HomeMy WebLinkAboutALL DOCS - 08-00228 - Taylor Chevrolet - Car Wash Addition - Site PlanSite Plan Review Checklist
Project: F ? Wtbn
Permit # 00
Zone: M-) �
Surrounding Land Uses:5C, XAG t
Elevations submitted: v-
Landscape Plan submitted:
Lighting Plan submitted:
Use Consistent with zoning designation
rteyunuu
rrowaetl
npprovetl?
Compliance with Comprehensive Plan
Flood Plain Check
Plans are to scale
North arrow
Building Coverage
Building setbacks:
Front yard
Side yard ' J
Back yard
Building Height
Minimum distance between buildings
Clear site tirangle
Driveway, parking lot dimensions
Parking space # 6 6Z (JAO,�
Parking space sizes �
Parking isle widths Qj
Handicapped requirements
Unloading, loading area
Parking spaces located in close proximity to buildings
Sidwalks along right of way -
Internal pedestrian walkways
Snow storage
Open /common spaces functi al?
Fencing /screening (HVAC equipment, dumpsters, parking, etc.)
Trash dumpster shown and screened
Buffering /landscaping requirements
Lighting ' i
Design standards'
Committee Meeting Held If needed
Md
CITY OF
_R,EXBURG
I-— CW -
Amerca's F-MUY
Review Action
May 20, 2008
Permit Number: 08 00228
Project Name: Taylor Chevrolet Car Wash Addition-Site Plan
Project Type: Site Plan Review
P.O Box 280
19 E. Main St.
Rexburg, Idaho 83440
Phone(208)359 -3020
Fax(208)359 -3022
Review Item Actions Required for Approval Approved
' Id
Plumbing Review
Fire Separation
Parking Configuration
Parcel #'s RPRXBCA0360380