Loading...
HomeMy WebLinkAboutFIRE PLAN REVIEW - 97-00036 - Papa Kelsey's - RemodelREXBURG IIADISON COI'NTY FIRE DEPARIME}ilT P.O. Box 280 26 North Center Rorburg, Idaho 83440 (208) 3s9-3010 Storles: 1 Tvpe of Construction: Occupancy Classiflcation: A-3 Existinq Floor Area: 3360 1).Required Fire Flow (Appendix III-A) : 1500 q.p.m. 2).Water Supply (Article 9, Section 903) Required: yes Fire Hydrant Location: Center I 1st South. 50 South Center, 1st West & 1st South InTa.|_ ar Qrrnnl rz Annonf rh I a. VCS Fire Hydrant Locatj-on Acceptable: Yes 3.)Fire Apparatus Access Roads (Article 9 Section 902) L994 Uniform Fire Code PIan Review Buildinq Name: Papa Kelsev's Building Address: 40 West 1st South Required: Yes Acceptable: Width: Yes Length: Yes Turni-ng Radlus: Yes Grade: Yes Clearance: Yes Turn Around: NA P].an Date: 09-09-9? Review Date z O9-L6-97 (rr rf .ar-o. Yaq Vehicle Vertical Complete Road Acceptable: Yes Comments: Existino narkino lot 4 ) .Access Roads and Water Supply, fncluding Fire Hydrants Are Requlred To Be fnstalled And Made Serviceabl-e Prior To And Durinq Time Of Construction (Article 9 Section 901.3) Yes 5).fnstallation Of Portable Fire Extinguisher (Article 10 Section Plan Review P:no ? L002) Required: Yes Location Acceptable: Not Shown Type Provided Acceptable: Not shown Comments: Size and glacement must be approved before openina 6).Automatic Fire Extinguishing Systems: (Article 10 Section 1003 Required: No 7).Standpipes (Article 10 Section 1004) Required: No B).Ventilating Hood And Duct Fire Extinguishing System (Article 10 Section 7006.2) Required: No grease laden vapors 9).Fire Alarm Systems (Article 10 Section 7001) Required: No 10).other corrections That Are Required By special occupancy or conditions: chain co2 tanks to wal-l-, panic hardware required on both rear exit doors Plans As Submitted Are Acceptable: Yes Plans Checked By: Dee Owens Date: 09-L6-97