0.1.VPC VP Ref: Sha2e Name-- Main 1, Wall = 5 THIS DRAWING, INCLUDING THE INFORMATION HEREON. THE VP ENGINEER'S SEAL APPLIES Building Code; OOIBC REMAINS THE PROPE RTY OF VP BUILDINGS. ONLY TO THE WORK PRODUCT OF AND DESIGN AND PERFORMANCE Live Load: (Reducible) 20-00 psf IT IS PROVIDED SOLELY FOR E RECTING THE BUILDING DESCRIBED IN THE APPLCABLE PURCHASE ORDER AND SEQUIREMENTS SPECIFIED BY VP. THE VP ENGINEER'S SEAL DOES Coll. Load:Gravity 1.00, Uplift 0.00 psf SHALL NOT BE MODIFIED REPRODUCED OR USED FOR ,VtHOUTPR1ORwRrrTEN ANYOTHER PURPOSE W N I QT APPLY TO THE PERFORMANCE Wind Speed: 90.00 mph APPROVAL OF VP BUILDINGS. OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP Wind Exposure, C THE GENERAL CONTRACTOR AND/OR E RECTOR IS SOLELY EXCEPT TO ANY DESIGN OR PER- Roof Snow: 35.00 psf RESPONSIBLE FOR ACCURATE, GOOD QUALRY WORKMANSHIP IN ERECTING THIS, BUILDING IN CONFORMANCE WITH THIS FORMANCE REQUIREMENTS SPECIFIED BY VP. Snow Exposure Category: 1 Fully Exposed DRA INC, LS REFERENCED INT LL W PL D L �IS DRAWING, A AP bAEB EVP ERECTION GU Seismic Hazard / Use Group: Group 1 AND INDIUSTRY STANDARDS PERTAIN TO PROPER ERECTION, INCLUDING THE CORRECT USE OF TEMPORARY Use:St-andard Occu*Dancy Structu_rga S , RACING, VP Buildings, Inc. 3200 Players Club Circle Memphis TN 38125 REV DATE By DESCRIPTION T— NTS 12/10/2003 5:53:29 ROJECT 4091 Eagle Rock Dental 48x124x1i) 3AwcEN ADER'S PON VPC VERSION: 4 'ENAM':4091 Eagle Rock Dental 48x1.24x10 12-8-0.1.VPC 1. UNLESS NOTED, USE 1/2 DIAMETER A -325 BOLTS FOR GIRT LAP, GIRT TO FRAME, FLANGE BRACE TO FRAME, FLANGE BRACE TO GIRT, JAMB AND HEADER CONNECTIONS. SEE JOB DETAILS FOR,BOLT LENGTHS. 2. WIND AND FLANGE BRACING ARE AN INTEGRAL PART OF THE WALL STRUCTURAL SYSTEM AND SHOULD BE PROPERLY INSTALLED PRIOR TO ERECTION OF WALL AND ROOF SHEETS. REMOVAL OR ALTERATION OF WALL BRACING WITHOUT PRIOR AUTHORIZATION IS PROHIBITED. C:) r-1 --Ar- 61-11 1/411 VP Buildings, Inc. 3200 Players Club Circle Memphis TN 38125 NTS 12/1.0/2003 5: 53: 30 WALL SECONDARY ELEVATION WALL 6 BUILDER Teton West JOB # CUSTOMER DATE LOCA-nON Idaho 12/5/2003 BUILDINGS DRAWWCHECK PROJECT � 4091 Eagle Rock Dental 48 124.1 Y-8 - 0 3:�,-wm BULDER's PON V VERSION: 4 . Ob PAGE FILENAME: 4091 Ea le Rock Dprital 48x124x10 1-2-8-03-VPC VP Ref: Name = Main 1, Wall = 6 THE VP ENGINEER'S SEAL APPLIES ,Sha2e Building Code.- OOIBC THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS. ONLY TO THE WORK PRODUCT OF VP AND DESIGN AND PERFORMANCE Live Load: (Reducible) 20.00 psf IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING REQUIREMENTS SPECIFIED BY VP. THE VP ENGINEER'S SEAL DOES Coll. Load:Gravity 1.00, Uplift 0.00 psf DESCRIBED IN THE APPLICABLE PURCHASE ORDER AND SHALL NOT BE MODIFIED, REPRODUCED OR USE D FOR ANYOTHE R PURPOSE WTHOUT PRIOR WRffTE N NOT APPLY TO THE PERFORMANCE Wind Speed: 90.00 mph APPROVAL OF VP BUILDINGS. OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP I Wind Exposure: C THE GENERAL CONTRACTOR ANDIOR ERECTOR IS SOLELY EXCEPT TO ANY DESIGN OR PER- Roof Snow.- 35.00 psf RESPONSIBLE FOR ACCURATE, GOOD QUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN CONFORMANCE WITH THIS FORMANCE REQUIREMENTS SPECIFIED BY VP. Snow Exposure Category: 1 Fully Exposed DRAWING, DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP ERECTION GUIDES, Seismic Hazard Use Group: Group 1 AND INDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OF TEMPORARY B u.j j,g,jnj. C)-ccu-p-ancy----�triagti;rlp,�5 I BRACING, VP Buildings, Inc. 3200 Players Club Circle Memphis TN 38125 NTS 12/1.0/2003 5: 53: 30 WALL SECONDARY ELEVATION WALL 6 BUILDER Teton West JOB # CUSTOMER DATE LOCA-nON Idaho 12/5/2003 BUILDINGS DRAWWCHECK PROJECT � 4091 Eagle Rock Dental 48 124.1 Y-8 - 0 3:�,-wm BULDER's PON V VERSION: 4 . Ob PAGE FILENAME: 4091 Ea le Rock Dprital 48x124x10 1-2-8-03-VPC