Loading...
HomeMy WebLinkAboutSTRUCTURAL CALCULATIONS - 14-00198 - 880 South 2275 West - SFRlK "tTfT-l=* Kartchner Homes 601 W. 1700 S. Blds B Logan Utah 8$21 435.7 55.9530 York Engineering Inc. Structural Calculations Vergie Scroughams Summerfield Subdivision Block 2, Lot l0 Rexburg, ID 83440 Prepared For: rill0NffpN q7i7 af ZtJt May 6,2014 Structural Calculations Kartchner Homes Vergie Scroughams 880 S. 2275 W. Rexburs York Engineering Inc. 2329 W. Spring Hollow Rd. 40 l0 D (90 mph basic) Exposure C or(100 mph basic) Exposure B May 6,2014 For: Plan #: Location: From: Morgan, Utah 84050 (801) 876_3501Design Criteria 2012 IRC: RoofLoad; Roof Live Load (pSF) 40 Dead Load (pSF) 15Floor Load: Live Load (pSF) Dead Load (pSF) Seismic Zone: Wind Speed: 115 mph ult. 130 mph ult. Material Properties & Assumptions Concrete (fc'): 2500 psi(found.) to +OOO psi (susp. slab)concrete Reinforcement: ASTM 4615 Grad. oo a Grade 40Site conditions: Dry & stable granular based, 1500 psF Bearing capacity, Granular BasedBackfill (KH:35 pcf),Slope noito exceed 20Yo, Setback from slopes is minimum of 25,Dimensional Lumber: Hem or Doug Fir #2 & BTRSteel: ASTM ,{36 Use Simpson straps and tie downs, and meet nailing, reinforcement and other structuralrequirements as noted on the dlawing and within th;pd";;;this document. These structuralcalculations are based on conditions-and assumption, ti.t"o above. If the conditions listed hereinare not met or are different it shall be brought to the attention of the engineer. noorr.ur. unobeam system to be engineered-by the suppfier. This .ngin"";ing assumes that the building site isdry and stable, a high water tabll or adverse soils such as plastic clays, fills etc. could causefuture flooding, settlement, site instability, or other adverse conditions.i Verification of andliability for the soil bearing pressure, site stability, and all other site conditions, including siteengineering as required, is the responsibility of others. these calculations and engineering are forthe new building structure only and do not provide any engineering analysis of orliability/warranty for the non-structural portions of the bff;i;g, or the site itself. yorkEngineering Inc' does not assume the role of "Registe."d t;;Lr professional in Responsiblecharge" on this projeg!' The purpose of these calculations and engineering is to help reducestructural damage and loss of life due to seismic activity u"iorhigh wind conditions. Thecontractor shall verify all conditions, dimensions and .i.u"turut aetaits of the drawing.All exterior walls shall be sheathed withT/16" APA ratea structural wood panel. Block all ft0tMrPh0 horizontal edges I t/2" nominal or wider. Sheathing shall extend continuous from floor to top plate and be nailed at least 4" O.C. along sill plate. Nails shall be placed not less than/2,, from edge ofpanel and driven flush but shall not fracture the surface ofthe sheathing. Extend sheathing over gable end to wall joints & over rim joist between floors and naiito rim and wallplates 6" O.C. The following general requirements shall be followed during construction: 1. Contractor to verify all dimensions, spans, & conditions and notify engineer of any errors, omissions, or discrepancies prior to construction. 2. Use Simpson ,{35 ties each cantilevered joist to sill or top plate. 3. Use Simpson Hl, H2.5 or equiv. ties each end of each truss. 4. Use l/2" x 10" J bolts 32" O.C. all foundation walls up to 8'. Use 5/8" bolts with all walls over 8'high. use 3" x 3" x 1/4" washers 5. If discrepancies are found, the more stringent specification shall be followed. 6. All multiple beams and headers to be nailed using l6d two rows 12" o.c. 7. Contractor shall assure that all materials are used per manufactures recommendations. 8. Site engineering and liability shall be provided by the owner/builder as required. 9. Connect beams & headers over 6 ft., to trimmers with appropriate connectors/hangers. 10. Contractor shall assure that footings are properly drained and that soil is dry andihat footings rest on undisturbed native soil and that building horizontal clearance from footings to adjacent slopes be a minimum of 25 feet and that the intent of IRC section R403. I .7 .2 is met. If set backrequirements of R403.1 .7.2 cannot be met then contact engineer for further design requirements. 10. The contractor shall conform to all building codes and practices as per the 2009 IRC.I 1. Use balloon framing method when connecting floors in split level disigns. 12. Nail all shear walls to floor joist using 2: 16d 16" O.C. Add additional floor joist as reqd. 13. Provide joist and rafter hangers as per manufacturers' specifications. 14. Foundation steps shall not exceed 4 feet or lzthe horizontal distance between steps. Horz. re-bar shall be 12" o.C. through step downs and extend 48" either side of step 15.If garage return walls are less than 32" wide then extend headers across return walls with 2 king studs on either end extending from the top of the header to the bottom plate or install (2)MST 36 straps each end of header extend across wing walls. 16. Use a minimum of 2-9 vz" LYLs for all headers carrying girder loads. 17. Use 1 1/8" wide timberstrand or equiv. for all rim joist 18. Provide solid blocking through structure down to footing for all load paths. 19. Builder shall follow all recommendations found in all applicable Geotechnical reports.20. Stacking of two sill plates is permitted with 5/8" J-bolts through both plates. Sta&ing morethan two plates is not permitted without special engineering Plan: SFl0B2 Date: 5 May 2014 Location: Block 2 Lot 10 Summerfield Subdivision Footing Calculations Concrete Specs Density (pcf) Strength (psi) Clear Cover Thickness (in) Foundation Overall Height (ft) Height (in) WallThickness (ft) Thickness (in) Weight (kips/|ft) Footing Specs width (ft) Width (in) Height (ft) Height (in) Weight (kips/|ft) Area per lft Soil Specs Density (pcf) SoilPressure (psf) Weight (kips/|ft) Building Loads Roof span Roof (kips/|ft) WallHeight (ft) Wall Load (kips/|ft) Floor span Floor Loads (kips/|ft) Total(kips.lfi) Calculations back front left 150 150 3000 3000 33 7.83 7.83 94 94 0.67 0.67 88 0.78 0.78 1.67 1.67 20 20 0.83 0.83 r0 10 0.21 0.21 1.67 1.67 right interior 150 150 150 3000 3000 3000 333 TotalWeight on Soil (kips) 2.53 Soil Load (ksf) 1.52 7.83 7.83 94 94 0.67 0.67 88 0.78 0.78 1.50 1.50 18 18 0.83 0.83 10 10 0.19 0.19 1.50 1.50 0.08 1 0.67 I 0.01 1.33 16 0.67 8 0.13 1.33 125 125 125 1500 1500 1500 0.41 0.41 0.00 440 0.11 0.11 0.00 14 14 12 0.28 0.28 0.18 14 14 32 0.35 0.35 0.80 0.74 0.74 0.98 1.71 1.71 1.14 1.14 1.12 0.84 lU lU 16 10108 Required Footing Width (in) Required Footing Depth (in) 125 125 1500 1500 0.49 0.49 2U 10 47 1.29 10 0.20 2 0.05 1.54 ztt 10 47 1.29 10 0.20 2 0.05 1.54 2.53 1.52 Plan: SF10B2 Date: Location: Sawn Lumber Load Parameters Floor Live Load(psf) Floor Total Load(psf) Floor 1 Span(ft) Total Floor Load(plf) Wall Height (ft) WallWeight (psf) WallLoad(plf) Roof LL (psf) Total Roof Load(psf) Roof Span(ft) Total Roof Load(ptf) Beam Weight (ptf) Live Load (plf) TotalLoad (ptf) Reactions & Moment Duration Increase Beam Span(ft) Reaction 1 (tb) Reaction 2 (lb) Max Moment FtLb Max Shear Lb Determine Beam Size Depth Estimate (in) Width Estimate (in) CF= Area = Momemt of lnertia | = Maximum Bend Stress = Allowable bend Stress Factor Of Safety = Allowable Sheer Stress Max Shear Cap (lbs) = Factor Of Safety = Bearing Required = E (psi) Deflection LL (in) Lload Def. Limit L/ Allowable Deflection (in) LL Deflection F/S Deflection TL (in) Tload Def. Limit L/ Allowable Deflection (in,; TL Deflection F/S Selection SMay 2014 Block 2 Lot 10 Summerfield Sul FB-1 RB-3 RB4 40 40 40 50 50 502600 65000 000 20 20 20 000 40 40 40 55 55 55 04637 0 1265 1018 4.4 5.6 4.4 520 920 740 654 1271 1022 111 542 1636 2541 1022 1636 2541 1022 2045 2541 511 1636 2541 1022 7.25 9.25 7.25 333 1.20 1.10 1.20 21.75 27.75 21.75 95 198 95 934 713 233 1020 935 1o2o1.09 1.31 4.37 180 165 1802610 3053 2610 1.60 1.20 2.55 1.35 2.09 0.841300000 1300000 1300ooo 0.06 0.02 o.0o 360 360 360 0.17 0.13 o.o72.82 6.47 30.99 0.07 0.03 0.oo240 240 2400.25 0.2 0.1 3.36 7.03 33.67 2:2x8 2:2x10 2:2xg RB-1 Plan: Date: LVL Beam Location: Load Parameters Floor LL (psf) Total Floor Load(psf) Floor Span (ft) Total Floor Load (ptf) Wall Height (ft) WallWeight (psf) Wall Load (plf) Roof LL (psf) Total Roof Load (psf) Roof Span (ft) Roof Load (ptf) Beam Weight (ptf) Live Load (plf) Total Load (ptf) Reactions & Moment Duration Increase Beam Span(ft) Reaction 1 (tb) Reaction 2 (tb) Max Moment FtLb Max Shear Lb Max Shear Stress (psi) Determine Size Depth Estimate (in) Width Estimate (in) Cross Area (in^2) Allowable Bending Stress = Allowable Moment = Momemt of Inertia I = Factor Of Safety = Allowable Sheer Stress (psi)= Allowable Sheer Force (lb)=Factor Of Safety -- Bearing Required = E (psi) Deflection LL (in) Lload Def. Limit L/ Allowable Deftection (in)LL Deflection F/S Deflection TL (in) Tload Def. Limit L/Allowable Deflection (in) TL Deflection F/S Selection 40 55 22 605 16 440 661 1 16 5290 5290 21160 5290 94 16.00 3.5 56 2500 31114 1 195 1.47 285 10640 2.01 2.02 1 900000 0.29 360 0.53 1.87 0.43 240 0.80 1.86 2:16" RB-2 40 50 0 0 0 20 0 40 55 46 1265 10 920 1275 1 6 3824 3824 5736 3824 115 9.50 3.5 33 2684 11775 250 2.05 285 6318 1.65 1.46 1 900000 0.06 360 0.20 3.54 0.08 240 0.30 3.83 2:9 /2" 40 50 0 0 2 20 40 ptan: SF10B2 Date: 5 May 20i4 Location: Btock 2 Lot 1O Summerfield SubdivisionSeismic Calculations Loading Summary Floor Dead Load (psD 10 Seismic Zone EFfoor Live Load(ps0 40walls (E)d)(psf) 20 Roof Ll(psf) 40Walls (htxpsD 10 Roof DL(psi 15Roof Dead Load(psf) 1 sRoof Slope Exterior Snow Load Reduction Slope Snow Pitch over 20 Rs Reduction L.L.- Reduction Total Load Roof Floor 1 Laterat ForceFloor 2 Laterat ForceRoot Laterat ForceTotal seismac Mass =Total Lateral Force = 6 t12 combination Seismic paramaters 26.56 V=Cs,Wt.4 40.00 Fa= 'l R= Ss= Sms= 40.00 Sds= 55.00 cs= 0.1 1 1 Adj. Factor 1.4 Cs= 0.0790 roof wall Total Mass Tributary to Roof Levels = Shear (V)(tbs) Roof Levers = Length W(psf) tb/ft 40 t0 400wall height 0 Total Mass Tributary to Floor 2=Shear (V)(lbs) Floor Levets = Length W(psf) tb/ft 40 10 4OOwail height 9 Total Mass Tributary to Floor 1 = Shear (VXlbs) Ftoor Levers = width w(rb) 50 46000 8 100 541 00 4276 widrh w(tb) 500 8100 0 0 width w(b) 50o 9900 9900 783 o/o Force Total Sheer I100.000/0 4.276.1591tJ.o0% 4.2ttt15910.0Ut/o 4.Zt6,tb91 142 t6 6.5 table 16'17.6 0.9 0.90 eq. 16-16 0.60 eq 16-18 per eq. I6-49 Length W(ps0 Lb/ft40 23 g2o Floor 2 Floor 1 (, 0 42t6 040uu 427ti seismic Force DistriDution** Roof secrions *-- ijld w(x) kip w(x)H(x)iisSit ;1" s' I''v/sum(wr-Hr) = J:rt8!tr, ?3,", "n""r 1,o3lr= E asemen[ Dneer wattTotal Load (kips) nght stdeleft side rontDact( Ftoor 1 sneer watlTotal Load (kips)ngnt stde len stde ront DACK Ftoor z Sneer watlTotal Load (kips) nght srde len side ront back Length Shear Wail Load (pto ;x Not Apptrcabte .:x Not Apptrcabte .:X Not Apptr€bte,w Not Apptrcabte Siear Wail Load (ptf) 6q ?53 E6 Shear Wall Load {olf)Not Appttcabte Not Appticabte Not AppxcaDte Not Appttcabte f_o-q 9L uL (ptf) cntrcat | (n)1292.5 1027 31292.5 1027 1110 493 21'10 493 3 46R-1ggs -3415 _saos.ii!8 .i?t8 .3?t3-rro _1716 _2701 r-(rorat) 4.32.12.12.12.1 r-(totat) 4.3 2.1 2.1 2.1 2.1 r-(rotat) 4.3 2.1 2.'l 2.1 2.',| Length 46 31 14 z5 Lengtn 101010 lo shear wail cflttcat Lengths wal uL t_toor uLrront 2OO 50Pgc.I zou 50itil' 233 #3 s:lgyl"-tg yptLT, Force Req'd to prevent o1 (tbslHa-nel Length (ft) 2 3E:"J,' gPx ??9"RightLeft -149 _642 256 _237 plan: SF10B2 Date: 5 May 2014 Location: Block 2 Lot 1O Summerfiold Subdivision :,t^'11.:.:0,1n_9r:ytarions usins Main windforce_Resi",i" g t"i;i;;;in"lLongitudinal Diection Wihd Oosign Cffici€nts P=wind load,exp coeff'lw P=Design Pressure Horizontat Wind Load (from table i609.6.2.i(i)Wall Load (psf)= end zone (A) 16.1interior zone (C) 11.7Roof Load (psD= end zone (B) 2.6rnleriorzone (D) VerlielWind Load (from tabte 1609.6.2.1(1) Roof Load (psD= end zone windrerd (E) _7.2 eno zone teeward (F) -9.8 lnteriorzone wjndwd (c) _5.2 Inrenorzone leeward (H) _5.2 Exposure Coefficient (from tab|e .1609.6.2.1(4) lFlmportan@ Factor (from tablo 1604.5) Erposure Roof Slop€ - RootAngle (dq)= P=wind load*exp coefrlw horizontal wall interior horizonlal wall end zone honzontal roof interior horizontal roof end zone verti€l end zone windward vert,€lend zone leewad verti€l interior zone windwardvertiei inlerior zone leeward .4'Hmean .1'base End Zone Width (fr) lnterior Zone Vvldth (ft) Gable Rd Load 1.21 1.0 10 RoofHeight 1O.OOu Wa[ Height 10 Truss Span 40 6 /12 26.56 Sine = 0.4472 Minimum pressure Adjusted 14.16 14.16 19.48 .19.48 o.zt 10.00 3.15 1O.OO-8.71 o.oo-11.86 o.oo-6.29 o.oo-o.ze 0 00 6 4 4 42422nd storyEnd Zone Width (ft)2nd Storylnterior Zone Wdth (ft) Hip Roof Load End lnterior Width HeighrEno 4 1.slnterior 42 4.04 Force (lbs)'t49 3543 3692.83 Fore llbs) 5000 640 5840 2nd StorForco (|ffi) For@ {tMrco i55_85595 594.59750.442 750.44 Area 500 84 Wind Load 19.48 1 4.16 Sum = 10.00 10.00 Total wjdth H€ight Wid Lcd :no. 4 1.0 19.48lnrenor 42 1.00 14.16 Sum = Floor 2 Diaphragm Sh€r Total Shear (tbs) Front Wall Length Back Wail Lenglh Floor I Diaphragm Shear Total Shear(lbs) Front Wall Length Back Wall Length hsement Djaphragm Sh@r Total Shear (tbs) Frcnt Wall Length Back Watl Length Critical Wall Length (fl)= Front Wall Dead Load (plD= Front Wall Criti€i Lenoth {ft1=Back Watt Dead Load iptD:Back Wall Critiet Length (ft)= widtheno zone windward 4 leeward 4inlerior zone windward 42 leeward 42 longth Wind L@d18.00 FALSE IE.OO FALSE,18,00 FALSE 1E.OO FALSE Sh€ar Watt Loads (ptf) Not Applicabte Not Appticabte ShearWail Loads (ptf) 450 252 Shear Wail Loads (pto Not Applicabte Not Applicabte Total 10729 Toral (ptf) 60 5840 10 10 12594 14 25 13344 10 10 1027 4 1027 2 Fo.€ {lbs)0 0 0 0 12-3107 -4295 763 -424 Calculate Uptift, Force Req'd to prevent OT (tbs) _ panet Length (ft) 2 3 :.1, 1731 .t247 tracK 544 60 8 10-1172 -2140 -2360 -3327 plan: SFIOB2 Date: 5 May 2Ol4 I*..i.::.:H:::11",,,"'::1T; "":fi t,1":?:f"".;:ff T;'.Tijj,fffii*",I EnsveEe Direction Wind Design Cdci€nts P=wind load'exp @eff*lwP:Design pressure Horizontat vvtnd Load (from tabte 1609.6.2.1(1)Wall Load (psf)= end zone (A) j6.1 fnrenorzone (C) 1]Roof Load (psf)= end zone (B) 2.6rnrenor zone (D) 2.7verti€t Wnd Load (from table 1609.6.2.1(t)Kool Load (psD= end zone windMrd (E) _7.2 eno zone leeward (F) _9.8fntenor zone windward (G) -5.2 Inreior zone leeward (H) _5.2 Exposure Coefficient (frcm tabte 1609.6.2..,(4)rFrmponan@ Factor (from table .j604.5) ExFsure R@f Abgte (&g)= P=wind load*exp coefllw horizontal wall interior horizontal wall end zone honzontal roof intefior hodzontal roof end zoneverti€l end zone windward verti€l end zone leewardverti€l intedor zone windwardveni€l inlerior zone leeward End Zone Width (ft)Interior Zone Width (ft) Gable Ret Lad Hip Rod Led Wall Lcd 1.2'l 1.0 10 RoofHeight 10u Wa[ Heighl 10Iruss Span 40 6 t1226.56 Sine = 0.4472 Minimum prcssure Adjusted14.16 14.1619.48 19.483.27 10.003.15 1O.OO-8.71 o.oo-11.86 o.oo-6.29 o.oo-6.29 o.oo "1 2nd storyEnd Zone Wtdth (n)rz 2nd Storylnterior Zone Width (ft)32 !1elt windlcd Force(tbs)ilo 1213 ;13"sum = 2a49.178 W;nd L@d Force {tbs)'19.48 156 14.16 453 Sum = 608.872 10.00 40oo10.00 640rotal 4640 width 32 400 64 width 4 32 width 4 32 32 End Inlerior End Inlerior End Inlerlor 4640 10 1o 10120 46 107291010 4933 493 2 Hdght 1.0 1.00 2nd Story 155.848 453.024 608.872 end zone windward leewardinterior zone windward Eeward tengh 43.00 43.0043.0043.00 FALSE FALSE Fore (tbs) 0 0 0 0 Floor2 Diaphragm Shear Total Shear(tbs) Lefl Wail Length Right Wall Length Floor I Oiaphragm Shear Tolal Shear(tbs)Lefi Wall LenothRighr walt Le;gth basehent Diaphragm SharTotal Shear(lbs) Lefl Wail LenqthRight Wall Le;grh Critical Walt Length (ft)=Lefl Wall Dead Load (olfl= Lefl Walt Critical Lenoih iftr=Right Wail Dead t_oaj roiOlRight Wall Critiet Lengih ifr)= Calcutate Uptifr, Force R;q,d to prevent oT (tbs)panel Length (fi) 2 3rronr aE2aacr ;il il" Shear Wail Loads (pto Not Appti€bleNot Appti€bte Shear Wail Loads (ptf) 110 Shear Walt Loads (ptf) Not Applieble Not Appliebte fotal ,3344 Tolal (pl0 67 46R tzt -299 _72\-192 €i8 -1g/,t 10 12-1151 -1577-1471 "1A97