HomeMy WebLinkAboutLETTER - 12-00148 - BYUI Dry Storage Bldg - Occupancy Changev
BYU
IDAHO
Apnl2,20L2
Val Christensen
Gtyof Rexburg
35 Nonh 1" Easr
Rexburg,Idaho 83440
Facility Planning & Construction
Brigham Young University-rdaho . 2g3 physicar prant. Rexburg, rD . g3460-8205
a
o
o
o
Fire-Resistance R"d"g Requirements for Building Elements: 0 houn per table 601Fire-Resistance R"ti"g Requirements for Exerior'Walls Based on Fire Separation Distance:0 hours pertable 6Q2
Automatic Sprinkler Sptern: not require dper903.2.4
Ponable.Fire Extinguishen: required pergO6.Each space u/ithin the facilityis equipped witha portable fire extinguisher.
Izlanual Fire Alarm Slaterrr not require d per 907.2.4
REt
Dear Val,
For approximately one year BYU-Idaho las been collectirg *d sorting recyclable material from thecampus waste stream. $ yo" are aware, the University is beginning " p-ilot progra- to collect andsort recplable material.fro- F1Grygf Rexbury-s *"rr. ,rrf"-. ri.'"rr.l"i[q-"i.., ,o.ing *ds.toragg priorto being shipp:4:Fo.tthis puqpose-BYU-Idaho proposes to utilize " l"ry.rponi6n of
th:.:"r-gDryStorage Byildinq locatei wist of South 1" \fist ^Sro.r.
A 6o*id oirh.';t;;;;.building with the proposed "r." indi."t d is attached herewith.
F: {vtpr:age building was constructed and occupied in compliance with the 2006 IntemationalBuilding C-ode group S-1 occupancyrequirements. in2ol.ltheiortion of tn. f".itityutilized forpP:es:ing.reclclable llerials was granted a change in occuparrcyclassificationi" r-r. The portionsof the.faciliryproposed to augment ihe existing pr6cessing ri.r "iro ;q.,i.. ;;h*ge i' occupancyclassification from S- 1 to p- t. unless mistaLen] the jaciliri can accommodarc non-sep anteduses s- 1and F-1 without requiring modification. A brief code arr"llnis follows.
o LJse and occupancyclassification: S-1 and F-1, non-separated use per 50g.3. T)pe of Construction: V-B
. Allowable Building Fleight: 1 storyper Table 503
o Actual Building Fleighr 1 story
o Allovrable Area: 8,500 square feet per Table 503
o Actual Building Area: 8,000 square feet
jedd alan walker campus Architect I phone: (208) 496-2663 | Fax: (208) 496-6449 | watkerje@byui.edu
t
BYU-Idaho requests a new certificate of occupancyif the cirydetermines the requiremenrs for the
new occupancyclassification have been met. Please let us knowwhat fee amounts are required and
whether our code anahnis is accurate.
BYU
I DAII O
Thanks,
z/rcrZ 2.
j(Adawalker
Campus Architect
cc
Rulon Nielsen
Facility Planning & Construction
Brigham Young University-ldaho . 283 Physical Plant . Rexburg, lD . 83460-8205
-k/"4*-
jedd alan walker Campus Architect I Phone: (208) 496-2663 | Fax: (208) 496-6449 | watkerje@byui.edu
BYU
I DAI{ O
Facility Planning & Construction
Brigham Young University-ldaho . 283 Physical plant . Rexburg, lD . g3460-9205
{"*
Apri2,2012
Val Clristensen
Gtyof Rexburg
35 Nonh 1" Easr
Rexburg,Idaho 83440
RE: Change of Occupanc).- DryStorage Building
. -i-,.\i.11.. - '
+f"
DearVal,
For approximatelyone par BYU-Idaho has been collecting and sorring recplable material from the
campns v/Tte stream. $ yot are aware,the Universicyis beginning a pilot progfilm to collect andsort recyclable material.fr.om t-hgGqrof Rexburg's waste st e"rn The material lequires sorting and
s.toragg prior to being shipped. For this purpose BYU-Idaho proposes to utilize il^tg"rponi6n of
lhg.g1"rhg DryStorage Building located.west of South 1." 'Wist -Sto.t.
A drawing of"ttr. drystorage
building with the proposed area indicated is attached herewith.
1: irytr"rage building was constructed and occupied in compliance with the 2}e6lnternationalBuilding C.ode group S-1 occupancyrequirements .ln2OtL the ponion of the facilityutilized forprocessing.recyclable materials was glanted a change in occupancyclassification to F-1. The portionsof thg.faclivproposed to augment the existing processing "o" "[ro require a change ir, occuia.rcy
classificationfromS-1toF-1.Unlessmistaken,thefact)ttycanaccommodrt,ron-r.panted*.rS-t
and F-1 without requiring modification. A brief code anaiysis follows.
o IJse and OccupancyClassification: S-1 and F-1, non-separated use per 508.3
. Type of C-onstruction: V-B
. Allowable Building Fftighu L storyperTable 503
. Actual Building Fftighu 1 story
. Allowable Area: 8,500 square feet per Table 503
o Actual Building Area: 8,000 square feet
o Fire-Resistance Rating Requirements for Building Elements: O houn per table 601o Fire-Resistance-Rating Requirements for Exterior \Walls Based on Fire Separation Distance:0 houn pertable 602
o Automatic Sprinkler Sptern: not require d per 903.2.4
o Portable Fire Exting"T!.^, required per 906. Each space wirhin the facilityis equipped with
a portable fire exringuisher.
. I\{a.nual Fire Alarm Spterrr not require d per 907 .2.4
i,..''.''
jedd alan walker Campus Architect I Phone: (208) 496-2663 | Fax: (208) 496S449 | walkerje@byui.edu
BYU
IDAHO
Facility Planning & Construction
Brigham Young University-ldaho . 283 Physical Plant . Rexburg, lD . 83460-8205
BYU-Idaho requests a new certificate of occupancy if the city determines the requirements for the
new occupancyclassification have been mel Please let us know what fee amounts are required and
whether our code analvsis is accurate.
Thanks,
Oed fr/-A.--
{aa^walker
Campus Architect
LL
Rulon Nielsen
jedd alan walker Campus Architect I Phone: (208) 496-2663 | Fax: (208) 496S449 | walkerje@byui.edu