Loading...
HomeMy WebLinkAboutBaker, Stanley Trust - 340 Eagle SummitP.O. Box 280 c il y e x l u r 12 North Center Street Rexburg, Idaho 83440 STATE OF IDAHO PHONE (208) 358`3020 FAx (208) 359 -3022 E-MAIL cityhaI1 @ci.rexburg.id.us CERTIFICATE OF OCCUPANCY City of Rexburg Department of Building Inspection Building Permit No: R- o3 -07 Applicable edition of code: ❑ International Building Code 2000 ❑ International Residential Code 2000 ❑ Uniform Building Code 1 997 Site address: 336Z34o Eagle Summit Use and occupancy: Residential Home Type of construction: Wood Frame Design occupant load: Residential Units Sprinkler System required: ❑ Yes ❑ No Name and address of owner: Sainsbury Construction 4829 N. Haroldson Idaho Falls, Id. 83401 Contractor: Sainsbury Construction Special conditions: Occupancy: ❑ Full ❑ Partial ❑ Temporary This Certificate, issued pursuant to the requirements of Section log of the International Building Code, certifies that, at the time of issuance, thislbuilding or that portion of the building that was inspected on the date listed was found to be in compliance with the requirements of the code for the group and division of occupancy and the use for which the proposed occupancy was classified. Date: May 13, C.O. Issued by: There shall be no future change in the existing occupancy classification of the building nor shall any structural changes, modifications or additions be made to the building or any portion thereof until the Building Official has reviewed and approved said future changes. Water Department �j " Fire Department State of Idaho Electrical Department - (208- 356-4830 ) ❑ Merlin Webster INSPECTION TICKET r JX' - Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire Inspection Request: Recd By - 16 Date J ,7 � I Req. By / 1�� Phone No. Project � S , ,... r Permit No — ( 7 Address ` ����� � Inspection Types Lw Day /Time Req. Inspector's Report ❑ Res. ❑ Comm. INSPECTED ITEMS CONFORM TO APPROVED DWGS ❑Y ❑ N ❑ N/A INSPECTOR'S ACTION PROVED 0 DISAPPROVED I] FINAL ❑ C.O. (FINAL) ❑ NOT APPLICABLE ❑ DID NOT INSPECT ACTION REQUIRED: 5%" t n W1*9 -OINCe Copy *Now - Job Copy Pb* - ev % Copy F- FIR -CO03 INSPECTION TICKET ❑ Bldg. t, Plumb. ❑ Elect. ❑ Mech. ❑ Fire Inspection Request: Rec'd By Date 2- C- ) ( CA- Req. By Phone No. - � 1 - -- 0 1 - 0002- Project 11 S O I "t Permit No. [Z fj� Address - _ �` % It U ' kC\ \; L l Inspection Type t �J Day /Time Req. Inspector's Report a ❑ Comm. d � INSPECTED ITEMS CONFORM TO APPROVED DWGS INSPECTOR'S ACTION [ROVED El DISAPPROVED C.O. (FINAL) ❑ NOT APPLICABLE ACTION REQUIRED: ❑Y ❑ N ❑ N/A Q FINAL ❑ DID NOT INSPECT Signed Rec't Acknowledged While - Office Copy Yellow - Job Copy F- FIR -CO03 Inspector Pink - Inspector's Copy INSPECTION TICKET 3 1 k � ❑ Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire Inspection Request: Rec'd By I W Date Req. By V � L Phone No. Project nait u2i Permit No. R-6 — D7 - 1 5' Address �7�� �, Q1 Inspecti< Day /Time Req. Inspector's Report Res. ❑ Comm. INSPECTED ITEMS CONFORM TO APPROVED DWGS 1NSPOR'S ACTION APPROVED ❑ DISAPPROVED X"'O. (FINAL) ❑ NOT APPLICABLE ACTION REQUIRED: F1 ❑N El N/A ❑ FINAL ❑ DID NOT INSPECT Rec't Acknowledged White - Office Copy F- FIR -CO03 Yellow - Job Copy Pink - Inspector's Copy �^ 1 INSPECTION TICKET �. Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire Inspection Request: Rec'd By �, , Q Date 2 - C'1 m Req. By (JC Phone No. X1 C-)� Address Inspection Type Day /Time Req.'s Inspector's Report yJ Res. ❑ Comm. 5 9P % r'N t - k ' f�a�d�a C iK 4�'a4� 5�rao W f� • f � �$ W�'I (d'�TS fG�G 6F 1Jd t"YKS �at.tS� #S ' GJ,'✓ra�vuJ ul�� co yerT had INSPECTED ITEMS CONFORM TO APPROVED DWGS DY ❑ N ❑ N/A INSPECTOR'S ACTION APPROVED ZDISAPPROVED 338 [] FINAL eI C.0. (FINAL) 3 ❑ NOT APPLICABLE [j DID NOT INSPECT ACTION REQUIRED: // t � j � ` ���� C o n lti Signed Rec't Acknowledged While - Office Copy Yellow - Job Copy rnrw - Inspector's Copy F- FIR -CO03 1 FINAL INSPECTION CHECKLIST Date: 34a4�4�/ Project: Job Address: Building Permit Number: p03 -07 -lam The following comments based on the 2000 edition of the International Residential Code should be resolved before an occupancy permit is issued. This correction list is not a building permit. The approval of plans and specifications does not permit the violation of any section of the Intemational Residential Code or any federal, state or local regulation. �� n. ► b �, �dSGaP i �� �4;ro.v�P W � w olz , � LO t cove - d $a �lu w /r,dou� et( Gayea � r�; j Czar°►�� r j.�• � rn,+ •���G�e vF 13d�w�s� 3 -12 -03 El OUTSIDE 4 House Numbers (visible from the street) Grade (yard is sloped away from foundation) �idewalk & Landscape Strip 5' wide (W/ 6" of granular borrow (hill 12 ")) - -7' LS strip _ZFront Setback Coverage 60% min green LWindows - Covers and Screens (shall be releasable or removable from the inside for egress it Gp Window Wells min. 24" clear (out and above) well / Exterior Steps (7 3/4 " max. rise & 10" min. tread) / / " Stairway Handrails 4 or more risers or over 30" ( <4" max. spacing of uprights) Guardrails (provide if over 30" above floor /grade & 4" max sphere spacing for uprights) Landings (36" x 36" min., (not req. - at the top of the stair if a door does not swing over stairs) Thresholds 1 1/2" max. above floor or landing (7 3/4" max if door does not swing over landing) _ZPosts (required to be treated, redwood or cedar if in contact of concrete / earth) Roofing (no apparent leaks, installed properly and roofing as per plans) —/—/Masonry (lintels as per table 703.7. 1) Z Roof Ventilation (as per plans) INSIDE Egress Doors (all egress doors must be able to open from inside without use of keys or tools) Window Energy talc's: match actual window /S afety Glazing provided in all doors, within 24" of door arc and below 60 ", & in tub enclosure Z Bathroom Ventilation (either operable window or fan that vents directly to outside) inks, Bathtubs and Showers (check for caulking, operation and leaks) �tairway Illumination (switch at top and bottom) _ZStairs (7 3/4 "max. riser, 10 "' min. tread, (nosing 3/4" to 1 1/4" with solid risers) �, Handrails Cont (34" to 38 ", 1 1/2" to wall, and aria 1 1/4" to 2" dia. upright < 4 ", triangular space 6" max) 081213/2003 12:08 2085525745 SAINSBURY CONST PAGE 02 City of Rexburg Building Department Jon Berry 1.2 North Center Street Rexburg, Idaho Alan Cook Sainsbury Construction 4697 N. Haroldsen Dr. Idaho Falls, Idaho ie: plan corrections Lot 15 Mr. Berry Thank you for faxing the information, the following corrections are being made: I . Stock components will supply the details and information requested. 2. Stock components will redesign the truss system to comply with the fire wall requirements. the su lien. 3. The floor system design will be provided per the TJI expert from pp 4, W propose to add 4 alternate b raced wall p h ho wal ere will be bolt d t (3) £rat /� 1 rig anchor bolts installed on each. side of bay w members and straps installed at the openizigs. I will bring the truss details and floor detail to you as soon as possible. ' Mm you Alan Don Cook 757 -9254 529 -4510 cya�asbu� �5�j -9Z5� Permit Number REScheck Compliance Certificate 2000 IECC REScheckSoftware Version 3.5 Releas la Data filename: Untitled.rck cf�? -Znfi Jhecked By/Date TITLE: TOWNHOME CITY: Idaho Falls STATE: Idaho HDD: 7918 CONSTRUCTION TYPE: Single Family DATE: 08/21/03 DATE OF PLANS: 8/15/03 PROJECT INFORMATION: LOT 15, BLOCK 1, EAGLE WOOD DIVISION #1 COMPANY INFORMATION: SAINSBURY CONSTRUCTION 4697 N. HAROLDSEN DR. IDAHO FALLS, IDAHO 83401 COMPLIANCE: Passes Maximum UA = 782 Your Home UA = 632 19.2% Better Than Code (UA) Ceiling 1: Flat Ceiling or Scissor Truss Wall 1: Wood Frame, 24" o .c. Basement Wall 1: Solid Concrete or Masonry Wall height: 8.0' Depth below grade: 7.0' Insulation depth: 8.0' Window 1: Vinyl Frame:Double Pane with Low -E Door 1: Solid Door 2: Glass Furnace 1: Forced Hot Air 90 UE Air Conditioner 1: Electric C tral Air, 10 SEER Gross Glazing Area or Cavity Cont, or Door Perimeter R -Value R -Value U- Factor UA 3382 0. 0.0 98 3376 19.0 0.0 199 2800 11.0 0.0 141 V 350 0.34 119 84 0.35 29 132 0.35 46 COMPLIANCE STATEMENT: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the 2000 IECC requirements in REScheckVersion 3.5 Release la (formerly MECchec4 and to comply with the mandatory requirements listed in the RESchecklnspection Checklist. lder/Designer A tooj Date REScheck Inspection Checklist 2000 IECC REScheckSoftware Version 3.5 Release la DATE: 08/21/03 TITLE: TOWNHOME Bldg. Dept. Use I Ceilings: 1. Ceiling 1: Flat Ceiling or Scissor Truss, R-40.0 cavity insulation Comments: Above -Grade Walls: 1. Wall 1: Wood Frame, 24" o .c., R -19.0 cavity insulation Comments: Basement Walls: 1. Basement Wall 1: Solid Concrete or Masonry, 8.0' ht/7.0' bg/8.0' insul, R -11.0 cavity insulation Comments: Windows: 1. Window 1: Vinyl Frame:Double Pane with Low -E, U- factor: 0.340 For windows without labeled U- factors, describe features: # Panes Frame Type Thermal Break? [ ] Yes [ j No Comments: Doors: 1. Door 1: Solid, U- factor: 0.350 Comments: 2. Door 2: Glass, U- factor: 0.350 Comments: Heating and Cooling Equipment: 1. Furnace 1: Forced Hot Air, 90 AFUE or higher Make and Model Number 2. Air Conditioner 1: Electric Central Air, 10 SEER or higher Make and Model Number Air Leakage: Joints, penetrations, and all other such openings in the building envelope that are sources of air leakage must be sealed. Recessed lights must be 1) Type IC rated, or 2) installed inside an appropriate air -tight assembly with a 0.5" clearance from combustible materials. If non -IC rated, the fixture must be installed with a 3" clearance from insulation. Vapor Retarder: [ ] Required on the warm -in- winter side of all non - vented framed ceilings, walls, and floors. i Materials Identification: [ ] Materials and equipment must be installed in accordance with the manufacturer's installation instructions. [ ] Materials and equipment must be identified so that compliance can be determined. [ ] Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment must be provided. V . Insulation R- values, glazing U- factors, and heating equipment efficiency must be clearly marked on the building plans or specifications. Duct Insulation: [ ] I Ducts in unconditioned spaces must be insulated to R -5. Ducts outside the building must be insulated to R -8.0. I Duct Construction: [ ] I All joints, seams, and connections must be securely fastened with welds, gaskets, mastics (adhesives), mastic -plus- embedded - fabric, or tapes. Duct tape is not permitted. Exception: Continuously welded and locking -type longitudinal joints and seams on ducts operating at less than 2 in. w.g. (500 Pa). [ ] I Ducts shall be supported every 10 feet or in accordance with the manufacturer's instructions. [ ] I Cooling ducts with exterior insulation must be covered with a vapor retarder. [ ] I Air filters are required in the return air system. [ ] The HVAC system must provide a means for balancing air and water systems. Temperature Controls: [ ] I Thermostats are required for each separate HVAC system. A manual or automatic means to partially restrict or shut off the heating and/or cooling input to each zone or floor shall be provided. Service Water Heating: [ ] I Water heaters with vertical pipe risers must have a heat trap on both the inlet and outlet unless the water heater has an integral heat trap or is part of a circulating system. [ ] I Insulate circulating hot water pipes to the levels in Table 1. I Circulating Hot Water Systems: [ ] I Insulate circulating hot water pipes to the levels in Table 1. I Swimming Pools: [ ] I All heated swimming pools must have an on/off heater switch and require a cover unless over 20% of the heating energy is from non - depletable sources. Pool pumps require a time clock. Heating and Cooling Piping Insulation: [ ] I HVAC piping conveying fluids above 105 'F or chilled fluids below 55 O F must be insulated to the levels in Table 2. Table 2: Minimum Insulation Thickness for HVAC Pipes, Fluid Temp. Insulation Thickness in Inches by Pipe Sizes a Range F 2" Runouts 1" and Less Table l: Minimum Insulation Y rickness for C1rcx1# ng Hot Water Pipes. to 2" 2.5" to 4" Heating Systems Insulation Thickness in Inches by Pipe Sizes Heated Water Non - Circulating Runouts Circulating Mains and Runouts Temperature ( F) Up to 1" Up to 1.25" 1.5" to 2.0" Over 2" 170 -180 0.5 1.0 1.5 2.0 140 -160 0.5 0.5 1.0 1.5 100 -130 0.5 0.5 0.5 1.0 Table 2: Minimum Insulation Thickness for HVAC Pipes, NOTES TO FIELD (Building Department Use Only) Fluid Temp. Insulation Thickness in Inches by Pipe Sizes Piping System Types Range F 2" Runouts 1" and Less 1.25" to 2" 2.5" to 4" Heating Systems Low Pressure/Temperature 201 -250 1.0 1.5 1.5 2.0 Low Temperature 120 -200 0.5 1.0 1.0 1.5 Steam Condensate (for feed water) Any 1.0 1.0 1.5 2.0 Cooling Systems Chilled Water, Refrigerant, 40 -55 0.5 0.5 0.75 1.0 and Brine Below 40 1.0 1.0 1.5 1.5 NOTES TO FIELD (Building Department Use Only) v Al Son xG`9 CITY of ° REXBURG Americas Family Community 1/10/2007 Sainsbury Construction 4829 N. Haroldsen Dr. Idaho Falls, ID 83401 Re: Building Permits Dear Builder, After reviewing your file it was determined you have not had final approval on the permits listed below. It is important that a final inspection is completed and approved before the home can be legally occupied. If anyone has already moved in then you must get your final accomplished immediately to avoid any consequences. Under limited conditions a temporary occupancy may be arranged with the building official, but is valid only for 30 days ors if issued during winter, 30 days after ground thaws for yard work. Please arrange to have a final inspection by calling 359 -3020 (ext. 345) so we can close the permits and grant legal occupancy. If you have any questions, please contact me at extension 325. Thank you for your cooperation Quinton Owens` Building Inspector. The following homes have not had final approval. Permit Address R03-07-14':' 576 Eaglewood R03. -07 -15 340 Eagle Summit 0400167 668 &.670 Englewood 0400168 i 322 & 326 Eagle Summit 19 E. Main Rexburg ID 83440 P. O. Box 280 ' wtivw_rexburg org Phone (208) 359.3020 ext.326 Fax (2 08) 359.3024 Permit Number REScheck Compliance Certificate 2000 IECC RES check Software Version 3.5 Release Id Data filename: Untitled. rck Checked By/Date PROJECT TITLE: Sainsbury CITY: Rexburg STATE: Idaho HDD: 8693 CONSTRUCTION TYPE: Single Family DATE: 08/25/03 PROJECT DESCRIPTION: lot 15 eaglewood � COMPLIANCE: Passes Maximum UA = 618 Your Home UA = 510 17.5% Better Than Code (UA) Ceiling 1: Flat Ceiling or Scissor Truss Wall 1: Wood Frame, 24" o .c. Window 1: Vinyl Frame:Double Pane with Low -E Door 1: Solid Door 2: Glass Basement Wall 1: Solid Concrete or Masonry Wall height: 8.0' Depth below grade: 7.0' Insulation depth: 8.0' Window 2: Vinyl Frame:Double Pane with Low -E Furnace 1: Forced Hot Air, 90 AFUE Gross Glazing Area or Cavity Perimeter R -Value R -Value 3363 40.0 2691 19.0 213 0.0 40 140 60 0.340 2392 11.0 0.350 18 COMPLIANCE STATEMENT: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the 2000 IECC requirements in RES checkVersion 3.5 Release l d (formerly MEC chec.� and to comply with the mandatory requirements listed in the REScheckInspection Checklist. Builder/Designer Date Glazing Cont. or Door R -Value U- Factor UA 0.0 98 0.0 140 0.340 72 0.350 14 0.350 21 0.0 147 0.350 18 COMPLIANCE STATEMENT: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the 2000 IECC requirements in RES checkVersion 3.5 Release l d (formerly MEC chec.� and to comply with the mandatory requirements listed in the REScheckInspection Checklist. Builder/Designer Date City of Rexburg Building Department Jon Berry 12 North Center Street Rexburg, Idaho Alan Cook Sainsbury Construction 4697 N. Haroldsen Dr. Idaho Falls, Idaho ie: Plan corrections Lot 15 Mr. Berry Thank you for faxing the information, the following corrections are being made: 1. Stock components will supply the details and information requested. 2. Stock components will redesign the truss system to comply with the fire wall requirements. 3. The floor system design will be provided per the TJI expert from the supplier. 4. We propose to add 4 alternate braced wall panels in the back wall. There will be 5/8" anchor bolts installed on each side of bay with HD5A holddowns bolted to (3) framing members and straps installed at the openings. I will bring the truss details and floor detail to you as soon as possible. "Than you Alan Don Cook 757 -9254 529 -4510 25 August 2003 Sainsbury Construction 4697 N. Haroldsen Dr Idaho Falls, Id 83401 Dear Sirs: In order to complete your plan review, there are some areas that we need more information on. Below are listed the areas of concern. 1. In the truss calculation sheets submitted for the trusses A -1, E -1, E -2, and E -3 require mechanical connections for uplift control well in excess of 600 pounds up to over 1300 pounds. We need a detail as to how this will be accomplished. 2. Trusses E1 thru E11 are running through the party separation wall. This wall is to be 2 separate structurally independent, 1 hour fire rated walls from the foundation to the roof sheathing each sheathed on both sides with drywall. These trusses need to be redesigned without going through the fire rated wall. 3. In the basement in the vicinity of the stairs there are TH's that cannot safely span the entire 32'length of the basement. This situation needs to be addressed. 4. Maximum spacing for braced wall panels is 25'. The back wall needs at least another, possibly 2 panels to be in compliance. Your help in resolving these problem areas is greatly appreciated and the sooner they are corrected the sooner we can get your permit issued. Thank you Jon Berry Building Inspector I RESIDENTIAL PLAN CHECKLIST Date 1 , er Project: Job Address: 338 /3 'qo c�,SCW� Building Permit Number Zoning: (_iD lZ — l Number of Stories: Floor Area l552 C A x Z = S 1 05 Description: Valuation: Permit Fee: Plan Check Fee: i nn rn ' _ The following comments based on the �uG� edition or the intemationat Residential Code should be resolved before a building permit is issued. This correction list is not a building permit. The approval of plans and specifications does not permit the violation of any section of the lntemational Residential Code or any federal, state or local regulations. PLAN CHECK A�Plans _To Scale Legible Plot Plan Y / N Flood Plain Floor / Foundation Plan Section showing construction details - Building Elevations Design Criteria (shall be identified on plans as Wind - 85 m.p.h., Snow - 35 lb. Per sq ft.) Truss Calculation Sheets / Floor Joist Details Energy Calculations (R320 & Ch 11) B. Zoning (check one - in some cases LDR2 and MDR may apply) LDR "' LDR1 _Lot area — LDR 12,000 sq. ft. min. (width 80 ft. min) & LDR1- 8,000 sq. ft. min (width60 ft. min.).( LDRI duplex - 10,000 sq. ft ,�a� ,. C. Use ''Single Family 'Duplex (LDR1 only - Conditional use permit ?) �w pbayas D. Set Backs (taken from eaves) / /Front set back (32 ft. from curb) ✓ Note: 60% min of front yard green - set back (LDR 25 ft. & LDRl 20 ft.) Si d es set backs (6" for every ft. of building height with LDR - 7.5' min., & LDRi - 6' min.) /Building- Height (maximum 30 ft.) E. footings Proper Size (as per Table 403.1.1, use 1500 psf unless soil type is known, Table 401.4.1 for soil bearing) •!�Rebar (244 continuous) Girder Support Footings (size as per Table 502.3.4(2)) Footing Depth (36" below finished grade) H. Exterior Covering •! Siding - , "Brick or Stone Veneer L Roof Covering and Ventilation ✓Roof Ventilation (as per -R806) .,/Asphalt Shingles _Slate Shingles, Metal, _Clay, Tile or Concrete, _Wood, I Firewalls Garage (a one -hour fire- resistive separation between garage & house) (8321) Wood Shakes _ ✓Door from Garage to House (13/4" solid wood, exterior metal or 20 min. rated fire door required) (R321) -**'Two Family Dwelling Separation (1 hr. firewall)(R321) j 0��, K. General Requirements House Numbers (R325) Light and Ventilation (design as per Section R303) Minimum Room Areas ( one room at least 120 sf., other habitable rooms min. of 70 sf, min habitable rooms dimen. of 7 ft) (8304) ✓Windows at Hazardous Locations w /in 24" of side hinged door frame (8308) Window Egress (8310) ✓Exit Door (one exit door must be 36" wide) (Section R311) / Landings (a min. 3' x 3' landing required at each side of egress doors with thresholds not more than 1 1/2" higher than ianding)(R311) at bottom of stairs - No req. at top if door DAN swing over stairs) (R311) ✓ Stair Rise / Run (7 3/4" max. rise & 10" min. tread) Stair Width (36" min), _Stairway Headroom (6'8" min.) Handrails (34 "to 38" above stair nosing)(R311) ! Protection (enclosed accessible space under stairs shall be covered with 1/2" drywall)(R311) - (36" height, mandatory at 30" drop or 4 or more risers and 4" sphere max.)(R316) - Detectors each bedroom and common area and one on each level (R 317) Mechanical Ventilating Systems (in bathrooms, laundry rooms and similar rooms)(R303) f APPLICATION FOR BUILDING PERMIT CITY OF REXBURG, IDAHO Date of Application 2 MXI� JFR Name Site .A MaiH City /� `' Telephone/Fax/Mobile 629 --45 SS 2 - 574 CONTRACTOR 7 S 7 — Name Mailing Address City /State /Zip Telephone/Fax/Mobile PROJECT INFORMATION DEPARTMENT APPROVAL Property Zone: C—D Q. " l Is existing use compatible with zoning, (screening parking, )tc) When was this building last occupied Architect/ Engineer Firm Plan Name Subdivision Lot Block Circle One Residenti Commercial Educational Government Remodel Other Circle One New Hous Addition/Remodel to House New Commercial Commercial Remodel Circle One Basement: None/ Finished / Unfinished Other: None/ Patio/ Carport/ Awning N/A Lot Square Footage Lot Width Square Feet % o Square Feet X �Gara e S � , // / yy ��.... g q Number of Stories Height of Building What will strfZC4t P44 ed for: Home Home Business Apartment Commercial Other Will there be an apartment? Total Estimated Co If so, how many units Are you in a flood plain Signature of Applicant Code Building Permit Fees 9 30 . Zone of REX 13uRO Plan Check Fees 3 Building Type �' Plumbing Permit Fees 3 . jkjl 3 1 2 003 Digging Permit Fees Water & Sewer Fees P p,`p CASH $ — Front Footage Fee CHEC TOTAL Signature of Inspector Issued by 9 q Permit No. 9 -03- 0 7-1 , 09/09/2003 09:00 or City of Rexburg (208)359.3020 12 North Center Street Rexburg, Idaho 83440 e Value of Construction: Finished Sq Footage Unfinished Stf Footage Garage Square Footage Construction varue Factor :h 2085525745 SAINSBURY CONST PAGE 02 "ees owner: Sainsbury corn, str' d Buildin Cost S Ft nq Twin'Horne Lot f Realderrtlal . q Addres 5761waglewood pr Date• 7/29!7003 Basement dirt permit N Apartments ;gjQ;pp umber $254,243 Const. Twe!a:�1s~a:,:vc Cara Rate Chart: Begin End 0 500 501 2,000 2,001 25,000 25,001 50,000 50,001 100,000 100,001 500,000 500,001 1,000,000 1000001 Mechani cal Valuation 98,999,999 3.05 100 rt Uost a 768.42 APartmeM Ft Cost = 32 ommarcial Ft Cost br L$40,951-26 523.56 Parking t Coat • 243.23 Fee: Bas® Plua Per 23.50 0.00 100 23.50 3.05 100 69,25 14.00 1000 391.75 10.10 1000 643.75 7,00 1000 993.75 5.60 1000 3233.75 4.75 1000 5608.75 3.65 1000 Total Building Permit Fee: Plan Check Fee; Rate Chart: Residential & Non Commercial Number Number of Fixtures 32 01- 322,11 SPrInWer Fee: Rate Per Fixture $18.00 Fix� tt" Fee: J Sprinkler $0.00 $8.00 Fee: Base Fee $30.00 Base Fee: 35- 347.42 36.0 Total Plumbing Permit Fee: Rate Chan: Commercial 30.0 SEP Cost of plumbing; $0 Katie Chart: Begin End 0 Base Pius Per 20,000 20,001 100,000 30.00 310% 1 630.00 2,0% 100 .001 200,000 200,001 99,999,999 1 2230.00 1.0% 3230.00 1 0.536 1 er & Sewer Permit Total Plumbing Permit Fee: r"'t. Atlditiortaf r Line Size Inches Meter Number of Meter 0.75 0.75 $125.00 Parts* Meters Part l Meter Parts 1.00 $195'00 $182.00 2 Meter Box $70.00 $182.00 p' Ring & Lid $32.00 Curb StOp $27.00 2.00 3.00 $1,327.79 $49.62 0 $0.00 Setter $53.00 "'2" $1.868.00 4.00 $2,618.50 $39.54 p Angle stop $82.33 2.00 0 "•2" Elbow $36.25 2.00 $ 0 $36.25 1 0 42Rktt Fees Total Water Meter and Parts; Digging Permit Feea W r R Amer Rats, S en Minimum & All Homes $1,100.00 Minimum & All Homes $575.00 2 Apts (# of Students) $270.00 2 APta (# of StuderAS) 0 Apto (Fare lyy Housing) $425.00 $437.50 g 0 Apts (Family Housing) 0 Water Front Footage 0 Sewer Front Footage $ 500 . 00 0,00 .0 Total Water & Sewer Permit F $500.00 0.00 M$12.00 Total All Fees: 1,857.51 U ! 34-346,30 $1,150.00 =1,867,51 01- 322,11 r ��, 90 $186.75 01- 322.17 $0.00 1 7 a 256.0 $0.00 35- 347.42 36.0 30.0 SEP 9 2003 $322.00 01- 322.14 CITY OF FXgi mn $0.00 101- 322,14 $0.00 $0,00 $0.00 $0.00 $0.00 $614.00 $2,200.00 ! 34-346,30 $1,150.00 35 - 347.30 $ 34- 346.30 $ 5- 347.30 $0.00 $0.00 35 -347.30 $0.00 34- 346.42 $0.00 35- 347.42 $3,964.00 3uilding Pennit Valuation Fees Const Type_ Owner: Sainsbury C °nstracti� Residential .��. Cost Sq Ft X77 Building Name: Twin Home Loth 19f $14_ '•ity of Rexburg (208)359 -3020 Address: 576 Eaglewood Dr Basement $0. 12 North Center Street Date: 729/2003 Apartments Rexburg, Idaho 83440 Garage $24. Permit Number commercial Value of Constriction: $254,243 Const. Typ Residential or t $188,768.42 Apartments $ Finished Sq Footage 3,224 4 $40,951.25 ommercial rF Unfinished Sq Footage 3,224 7 $24,523.56 Parking $0.00 Garage Square Footage 1,160 87 % Total Square Foot Cost = $254,243.23 $0.00 Construction Value Factor End Base Plus Per Fees Begin 0 500 23.50 0.00 100 0 Rate Chart: 501 2,000 23.50 3.05 100 0 2,001 25,000 69.25 14.00 1000 0.00 0.00 25,001 50,000 391.75 10.10 1000 7.00 1000 0.00 50,001 100,000 643.75 500,000 993.75 5.60 1000 1,857.51 100,001 500,001 1,000,000 3233.75 4.75 1000 000 0.00 1,000,001 99,999,999 5608.75 3.65 1000 $1,867.51 01- 322.11 Total Building Permit Fee: Mechanical Valuation $0 Plan Check Fee: $185.75 01- 322.17 Plumbing Permit Rate Chart: Residential & Non Commercial Number Fixture Fee: 256.00 32 Number of Fixtures �_� Sprinkler Fee: 36.00 Sprinkler Fee: $18.00 L� Base Fee: 30.00 Rate Per Fixture $8.00 Total Plumbing Permit Fee: $322.00 01- 322.14 Base Fee $30.00 Rate Chart: Commercial Cost of Plumbing: $0 End Base Plus Per Fees Begin 0 20,000 30.00 3.0% 1 0.00 Rate Chart: 20,001 100,000 630.00 2.0% 1 0.00 100,001 200,000 2230.00 1.0°x6 00 0.00 0. 200,001 99,999,999 3230.00 0.5% 1 Total Plumbing Permit Fee: $0.00 01- 322.14 Water & Sewer Permit Addi Tonal Number of Meter Water Line Size Inches Meter Parts- Meters Parts.. $614.00 0.75 0.75 $125.00 $182.00 2 $0.00 * *Total Meter Parts 1.00 $195.00 $182.00 0 $0.00 Meter Box $70.00 Ring & Lid $32.00 2.00 $1,327.79 $49.62 0 $0.00 $0.00 $0.00 Curb Stop $27.00 3.00 $1,868.00 $39.54 0 $0.00 Setter $53.00 4.00 $2,618.50 0 0 * * *2" Angle Stop $82.33 2.00 $82.33 -- 0 ** *2" Elbow $36.25 2.00 $36.25 1 Total Water Meter and Parts: $614.00 25 346.20 Hookup Fees Water Rate Sewer Rate Students Acres Units Digging Permit Fees 2 $2,200.00 34- 346.30 Minimum &All Homes $1,100.00 2 $1,150.00 35- 347.30 Minimum & All Homes $575.00 0 $0.00 34- 346.30 Apts {# of Students) $270.00 �6 0 $0.00 35- 347.30 Apts (# of Students) $437.50 1.. -._ = p $0.00 34- 346,30 Apts (Family Housing) $425.00 0 $0.00 35- 347.30 Apts (Family Housing) e $500.00 0.00 0 $0.00 34- 346.42 Water Front Footage $12.00 �' 0 $500.00 0.00 0 $0.00 35- 347.42 Sewer Front Footage $3,964.00 Total Water & Sewer Permit Fe as JUL 3 1 2003 Total All Fees: $6,329.26 (•.ITV r1F RFXRI 1R(-, CITY OF REXBURG BUILDING INSPECTION SEQUENCE Type of Inspections: For on -site construction, from time to time the building official, upon notification from the permit holder or his agent, shall make or cause to be made any necessary � — ' and shall either approve that p f�on .as_com or shall notify -- -- m erein the i I f I C� Y N � N Z � J IL i N N N � E a Z Q W Q i Z T O M T 0✓ r n F Vf T M n M to Gb '- 8°� y O a A A m m rn Z 00 N 3 y ? O LU W LL r 0 0 V ' N►�MMNM 171 Z w O C n to L C N cn N �J E AM C Cn Q _ N C Y N � N Z � J IL i N N N � E a Z Q W Q i Z T O M T 0✓ r n F Vf T M n M IL Q Q W _ H Z 00 N 3 y ? O LU W LL r Y N � N Z � J IL i N N N � E a Z Q W Q i Z T O M T 0✓ r n F Vf T M n M N y LU W r 0 0 V ' ' ' O C n to L C N cn N �J E AM C Cn N C W 3 V IL . U ti LL .y' t O Q V CL O C O C y o o v I 5 � Q U CO F N M n cn c c 4 W J 0 cc LL LL 0 4 0 Z 1, 2 Q `w Y N � N Z � J IL i N N N � E a Z Q W Q i Z T O M T 0✓ r n F Vf T M n M N W G U r t O C C N cn N N W G U bZ �T 09109/2003 09:00 2005525745 SAINSBURY CON- FAX COVER SHEET DATE: PAGE 01 TO:" ATTN: NUMBER OF PAGES INCLUDING COVER: — REMARKS: FROM: ALx -h o 4697 NORTH HAROLDSEN DRWE IDAHO FALLS IDAHO 83401 (208) 529 -4510 (208) 552 -5745 FAX UgG ci P.O. Box 280 2ex 12 North Center Street Rexburg, Idaho 83440 v p PHONE (208) 359.3020 STATE OF IDAHO E -MAIL cityhaII@cLrre us g e[ISHEO 25 August 2003 Sainsbury Construction 4697 N. Haroldsen Dr Idaho Falls, Id 83401 Dear Sirs: In order to complete your plan review, there are some areas that we need more information on. Below are listed the areas of concern. 1. In the truss calculation sheets submitted for the trusses A -1, E -1, E -2, and E -3 require mechanical connections for uplift control well in excess of 600 pounds up to over 1300 pounds. We need a detail as to how this will be L� accomplished. 2. Trusses E1 thru El 1 are running through the party separation wall. This wall is to be 2 separate structurally independent, 1 hour fire rated walls from the foundation to the roof sheathing each sheathed on both sides with drywall. These trusses need to be redesigned without going through the fire rated wall. 3. In the basement in the vicinity of the stairs there are TJI's that cannot safely span the entire 32'length of the basement. This situation needs to be y addressed. 4. Maximum spacing for braced wall panels is 25'. The back wall needs at least C A-0 � another, possibly 2 panels to be in compliance. N Your help in resolving these problem areas is greatly appreciated and the sooner they are corrected the sooner we can get your permit issued. Thank you Jon Berry Building Inspector � V , U �9 W - - �: _N. -- : - -_ -._ �� I �' � _�._ f�. �� -_ � �; __- - , `�_ 3_, Y = ° =r __ A3: - -_ r -_ - - r Y N US ._ n s ez - A _ 1 N -- 4 F2- \ _ F6 \\ n --go 0` - - a - - J - -- / 1 A I - N _ ^ 4 1 ...= _— — - --_ cl n N M This series provides high uplltt resrsrdll­­ ­-- The HGT series can be installed on trusses ad 4 ply wbeam with op cnoiu slopes from 3:12 to 8:12. Available in 2 -ply, 3-ply MATERIAL: HGT -7 gauge, LG Tint LGTUMGMGT -12 gauge FINISH: HGT— Simpson gray p girder or beam, INSTALLATION: When te edGFasten to act as shone unit shimming is CODES: See page 8 for Code Listing Key Chart. nu i Y 1. Attached members must be designed to resist applied loads. 2. HGT allowable loads in 8" wide tie -beam using Simpson Epoxy Tie: with 2500 psi tie -beam - 6,710 Ibs (HGT -2) and 8,750 Ibs (HGT -3); with 3000 psi tie beam = 7,395 Ibs (HGT -2) and 9,650 lbs (HGT -3). Load values have been reduced to rellect o.c. anchors. Minimum embedment depth for %a anch ac . HGT n 3. HGT additional anchorage products to be designed by others. to 4. Allowable loads have been increased 33% and 60% for to earthquake or wind loading; no further increase allowed; o reduce where other loads govern. o V 3,, dia. washers for concret (washers not suDD 1 usses to support sheathing. Z2 clips secure 2x4 flat blocking between foists or tr MATERIAL: Z clips —see table. A21 and A23 -18 ga.; all other A angles -12 ga. FINISH: Galvanized astenrs. See General INSTALLATION: • Use o Z clips do not p de lateral stabilety. Do not walk on s or • apply load until diaphragm is installed and nailed to stiffeners. CODES: See page 8 for Code Listing Ke C hart. A44 Installation IR (A33 similar) 1.228 and Z38 do not have nail holes. Fastener quantities are as required. 2. Allowable loads have been increased 25% for roof loading (Z clips), 33% and 60% for earthqua a or wind loading (A angles); increase allowed; reduce where other loads govern. with a nail 3.Z4 and Z6 loads apply into the top and a nail into the seat. Install two LBP%" washers on top of each crescent washer ood (total our %" washers) ter installation. All washers and crescent washer are required. crescent washer are supplied. Typical Z2 Installation The H2.5A is symetrically designed for easy installation, with higher uplift loads to meet new code requirements. A placement mark allows easy installation on double top plates. The H5A has an installed cost benefit, as it only requires 6 nails, to meet lower uplift requirements. Allowable loads for more than one direction for a single connection cannot be added together. A design load which can be divided into components in the directions given must be evaluated as follows: Design Uplift/Allowable Uplift + Design Lateral Parallel to Plate /Allowable Lateral Parallel to Plate + Design Lateral Perpendicular to Plate /Allowable Lateral Perpendicular to Plate < 1.0. 3 /Q w 1 J n Ir H6 H7 The H connector series provides wind /seismic ties for trusses and rafters. MATERIAL: See table FINISH: Galvanized. H1 1Z made in Z -MAX. Some models available in stainless steel or Z -MAX; see Corrosion - Resistance, page 7. INSTALLATION: • Use all specified fasteners. See General Notes. • H1 can be installed with flanges facing inwards (reverse of H1 drawing number 1). When installed inside a wall, a birdsmouth cut is required. • H2.5, H3, H4, H5 and H6 ties are shipped in equal quantities of rights and lefts. • Bend the H7 over the top of the truss. Install a minimum of four 8d nails into the truss, including two into the truss side • Hurricane Ties do not replace solid blockir CODES: See page 8 for Code Listing Key Chart. H2.5A s { � a 3 E I — uccu inaeasea ss ro and 60% for earthquake or wind loading with no further increase allowed; reduce where other loads govern. 2.Allowable loads are for one anchor. A minimum rafter thickness of 2 must be used when framing anchors are installed on each side of the joist and on the same side of the plate. 132 3. Allowable uplift load for stud to bottom plate installation is 400 Ibs (H2.5); 390 Ibs (H2.5A); 360 Ibs (H4) and 310 Ibs (Ha). H9 F 3 1 H4 U.S. Patel 4,714,37; • 4. The H9KT is sold in 20 piece packs with screws. 5. When cross -grain bending or cross -grain tension cannot be avoided, mechanical reinforcement to resist such forces should be considered. 6. Hurricane Ties are shown installed on the outside of the wall for clarity. Installation on the inside of the wall is acceptable. For a Continuous Load Path, connections must be on same side of the wall. , :tea H11Z tii 0 STOCK i:OMPONENTS !, To. - Delivery List _ - -_ -- 16T5ri PEDtRSON ST. job Number: IDAHO FALLS DRIGGS 2 Page: Phone: 208 - 528 -2309 Fax: 208 - 528 -2320 Date: 08 -29 -2003 - 10:06:40 AM - -- Project ID: Q39441 -- EWOOD - -- P o'e rct:EAGL _ -- - - * -- 16610 Model: , Accou nt No: 2963 _ - -- - - -- Designer: JEROD Contact Site: Salesperson: BOB Name: Quote Number: Phone: x: Load B Fa : Y Tentative Delivery Date: e: LOH ROH Profile: 2-0-0 2 -0 -0 - - -- 10 -0 -0 �1 4 0 � -- - 2 -0 0 2 -p -0 - - - -- -- c3 -8 -0 ROOF TRUSS .-8.00 I10-0 -0 1 -4 -0 1401 - 1 each , 6 Rows Lat Brace 0.00 - -- - - bs. each _ _ - -- - -- - r- - - - - -- 4 -0-0 - -- -- 7- 0- 0 MONO HIP 8.00 2 0 0 12-0-0 1 E6 - CAP - - - - 31 lbs. each -- -- c3 -8 -0 i -- - - - - -- - -12.4 7 25 - 0 ROOFTRUSS -8.00 0 -0 -0 0 -0- 1 E7 -- 6 Rows Lat Brace 0.00 � - - - - -- 137 lbs. each - - 3 E7 -CAP 7-0-0 MONO PIGGYBAC8.00 2-0-10 0 - -- - 0.00 - 25 lbs. each - - -4- - - -_ 2 E8 25 - 0 -0 ROOF TRUSS 12 4 -8.00 7 0 -0 0 �1�708 - -- -_ 135 Ibs. ea 6 Rows Lat Brace - - -- - _ _ .7.7.9 1 FIG 22 - - 0 ROOFTRUSS 8.00 0 -0 -0 0 -0 -0 -- 98 lbs. each -_ - •8.10 -3 5 F2 22 - 10 - 0 ROOF TRUSS 8.00 1 4 0 0 0 0 - - - - - -- -- 87 Ibs. each -._ -- 0.00 - -- 9-2-14 1 F3 22-10-0 ROOF TRUSS 8.00 1-4-0 0 0 0 2 Rows Lat Brace 0.00 - - - � 116 lbs. each - - - - - -- 1 1 14 F4 22-10-0 ROOF TRUSS 8.00 1-4-0 0 0-0 - - - - - 4 Row Bra ce 0 00 - - 1151bs. each - - r - -- - - - - -- 11 -10 -14 1 F5 22 10 - 0 'ROO FTRUSS 8.00 1 - 4-0 118 lbs. each -- 5 Rows Lat Brace 0.00 - - - - - - -- - - 13-2 - 1 F6 - -- -- - - 22 - 10 - 0 5 Rows at Brace - ce O 00 _ 1 4 0 0 0 0 -- ..- - - -- - -- 1251bs. each _ __- - � 13 - 1 F7 22-10-0 ROOF TRUSS 8.00 1-4-0 10-0-0 -- - 0.00 7 - CAP R � 125 Ibs. eac 5 ows Lat ra - 1 F 4-10-0 MONO HIP 8.00 2 -0 -0 2-0-0 -- 0.00 - - 14 Ibs. each - ® ROOFTRUSS 8.00 1 -4 -0 0 -0 -0 1 F8 22 -10 -0 _ -8 - - 125lbs. each 2 8 - 0 ` -- - -- 5 Rows Lat Brace 0. - - - -- - 2 -0 -0 2-0 000 1 F8 -CAP 4 - MONO HIP . - -- - - - - -- I - - - - - - -- - _ _- - - - - - - 151bs. each 22- 10- 0 'ROOFTRUSS 8.00 1 -4 -0 0 -0 -0 125 Ibs. each 5 Rows Lat 00 = -- - - 4 -10 0 MONO PIGGYBAC8 00 11 2-0-0 - - - -- - 1 F9 -CAP 0.00 1 0- 0 - 0 -- - 16 1bs. each STOCK COMPONENTS To: Deliv List 1635 FEDI =RSON ST. (2) 2 -Ply IDAHO FALLS DRIGGS Job Number: Phone: 208-528-2309 Fax: 208-528-2320 Page: 3 4 Date: 08 -29 -2003 - 10:06:41 AM Project:EAGLEWOOD Block No: 14 -6 -0 Project ID: Q39441 Model: Lot No: 0 -0 -0 !0 -0 -0 Contact Site: Office: Deliver TO: Account No: 296316610 2X6/2X 0.00 Designer: JEROD Salesperson: BOB Name: �N Phone: 2 H1 (1) 2 -Ply Quote Number: Fax: C 3 -8 -0 1 -4 -0 I 0-0 -0 h � � � Tentative Delivery Date: Profile: I Qty:l Truss Id: Span: I Truss Type: Slope:1 LOH I ROH I Load By: Above listed items have been received in good condition. (exceptions listed to right). Received by: Thank You for your Business. (2) 2 -Ply 1 12 - 0 - 13 4 G1 14 -6 -0 ', ROOFTRUSS 4.87 0 -0 -0 !0 -0 -0 � � 74 l each 2X6/2X 0.00 �N 2 H1 (1) 2 -Ply 12 -11- ! ROOF 8.00 C 3 -8 -0 1 -4 -0 I 0-0 -0 h � � � 17 lbs. 2X4 /2X � 0.00 Ro La Bra e ach 4-11-0 4 H1 -CAP -4 -8 MONOPIGGYBA(8.00 i2 -0 -0 0 -0 -0 2 6 lbs. e ach I 7 0.00 -- - - -- _ -- - '12-11-3C3-8-0 1 r- 0 1 H2 X24 -11-0 � 8.00 �1 -4 -0 -0 -0 142 l bs. ea ch 5 Rows Lat Bra 0.00 — - - - -- - -- - - 24 11 0 12 -0 -12 8.000.0. ':ROOFTRUSS � X 0-0 -0 � 2 H3 - - ' 136 lbs. each o.0 I s 1 5 Rows Lat Bra 4 -9 -10 I 2 HF -A1 7 - 11 - 8 I<lNCPOST 14.42 ' -0 -0 0 -0 -0 31 l bs. e ac h 0.00 2 -6 -11 8 J1 1 - 11 - 11 'ROOF TRUSS 8.00 11 -4 -0 0 -0 -0 7 lb e ach 0. 00 2 J1A 5 - 9 - 11 ROOFTRUSS 8.00 0 - 0 - 0 0 - 0 - 0 14 lb e ach 0.00 3- 10 -11, 8 J2 13 -11-11 'ROOFTRUSS '8.00 11 -4 -0 0 -0 -0 1 2 lbs. ea 0. 5 -2 -11 6 J3 5 - -11 ' ROOFTRUSS 8.00 1 - - 0 - 0 - 0 17 lb eac _ 0.00 6 -6 -14 10 M1 8 -0 -0 ROOFTRUSS 8.00 1 -4 -0 0 -0 -0 32 l bs. eac 0 .00 2 -11 -3, 8 IM2 2 -6 -8 ROOFTRUSS 1 8.00 1 1 -4 -0 0 -0 -0 10 lbs. eac 0.00 Above listed items have been received in good condition. (exceptions listed to right). Received by: Thank You for your Business. STOCK COMPONENTS 1676 Pr=DtRSON ST. To: Delivery List IDAHO FALLS DRIGGS Job Number: Phone: 208-528-2309 Fax: 208-528-2320 Page: 1 -- -- - - Date: 08 -29 -2003 - 10:06:40 AM Project:EAGLEWOOD Block No: Mod el: Lot No : Project ID: Q39441 Contact Site: Office: Deliver To: Account No: Designer: 296316610 JEROD Name: Salesperson: BOB Phone: Quote Number: Fax: Tentative Delivery Date: Profile: Qty: Truss Id: Span: Truss Type: Slope: LOH ROH Load By: 4 Al O 6 -6 -14' 23 - 10 - 8.00 1 -4 -0 'I ROOFTRUSS 0 -0 -0 - 110 lbs. each 2X4/2 0.00 _ - -- -- -- 7 -10 -14 2 A2 04 lbs. 23- 10- O''ROOFTRUSS 8.00 1 -4 -0 0. 00 0 -0 -0 - - - - -- - 1 ea ch - � - -- - -- -- 9 -2 141 6 A3 23 -10 -0 ROOFTRUSS 8.00 I0 -0 -0 1 -4 -0 113 lbs. e ach 1 R ow Lat Brace 6.00 - - -- - - + 10 -2 -14 2 A4 23-10-0 ROOF TRUSS 800 i0 -0 -0 1 -4 -0 131 lbs . each 3 Rows Lat Bra 6.00 - , 11 -- - -- - - - - -,' - 6 -14 -- -� - - - -- - - 2 IA5 23 - 10 - 0 ,ROOFTRUSS 1 8.00 0 -0 -0 1 -4 -0 -- 1 58 lbs. ea 8 Ro Lat Brace 6.00 ' - f' I 12 -10 -14 t -- 2 B1 34 -0 -0 ROOFTRUSS 8.00 1 -4 -0 1 -4 -0 1 u -_, -- 182 lbs. eac 3 Ro ws Lat Bra 0.00 - - -T -- 1 2 -9 -4 r I 6 B2 33 -9 -0 'ROOF TRUSS 8.00 1 -4 -0 0 -0 -0 1 85 lbs. each 6 Rows Lat B race 4. I12-9-4 8 B3 30 -3 -8 ROOFTRUSS 8.00 0 -0 -0 0 -0 -0 171 lbs. each 7 Ro ws Lat Brac 4 .00 13 -6 -14 �r 16 64 30 ROOFTRUSS 1 8.00 0 - - 1 - 4 - 0 L � 173lbs.each 7 Row La Brace 4 6-2-3 2 C1 14-10-0 ;ROOFTRUSS 8.00 1 -4 -0 1 -4 -0 46 lbs. each 0.00 4 -11 -9 2 C1G 14 -10 -0 ROOFTRUSS 8.00 0 -0 -0 0 -0 -0 5 0.00 _ 6 -2 - 10 ',C2 14 -8 -0 ROOFTRUSS 8.00 1 -4 -0 0 -0 -0 44 lbs. each 0.00 - -- 6 6 3 4 "CR1 44 lbs. 11 - -0 ROOF TRUSS 5.66 1 -10 -10 0.00 '0 -0 -0 - - - each - - 2 -10 -12 I 4 CR2 3 -0 -7 ROOFTRUSS 1 , 6.73 1 -6 -7 0 -0 -0 G 11 lbs. each 0.00 - - -- 9 -6 -14, 7 D1 25 -0 -0 ROOFTRUSS 8.00 0 -0 -0 1 -4 -0 t- 95lbs. each 0.00 9 -6 -14 1 D1 G 25-0-0 ROOFTRUSS 8.00 1-4-0 1-4-0 -- 123 lbs. each 1 Row Lat Bra 0. 00 -- 110 -6 -14 1 E1 25 -0-0 0-0-0 1 - 4 0 131 lbs. each 5 Rows at B ac . 11 -10 -114 1 E2 25 -0 -0 ROOF TRUSS 8.00 I0 -0 -0 1 -4 -0 131 lbs. each 15 Rows Lat Brace 0.00 13 -2 -14 1 E3 25 -0-0 ROOF TRUSS -8.00 : 0-0-0 :1-4-0 �' -- -- 131 lbs. each 5 Row La Brace 0 .00 _ I13 -2 -14 1 E4 25 - 0 - 0 ROOF -s.00 o -o -o 1 -4 0 I 131 lbs. each 5 Rows Lat Brace 0.00 J — — — Truss Truss Type Q39441 Al ROOF TRUSS �h�son�omponents - IF,TdaTio�alls�$�403, JEROD -1 -4 -0 4 -3 -15 1 -4 -0 4 -3 -15 8 -0 -0 12 -0 -0 3 -8 -1 4 -0 -0 Qty Ply DRFGGS /EAGLEWOOD76= 2 -- i i2 1 2 Job Reference (optional) - 5 o�1y3�0031M1i e n us nes, nc_F n'7kug 22 43 4T20D age 5x5 = r l 0 3x4 = 8 -0 -0 1 16 -0 -0 16 -0 -0 19 -8 -1 23 -10 -0 4 -0 -0 3 -8 -1 4 -1 -15 Scale = 1:43.4 5x5 = LUMBER TOP CHORD 2 X 4 SPF No.2 BOT CHORD 2 X 6 SPF No.2 WEBS 2 X 4 SPF Stud /Std 8 -0 -0 23 -10 -0 8 -0 -0 Plate Offsets(XY): 7 -10 -0 (loc) LOADING (psf) TCLL 35 0 SPACING Plates Increase 2 -0 -0 1.15 CSI TC 0.34 DEFL in Vert(LL) -0.18 TCDL 8.0 Lumber Increase 1.15 NO BC 0.73 WB 0.62 Vert(TL) -0.26 Horz(TL) 0.04 BCLL 0.0 Rep Stress Incr n/a n/a BCDL 8.0 Code IRC2000 1ANSI95 (Matrix) Weight: 222 1b LUMBER TOP CHORD 2 X 4 SPF No.2 BOT CHORD 2 X 6 SPF No.2 WEBS 2 X 4 SPF Stud /Std BRACING TOP CHORD Sheathed or 5 -5 -6 oc purlins. BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing. REACTIONS (lb /size) 8= 2607/0 -5 -8, 2= 2745/0 -5 -8 Max Horz 2= 185(load case 6) Max Uplift8=- 872(load case 8), 2=- 952(load case 7) Max Grav8= 3006(load case 3), 2= 3225(load case 2) FORCES (lb) - First Load Case Only TOP CHORD 1 -2 =72, 2 -3= -4340, 3 -4= -4108, 4 -5= -3432, 5 -6= -3409, 6 -7= -4081, 7 -8 =-4281 BOT CHORD 2 -11 =3462, 10 -11 =3501, 9 -10 =3501, 8 -9 =3370 WEBS 3 -11= -104, 4 -11 =1954, 5 -11= -118, 5 -9= -157, 6 -9 =1941, 7 -9 = -19 NOTES 1) 2 -ply truss to be connected together with 0.131 "x3" Nails as follows: Top chords connected as follows: 2 X 4 - 1 row at 0 -9 -0 oc. Bottom chords connected as follows: 2 X 6 - 2 rows at 0 -6 -0 oc. Webs connected as follows: 2 X 4 - 1 row at 0 -9 -0 oc. 2) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 3) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 4) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 5) Provide adequate drainage to prevent water ponding. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 872 lb uplift at joint 8 and 952 lb uplift at joint 2. 8) Girder carries hip end with 8 -0 -0 end setback 9) Special hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 865.61b down and 437.71b up at 16 -0 -0, and 884.0lb down and 447.Olb up at 8 -0 -0 on bottom chord. The design /selection of such special connection device(s) is the responsibility of others. r� 0 LOAD CASE(S) Standard 1) Snow: Lumber Increase =1.15, Plate Increase =1.15 Uniform Loads (plf) Vert: 1 -4= -86.0, 4 -6= -43.0, 6 -8= -86.0, 2 -11= -16.0, 9 -11 =- 200.3, 8 -9= -16.0 Concentrated Loads (lb) Vert: 11= -884.0 9= -865.6 23 -10 -0 7 -10 -0 (loc) I /defl L/d PLATES GRIP 9 -11 >999 240 M1120 197/144 9 -11 >999 180 8 n/a n/a Weight: 222 1b BRACING TOP CHORD Sheathed or 5 -5 -6 oc purlins. BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing. REACTIONS (lb /size) 8= 2607/0 -5 -8, 2= 2745/0 -5 -8 Max Horz 2= 185(load case 6) Max Uplift8=- 872(load case 8), 2=- 952(load case 7) Max Grav8= 3006(load case 3), 2= 3225(load case 2) FORCES (lb) - First Load Case Only TOP CHORD 1 -2 =72, 2 -3= -4340, 3 -4= -4108, 4 -5= -3432, 5 -6= -3409, 6 -7= -4081, 7 -8 =-4281 BOT CHORD 2 -11 =3462, 10 -11 =3501, 9 -10 =3501, 8 -9 =3370 WEBS 3 -11= -104, 4 -11 =1954, 5 -11= -118, 5 -9= -157, 6 -9 =1941, 7 -9 = -19 NOTES 1) 2 -ply truss to be connected together with 0.131 "x3" Nails as follows: Top chords connected as follows: 2 X 4 - 1 row at 0 -9 -0 oc. Bottom chords connected as follows: 2 X 6 - 2 rows at 0 -6 -0 oc. Webs connected as follows: 2 X 4 - 1 row at 0 -9 -0 oc. 2) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 3) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 4) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 5) Provide adequate drainage to prevent water ponding. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 872 lb uplift at joint 8 and 952 lb uplift at joint 2. 8) Girder carries hip end with 8 -0 -0 end setback 9) Special hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 865.61b down and 437.71b up at 16 -0 -0, and 884.0lb down and 447.Olb up at 8 -0 -0 on bottom chord. The design /selection of such special connection device(s) is the responsibility of others. r� 0 LOAD CASE(S) Standard 1) Snow: Lumber Increase =1.15, Plate Increase =1.15 Uniform Loads (plf) Vert: 1 -4= -86.0, 4 -6= -43.0, 6 -8= -86.0, 2 -11= -16.0, 9 -11 =- 200.3, 8 -9= -16.0 Concentrated Loads (lb) Vert: 11= -884.0 9= -865.6 - - - - - -- FJlnY _ Truss Truss Type - !, Qty P 7DRR EW06D78= 2a7JR(ID)K Q39441 A2 ROOF TRUSS 2 1 Job Reference (optional) n erson Idaho Falls, ID 83403, JEROD - — -- 5 100 s May 30 i e n ustnes, nc. ri ud - 23 - 68:43:42 2003 Page .1 -4 -0, 5 -2 -7 1 -4 -0 5 -2 -7 4x8 - 45 11 4 5 O 10 -0 -0 14 -0 -0 4 -9 -9 4 -0 -0 18 -9 -9 23 -10 -0 4 -9 -9 5 -0 -7 Scale = 1:43.3 M O 5 -2 -7 10 -0 -0 14 -0 -0 18 -9 -9 23 -10 -0 5 -2 -7 4 -9 -9 4 -0 -0 4 -9 -9 5 -0 -7 date Offs _(X,Y)_._ j2 i 3�� =14]; [4:0- 4�-41,[7:0-0-3,0-0-51 - - - - - -- - - LOADING (psf) SPACING 2 -0 -0 CSI DEFL in (loc) I /deft Ud PLATES GRIP TCLL 35.0 Plates Increase 1.15 TC 0.50 Vert(LL) -0.07 11 -12 >999 240 M1120 197/144 TCDL 8.0 i Lumber Increase 1.15 BC 0.68 Vert(TL) 0.02 1 >821 180 BCLL 0.0 Rep Stress Incr YES WB 0.46 Horz(TL) 0.05 7 n/a n/a BCDL 8.0 Code IRC2000 /ANS195 (Matrix) Weight: 104 lb LUMBER BRACING TOP CHORD 2 X 4 SPF No.2 TOP CHORD Sheathed or 3 -6 -2 oc purlins. BOT CHORD 2 X 4 SPF No.2 BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing. WEBS 2 X 4 SPF Stud /Std REACTIONS (lb /size) 7=1187/0-5-8,2=1338/0-5-8 Max Horz2= 227(load case 6) Max Uplift7=- 172(load case 8), 2=- 258(load case 7) Max Grav7= 1498(load case 3), 2= 1733(load case 2) FORCES (lb) - First Load Case Only TOP CHORD 1 -2 =67, 2 -3= -1783, 3 -4= -1343, 4 -5= -1030, 5 -6= -1341, 6 -7= -1782 BOT CHORD 2 -12 =1359, 11 -12 =1359, 10-11=1032,9-10=1350,8-9=1350,7-8=1350 WEBS 3-12=90,3-11=-409,4-11=305,4-10=-4,5-10=301, 6-10=-400,6-8=106 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf, BCDL= 4.8psf; Category II; Exp C, enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 5) Provide adequate drainage to prevent water ponding. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 172 lb uplift at joint 7 and 258 lb uplift at joint 2. LOAD CASE(S) Standard 1.5X4 II 3X4 = 3X0 - 3X4 = 1.5x4 II Job , ' Truss Truss Type Q39441 lA3 IROOFTRUSS An erson omponents 2 1F, Idaho Fads, ID 83403, I JEROD 3 -11 -15 7 -9 -0 3 -11 -15 3 -9 -1 0 5 21 -4 -8 , 23 -10 -0 2 -0 -0 2 -5 -8 1 -4 -0 Scale = 1:44.0 REACTIONS (lb /size) 1=1187/0-5-8,8=1338/0-5-8 Max Horz 1=- 271(load case 5) Max Upliftl=- 183(load case 7), 8=- 270(load case 8) Max Gravl= 1391(load case 2), 8= 1627(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1 -2= -1743, 2 -3= -1502, 3 -4= -1483, 4 -5= -1174, 5 -6= -1428, 6 -7= -2535, 7 -8= -1739, 8 -9 =67 BOT CHORD 1 -14 =1348, 13 -14 =1275, 12 -13 =1143, 11 -12 =2107, 10-11=1405,8-10=1301 WEBS 2 -14= -215, 3 -14= -296, 3- 13 = -17, 4 -13 =485, 4 -12= -305, 5 -12 =749, 6 -12= -1103, 6 -11 =466, 7 -11 =928, 7 -10= -625 NOTES 1) Wind: ASCE 7 -98; 90mph, h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 183 lb uplift at joint 1 and 270 Ito uplift at joint 8. -- Qty Ply - -- TDRTGGSIEAGLEWO�Oti78 201JR�ID)� - I 6 1, Job Reference f00 sTvTa�0 _2i60FMT1c n us rries, Fn Aug �2 OS:43 42 2003 Pagel 9 -9 -0 1 11 -10 -0 1 19 -4 -8 2 -0 -0 2 -1 -0 7 -6 -8 4x5 11 P� 0 GRIP 197/144 LOAD CASE(S) Standard 5x8 - 6.00 (iS 5x5 - 7 -9 -0 , 9 -9 -0 , 11 -10 -0 19 -4 -8 21 -4 -8 23 -10 -0 7 -9 -0 2 -0 -0 2 -1 -0 7 -6 -8 2 -0 -0 2 -5 -8 P1afte - Off sef s - �X,Y)` [ 1 0 0-3,6 -0-9]; [8 - .E�e0 -0 -4], [1 -2 -4J, [14:0- fi - 0,0 -2 LOADING (psf) SPACING 2 -0 -0 CSI DEFL in (loc) I /deft L/d PLATES TCLL 35.0 Plates Increase 1.15 TC 1.00 Vert(LL) -0.12 11 -12 >999 240 M1120 TCDL 8.0 Lumber Increase 1.15 BC 0.74 Vert(TL) -0.21 11 -12 >999 180 BCLL 0.0 Rep Stress Incr YES WB 0.79 Horz(TL) 0.10 8 n/a n/a BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) Weight: 114 lb LUMBER BRACING TOP CHORD 2 X 4 SPF 1650F 1.5E TOP CHORD Sheathed or 1 -7 -8 oc purlins. BOT CHORD 2 X 4 SPF No.2 BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing. WEBS 2 X 4 SPF Stud /Std WEBS 1 Row at midpt 6 -12 REACTIONS (lb /size) 1=1187/0-5-8,8=1338/0-5-8 Max Horz 1=- 271(load case 5) Max Upliftl=- 183(load case 7), 8=- 270(load case 8) Max Gravl= 1391(load case 2), 8= 1627(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1 -2= -1743, 2 -3= -1502, 3 -4= -1483, 4 -5= -1174, 5 -6= -1428, 6 -7= -2535, 7 -8= -1739, 8 -9 =67 BOT CHORD 1 -14 =1348, 13 -14 =1275, 12 -13 =1143, 11 -12 =2107, 10-11=1405,8-10=1301 WEBS 2 -14= -215, 3 -14= -296, 3- 13 = -17, 4 -13 =485, 4 -12= -305, 5 -12 =749, 6 -12= -1103, 6 -11 =466, 7 -11 =928, 7 -10= -625 NOTES 1) Wind: ASCE 7 -98; 90mph, h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 183 lb uplift at joint 1 and 270 Ito uplift at joint 8. -- Qty Ply - -- TDRTGGSIEAGLEWO�Oti78 201JR�ID)� - I 6 1, Job Reference f00 sTvTa�0 _2i60FMT1c n us rries, Fn Aug �2 OS:43 42 2003 Pagel 9 -9 -0 1 11 -10 -0 1 19 -4 -8 2 -0 -0 2 -1 -0 7 -6 -8 4x5 11 P� 0 GRIP 197/144 LOAD CASE(S) Standard 5x8 - 6.00 (iS 5x5 - fTo b Truss Truss Type ( lA4 ROOFTRUSS — Anderso�onents = ,, Idaho Td�Falls, ID 83403, JERO� Qty -- Ply 7RTGGS7EAGLEW00D78 }K 2� sMa 3 1 J 0�06 b 3I0fiTe�ln usri�FriAu 2208:43:a3�003 - tea e� Y 9 9 0 - ,4 ; 0 7 -9 -0 10 -4 -0 14 -10 -4 19 -4 -8 , 21 -4 -8 23 -10 -0 �5 -2 -C 0 -4 0 7 -5 -0 2 -7 -0 4 -6 -4 4 -6 -4 2 -0 -0 2 -5 -8 1 -4 -0 3x4 - 3x4 - 45 II 1 2 3 1 M, 0 Scale = 1:46.5 01 1.5x4 11 5x6 = 6.00 FT£ 5x5 = 7 -9 -0 , 9 -9 -0 19 -4 -8 21 -4 -8 23 -10 -0 7 -9 -0 2 -0 -0 9 -7 -8 2 -0 -0 2 -5 -8 - P late — Offsets (X, [A:(Y- T1 I - T 0 = -2], 19: -2- 0� -4], [T0� =5- �0 -2 -8], j 8�, 2 -8] LOADING (psf) SPACING 2 -0 -0 CSI DEFL in (loc) I /defl L/d PLATES GRIP TCLL 35.0 Plates Increase 1.15 TC 0.87 Vert(LL) -0.19 10 -11 >999 240 M1120 197/144 TCDL 8.0 Lumber Increase 1.15 BC 0.65 Vert(TL) -0.37 10 -11 >753 180 BCLL 0.0 Rep Stress Incr YES WB 0.98 Horz(TL) 0.09 7 n/a n/a BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) Weight: 132 lb LUMBER BRACING TOP CHORD 2 X 4 SPF 2100F 1.8E 'Except' TOP CHORD Sheathed or 3 -0 -7 oc purlins, except end verticals. T3 2 X 4 SPF No.2 BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing. BOT CHORD 2 X 4 SPF No.2 WEBS 1 Row at midpt 2 -12 WEBS 2 X 4 SPF Stud /Std 'Except` 2 Rows at 1/3 pts 1 -13 EV1 2 X 4 SPF No.2 REACTIONS (lb /size) 13=1191/0-5-8,7=1343/0-5-8 Max Horz 13=- 425(load case 8) Max Uplift13=- 235(load case 5), 7=- 236(load case 8) Max Grav13= 1305(load case 2), 7= 1711(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1 -2= -737, 2 -3= -871, 3 -4= -1121, 4 -5= -2517, 5 -6= -2462, 6 -7= -1760, 7 -8 =67, 1 -13= -1124 BOT CHORD 12- 13 =34, 11 -12 =819, 10-11=1306,9-10=1441, 7 -9 =1340 WEBS 1-12=1084,2-12=-1133, 2-11=564,3-11=391, 4 -11= -659, 4 -10 =1091, 5 -10= -276, 6-10=766,6-9=-655 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf, Category II; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 5) Provide adequate drainage to prevent water ponding. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 235 lb uplift at joint 13 and 236 lb uplift at joint 7. LOAD CASE(S) Standard - - Truss ,Truss Type Qty Ply I DRTGGSIEWGLEWOOD78- 2077R(ID O n 4 erw om onen s - I- TF Tdaho Falls, fD 83408 ROOF TRUSS 2 1 I Job Reference (optional) -- - __ -- - gp260 T - "- p , �EROT3 b. - t00 s May 3 IhJI "Tek Indusfnes, lnc. r�22 689:44 2 - 003 age 2 -4 -0 , 8 -4 -0 1 9 -9 -0, 14 -6 -12 19 -4 -8 1 21-4-8 1 23-1 O-OZ5-2-Q 2 -4 -0 6 -0 -0 1 -54 4 -9 -12 4 -9 -12 2 -0 -0 2 -5 -8 1 -4 -0 4x8 - Scale = 1:54.0 8.00 FIT 4x10 II 0 LUMBER TOP CHORD 2 X 4 SPF No.2 BOT CHORD 2 X 4 SPF No.2 WEBS 2 X 4 SPF Stud /Std REACTIONS (lb /size) 16=1191/0-5-8,9=1343/0-5-8 Max Horz 16=- 449(load case 8) Max Upliftl6=- 219(load case 8), 9=- 240(load case 8) Max Grav 1 6= 1 493(load case 3), 9= 1957(load case 3) BRACING TOP CHORD Sheathed or 2 -9 -7 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing. WEBS 1 Row at midpt 4-13,5-13 2 Rows at 1/3 pts 2 -15, 3 -14, 1 -16 FORCES (lb) - First Load Case Only TOP CHORD 1 -2= -320, 2 -3= -619, 3 -4= -944, 4 -5= -1124, 5 -6= -2328, 6 -7= -2529, 7 -8= -2464, 8 -9= -1759, 9- 10 =67, 1 -16= -1167 BOT CHORD 15 -16 =5, 14-15=250,13-14=739, 12 -13 =1279, 11-12=1439,9-11=1339 WEBS 2 -15= -937, 2 -14 =776, 3 -14= -933, 3 -13 =1018, 4- 13 = -87, 5 -13= -678, 5 -12 =1123, 7 -12= -294, 8 -12 =772, 8 -11= -652, 1 -15 =1017 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C, enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 5) Provide adequate drainage to prevent water ponding. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 219 lb uplift at joint 16 and 240 lb uplift at joint 9. LOAD CASE(S) Standard 1.5x4 11 8x8 = 5x5 = 6.00 FIT 5x5 = 2 -4 -0 7 -9 -0 9 -9 -0 19 -4 -8 21 -4 -8 23 -10 -0 2 -4 -0 5 -5 -0 2 -0 -0 9 -7 -8 T 2 -0 -0 2 -5 -8 - Plate Offsets I Edg [2:0 =2- 12,0 -2_-8]; [5T0- T2,62_-O], [ Edge -0-4]J f 0- 2- &0 -2 -4], _[13 0- 6- 0,0 - 3- 4j - [1 4 :tf= 2- 8,0 , [T5 0- 3- 8,0 - 2-12l - LOADING (psf) SPACING 2 -0 -0 CSI DEFL in (loc) I /deft L/d PLATES GRIP TCLL 35.0 Plates Increase 1.15 TC 0.84 Vert(LL) -0.24 12 -13 >999 240 M1120 197/144 TCDL 8.0 Lumber Increase 1.15 BC 0.65 Vert(TL) -0.42 12 -13 >674 180 BCLL 0.0 Rep Stress Incr YES WB 0.96 Horz(TL) 0.13 9 n/a n/a BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) Weight: 158 lb LUMBER TOP CHORD 2 X 4 SPF No.2 BOT CHORD 2 X 4 SPF No.2 WEBS 2 X 4 SPF Stud /Std REACTIONS (lb /size) 16=1191/0-5-8,9=1343/0-5-8 Max Horz 16=- 449(load case 8) Max Upliftl6=- 219(load case 8), 9=- 240(load case 8) Max Grav 1 6= 1 493(load case 3), 9= 1957(load case 3) BRACING TOP CHORD Sheathed or 2 -9 -7 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing. WEBS 1 Row at midpt 4-13,5-13 2 Rows at 1/3 pts 2 -15, 3 -14, 1 -16 FORCES (lb) - First Load Case Only TOP CHORD 1 -2= -320, 2 -3= -619, 3 -4= -944, 4 -5= -1124, 5 -6= -2328, 6 -7= -2529, 7 -8= -2464, 8 -9= -1759, 9- 10 =67, 1 -16= -1167 BOT CHORD 15 -16 =5, 14-15=250,13-14=739, 12 -13 =1279, 11-12=1439,9-11=1339 WEBS 2 -15= -937, 2 -14 =776, 3 -14= -933, 3 -13 =1018, 4- 13 = -87, 5 -13= -678, 5 -12 =1123, 7 -12= -294, 8 -12 =772, 8 -11= -652, 1 -15 =1017 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C, enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 5) Provide adequate drainage to prevent water ponding. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 219 lb uplift at joint 16 and 240 lb uplift at joint 9. LOAD CASE(S) Standard _ _ - _ _ F .._ - - -- Truss Type -- - TQty Ply GGS/E_AGMVOOD /8- 207JRMK_ ob Truss Q39441 131 ROOF TRUSS 2 1 Job Reference A nderson Componen s - Idaho Falls, 83403�ER�� — _5100 s 20 May _3U 03 MiTe_K In us es,nc. _Fn'Aug 22 Pagan - 1 -4 -p 7 -4 -12 14 -6 -0 16 -6 -9 22 -2 -6 1 27 -10 -12 34 -0 -0 3,5 -4 - 1 -4 -0 7 -4 -12 7 -1 -4 2 -0 -0 5 -8 -6 5 -8 -6 6 -1 -4 1 -4 -0 Scale = 1:67.7 5x8 - 45 II r` v 7 -4 -12 1 14 -6 -0 16 -6 -0; 25 -0 -9 34 -0 -0 7 -4 -12 7 -1 -4 2 -0 -0 8 -6 -9 8 -11 -7 Plate Offsets [4:0-3-0,0-2_-T21,_[9 G-0 I'tS0 8 -1 -81 LOADING (psf) SPACING 2 -0 -0 i CSI DEFL in TCLL 35.0 Plates Increase 1.15 TC 0.96 Vert(LL) -0.15 TCDL 8.0 Lumber Increase 1.15 BC 0.86 Vert(TL) -0.27 BCLL 0.0 Rep Stress Incr YES WB 0.87 Horz(TL) 0.07 BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) -- _ ------ -- - - LUMBER - -- -- -- - BRACING TOP CHORD 2 X 4 SPF No.2 *Except* TOP CHORD T1 2 X 4 SPF 1650F 1.5E BOT CHORD BOT CHORD 2 X 4 SPF No.2 WEBS WEBS 2 X 4 SPF Stud /Std *Except* EV1 2 X 4 SPF No.2 REACTIONS (lb /size) 16=1849/0-5-8,9=1857/0-5-8 Diq 0 (loc) I /deft L/d PLATES GRIP 9 -11 >999 240 M1120 197/144 9 -11 >999 180 9 n/a n/a Weight: 182 lb Sheathed or 2 -5 -10 oc purlins, except end verticals. Rigid ceiling directly applied or 10 -0 -0 oc bracing. 1 Row at midpt 3 -14, 4 -13, 6 -13 Max Horz 16=- 357(load case 5) Max Uplift16=- 338(load case 7), 9=-351 (load case 8) Max Grav16= 2193(load case 2), 9= 2258(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1 -2 =74, 2 -3= -1907, 3 -4= -1644, 4 -5= -1251, 5 -6= -1624, 6 -7= -2191, 7 -8= -2329, 8 -9= -2625, 9- 10 =67, 2 -16= -1785 BOT CHORD 15 -16 =151, 14-15=1447,13-14=1234, 12 -13 =1656, 11-12=1656,9-11=2042 WEBS 3 -15= -271, 3-14=-301,4-14=264,4-13=82,5-13=578,6-13=-702,6-11=491, 8-11=-375,2-15=1352 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf, Category II; Exp C; enclosed,MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 5) Provide adequate drainage to prevent water ponding. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 338 lb uplift at joint 16 and 351 lb uplift at joint 9. LOAD CASE(S) Standard - 10 1D 14 13 IL II IA. - 2x4 II 3x10 = 3x4 = 3x8 - 3x4 - 3x4 = q � _ - Truss Truss Type Q39441 B2 ROOFTRUSS L Vnde -- rsoh�pone — nts - - I` IF, - aho aF�83401, JERO[Y -- 6 -9 -12 13 -4 -0 6 -9 -12 6 -6 -4 8.00 rfT 4� Qty Ply — [ORIGSS[EAGLEWGOD/a-20 /JRM3)FK— 6 1 Job Reference (optional) 5. TOZ s May W 200 i e n us nes nc Fri Aug_M_08 43:45 _U3 a 15 -6 -0 19 -5 -10 23 -5 -4 28 -6 -3 33 -9 -0 2 -2 -0 3 -11 -10 3 -11 -10 5 -0 -15 5 -2 -13 4x4 - 6 6 -9 -12 1 1 3 -4 -0 ,15 -6 -0, 23 -5 -4 1 28 -6 -3 1 33 -9 -0 LUMBER 6 -9 -12 6 -6 -4 2 -2 -0 7 -11 -4 T4 2 X 4 SPF 1650F 1.5E 5 -0 -15 - Pl� (X,YF 0 = �8�0 1 1 - T2y, 0- 2�2- 10], gd J J [1 - 0 4 -0- 3 -T1]; LOADING (psf) SPACING 2 -0 -0 CSI DEFL in (loc) I /deft L/d TCLL 35.0 Plates Increase 1.15 TC 0.91 Vert(LL) -0.45 13 >898 240 TCDL 8.0 Lumber Increase 1.15 BC 0.99 1 Vert(TL) -0.65 13 -14 >621 180 BCLL 0.0 Rep Stress Incr YES WB 0.84 Horz(TL) 0.41 11 n/a n/a BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) LUMBER BRACING TOP CHORD 2 X 4 SPF No.2 'Except' TOP CHORD T4 2 X 4 SPF 1650F 1.5E BOT CHORD BOT CHORD 2 X 4 SPF No.2 'Except" WEBS B3 2 X 4 SPF 165OF 1.5E WEBS 2 X 4 SPF Stud /Std 'Except' W7 2 X 4 SPF No.2, EV1 2 X 4 SPF No.2 WEDGE Right: 2 X 6 SPF No.2 REACTIONS (lb /size) 17= 1844/0 -5 -8, 11= 1703 /Mechanical Max Horz 17=- 364(load case 5) Max Upliftl7=- 324(load case 7), 11=- 270(load case 8) Max Grav 1 7=2127(load case 2), 11= 2075(load case 3) 5 -2 -13 PLATES M1120 Weight: 186 lb Sheathed or 1 -11 -3 oc purlins, except end verticals. Rigid ceiling directly applied or 9 -8 -9 oc bracing. 1 Row at midpt 3 -15, 5 -15, 5 -14, 6 -14 2 Rows at 1/3 pts 7 -14 FORCES (lb) - First Load Case Only TOP CHORD 1 -2 =74, 2 -3= -1870, 3 -4= -1685, 4 -5= -1505, 5 -6= -1548, 6 -7= -1570, 7 -8= -4039, 8 -9= -3943, 9 -10= -4070, 10- 11= -4705, 2- 17 = -1785 BOT CHORD 16 -17 =124, 15 -16 =1427, 14 -15 =1342, 13 -14 =1928, 12 -13 =3920, 11 -12 =3917 WEBS 3 -16= -319, 3 -15= -232, 5 -15= -210, 5 -14= -149, 6 -14 =1396, 7 -14= -1447, 7 -13 =2776, 8 -13= -381, 10- 13 = -423, 10- 12 =80, 2 -16 =1369 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf, BCDL= 4.8psf; Category II; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non- concurrent with other live loads. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 6) Refer to girder(s) for truss to truss connections. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 324 lb uplift at joint 17 and 270 lb uplift at joint 11. Scale = 1:65.5 0 GRIP 197/144 LOAD CASE(S) Standard 17 16 15 3x8 4.00 Ff2 5x10 N 2x4 II 3x10 - 5x8 - [.,o iTrdss Truss T e Qty i Ply � DRfGG57EAG[ YP Q39441 B3 ROOF TRUSS 8 1 derson om one - �ho-Falls, fDM40 Job Reference - An P I JER�D - — �TO� s Nla�6�663T71 "Tek Ind 5 -1 -0 9 -10 -8 12 -0 -8 16 -0 -2 1 19 -11 -12 25 -0 -11 5 -1 -0 4 -9 -8 2 -2 -0 3 -11 -10 3 -11 -10 5 -0 -15 4x4 = 2 0 25 -0 -11 5 -0 -15 in (loc) I /deft -0.40 11 >899 -0.56 11 -12 >637 0.38 9 n/a LUMBER 14 13 3x8 4.uu 111 T3 2 X 4 SPF 165OF 1.5E 44 - 5x8 = WEBS B3 2 X 4 SPF 165OF 1.5E 9 -10 -8 1 12 -0 -8, 19 -11 -12 W6 2 X 4 SPF No.2, EV1 2 X 4 SPF No.2 9 -10 -8 2 -2 -0 7 -11 -4 Plafe (X,Y) LOADING (psf) SPACING 2 -0 -0 CSI DEFL TCLL 35.0 Plates Increase 1.15 TC 0.93 Vert(LL) TCDL 8.0 Lumber Increase 1.15 BC 0.94 Vert(TL) BCLL 0.0 Rep Stress Incr YES WB 0.82 Horz(TL) BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) 25 -0 -11 5 -0 -15 in (loc) I /deft -0.40 11 >899 -0.56 11 -12 >637 0.38 9 n/a LUMBER BRACING TOP CHORD 2 X 4 SPF No.2 *Except* TOP CHORD T3 2 X 4 SPF 165OF 1.5E BOT CHORD BOT CHORD 2 X 4 SPF No.2 *Except* WEBS B3 2 X 4 SPF 165OF 1.5E WEBS 2 X 4 SPF Stud /Std *Except* W6 2 X 4 SPF No.2, EV1 2 X 4 SPF No.2 WEDGE Right: 2 X 4 SPF Stud /Std REACTIONS (lb /size) 9= 1530 /Mechanical, 14= 1530/0 -5 -8 30 -3 -8 5 -2 -13 5x 10 30 -3 -8 5 -2 -13 L/d PLATES 240 M1120 180 n/a Weight: 171 lb 0 Scale = 1:63.2 GRIP 197/144 Sheathed or 2 -2 -12 oc purlins, except end verticals. Rigid ceiling directly applied or 10 -0 -0 oc bracing. 1 Row at midpt 2 -13, 3 -13, 3 -12 2 Rows at 1/3 pts 5-12,2-14 Max Horz 14=- 373(load case 5) Max Uplift9=- 241 (load case 8), 14=- 219(load case 8) Max Grav9= 1955(load case 3), 14= 1593(load case 2) FORCES (lb) - First Load Case Only TOP CHORD 1 -2= -177, 2 -3= -1254, 3 -4= -1199, 4 -5= -1245, 5 -6= -3474, 6 -7= -3378, 7 -8= -3505, 8 -9= -4173, 1 -14= -235 BOT CHORD 13 -14 =825, 12 -13 =986, 11 -12 =1593, 10 -11 =3468, 9 -10 =3465 WEBS 2 -13 =213, 3 -13= -386, 3 -12 =110, 4 -12 =991, 5 -12= -1326, 5 -11 =2490, 6 -11= -381, 8 -11= -465, 8- 10 =81, 2 -14= -1438 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98, Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 241 lb uplift at joint 9 and 219 lb uplift at joint 14. LOAD CASE(S) Standard o . Truss Truss Type Q39441 B4 ROOF TRUSS n erson om onenfs - p - ZF;lda��lls, ID�3aD�JERO� - 5 -1 -0 9 -10 -8 12 -0 -8 16 -0 -2 5 -1 -0 4 -9 -8 2 -2 -0 3 -11 -10 4x4 - 4 Scale: 3/16 " =1' 0 4x4 — 9 -10 -8 5x8 - 12 -0 -8 19 -11 -12 25 -0 -11 1 30 -6 -8 9 -10 -8 2 -2 -0 7 -11 -4 5 -0 -15 5 -5 -13 a e Offsets - 15:0= D T £0�12], LOADING (psf) SPACING 2 -0 -0 CSI DEFL in (loc) I /defl L/d PLATES GRIP TCLL 35.0 Plates Increase 1.15 TC 0.83 Vert(LL) -0.42 11 -12 >871 240 M1120 197/144 TCDL 8.0 Lumber Increase 1.15 BC 0.87 Vert(TL) -0.58 12 -13 >626 180 BCLL 0.0 Rep Stress Incr YES WB 0.82 i Horz(TL) 0.39 9 n/a n/a BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) Weight: 173 lb LUMBER BRACING TOP CHORD 2 X 4 SPF No.2 *Except* TOP CHORD Sheathed or 2 -2 -3 oc purlins, except end verticals. T3 2 X 4 SPF 165OF 1.5E BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing. BOT CHORD 2 X 4 SPF No.2 *Except* WEBS 1 Row at midpt 2 -14, 3 -14, 3 -13 B3 2 X 4 SPF 165OF 1.5E 2 Rows at 1/3 pts 5-13,2-15 WEBS 2 X 4 SPF Stud /Std *Except* W6 2 X 4 SPF No.2, EV1 2 X 4 SPF No.2 WEDGE Right: 2 X 4 SPF Stud /Std REACTIONS (lb /size) 9= 1684/0 -5 -8, 15= 1535/0 -5 -8 Max Horz 15=- 392(load case 5) Max Uplift9=- 326(load case 8), 15=- 217(load case 8) Max Grav9= 2193(load case 3), 15= 1596(load case 2) FORCES (lb) - First Load Case Only TOP CHORD 1 -2= -177, 2 -3= -1259, 3 -4= -1204, 4 -5= -1251, 5 -6= -3506, 6 -7= -3409, 7 -8= -3535, 8 -9= -4217, 9- 10 =63, 1 -15= -235 BOT CHORD 14 -15 =828, 13 -14 =990, 12 -13 =1603, 11 -12 =3518, 9 -11 =3511 WEBS 2 -14 =215, 3 -14= -388, 3 -13 =113, 4 -13 =997, 5 -13= -1338, 5 -12 =2520, 6 -12= -384, 8 -12= -486, 8- 11 =66, 2 -15= -1443 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf, Category 11; Exp C. enclosed;MWFRS gable end zone,Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 6) Bearing at joint(s) 9 considers parallel to grain value using ANSI /TPI 1 -1995 angle to grain formula. Building designer should verify capacity of bearing surface. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 326 lb uplift at joint 9 and 217 lb uplift at joint 15. LOAD CASE(S) Standard Qty Ply 0D78- 2D1JRfID)K 16 1 Job Reference (optional) b 100 S 30 2003 MiTek n us rles,7nc. Fri Aug 22 age 1 19 -11 -12 25 -0 -11 1 30 -6 -8 31 -10 3 -11 -10 5 -0 -15 5 -5 -13 1 -4 -0 JotY_ ► – Truss – Truss TYPe – Qty _ _ — Ply - j DRIGGS GLEWOOD78- 207JR(ID)R - Q39441 ��C1 ROOFTRUSS 12 1, J ob 3- Ref erence (optional) �n o�rien�F�daho F - ails; fIT83403 JERC� — — 5. - 100 s�pa�y�0 I 2003 MiTeklndusfnes, nc. n ug 08:43603 —age 'er -1 -4 -0 7 -5 -0 14 -10 -0 16 -2 -0 1 -4 -0 7 -5 -0 7 -5 -0 1 -4 -0 Scale = 1:29.0 4x4 = 3 d 1 Plal _eDffs;� (X,Y)- j4:0= DT,0 -0-2T_ LOADING (psf) SPACING 2 -0 -0 CSI TCLL 35.0 Plates Increase 1.15 TC 0.75 TCDL 8.0 Lumber Increase 1.15 BC 0.68 BCLL 0.0 Rep Stress Incr YES WB 0.17 BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) wmacrc TOP CHORD 2 X 4 SPF 1650F 1.5E BOT CHORD 2 X 4 SPF No.2 WEBS 2 X 4 SPF Stud /Std REACTIONS (lb /size) 2= 874/0 -5 -8, 4= 874/0 -5 -8 Max Horz 2=- 161(load case 5) Max Uplift2=- 198(load case 7), 4=- 198(load case 8) Max Grav2= 1088(load case 2), 4= 1088(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1-2=67,2-3=-916,3-4=-916,4-5=67 BOT CHORD 2-6=622,4-6=622 WEBS 3 -6 =184 r N DEFL in (loc) I /defl L/d PLATES GRIP Vert(LL) -0.17 4 -6 >999 240 M1120 197/144 Vert(TL) 0.23 5 >87 180 Horz(TL) 0.01 4 n/a n/a Weight: 47 lb BRACING TOP CHORD Sheathed or 5 -0 -0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing. NOTES 1) Wind: ASCE 7 -98, 90mph, h =25ft; TCDL= 4.8psf; BCDL= 4.8psf, Category II; Exp C; enclosed,MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 198 lb uplift at joint 2 and 198 lb uplift at joint 4. LOAD CASE(S) Standard 7 -5 -0 14 -10 -0 7 -5 -0 7 -5 -0 _ _ A truss Truss Type - Q39441 C1G ROOF TRUSS �rson�enls — tF, @a�Fails ID 9340 7ER0� - 7 -5 -0 7 -5 -0 Ci 0 0 Scale = 1:25.9 0 0 REACTIONS (lb /size) 1= 142/14 -10 -0, 7= 142/14 -10 -0, 10= 186/14 -10 -0, 11= 164/14 -10 -0, 12= 312/14 -10 -0, 9= 164/14 -10 -0, 8= 312/14 -10 -0 Max Horz 1=- 146(load case 5) Max U pliftl =- 1 8(load case 5), 11=- 66(load case 7), 12=- 126(load case 7), 9=- 64(load case 8), 8=- 126(load case 8) Max Grav 1 = 1 96(load case 2), 7= 196(load case 3), 10= 186(load case 1), 11= 255(load case 2), 12= 452(load case 2), 9= 255(load case 3), 8= 452(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1 -2 =42, 2- 3 = -91, 3- 4 = -78, 4- 5 = -78, 5- 6 = -91, 6 -7 = -99 BOT CHORD 1- 12 =28, 11- 12 =28, 10- 11 =28, 9- 10 =28, 8 -9 =28, 7 -8 =28 WEBS 4 -10= -146, 3 -11= -147, 2 -12= -241, 5-9=-147,6-8=-241 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see MiTek "Standard Gable End Detail' 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 4) Gable requires continuous bottom chord bearing. 5) Gable studs spaced at 2 -0 -0 oc. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 18 lb uplift at joint 1, 66 lb uplift at joint 11, 126 lb uplift at joint 12, 64 lb uplift at joint 9 and 126 lb uplift at joint 8. Qty Ply — j DRIGZS7EA�GLEWOOD78 M7JROD)R — - 2 i 1 1 i Job Reference (optional) 00 s aM�620OTMi7ek us rtes, In Fri u�8.'43 - .47 2003 - gaeI- 14 -10 -0 7 -5 -0 44 = 4 LOAD CASE(S) Standard 14 -10 -0 14 -10 -0 - Plate Off [56 361 =0], [6 [8 T2- 0,0= - I - -O r j9`.0�0 - -1=0] LOADING (psf) SPACING 2 -0 -0 CSI DEFL in (loc) I /deft L/d PLATES GRIP TCLL 35.0 Plates Increase 1.15 TC 0.23 Vert(LL) n/a n/a 999 M1120 197/144 TCDL 8.0 Lumber Increase 1.15 BC 0.15 Vert(TL) n/a n/a 999 BCLL 0.0 Rep Stress Incr NO WB 0.09 Horz(TL) 0.00 7 n/a n/a BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) Weight: 52 lb LUMBER BRACING TOP CHORD 2 X 4 SPF No.2 TOP CHORD Sheathed or 6 -0 -0 oc purlins. BOT CHORD 2 X 4 SPF No.2 BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing. OTHERS 2 X 4 SPF Stud /Std REACTIONS (lb /size) 1= 142/14 -10 -0, 7= 142/14 -10 -0, 10= 186/14 -10 -0, 11= 164/14 -10 -0, 12= 312/14 -10 -0, 9= 164/14 -10 -0, 8= 312/14 -10 -0 Max Horz 1=- 146(load case 5) Max U pliftl =- 1 8(load case 5), 11=- 66(load case 7), 12=- 126(load case 7), 9=- 64(load case 8), 8=- 126(load case 8) Max Grav 1 = 1 96(load case 2), 7= 196(load case 3), 10= 186(load case 1), 11= 255(load case 2), 12= 452(load case 2), 9= 255(load case 3), 8= 452(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1 -2 =42, 2- 3 = -91, 3- 4 = -78, 4- 5 = -78, 5- 6 = -91, 6 -7 = -99 BOT CHORD 1- 12 =28, 11- 12 =28, 10- 11 =28, 9- 10 =28, 8 -9 =28, 7 -8 =28 WEBS 4 -10= -146, 3 -11= -147, 2 -12= -241, 5-9=-147,6-8=-241 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see MiTek "Standard Gable End Detail' 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 4) Gable requires continuous bottom chord bearing. 5) Gable studs spaced at 2 -0 -0 oc. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 18 lb uplift at joint 1, 66 lb uplift at joint 11, 126 lb uplift at joint 12, 64 lb uplift at joint 9 and 126 lb uplift at joint 8. Qty Ply — j DRIGZS7EA�GLEWOOD78 M7JROD)R — - 2 i 1 1 i Job Reference (optional) 00 s aM�620OTMi7ek us rtes, In Fri u�8.'43 - .47 2003 - gaeI- 14 -10 -0 7 -5 -0 44 = 4 LOAD CASE(S) Standard ( Truss Truss Type erson�m on nts - , ROOF TRUSS And p e � Ida ER06 -- -1 -4 -0 7 -5 -0 1 -4 -0 7 -5 -0 - - -- __[Qty _ Ply -: DRIGGSIEAGLEW00D78-2O7JR(IDjK_____ Job -- -- 100 shy 3 2003 Mi Au 22 4T47 - M3 - 1 e� 9 9 14 -8 -0 7 -3 -0 44 - Scale = 1:27.8 3 J REACTIONS (lb /size) 4=721/0-3-8,2=878/0-5-8 Max Horz 2= 175(load case 6) Max Uplift4=- 111(load case 8), 2=- 199(load case 7) Max Grav4= 850(load case 3), 2= 1087(load case 2) FORCES (lb) - First Load Case Only TOP CHORD 1-2=67,2-3=-927,3-4=-923 BOT CHORD 2-5=632,4-5=632 WEBS 3 -5 =192 7 -5 -0 7 -5 -0 LOADING (psf) SPACING 2 -0 -0 CSI TCLL 35.0 Plates Increase 1.15 TC 0.73 TCDL 8.0 Lumber Increase 1.15 BC 0.82 BCLL 0.0 Rep Stress Incr YES WB 0.17 BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) LUMBER Vert(LL) TOP CHORD 2 X 4 SPF 1650F 1.5E 'Except' 4 -5 T2 2 X 4 SPF 2100F 1.8E 240 M1120 197/144 BOT CHORD 2 X 4 SPF No.2 -0.25 WEBS 2 X 4 SPF Stud /Std >679 REACTIONS (lb /size) 4=721/0-3-8,2=878/0-5-8 Max Horz 2= 175(load case 6) Max Uplift4=- 111(load case 8), 2=- 199(load case 7) Max Grav4= 850(load case 3), 2= 1087(load case 2) FORCES (lb) - First Load Case Only TOP CHORD 1-2=67,2-3=-927,3-4=-923 BOT CHORD 2-5=632,4-5=632 WEBS 3 -5 =192 BRACING TOP CHORD Sheathed or 5 -1 -5 oc purlins. BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing. NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C. enclosed,MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 111 lb uplift at joint 4 and 199 lb uplift at joint 2. LOAD CASE(S) Standard 14 -8 -0 7 - 3 -0 DEFL in (loc) I /deft Ud PLATES GRIP Vert(LL) -0.20 4 -5 >873 240 M1120 197/144 Vert(TL) -0.25 4 -5 >679 180 Horz(TL) 0.01 4 n/a n/a Weight: 44 lb BRACING TOP CHORD Sheathed or 5 -1 -5 oc purlins. BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing. NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C. enclosed,MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 111 lb uplift at joint 4 and 199 lb uplift at joint 2. LOAD CASE(S) Standard -- -- -- yp - — Qty TPIy . - DRIGDS/EAGLEWOOD/ &-207JR(ID)K— -- - 7 T� Truss T e 039441 CR1 ROOF TRUSS 4 1 a o a s, fD 83�� �dersmCom one - Job Reference (optional) p �F ld I daho lr 3 JER�� 5 T00� aVTy 30 2663 IJfiTek Indusfnes, Inc. nc. n u�2 08:4 48 20D� age - 1 -10 -10 1 -10 -10 5 -10 -15 5 -10 -15 11 -3 -0 5 -4 -1 1.5x4 II 5 lqJ LUMBER TOP CHORD 2 X 4 SPF 165OF 1.5E BOT CHORD 2 X 4 SPF No.2 WEBS 2 X 4 SPF Stud /Std REACTIONS (lb /size) 2= 721/0 -7 -12, 6= 1056 /Mechanical DEFL in (loc) Vert(LL) -0.03 2 -7 Vert(TL) -0.15 1 Horz(TL) 0.01 6 BRACING TOP CHORD BOT CHORD 11 -3 -0 5 -4 -1 I /defl L/d I >999 240 >183 180 n/a n/a Scale = 1:27.5 PLATES GRIP M1120 197/144 Weight: 45 lb Sheathed or 6 -0 -0 oc purlins. Rigid ceiling directly applied or 10 -0 -0 oc bracing. Max Horz 2= 384(load case 5) Max Uplift2=- 108(load case 5), 6=- 397(load case 5) FORCES (lb) - First Load Case Only TOP CHORD 1-8=59,2-8=59,2-3=-987,3-4=137,4-5=-23 BOT CHORD 2-7=845,6-7=845 WEBS 3 -7 =123, 3- 6 = -967, 4- 6 = -495 NOTES 1) Wind: ASCE 7 -98, 90mph; h =25ft, TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C, Fully Exp. 3) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 108 lb uplift at joint 2 and 397 lb uplift at joint 6. LOAD CASE(S) Standard 1) Snow: Lumber Increase =1.15, Plate Increase =1.15 Uniform Loads (plf) Vert: 1 -8= -86.0 Trapezoidal Loads (plf) Vert: 8=- 0.0- to -5 =- 242.0, 2=- 1.3- to- 6 = -45.0 5 -10 -15 5 -10 -15 LOADING (psf) SPACING 2 -0 -0 CSI TCLL 35.0 Plates Increase 1.15 TC 0.88 TCDL 8.0 Lumber Increase 1.15 BC 0.46 BCLL 0.0 Rep Stress Incr NO WB 0.69 BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) LUMBER TOP CHORD 2 X 4 SPF 165OF 1.5E BOT CHORD 2 X 4 SPF No.2 WEBS 2 X 4 SPF Stud /Std REACTIONS (lb /size) 2= 721/0 -7 -12, 6= 1056 /Mechanical DEFL in (loc) Vert(LL) -0.03 2 -7 Vert(TL) -0.15 1 Horz(TL) 0.01 6 BRACING TOP CHORD BOT CHORD 11 -3 -0 5 -4 -1 I /defl L/d I >999 240 >183 180 n/a n/a Scale = 1:27.5 PLATES GRIP M1120 197/144 Weight: 45 lb Sheathed or 6 -0 -0 oc purlins. Rigid ceiling directly applied or 10 -0 -0 oc bracing. Max Horz 2= 384(load case 5) Max Uplift2=- 108(load case 5), 6=- 397(load case 5) FORCES (lb) - First Load Case Only TOP CHORD 1-8=59,2-8=59,2-3=-987,3-4=137,4-5=-23 BOT CHORD 2-7=845,6-7=845 WEBS 3 -7 =123, 3- 6 = -967, 4- 6 = -495 NOTES 1) Wind: ASCE 7 -98, 90mph; h =25ft, TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C, Fully Exp. 3) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 108 lb uplift at joint 2 and 397 lb uplift at joint 6. LOAD CASE(S) Standard 1) Snow: Lumber Increase =1.15, Plate Increase =1.15 Uniform Loads (plf) Vert: 1 -8= -86.0 Trapezoidal Loads (plf) Vert: 8=- 0.0- to -5 =- 242.0, 2=- 1.3- to- 6 = -45.0 I Jc� _— ■ -- T ur ss — - - Truss Type Q39441 I CR2 ROOFTRUS And-F Idaho Falls;lD83403 JERO - Qt y - __DR1GGSIE EEWOODM8 2a7JR(ID)K_ 5 106s�36200T Reference (optional) 03T71iTek Indus nes, nc. Fri Aug 3:4ge -1 -6 -7 1 3 -0 -7 Scale = 1:11.1 v LOADING (psf) SPACING 2 -0 -0 CSI TCLL 35.0 Plates Increase 1.15 TC 0.39 TCDL 8.0 i Lumber Increase 1.15 BC 0.05 BCLL 0.0 Rep Stress Incr NO WB 0.00 BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) LUMBER TOP CHORD 2 X 4 SPF No.2 BOT CHORD 2 X 4 SPF No.2 WEBS 2 X 4 SPF Stud /Std REACTIONS (lb /size) 2= 253/0 -5 -10, 4 =10 /Mechanical, 3 =2 /Mechanical Max Horz 2= 68(load case 5) Max Uplift2=- 121(load case 5), 3=- 46(load case 7) Max Grav2= 253(load case 1), 4= 36(load case 2), 3= 60(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1-2=68,2-3=-47 BOT CHORD 24=0 WEBS 3 -4 =0 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf, BCDL= 4.8psf; Category II; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 121 lb uplift at joint 2 and 46 lb uplift at joint 3. 7) Gap between inside of top chord bearing and first diagonal or vertical web shall not exceed 0.500in. LOAD CASE(S) Standard 1) Snow: Lumber Increase =1.15, Plate Increase =1.15 Uniform Loads (plf) Vert: 1 -2= -86.0 Trapezoidal Loads (plf) Vert: 2=- 5.4- to- 3= -65.2, 2= 40 -to -4= -12.1 1 -6 -7 3 -0 -7 3 -- 3 -0 -7 3 - -7 DEFL in (loc) I /deft Ud PLATES GRIP Vert(LL) -0.00 2 -4 >999 240 M1120 197/144 Vert(TL) -0.09 1 >241 180 Horz(TL) 0.00 3 n/a n/a Weight: 11 lb BRACING TOP CHORD Sheathed or 3 -0 -7 oc purlins. BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing. REACTIONS (lb /size) 2= 253/0 -5 -10, 4 =10 /Mechanical, 3 =2 /Mechanical Max Horz 2= 68(load case 5) Max Uplift2=- 121(load case 5), 3=- 46(load case 7) Max Grav2= 253(load case 1), 4= 36(load case 2), 3= 60(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1-2=68,2-3=-47 BOT CHORD 24=0 WEBS 3 -4 =0 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf, BCDL= 4.8psf; Category II; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 121 lb uplift at joint 2 and 46 lb uplift at joint 3. 7) Gap between inside of top chord bearing and first diagonal or vertical web shall not exceed 0.500in. LOAD CASE(S) Standard 1) Snow: Lumber Increase =1.15, Plate Increase =1.15 Uniform Loads (plf) Vert: 1 -2= -86.0 Trapezoidal Loads (plf) Vert: 2=- 5.4- to- 3= -65.2, 2= 40 -to -4= -12.1 1 -6 -7 3 -0 -7 3 -- � Q - - ROOF TRUSS 4 D1 - - - y �RtGGS /EAGCEOVOOD /8= 207JR(ID) o Truss Truss Type Qty PI a o FaHs,1D _8Z403, JEROD -- 3T00 s M 1 39441 arson om C onen s - I Job Reference (optional) p a�0 2003TNIiTercln us nes, nc. rl•�22 68:43:42003 a� 6 -5 -7 12 -6 -0 18 -6 -9 25 -0 -0 26 -4 -9 6 -5 -7 6 -0 -9 6 -0 -9 6 -5 -7 1 -4 -0 Scale = 1:45.6 44 = 3 vI 0 REACTIONS (lb /size) 1=1256/0-3-8,5=1399/0-3-8 Max Horz 1=- 281(load case 5) Max Upliftl=- 196(load case 7), 5=- 276(load case 8) Max Gravl= 1476(load case 2), 5= 1690(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1-2=-1860,2-3=-1622,3-4=-1608,4-5=-1848,5-6=67 BOT CHORD 1-9=1422,8-9=950,7-8=950,5-7=1407 WEBS 2- 9 = -457, 3 -9 =632, 3 -7 =607, 4- 7 = -446 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf, Category II; Exp C; enclosed,MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 196 lb uplift at joint 1 and 276 lb uplift at joint 5. 0 GRIP 197/144 LOAD CASE(S) Standard 3x4 - 3x4 - 3x4 - 8 -5 -10 16 -6 -6 25 -0 -0 8 -5 -10 8 -0 -12 8 -5 -10 ma Offse (Xl) : [9 0- 0 - T,0-62], [ 4:0- 2-,0 -0], [ 5�-00-T0 -0 -2] - LOADING (psf) SPACING 2-0-0 CSI DEFL in (loc) I /deft Ud PLATES TCLL 35.0 Plates Increase 1.15 TC 0.90 Vert(LL) -0.18 1 -9 >999 240 M1120 TCDL 8.0 Lumber Increase 1.15 BC 0.79 Vert(TL) -0.30 1 -9 >989 180 BCLL 0.0 Rep Stress Incr YES WB 0.57 Horz(TL) 0.05 5 n/a n/a BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) Weight: 96 lb LUMBER BRACING TOP CHORD 2 X 4 SPF No.2 TOP CHORD Sheathed or 2 -10 -9 oc purlins. BOT CHORD 2 X 4 SPF No.2 BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing. WEBS 2 X 4 SPF Stud /Std REACTIONS (lb /size) 1=1256/0-3-8,5=1399/0-3-8 Max Horz 1=- 281(load case 5) Max Upliftl=- 196(load case 7), 5=- 276(load case 8) Max Gravl= 1476(load case 2), 5= 1690(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1-2=-1860,2-3=-1622,3-4=-1608,4-5=-1848,5-6=67 BOT CHORD 1-9=1422,8-9=950,7-8=950,5-7=1407 WEBS 2- 9 = -457, 3 -9 =632, 3 -7 =607, 4- 7 = -446 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf, Category II; Exp C; enclosed,MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 196 lb uplift at joint 1 and 276 lb uplift at joint 5. 0 GRIP 197/144 LOAD CASE(S) Standard - -- ---- ,-T--Ss - - -- - - ,Truss i yT e Qty i - Ply 039441 ROOF TRUSS p D1G a o a s, D 830 1 a �� 1 Job Reference (optional) n erson - Com onents - 3 JEROD _. ST00 s101 - 2 03TNiTek�n us nes, 1n - c. Fn l�ug�2 08:4349 266 12 -6 -0 25 -0 -0 12 -6 -0 12 -6 -0 Scale = 1:43.5 4x4 - v 0 0 3x4 - 25 -0 -0 &IIIIai; 0 0 0 Plate 0Tfs_eTs_(X,l): [8`.0- 3- 3;0 -1 -0], [9:0 -3 -36 f_-0], [10:0- 3- 0- 3- 3;0- 1- 0],TT2 0- X3,61 =0] [16:0- 2_G,_0 -i -0], [17:0- 2- 0,0 -1 -0], [18:0- 2- 0,0 -1 - 0] LOADING (psf) SPACING 2-0-0 T CSI DEFL in (loc) I /defi L/d PLATES GRIP TCLL 35.0 Plates Increase 1.15 TC 0.10 i Vert(LL) n/a n/a 999 M1120 197/144 TCDL 8.0 Lumber Increase 1.15 BC 0.07 Vert(TL) n/a n/a 999 BCLL 0.0 Rep Stress Incr NO WB 0.26 Horz(TL) 0.00 13 n/a n/a BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) Weight: 114 lb LUMBER BRACING TOP CHORD 2 X 4 SPF No.2 TOP CHORD Sheathed or 6 -0 -0 oc purlins. BOT CHORD 2 X 4 SPF No.2 BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing. OTHERS 2 X 4 SPF Stud /Std REACTIONS (lb /size) 1= 104/25 -0 -0, 13= 104/25 -0 -0, 20= 162/25 -0 -0, 21= 203/25 -0 -0, 22= 204/25 -0 -0, 23= 206/25 -0 -0, 24= 196/25 -0 -0, 25= 235/25 -0 -0, 18= 195/25 -0 -0, 17= 205/25 -0 -0, 16= 206/25 -0 -0, 15= 196/25 -0 -0, 14= 235/25 -0 -0 Max Horz 1= 210(load case 7) Max Upliftl=- 45(load case 5), 13=- 18(load case 6), 21=- 74(load case 7), 22=- 85(load case 7), 23=- 82(load case 7), 24=- 79(load case 7), 25=- 94(load case 7), 18=- 77(load case 8), 17=- 85(load case 8), 16=- 82(load case 8), 15=- 79(load case 8), 14=- 94(load case 8) Max Gravl= 139(load case 2), 13= 139(load case 3), 20= 162(load case 1), 21= 308(load case 2), 22= 296(load case 2), 23= 300(load case 2), 24= 285(load case 2), 25= 342(load case 2), 18=301 (load case 3), 17= 297(load case 3), 16= 300(load case 3), 15= 285(load case 3), 14= 342(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1- 2 = -82, 2- 3 = -88, 3- 4 = -86, 4- 5 = -86, 5- 6 = -86, 6- 7 = -85, 7- 8 = -85, 8- 9 = -86, 9- 10 = -86, 10- 11 = -86, 11- 12 = -88, 12- 13 = -82 BOT CHORD 1 -25 =0, 24 -25 =0, 23 -24 =0, 22 -23 =0, 21 -22 =0, 20 -21 =0, 19 -20 =0, 18- 19 =32, 17- 18 =32, 16- 17 =32, 15- 16 =32, 14- 15 =32, 13 -14 =32 WEBS 7 -20= -132, 6-21=-170,5-22=-173, 4 -23= -173, 3 -24= -168, 2 -25= -186, 8 -18= -170, 9 -17= -173, 10- 16 = -173, 11- 15 = -168, 12- 14 = -186 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see MiTek "Standard Gable End Detail' 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 4) All plates are 1.5x4 M1120 unless otherwise indicated. 5) Gable requires continuous bottom chord bearing. 6) Gable studs spaced at 2 -0 -0 oc. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 45 lb uplift at joint 1, 18 lb uplift at joint 13, 74 lb uplift at joint 21, 85 lb uplift at joint 22, 82 lb uplift at joint 23, 79 lb uplift at joint 24, 94 lb uplift at joint 25, 77 lb uplift at joint 18, 85 lb uplift at joint 17, 82 lb uplift at joint 16, 79 lb uplift at joint 15 and 94 lb uplift at joint 14. LOAD CASE(S) Standard , r ;Truss Truss Type Qty Ply AGLEW0�)D78- 201JR(IDj Tan erso�ne�s - E 7F;ldaho Fad, ID JERGD ROSS __ - 100 s I May 30 2003 MiTek fndusTnes, n ug E2 0 43:49 2003 Pagel 4-2-7 4 -2 -7 7 -10 -8 13 -5 -9 4 -2 -7 3 -8 -1 5 -7 -1 19 -0 -11 24 -7 -12 30 -5 -4 5 -7 -1 5 -7 -1 5 -9 -8 5x5 = 3 8.00 r1T n 2x4 II 3x6 = 3x8 = 4x6 = 4 5 6 7 T2 51 -2 -8 36 -1 -0 , 41 -10 -8 , 45 -6 -9 , 49 -10 -8 Sole = 1:86.8 5 -7 -12 5 -9 -8 3 -8 -1 4 -3 -15 1 -4 -0 5x5 = 3x8 = 3x6 - 8 9 10 T4 2x4 2 W W7 6 W1 0 11 2 13 X x4 1 1 �I 0 4x5 - 22 21 20 19 2318 17 16 15 4x8 - 4x4 = 4x6 = 48 - 2x4 II 44 - 2x4 11 46 = 7 -10 -8 13 -5 -9 19 -0 -11 7 -10 -8 5 -7 -1 5 -7 -1 24- 7- 1225 -4 30 -5 -4 36 -1 -0 5 -7 -1 0 -4 -8 5 -5 -0 5 -7 -12 LOADING (psf) SPACING 2 -0 -0 TCLL 35.0 Plates Increase 1.15 TCDL 8.0 Lumber Increase 1.15 BCLL 0.0 Rep Stress Incr NO BCDL 8.0 Code IRC2000 /ANSI95 LUMBER TOP CHORD 2 X 4 SPF No.2 BOT CHORD 2 X 6 DF 240OF 2.0E 'Except` B22X6 SPF No.2 WEBS 2 X 4 SPF Stud /Std CSI DEFL in (loc) I /deft TC 0.63 Vert(LL) -0.11 1 -22 >999 BC 0.32 Vert(TL) -0.16 1 -22 >999 FIBIGII-7? M&M1 Ud 240 180 14 4x8 = 49 -10 -8 T 8 -0 -0 PLATES M1120 12 ' 13� 0 4x5 - GRIP 197/144 WB 0.78 Horz(TL) 0.03 12 n/a n/a (Matrix) Weight: 521 lb BRACING TOP CHORD Sheathed or 5 -6 -0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing, Except: 6 -0 -0 oc bracing: 17- 18,15 -17. WEBS 1 Row at midpt 5 -18 REACTIONS (lb /size) 1= 2717/0 -2 -0, 18= 5012/0 -3 -8, 18= 5012/0 -3 -8, 12= 1027/0 -3 -8 Max Horz 1=- 185(load case 5) Max Uplift1=- 660(load case 6), 18=- 1347(load case 6), 12=- 193(load case 8) Max Grav1= 3224(load case 2), 18= 6173(load case 3), 18= 5012(load case 1), 12= 1609(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1 -2= -3623, 2 -3= -3365, 3 -4= -2793, 4 -5= -2777, 5 -6 =1690, 6 -7 =1690, 7 -8 =1690, 8 -9= -554, 9 -10= -762, 10- 11 = -979, 11- 12= -1267, 12 -13 =71 BOT CHORD 1 -22 =2940, 21 -22 =2777, 20 -21 =1356, 19 -20 =1356, 19 -23 =1356, 18 -23 =1356, 17- 18 = -332, 16- 17 = -332, 15 -16= -332, 14 -15= 554,12 -14 =963 WEBS 2-22=-230,3-22=1415,4-22=18,4-21=-535,5-21=1937,5-19=937, 5 -18= -4091, 8- 17 = -25, 8 -15 =1203, 9 -15= -705, 9 -14 =278, 10- 14 =75, 11- 14 = -252, 7- 18 = -511, 8- 18 = -1849 NOTES 1) 2 -ply truss to be connected together with 0.131'x3" Nails as follows: Top chords connected as follows: 2 X 4 - 1 row at 0 -9 -0 oc. Bottom chords connected as follows: 2 X 6 - 2 rows at 0 -9 -0 oc. Webs connected as follows: 2 X 4 - 1 row at 0 -9 -0 oc. 2) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf, BCDL= 4.8psf; Category 11; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 3) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp.; L= 45 -0 -0 4) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 5) Provide adequate drainage to prevent water ponding. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 7) Provide mechanical connection (by others) of truss to bearing plate at joint(s) 1. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 660 lb uplift at joint 1, 1347 lb uplift at joint 18 and 193 lb uplift at joint 12. 9) Girder carries tie -in span(s): 8 -0 -0 from 0 -0 -0 to 24 -0 -0 LOAD CASE(S) Standard 1) Snow: Lumber Increase =1.15, Plate Increase =1.15 Uniform Loads (plf) Vert: 1- 3= -86.0, 3- 10= -86.0, 10- 13= -86.0, 1 -23 =- 164.7, 12- 23 = -16.0 Tom, Trus§ Truss T e — Qt PhDRfGGS7E )K Q39441 E10 ROOF TRUSS Yp y y Job Reference (optional) - - antler §oh Comp- IF, Falfs, 1MM403, JEROD 5.100 slay 302663 fM e industries, Inc. f rn Aug 22 08:430 2003 Page 1 3 -9 -12 8 -7 -15 13 -6 -2 18 -0 -0 3 -9 -12 4 -10 -3 4 -10 -3 4 -5 -14 v N ?I 0 32 -0 -0 36 -6 -14 41 -4 -9 46 -2 -4 50 -0 -0 13 -11 -15 4 -6 -15 4 -9 -11 4 -9 -11 3 -9 -12 Scale = 1:87.1 6x6 ii 2x4 11 6x6 _ o 3 -9 -12 11 -1 -1 18 -0 -0 1 24 -9 -4 25 -1 32 -0 -0 38 -11 -12 3 -9 -12 7 -3 -5 6 -11 -0 6 -9 -4 0 -4 -8 6 -10 -4 6 -11 -12 P al to Offsets (X,l �i =0,0 =0 4]�6 0- 2- $,0 1 = T2 T,8 =�8 0 - 112r [ 0- 0,0= 0�j j1fi:08� =3 -0j C1�0= 2= ��3 =0] LOADING (psf) SPACING 2 -0 -0 CSI DEFL in (loc) I /deft Ud TCLL 35.0 Plates Increase 1.15 TC 0.85 Vert(LL) 0.06 15 -16 >999 240 TCDL 8.0 Lumber Increase 1.15 BC 0.33 Vert(TL) -0.10 15 -16 >999 180 BCLL 0.0 Rep Stress Incr YES WB 0.88 Horz(TL) 0.02 14 n/a n/a BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) LUMBER BRACING TOP CHORD 2 X 4 SPF No.2 'Except` TOP CHORD T6 2 X 4 SPF 210OF 1.8E BOT CHORD BOT CHORD 2 X 4 SPF No.2 'Except' M1120 B3 2 X 4 DF 240OF 2.0E WEBS WEBS 2 X 4 SPF Stud /Std 'Except' W7 2 X 4 SPF No.2, W11 2 X 4 SPF No.2 3 ht 0 46 -2 -4 50 -0 -0 7 -2 -8 3 -9 -12 GRIP PLATES M1120 197/144 Weight: 275 lb Sheathed or 5 -4 -14 oc purlins. Rigid ceiling directly applied or 10 -0 -0 oc bracing, Except: 6 -0 -0 oc bracing: 1-20,13-14. 1 Row at midpt 4 -20, 5 -18, 9 -16, 10 -14 2 Rows at 1/3 pts 6 -17, 8 -17, 7 -17 REACTIONS (lb /size) 20= 1292/0 -3 -8, 17= 2510/0 -3 -8, 17= 2510/0 -3 -8, 14= 1297/0 -3 -8 Max Horz 20=- 378(load case 5) Max Uplift20=- 235(load case 7), 17=- 369(load case 6), 14=-281 (load case 8) Max Grav20=1 981 (load case 2), 17= 2951(load case 2), 17= 2510(load case 1), 14= 1988(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1 -2 =343, 2 -3 =232, 3 -4 =348, 4 -5= -620, 5 -6= -298, 8 -9= -307, 9 -10= -626, 10 -11 =348, 11 -12 =233, 12 -13 =344, 6 -7 =328, 7 -8 =328 BOT CHORD 1- 20 = -193, 19 -20 =444, 18 -19 =367, 17 -18 =175, 16 -17 =182, 15 -16 =375, 14 -15 =447, 13- 14 = -194 WEBS 2 -20 =404, 4 -20= -995, 4- 19 = -74, 5 -19 =189, 5 -18= -435, 6 -18 =493, 6 -17= -1004, 8 -17= -1009, 8 -16 =489, 9 -16= -430, 9 -15 =180, 10- 15 = -65, 10- 14= -1003, 12- 14 = -403, 7- 17 = -652 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category 11; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) Unbalanced snow loads have been considered for this design. 4) Provide adequate drainage to prevent water ponding. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 235 lb uplift at joint 20, 369 lb uplift at joint 17 and 281 lb uplift at joint 14. LOAD CASE(S) Standard 20 19 18 17 16 15 14 3x6 — 3x6 = 5x5 - 3x8 - 5x5 - 3x6 - 3x6 - — __ -- - 'Tqh � Truss Truss Type PIGGYBACK n - Idaho daho Falls�_ff A(13 JEROD_ - A 7 -0 -0 7 -0 -0 44 - _' )Qty j Fly_ DFtTZiGS7EAGCEWOOD /& /JR(ID) -- 3 1 Job Reference (optional) - 5 - f90 — s Nay 30 2 03 I e n us nes - Ina r� i Aug 22 08W3:5620Q Page 14 -0 -0 7 -0 -0 3 Scale = 1:23.6 ro Ir 0 7 -0 -0 14 -0 -0 7 -0 -0 7 -0 -0 Plafe O se s ,Y): 14`. _0-( 7�G� LOADING (psf) SPACING 2-0-0 CSI DEFL In (loc) I /deft L/d PLATES GRIP TCLL 35.0 Plates Increase 1.15 TC 0.56 Vert(LL) -0.22 2 -6 >735 240 M1120 1971144 TCDL 8.0 Lumber Increase 1.15 BC 0.84 Vert(TL) -0.29 2 -6 >563 180 BCLL 0.0 Rep Stress Incr YES WB 0.17 Horz(TL) 0.09 5 n/a n/a BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) Weight: 42 lb LUMBER BRACING TOP CHORD 2 X 4 DF 240OF 2.0E TOP CHORD Sheathed or 6 -0 -0 oc purlins. BOT CHORD 2 X 4 SPF 1650F 1.5E BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing. WEBS 2 X 4 SPF Stud /Std REACTIONS (lb /size) 1=691/0-5-8,5=691/0-5-8 Max Horz 1= 142(load case 6) Max Uplift1=- 108(load case 7), 5=- 108(load case 8) Max Grav 1 =809(load case 2), 5= 809(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1-2=-339,2-3=-928,3-4=-928,4-5=-339 BOT CHORD 2 -6 =709, 4 -6 =709 WEBS 3 -6 =250 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 5) Bearing at joint(s) 1, 5 considers parallel to grain value using ANSI /TPI 1 -1995 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 108 lb uplift at joint 1 and 108 lb uplift at joint 5. 7) SEE MITek STANDARD PIGGYBACK TRUSS CONNECTION DETAIL FOR CONNECTION TO BASE TRUSS LOAD CASE(S) Standard J4) Truss Truss Type Qty PhDRTG /EAGL�W0 0 618- 2 0 /JR(ID - Q39441 i E11 IROOFTRUSS 2 1 Job Reference (optional) And erson Components -7F, Idaho FalUs 83403, JEROD --- 5. - TOU s May 30 21303 MiTek n ustnes; lnc. Fri Aug 22 06: age 1 7 -0 -7 , 11 -10 -10 , 16 -4 -8 30 -4 -8 34 -11 -6 , 39 -9 -1 46 -9 -0 7 -0 -7 4 -10 -3 4 -5 -14 13 -11 -15 4 -6 -15 4 -9 -11 6 -11 -15 Scale = 1:81.6 5x8 = 5x8 — 2x4 II ICI 1 9 -5 -9 1 16 -4 -8 1 23 -1 -12 23 Y -4 30 -4 -8 240 9 -5 -9 6 -11 -0 6 -9 -4 0 -4 -8 6 -10 -4 - - PIafe - Offsefis (XY): [5'.0� =2- - - - _ ST�70 6- 8,0_2 -8] [940�1�;0 =SOT [18. 1 - 8Fdge1 -- - LOADING (psf) SPACING 2 -0 -0 CSI DEFL in (loc) TCLL 35.0 Plates Increase 1.15 TC 0.98 Vert(LL) -0.13 19 -20 TCDL 8.0 Lumber Increase 1.15 BC 0.54 Vert(TL) -0.24 19 -20 BCLL 0.0 Rep Stress Incr YES WB 0.79 Horz(TL) 0.03 12 BCDL 8.0 Code IRC2000 /ANS195 (Matrix) LUMBER BRACING I /defl Ud PLATES GRIP >999 240 M1120 197/144 >999 180 n/a n/a Weight: 268 lb TOP CHORD 2 X 4 SPF No.2 *Except* TOP CHORD Sheathed or 3 -5 -6 oc purlins, except end verticals. T6 2 X 4 SPF 210OF 1.8E BOT CHORD Rigid ceiling directly applied or 6 -0 -0 oc bracing. BOT CHORD 2 X 4 SPF No.2 *Except* WEBS 1 Row at micipt 3 -20, 4 -17, 8 -15, 9 -12 B3 2 X 4 DF 240OF 2.0E 2 Rows at 1/3 pts 5 -16, 7 -16, 6 -16 WEBS 2 X 4 SPF Stud /Std *Except* W7 2 X 4 SPF 1650F 1.5E, W11 2 X 4 SPF 165OF 1.5E EV1 2 X 4 SPF 1650F 1.5E, EV2 2 X 4 SPF 165OF 1.5E REACTIONS (lb /size) 20= 910/0 -3 -8, 16= 2914/0 -3 -8, 16= 2914/0 -3 -8, 12= 915/0 -3 -8 Max Horz 20=- 340(load case 5) Max Uplift20=- 153(load case 7), 16=- 359(load case 6), 12=- 196(load case 8) Max Grav20= 1454(load case 2), 16= 3331(load case 2), 16= 2914(load case 1), 12= 1461(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1 -2= -612, 2 -3= -321, 3 -4= -793, 4 -5= -243, 7 -8= -254, 8 -9= -804, 9 -10= -317, 10- 11 = -607, 5 -6 =484, 6 -7 =484, 1 -20= -547, 11 -12= -543 BOT CHORD 19 -20 =706, 18 -19 =413, 17 -18 =413, 16 -17 =135, 15 -16 =143, 14 -15 =425, 13-14=425,12-13=713 WEBS 3 -20= -438, 3 -19= -398, 4 -19 =513, 4 -17= -628, 5 -17 =659, 5 -16= -1237, 7 -16= -1242, 7 -15 =655, 8 -15= -624, 8 -13 =507, 9- 13 = -392, 9- 12 = -453, 6- 16 = -650 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft, TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C, enclosed;MWFRS gable end zone,Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98, Pf =35.0 psf (roof snow); Exp C, Fully Exp. 3) Unbalanced snow loads have been considered for this design. 4) Provide adequate drainage to prevent water ponding. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 153 lb uplift at joint 20, 359 lb uplift at joint 16 and 196 lb uplift at joint 12. 37 -4 -4 46 -7 -2 r 6 -11 -12 9 -2 -14 0 -1 -14 LOAD CASE(S) Standard 20 19 18 17 16 15 14 13 12 3x6 - 3x6 — 46 - 3x8 — 5x10 = 3x6 - 3x6 - 3x6 - - , -- Truss Truss Type - - Q39441 E2 ROOF TRUSS — An erson Components_-JF,ldaho FaIls 1D 83463_,JER01Y_ 5 -0 -15 9 -10 -8 17 -4 -8 24 -10 -8 5 -0 -15 4 -9 -9 7 -6 -0 7 -6 -0 5x5 = 3x8 = 3 4 F 00 r ID n 0 1� 0 5 -0 -15 9 -10 -8 17 -4 -8 1 24 -7 -12 25 32 -4 -8 1 39 -10 -8 , 44 -8 -1 , 49 -10 -8 5 -0 -15 4 -9 -9 7 -6 -0 7 -3 -4 0 -4 -8 7 -4 -4 7 -6 -0 4 -9 -9 5 -2 -7 Fli a te Uffsets , 0:Edge,0 -0 -4] [15 �-T-T2 � gdg�[17 0- 3- O,Edge] LOADING (psf) I SPACING 2 -0 -0 CSI DEFL in (loc) I /deft L/d PLATES GRIP TCLL 35.0 i Plates Increase 1.15 TC 0.92 Vert(LL) -0.11 13 -14 >999 240 M1120 197/144 TCDL 8.0 Lumber Increase 1.15 BC 0.61 Vert(TL) -0.17 13 -14 >999 180 BCLL 0.0 Rep Stress Incr YES WB 0.81 Horz(TL) 0.05 10 n/a n/a BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) Weight: 227 lb LUMBER BRACING TOP CHORD 2 X 4 SPF 165OF 1.5E *Except* TOP CHORD Sheathed or 4 -1 -14 oc purlins. T2 2 X 4 SPF 210OF 1.8E, T4 2 X 4 SPF 210OF 1.8E BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing, Except: BOT CHORD 2 X 4 DF 240OF 2.0E *Except* 6 -0 -0 oc bracing: 14 -16. B2 2 X 4 SPF No.2 WEBS 1 Row at midpt 7 -14 WEBS 2 X 4 SPF Stud /Std *Except* 2 Rows at 1/3 pts 4-16,6-16 W6 2 X 4 SPF No.2, W82X4 SPF No.2 REACTIONS (lb /size) 1= 1038/0 -2 -0, 16= 2974/0 -4 -0 (input: 0 -3 -8), 16= 2974/0 -4 -0 (input: 0 -3 -8), 10= 1185/0 -3 -8 Max Horz 1=- 227(load case 5) Max Upliftl=- 169(load case 7), 16=- 678(load case 6), 10=- 274(load case 8) Max Grav1= 1568(load case 2), 16= 4007(load case 3), 16= 2974(load case 1), 10= I790(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1 -2= -1547, 2 -3= -1098, 3 -4= -840, 4 -5 =764, 5 -6 =764, 6 -7= -496, 7 -8= -844, 8 -9= -1102, 9 -10= -1536, 10 -11 =67 BOT CHORD 1 -20 =1168, 19 -20 =1168, 18 -19 =485, 17 -18 =485, 16 -17 =485, 15- 16 = -764, 14- 15 = -764, 13 -14 =496, 12 -13 =1160, 10 -12 =1160 WEBS 2 -20 =108, 2 -19 =406, 3- 19 =17, 4 -19 =474, 4 -18 =116, 4 -16= -1667, 6-14=1674,7-14=-986,7-13=464,8-13=18, 9 -13= -391, 9- 12 =88, 6- 16 = -1741 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf, BCDL= 4.8psf; Category II; Exp C, enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp.; L= 45 -0 -0 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 5) Provide adequate drainage to prevent water ponding. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 7) WARNING: Required bearing size at joint(s) 16, 16 greater than input bearing size. 8) Provide mechanical connection (by others) of truss to bearing plate at joint(s) 1. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 169 lb uplift at joint 1, 678 lb uplift at joint 16 and 274 lb uplift at joint 10. LOAD CASE(S) Standard Qty ply DRTG�,S7EAGCEWOiOD /8-20 /JR '1 1 Job Reference (optional) 3 60� aVT y 30_ZW3 n us nes, Inc. Fri Auq 22 08:43:51 2003 Paqe 32 -4 -8 39 -10 -8 44 -8 -1 , 49-10-851-2- 7 -6 -0 7 -6 -0 4 -9 -9 5 -2 -7 1 -4 -0 Scale = 1:86.9 5x5 = 4x6 = 5x5 = 3x6 = S R 7 R 2x4 II 3x8 = 46 = 4x5 = 5x5 = 3x8 = 2x4 II 2x4 II 4x6 = V15 - - Truss Truss TYPe Qty - Ply - URIGGS /EAGLEWOOD 78- 207JRODjK Q39441 E3 ROOF TRUSS 1 1 L rs�om on>s Job Reference (optional) Anderson fFTd�ioFa1Fs fD 8S403 JEROD_ t.100 sM6y - 3 2003 Indus rtes, nc. n ug 08:4T:52 2iSOI ga a 1 6 -0 -15 11 -10 -8 18 -3 -2 6 -0 -15 5 -9 -9 6 -4 -10 31 -3 -2 37 -10 -8 1 43 -8 -1 49 -10 -8 51-2-8 13 -0 -0 6 -7 -6 5 -9 -9 6 -2 -7 1 -4 -0 Scale = 1:87.0 5x5 - 3x8 - 46 - 3 c F 0 ro �I 0 5x5 - 2x4 II 3x8 - a � o 6 -0 -15 11 -10 -8 18 -3 -2 24 -7 -12 25 -4 31 -3 -2 37 -10 -8 43 -8 -1 49 -10 -8 6 -0 -15 5 -9 -9 6 -4 -10 6 -4 -10 0 -4 -8 6 -2 -14 6 -7 -6 5 -9 -9 6 -2 -7 P Ia�OfF:s — ets (xY`)_ [1: 30 0- MfO:E -0 41- [T8 -.0- 1 -12,_Edge] - — - - - - -_ - - -- -- - - - LOADING (psf) SPACING 2 -0 -0 CSI DEFL in (loc) I /deft L/d PLATES TCLL 35.0 Plates Increase 1.15 TC 0.94 Vert(LL) -0.11 1 -20 >999 240 M1120 TCDL 8.0 Lumber Increase 1.15 BC 0.44 Vert(TL) 0.03 11 >715 180 BCLL 0.0 Rep Stress Incr YES WB 1.00 Horz(TL) 0.04 10 n/a n/a BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) Weight: 2451b LUMBER BRACING TOP CHORD 2 X 4 SPF No.2 *Except* TOP CHORD Sheathed or 3 -0 -4 oc purlins. T2 2 X 4 SPF 165OF 1.5E, T4 2 X 4 SPF 1650F 1.5E BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing. BOT CHORD 2 X 4 DF 240OF 2.0E WEBS 1 Row at midpt 6 -16 WEBS 2 X 4 SPF Stud /Std 2 Rows at 1/3 pts 4-16,7-16 REACTIONS (lb /size) 1= 1005/0 -2 -0, 16= 3041/0 -3 -15 (input: 0 -3 -8), 16= 3041/0 -3 -15 (input: 0 -3 -8), 10= 1152/0 -3 -8 Max Horz 1=- 269(load case 5) Max Upliftl=- 168(load case 7), 16=- 613(load case 6), 10=- 275(load case 8) Max Gravl= 1544(load case 2), 16= 3951(load case 2), 16= 3041(load case 1), 10= 1770(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1 -2= -1459, 2 -3= -886, 3 -4= -626, 4 -5 =754, 5 -6 =754, 6 -7 =754, 7 -8= -634, 8 -9= -893, 9 -10= -1452, 10 -11 =67 BOT CHORD 1 -20 =1084, 19 -20 =1084, 18 -19 =223, 17 -18 =223, 16 -17 =223, 15 -16 =209, 14 -15 =209, 13 -14 =209, 12 -13 =1078, 10 -12 =1078 WEBS 2 -20 =141, 2 -19= -562, 3- 19 = -96, 4 -19 =647, 4- 17 =98, 4 -16= -1530, 7 -16= -1529, 7- 15 =97, 7 -13 =668, 8 -13= -109, 9-13=-544,9-12=125,6-16=-560 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp.; L= 45 -0 -0 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 5) Provide adequate drainage to prevent water ponding. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 7) WARNING: Required bearing size at joint(s) 16, 16 greater than input bearing size. 8) Provide mechanical connection (by others) of truss to bearing plate at joint(s) 1. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 168 lb uplift at joint 1, 613 lb uplift at joint 16 and 275 lb uplift at joint 10. LOAD CASE(S) Standard GRIP 197/144 t� 0 2x4 II 3x8 - 5x5 - 3x8 - 2x4 II 3x8 - 2x4 II 4x6 - J Truss -- Truss T e Qt - N DRIGGS7EFCGCEWOOD78 =201J Type Y Y R(ID)K i Q39441 E4 ROOF TRUSS 1 1 Job Reference (optional) �dersoh Components IF, - Tdaho Falls, OD 3T6t�30 NlTeklndbi tries, Inc. Fri Aug age 7 -0 -15 1 13 -10 -8 19 -3 -2 30 -3 -2 1 35 -10 -8 1 42 -8 -1 1 49 -10 -8 51 -2 -8 7 -0 -15 6 -9 -9 5 -4 -10 11 -0 -0 5 -7 -6 6 -9 -9 7 -2 -7 1 -4 -0 Scale = 1:87.0 5x5 - 5x5 - 3x8 _ 4x6 = 2x4 II 3x8 - 3 A 5 C. 7 A 0 W 0 25 -0 -4 7 -0 -15 13 -10 -8 19 -3 -2 24 -7 -12 30 -3 -2 35 -10 -8 7 -0 -15 6 -9 -9 5 -4 -10 5 -4 -10 0 -4 -8 5 -2 -14 5 -7 -6 Platei0ffsets 11:0-0- 3,0 -D I1 -0 -4], [18 -3_-T ge] - -- - -- LOADING(psf) SPACING 2 -0 -0 CSI DEFL TCLL 35.0 Plates Increase 1.15 TC 0.99 Vert(LL) TCDL 8.0 Lumber Increase 1.15 BC 0.52 Vert(TL) BCLL 0.0 Rep Stress Incr YES WB 0.99 Horz(TL) BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) 1� 0 49 -10 -8 7 -2 -7 PLATES GRIP M1120 1971144 Weight: 260 lb LUMBER BRACING TOP CHORD 2 X 4 SPF No.2 *Except* TOP CHORD Sheathed. T1 2 X 4 SPF 1650F 1.5E BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing, Except: BOT CHORD 2 X 4 DF 240OF 2.0E 6 -0 -0 oc bracing: 15- 16,13 -15. WEBS 2 X 4 SPF Stud /Std *Except* WEBS 1 Row at midpt 2 -19, 3 -19, 8 -13, 9 -13, 6 -16 W6 2 X 4 SPF No.2 2 Rows at 1/3 pts 4-16,7-16 REACTIONS (lb /size) 1= 991/0 -2 -0, 16= 3069/0 -3 -13 (input: 0 -3 -8), 16= 3069/0 -3 -13 (input: 0 -3 -8), 10= 1138/0 -3 -8 Max Horz 1=- 311(load case 5) Max Uplift1=- 172(load case 7), 16=- 523(load case 6), 10=- 284(load case 8) Max Grav1= 1549(load case 2), 16= 3820(load case 3), 16= 3069(load case 1), 10= 1773(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1 -2= -1396, 2 -3= -710, 3 -4= -449, 4 -5 =692, 5 -6 =692, 6 -7 =692, 7 -8= -457, 8 -9= -717, 9 -10= -1394, 10 -11 =67 BOT CHORD 1 -20 =1020, 19 -20 =1020, 18- 19 =51, 17- 18 =51, 16- 17 =51, 15- 16 =37, 14- 15 =37, 13- 14 =37, 12 -13 =1016, 10 -12 =1016 WEBS 2 -20 =169, 2 -19= -696, 3 -19= -215, 4 -19 =803, 4- 17 =78, 4 -16= -1441, 7 -16= -1441, 7- 15 =77, 7 -13 =822, 8 -13= -226, 9- 13 = -681, 9 -12 =156, 6 -16 =487 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow), Exp C, Fully Exp.; L= 45 -0 -0 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 5) Provide adequate drainage to prevent water ponding. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 7) WARNING: Required bearing size at joint(s) 16, 16 greater than input bearing size. 8) Provide mechanical connection (by others) of truss to bearing plate at joint(s) 1. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 172 lb uplift at joint 1, 523 lb uplift at joint 16 and 284 lb uplift at joint 10. 42 -8 -1 6 -9 -9 in (loc) I /deft L/d -0.15 1 -20 >999 240 -0.21 1 -20 >999 180 0.04 10 n/a n/a LOAD CASE(S) Standard 2x4 II 3x8 - 46 - 3x8 - 2x4 II Y 3x8 — 2x4 II 2x4 II 4x6 = JgJi Truss - -- ( Truss Type — 039441 ROOF TRUSS 1F ld�io aFlIS�3�03 Anderson om onents -- - p 1 JEROD 8 -0 -15 1 15 -10 -8 1 20 -3 -2 8 -0 -15 7 -9 -9 4 -4 -10 Qty Ply - DRIGGS7EAGLEWOOD78=207JRIID)K - IJob Reference (optional) 1 5. - T00 s V a 30 - 2003 Mi e n us nes_ ]nc. r�2Z_08.4333 2003 - e T 29 -3 -2 33 -10 -8 41 -8 -1 49 -10 -8 5 9 -0 -0 4 -7 -6 7 -9 -9 8 -2 -7 Scale = 1:87.0 5x5 = 5x5 - 2x4 II 4x5 = 5x5 = 0 �I n 8 -0 -15 8 -0 -15 Plate 0 ifse s , ) [1 'O- LOADING (psf) TCLL 35.0 TCDL 8.0 BCLL 0.0 15 -10 -8 24 -7 -12 7 -9 -9 8 -9 -4 f 3,0- 0 -10 [TO Edge, 0 -0 -4 [1 0- 3- 9,Edge] - SPACING 2 -0 -0 CSI Plates Increase 1.15 TC 0.90 Lumber Increase 1.15 BC 0.56 Rep Stress Incr YES WB 0.94 ?5 33 -10 -8 0 -4 -8 8 -10 -4 41 -8 -1 49 -10 -8 7 -9 -9 8 -2 -7 DEFL in (loc) I /deft L/d Vert(LL) -0.21 1 -18 >999 240 Vert(TL) -0.29 1 -18 >999 180 Horz(TL) 0.04 10 n/a n/a BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) LUMBER TOP CHORD 2 X 4 DF 240OF 2.0E 'Except' T2 2 X 4 SPF 1650F 1.5E, T3 2 X 4 SPF No.2 BOT CHORD 2 X 4 DF 240OF 2.0E WEBS 2 X 4 SPF Stud /Std "Except' W5 2 X 4 SPF No.2, W7 2 X 4 SPF No.2, W8 2 X 4 SPF No.2 BRACING TOP CHORD BOT CHORD WEBS 1� 0 PLATES GRIP M1120 197/144 Weight: 260 lb Sheathed or 4 -1 -0 oc purlins. Rigid ceiling directly applied or 6 -0 -0 oc bracing. 1 Row at mid pt 2 -17, 3 -17, 7 -13, 9 -13, 5 -15 2 Rows at 1/3 pts 4-15,6-15 REACTIONS (lb /size) 1= 1023/0 -2 -0, 15= 300510 -3 -9 (input: 0 -3 -8), 15= 3005/0 -3 -9 (input: 0 -3 -8), 10= 1170/0 -3 -8 Max Horz 1=- 353(load case 5) Max Upliftl =-1 82(load case 7), 15=- 416(load case 6), 10=- 301(load case 8) Max Gravl= 1604(load case 2), 15= 3588(load case 3), 15= 3005(load case 1), 10= 1819(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1-2=-1406,2-3=-620,3-4=-346, 4-5=529,5-6=529, 6-7=-355,7-8=-428,8-9=-631, 9 -10= -1408, 10 -11 =67 BOT CHORD 1 -18 =1016, 17 -18 =1016, 16- 17 = -7, 15- 16 = -7, 14- 15 = -21, 13- 14 = -21, 12 -13 =1017, 10 -12 =1017 WEBS 2 -18 =182, 2 -17= -813, 3 -17= -300, 4 -17 =947, 4 -15= -1317, 6 -15= -1318, 6 -13 =964, 7 -13= -310, 9 -13= -803, 9 -12 =171, 5 -15= -423 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 5) Provide adequate drainage to prevent water ponding. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 7) WARNING: Required bearing size at joint(s) 15, 15 greater than input bearing size. 8) Provide mechanical connection (by others) of truss to bearing plate at joint(s) 1. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 182 lb uplift at joint 1, 416 lb uplift at joint 15 and 301 lb uplift at joint 10. LOAD CASE(S) Standard 2x4 II 5x8 = 4x6 - 3x8 = 4x6 = 4x8 - 2x4 II -- yTruss Truss Type Q39441 I E6 ROOF TRUSS An erson omponen s�>`Iaah_oFalls;lD934U3, JER'OD Qty - Ply — DRIGGS7EAGLEVVOM /8- 2(rljR(1D)Ii -- — 5.j00 sVa 30 -2 Sob Reference (optional) g y i e nT�usfries, - In�ri A u 22M�3:532003 - Pa e 6 -1 -12 12 -0 -2 17 -10 -8 24 -10 -8 31 -10 -8 37 -8 -14 43 -7 -4 6 -1 -12 5 -10 -6 5 -10 -6 7 -0 -0 7 -0 -0 5 -10 -6 5 -10 -6 5x5 - 5x8 - 5x5 — G r 0 2' 0 3x6 - 8x8 - 44 II lo 8x8 - 3x6 - 9 -0 -15 17 -10 -8 24 -7 -12 25 -4 31 -10 -8 40 -8 -1 49 -10 -8 9 -0 -15 8 -9 -9 6 -9 -4 0 -4 -8 6 -10 -4 8 -9 -9 9 -2 -7 Plate O( T� 0- ,�0].fb 0",0- 1- 8TE � 0-4], 8;E] — - LOADING (psf) SPACING 2 -0 -0 CSI DEFL in (loc) I /deft L/d PLATES GRIP TCLL 35.0 Plates Increase 1.15 TC 0.79 Vert(LL) -0.18 1 -17 >999 240 M1120 197/144 TCDL 8.0 Lumber Increase 1.15 BC 0.41 Vert(TL) -0.29 1 -17 >999 180 BCLL 0.0 Rep Stress Incr YES WB 0.99 Horz(TL) 0.04 11 n/a n/a BC DL 8.0 Code IRC2000 /ANSI95 (Matrix) Weight: 258 lb LUMBER BRACING TOP CHORD 2 X 4 SPF No.2 'Except` TOP CHORD Sheathed or 2 -8 -3 oc purlins. T2 2 X 4 SPF 210OF 1.8E BOT CHORD Rigid ceiling directly applied or 6 -0 -0 oc bracing. BOT CHORD 2 X 4 DF 240OF 2.0E WEBS 1 Row at midpt 4 -16, 5 -16, 6 -16, 6 -14, 7 -14, 8 -14 WEBS 2 X 4 SPF Stud /Std 'Except' 2 Rows at 1/3 pts 6 -15 W4 2 X 4 SPF 2100F 1.8E, W6 2 X 4 SPF 2100E 1.8E W8 2 X 4 SPF 2100F 1.8E REACTIONS (lb /size) 1= 1087/0 -2 -0, 15= 2883/0 -3 -8, 15= 2883/0 -3 -8, 11= 1229/0 -3 -8 Max Horz 1=- 395(load case 5) Max Upliftl=- 186(load case 7), 15=-321 (load case 7), 11=- 308(load case 8) Max Grav 1 = 1 706(load case 2), 15= 3215(load case 2), 15= 2883(load case 1), 11= 1924(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1 -2= -1558, 2 -3= -1252, 3 -4= -1104, 4 -5= -477, 5 -6= -286, 6 -7= -296, 7 -8= -485, 8 -9= -1096, 9 -10= -1243, 10- 11= -1551, 11 -12 =67 BOT CHORD 1 -17 =1173, 16 -17 =727, 15- 16 = -327, 14- 15 = -327, 13 -14 =724, 11 -13 =1165 WEBS 2 -17= -433, 4 -17 =566, 4 -16= -743, 5 -16= -354, 6 -16 =1223, 6 -15= -2759, 6 -14 =1226, 7 -14= -349, 8 -14= -737, 8 -13 =555, 10 -13 =-432 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf, Category 11, Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non- concurrent with other live loads. 5) Provide adequate drainage to prevent water ponding. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 7) Provide mechanical connection (by others) of truss to bearing plate at joint(s) 1. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 186 lb uplift at joint 1, 321 lb uplift at joint 15 and 308 lb uplift at joint 11. 49 -10 -8 51 -2 ' 6 -3 -4 1 -4 -0 Scale = 1:86.9 LOAD CASE(S) Standard Truss - - Truss Type - Qty Ply DRIGGS/EAGLEWOOD /8- 20 /JR(ID)K 1 Q39441 1 E7 I ROOF TRUSS 1 Job Reference (optional) Anderso�ponents 1F; Idaho "Falls, 16 S340S,_JEROD 5100 s�CA ay 30 26031UiTek n us nes, Fn Fn Au�2 08:4T.b4 6 -1 -12 12 -0 -2 17 -10 -8 24 -10 -8 31 -10 -8 37 -8 -14 43 -7 -4 49 -10 -8 6 -1 -12 5 -10 -6 5 -10 -6 7 -0 -0 7 -0 -0 5 -10 -6 5 -10 -6 6 -3 -4 5x5 G 4x10 - 5x5 �I 0 9 -0 -15 1 17 -10 -8 24 -7 -12 25 31 -10 -8 9 -0 -15 8 -9 -9 6 -9 -4 0 -4 -8 6 -10 -4 aPl to Off 1 : - -3, -0- 1 0 -0- ge , - - 0-3- - -- - 40 -8 -1 49 -10 -8 8 -9 -9 9 -2 -7 2 0 LOADING (psf) SPACING 2 -0 -0 CSI DEFL in (loc) I /deft L/d PLATES GRIP TCLL 35.0 Plates Increase 1.15 TC 0.84 Vert(LL) -0.19 1 -17 >999 240 M1120 197/144 TCDL 8.0 Lumber Increase 1.15 BC 0.43 Vert(TL) -0.30 1 -17 >999 180 BCLL 0.0 Rep Stress Incr YES WB 0.98 Horz(TL) 0.04 11 n/a n/a BCDL 8.0 Code IRC2000 /ANS195 (Matrix) Weight:259lb LUMBER BRACING TOP CHORD 2 X 4 SPF No.2 'Except' TOP CHORD Sheathed or 2 -6 -5 oc purlins. T2 2 X 4 SPF 210OF 1.8E BOT CHORD Rigid ceiling directly applied or 6 -0 -0 oc bracing. BOT CHORD 2 X 4 DF 240OF 2.0E WEBS 1 Row at midpt 4 -16, 5 -16, 6 -16, 6 -14, 7 -14, 8 -14 WEBS 2 X 4 SPF Stud /Std `Except' 2 Rows at 1/3 pts 6 -15 W4 2 X 4 SPF 165OF 1.5E, W5 2 X 4 SPF No.2 W6 2 X 4 SPF 165OF 1.5E, W7 2 X 4 SPF No.2 W8 2 X 4 SPF 165OF 1.5E REACTIONS (lb /size) 1= 1100/0 -2 -0, 15= 2855/0 -3 -8, 15= 2855/0 -3 -8, 11= 1242/0 -3 -8 Max Horz 1=- 397(load case 5) Max Upliftl =-21 0(load case 7), 15=- 417(load case 7), 11=- 331(load case 8) Max Grav 1 = 1 762(load case 2), 15= 2902(load case 2), 15= 2855(load case 1), 11= 1978(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1 -2= -1582, 2 -3= -1276, 3 -4= -1129, 4 -5= -503, 5 -6= -302, 6 -7= -312, 7 -8= -511, 8 -9= -1121, 9 -10= -1267, 10- 11= -1575, 11 -12 =67 BOTCHORD 1 -17 =1193, 16 -17 =747, 15- 16 = -295, 14- 15 = -295, 13 -14 =744, 11 -13 =1186 WEBS 2 -17= -432, 4 -17 =566, 4 -16= -745, 5 -16= -341, 6 -16 =1207, 6 -15= -2731, 6-14=1210,7-14=-336,8-14=-740,8-13=555, 10 -13= -432 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf, Category II; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 5) Provide adequate drainage to prevent water ponding. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 7) Provide mechanical connection (by others) of truss to bearing plate at joint(s) 1. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 210 lb uplift at joint 1, 417 lb uplift at joint 15 and 331 lb uplift at joint 11. Scale = 1:85.6 LOAD CASE(S) Standard 3x6 - 6x8 - 44 II 5x8 3x6 - Job , -- -- - _I Truss Truss Type __— Q39441 E7-CAP HIP PIGGYBACK Anderso�ents - IF, WK._ all., ID 83403_,�EKOLf -- Q ply � —. jDRIGGSIEA�CEw00678�07JR ID K 1 1 - - - ST00 s May 30 003b Reference (optional) s c. rl F i Aug 2�08_2V3 -54 2063 Pages 2 -0 -0 7 -0 -0 12 -0 -0 14 -0 -0 2 -0 -0 5 -0 -0 5 -0 -0 2 -0 -0 Scale = 1:23.1 45 II 8.00 (fT L 2 -1 -12 2 -1 -12 LOADING (psf) i SPACING 2 -0 -0 TCLL 35.0 i Plates Increase 1.15 TCDL 8.0 Lumber Increase 1.15 BCLL 0.0 Rep Stress Incr YES BCDL 8.0 Code IRC2000 /ANSI95 LUMBER TOP CHORD 2 X 4 SPF 2100F 1.8E 'Except' T4 2 X 4 SPF No.2 BOT CHORD 2 X 4 SPF No.2 WEBS 2 X 4 SPF Stud /Std 11 -10 -4 9 -8 -8 CSI DEFL TC 0.48 Vert(LL) BC 0.99 Vert(TL) WB 0.68 Horz(TL) (Matrix) in (loc) I /defl L/d PLATES -0.24 9 >680 240 M1120 -0.35 9 >467 180 0.10 7 n/a n/a BRACING TOP CHORD BOT CHORD Weight: 43 lb co 0 14 -0 -0 2 -1 -12 GRIP 197/144 Sheathed or 4 -2 -11 oc purlins. Rigid ceiling directly applied or 6 -5 -6 oc bracing. REACTIONS (lb /size) 1=691/0-5-8,7=691/0-5-8 Max Horz 1= 35(load case 4) Max Upliftl =-1 59(load case 4), 7=- 159(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1-2=-339,2-3=-1759,5-6=-1759,6-7=-339,3-4=-1676,4-5=-1676 BOT CHORD 2-10=1597,9-10=2960,8-9=2960,6-8=1597 WEBS 3-10=446,5-8=446,4-9=-1,4-10=-1302,4-8=-1302 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf, BCDL= 4.8psf; Category II; Exp C; enclosed,MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 5) Bearing at joint(s) 1, 7 considers parallel to grain value using ANSI /TPI 1 -1995 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 159 lb uplift at joint 1 and 159 lb uplift at joint 7. 7) SEE MiTek STANDARD PIGGYBACK TRUSS CONNECTION DETAIL FOR CONNECTION TO BASE TRUSS LOAD CASE(S) Standard 4x5 11 48 _ 5 3 n FTruss - 6-9-4 048 6-10-4 -- YP : ROOF Qt Y � PI � DR1GG8/EAGCEW00678 2t5T D i Y � Vert(LL) -0.19 Q39441 E8 BC 0.43 TRUSS 1 1 Horz(TL) 0.04 - 834 3, JERO _ -- - 5_ 10D s M Job Reference (optional) a�0�0D3 - Mi a nT dusfries, I . Fri - uA&._54 2008 - - -- A nderson tom onen s - 1FTdaFo Falls, ID P 6-1-12 12 -0 -2 1 17 -10 -8 24 -10 -8 31 -10 -8 37 -8 -14 43 -7 -4 49 -10 -8 51 -2 -8 6 -1 -12 5 -10 -6 5 -10 -6 7 -0 -0 7 -0 -0 5 -10 -6 5 -10 -6 6 -3 -4 1 -4 -0 BOT CHORD 2 X 4 DF 240OF 2.0E WEBS Scale = 1:85.6 5x5 ii r 0 9015 8-9-9 P late O se s [1 :0 -G- 3,�� M 2], [1 t, [14: 6-9-4 048 6-10-4 LOADING (psf) SPACING 2 -0 -0 CSI I DEFL in TCLL 35.0 Plates Increase 1.15 TC 0.84 Vert(LL) -0.19 TCDL 8.0 Lumber Increase 1.15 BC 0.43 Vert(TL) -0.30 BCLL 0.0 Rep Stress Incr YES W13 0.98 Horz(TL) 0.04 BCDL 8.0 Code IRC2000 /ANS195 (Matrix) LUMBER BRACING TOP CHORD 2 X 4 SPF No.2 `Except' TOP CHORD T2 2 X 4 SPF 2100F 1.8E BOT CHORD BOT CHORD 2 X 4 DF 240OF 2.0E WEBS WEBS 2 X 4 SPF Stud /Std 'Except` W4 2 X 4 SPF 1650F 1.5E, W5 2 X 4 SPF No.2 W6 2 X 4 SPF 1650F 1.5E, W7 2 X 4 SPF No.2 W8 2 X 4 SPF 1650F 1.5E (loc) I /deft L/d 1 -17 >999 240 1 -17 >999 180 11 n/a n/a 9 -0 -15 17 -10 -8 24 -7 -12 25 -4 31 -10 -8 40 -8 -1 49 -10 -8 - - 8 -9 -9 9 -2 -7 PLATES GRIP M1120 197/144 Weight: 259 lb Sheathed or 2 -6 -5 oc purlins. Rigid ceiling directly applied or 6 -0 -0 oc bracing. 1 Row at midpt 4 -16, 5 -16, 6 -16, 6 -14, 7 -14, 8 -14 2 Rows at 1/3 pts 6 -15 REACTIONS (lb /size) 1= 1100/0 -2 -0, 15= 2855/0 -3 -8, 15= 2855/0 -3 -8, 11= 1242/0 -3 -8 Max Horz 1=- 397(load case 5) Max U plift 1 =-21 0(load case 7), 15=- 417(load case 7), 11=- 331(load case 8) Max G rav 1 = 1 762(load case 2), 15= 2902(load case 2), 15= 2855(load case 1), 11= 1978(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1 -2= -1582, 2 -3= -1276, 3 -4= -1129, 4 -5= -503, 5 -6= -302, 6 -7= -312, 7 -8= -511, 8 -9= -1121, 9 -10= -1267, 10- 11= -1575, 11 -12 =67 BOT CHORD 1 -17 =1193, 16 -17 =747, 15- 16 = -295, 14- 15 = -295, 13-14=744,11-13=1186 WEBS 2-17=-432,4-17=566,4-16=-745,5-16=-341,6-16=1207,6-15=-2731, 6-14=1210,7-14=-336,8-14=-740,8-13=555, 10 -13= -432 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 5) Provide adequate drainage to prevent water ponding. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 7) Provide mechanical connection (by others) of truss to bearing plate at joint(s) 1. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 210 lb uplift at joint 1, 417 lb uplift at joint 15 and 331 lb uplift at joint 11. 4x10 - 5x5 2)v 0 LOAD CASE(S) Standard 3x6 = 6x8 - 4x4 II 5x8 3x6 - i - Truss - - Truss Type - - -, Qty Pfy -- DRTGGS7EAGLEWOOD78- 20 /JRUDK HIP O n4erson ompone -I E8 C a p o a s, 403, I JER6IS GYBACK X00 s I May 3�2002WiTe ua nes, n ug 22 3:55 2003 Page f Job 4 -0 -0 10 -0 -0 14 -0 -0 4 -0 -0 6 -0 -0 4 -0 -0 Scale = 1:23.1 4x5 II 4 3 5x8 = co )r 0 4 -1 -12 9 -10 -4 4 -1 -12 5 -8 -8 - Plafeoffsets (XX j3 - 0-- �63-OT -- I /defl Ud PLATES GRIP LOADING (psf) SPACING 2 -0 -0 CSI DEFL TCLL 35.0 Plates Increase 1.15 TC 0.60 Vert(LL) TCDL 8.0 Lumber Increase 1.15 BC 0.57 Vert(TL) BCLL 0.0 Rep Stress Incr YES WB 0.57 Horz(TL) BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) co )r 0 LUMBER BRACING TOP CHORD 2 X 4 SPF 210OF 1.8E *Except* TOP CHORD Sheathed or 5 -4 -3 oc purlins. T4 2 X 4 SPF No.2 BOT CHORD Rigid ceiling directly applied or 6 -0 -0 oc bracing. BOT CHORD 2 X 4 SPF No.2 WEBS 2 X 4 SPF Stud /Std REACTIONS (lb /size) 1=85/0-5-8,6=444/0-5-8,8=852/0-5-8 Max Horz 8=- 77(load case 5) Max Upliftl=- 21 (load case 6), 6=- 89(load case 5), 8=- 111(load case 6) Max Gravl= 179(load case 2), 6= 694(load case 3), 8= 1078(load case 2) FORCES (lb) - First Load Case Only TOP CHORD 1-2=-39,2-3=192,4-5=-672,5-6=-217,3-4=-548 BOT CHORD 2-8=-61,7-8=-112,5-7=557 WEBS 3- 8 = -759, 4- 7 = -133, 3 -7 =704 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf, BCDL= 4.8psf; Category II; Exp C, enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) Unbalanced snow loads have been considered for this design. 4) Provide adequate drainage to prevent water ponding. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 6) Bearing at joint(s) 1, 6 considers parallel to grain value using ANSI /TPI 1 -1995 angle to grain formula. Building designer should verify capacity of bearing surface. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 21 lb uplift at joint 1, 89 lb uplift at joint 6 and 111 lb uplift at joint 8. 8) SEE MiTek STANDARD PIGGYBACK TRUSS CONNECTION DETAIL FOR CONNECTION TO BASE TRUSS LOAD CASE(S) Standard 14 -0 -0 4 -1 -12 in (loc) I /defl Ud PLATES GRIP -0.05 5 -7 >999 240 M1120 1971144 -0.07 5 -7 >999 180 0.02 6 n/a n/a Weight: 43 lb LUMBER BRACING TOP CHORD 2 X 4 SPF 210OF 1.8E *Except* TOP CHORD Sheathed or 5 -4 -3 oc purlins. T4 2 X 4 SPF No.2 BOT CHORD Rigid ceiling directly applied or 6 -0 -0 oc bracing. BOT CHORD 2 X 4 SPF No.2 WEBS 2 X 4 SPF Stud /Std REACTIONS (lb /size) 1=85/0-5-8,6=444/0-5-8,8=852/0-5-8 Max Horz 8=- 77(load case 5) Max Upliftl=- 21 (load case 6), 6=- 89(load case 5), 8=- 111(load case 6) Max Gravl= 179(load case 2), 6= 694(load case 3), 8= 1078(load case 2) FORCES (lb) - First Load Case Only TOP CHORD 1-2=-39,2-3=192,4-5=-672,5-6=-217,3-4=-548 BOT CHORD 2-8=-61,7-8=-112,5-7=557 WEBS 3- 8 = -759, 4- 7 = -133, 3 -7 =704 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf, BCDL= 4.8psf; Category II; Exp C, enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) Unbalanced snow loads have been considered for this design. 4) Provide adequate drainage to prevent water ponding. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 6) Bearing at joint(s) 1, 6 considers parallel to grain value using ANSI /TPI 1 -1995 angle to grain formula. Building designer should verify capacity of bearing surface. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 21 lb uplift at joint 1, 89 lb uplift at joint 6 and 111 lb uplift at joint 8. 8) SEE MiTek STANDARD PIGGYBACK TRUSS CONNECTION DETAIL FOR CONNECTION TO BASE TRUSS LOAD CASE(S) Standard -- yp - - — y Ply - DRIGGS/EAGLEWOO6/83DIJR(ID)l- - hi� ,Truss I Truss Type Qt I Q39441 E9 ROOF TRUSS 1 1 Job Reference (o ptional) Anderson Components = IF, Idaho Falls, ID 83403 JER06 5166s May 30 003 IDITk industries, Inc. 22 - 0$: age 3 -9 -12 51 -4 -0 - � -4 ; 0 8 -7 -15 13 -6 -2 18 -0 -0 32 -0 -0 , 36 -6 -14 41 -4 -9 46 -2 -4 50 -0 -0 dale 1:88.7 1- 4- 03 -9 -12 4 -10 -3 4 -10 -3 4 -5 -14 14 -0 -0 4 -6 -14 4 -9 -11 4 -9 -11 3 -9- 121 -4 -0 6x6 5x8 - 2x4 11 _ o YI 0 3 -9 -12 11 -1 -1 1 18 -0 -0 1 24 -9 -4 25 -1 12 32 -0 -0 38 -11 -12 3 -9 -12 7 -3 -5 6 -10 -15 6 -9 -4 0 -4 -8 6 -10 -4 6 -11 -12 Plafe 6ffseefs ()(lY 1 2.0-0 _-0, 0_-_9-A ' [7'0 2- 8,0 -1 -12] [9.0_-6-8_,0-27- -0 -0, 0-0 - [1 8: 2- 8,0 -3 -01, (20:0-2-8,13 _ LOADING (psf) SPACING 2 -0 -0 CSI DEFL in (loc) I /deft L/d TCLL 35.0 Plates Increase 1.15 TC 0.84 Vert(LL) -0.06 17 -18 >999 240 TCDL 8.0 Lumber Increase 1.15 BC 0.28 Vert(TL) -0.10 17 -18 >999 180 BCLL 0.0 Rep Stress Incr YES WB 0.98 Horz(TL) 0.02 16 n/a n/a BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) 51+ 0 46 -2 -4 50 -0 -0 7 -2 -8 3 -9 -12 PLATES GRIP M1120 197/144 Weight: 279 lb LUMBER BRACING TOP CHORD 2 X 4 SPF No.2 *Except* TOP CHORD Sheathed or 5 -8 -15 oc purlins. T6 2 X 4 SPF 210OF 1.8E BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing, Except: BOT CHORD 2 X 4 SPF No.2 *Except* 6 -0 -0 oc bracing: 2- 22,14 -16. B3 2 X 4 DF 240OF 2.0E WEBS 1 Row at midpt 5 -22, 6 -20, 10 -18, 11 -16 WEBS 2 X 4 SPF Stud /Std *Except* 2 Rows at 1/3 pts 7 -19, 9 -19, 8 -19 W7 2 X 4 SPF No.2, W11 2 X 4 SPF No.2 REACTIONS (lb /size) 22= 1415/0 -3 -8, 19= 2509/0 -3 -8, 19= 2509/0 -3 -8, 16= 1420/0 -3 -8 Max Horz 22=- 383(load case 5) Max Uplift22=- 313(load case 7), 19=- 363(load case 6), 16=- 367(load case 8) Max Grav22= 2187(load case 2), 19=2951 (load case 2), 19= 2509(load case 1), 16= 2194(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1 -2 =65, 2 -3 =596, 3 -4 =490, 4 -5 =607, 5 -6= -533, 6 -7= -244, 9 -10= -254, 10- 11 = -538, 11 -12 =607, 12 -13 =491, 13 -14 =597, 14- 15 =65, 7 -8 =372, 8 -9 =372 BOT CHORD 2- 22 = -407, 21 -22 =350, 20 -21 =307, 19 -20 =130, 18 -19 =137, 17 -18 =315, 16 -17 =353, 14 -16 =408 WEBS 3-22=-395,5-22=-1184,5-21=-20,6-21=138,6-20=-401, 7-20=463,7-19=-1003,9-19=-1008,9-18=458, 10- 18 = -395, 10 -17 =129, 11- 17 = -11, 11- 16= -1192, 13-16=-394,8-19=-652 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf, BCDL= 4.8psf, Category II; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 5) Provide adequate drainage to prevent water ponding. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 313 lb uplift at joint 22, 363 lb uplift at joint 19 and 367 lb uplift at joint 16. LOAD CASE(S) Standard 22 21 20 19 18 17 16 3x6 — 3x6 - 56 - 3x8 - 5x5 = 3x6 - 3x6 - iJAb ► 'Truss - Truss Type Q39441 1 1 E9 -CAP I HIP PIGGYBACK Anddrson - Falls, 1D 83403, JEROD MH .E Qty -TPly TDRIGGS1EAGLEWOOD /8= 207JRPD) - 5.100 s May 2 Job Reference ek 1 s nes, rf Aug22 - W41 :5fi 200TPage� 8 -0 -0 14 -0 -0 2 -0 -0 6 -0 -0 4x5 II 4 3 5x8 = Scale = 1:23.1 m 1; 0 6 -1 -12 1 7 -10 -4 1 14 -0 -0 6 -1 -12 1 -8 -8 6 -1 -12 - Pla - Fe - OffseUs — (XY )' - j3:0 -3 - 3 Ol - - LOADING (psf) SPACING 2 -0 -0 CSI DEFL in (loc) I /deft L/d PLATES GRIP TCLL 35.0 Plates Increase 1.15 TC 0.78 Vert(LL) -0.11 5 -7 >831 240 M1120 197/144 TCDL 8.0 Lumber Increase 1.15 BC 0.57 Vert(TL) -0.15 5 -7 >630 180 BCLL 0.0 Rep Stress Incr YES WB 0.57 Horz(TL) 0.03 6 n/a n/a BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) Weight: 44 lb LUMBER BRACING TOP CHORD 2 X 4 SPF No.2 TOP CHORD Sheathed or 6 -0 -0 oc purlins. BOT CHORD 2 X 4 SPF No.2 BOT CHORD Rigid ceiling directly applied or 6 -0 -0 oc bracing. WEBS 2 X 4 SPF Stud /Std REACTIONS (lb /size) 1=-26/0-5-8,6=135/0-5-8,8=1273/0-5-8 Max Horz 1= 119(load case 6) Max Upliftl=- 167(load case 3), 6=- 94(load case 2), 8=- 226(load case 7) Max Gravl= 128(load case 2), 6= 364(foad case 3), 8= 1306(load case 2) FORCES (lb) - First Load Case Only TOP CHORD 1-2=39,2-3=676,4-5=369,5-6=-64,3-4=213 BOT CHORD 2-8=-454,7-8=-502,5-7=-194 WEBS 3 -8= -1169, 4- 7 = -462, 3 -7 =616 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category 11, Exp C; enclosed,MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TOLL: ASCE 7 -98; Pf =35.0 psf (roof snow), Exp C; Fully Exp. 3) Unbalanced snow loads have been considered for this design. 4) Provide adequate drainage to prevent water ponding. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 6) Bearing at joint(s) 1, 6 considers parallel to grain value using ANSI /TPI 1 -1995 angle to grain formula. Building designer should verify capacity of bearing surface. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 167 lb uplift at joint 1, 94 lb uplift at joint 6 and 226 lb uplift at joint 8. 8) SEE MiTek STANDARD PIGGYBACK TRUSS CONNECTION DETAIL FOR CONNECTION TO BASE TRUSS LOAD CASE(S) Standard - - - jpbo Truss Truss Type Q39441 FIG ROOF TRUSS An erson ompon»�- I >� Falrs. 83403, J1=R0D 11 -5 -0 11 -5 -0 v O O Qfy Ply _ DRTG Z JR(1D)K Job Reference (optional) - --- ST60 s May 200TMiTe n�T�stnes, F�=8�43:56 - 2003 - Page F 22 -10 -0 11 -5 -0 44 = 1.5x4 II oatea1; 22 -10 -0 Scale = 1:41.8 v O O PlO ffsets ()(, [7 V- 1 -II ], - [8 0= 3,0 =1 [9: 3= 30 ,1 0T, - [1 0:0 -3-3- 0 LOADING (psf) SPACING 2 -0 -0 CSI DEFL in (loc) I /defl Ud PLATES GRIP TCLL 35.0 Plates Increase 1.15 TC 0.23 Vert(LL) n/a n/a 999 M1120 197/144 TCDL 8.0 Lumber Increase 1.15 BC 0.15 Vert(TL) n/a n/a 999 BCLL 0.0 Rep Stress Incr NO WB 0.21 Horz(TL) 0.00 11 n/a n/a BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) Weight: 98 lb LUMBER BRACING TOP CHORD 2 X 4 SPF No.2 TOP CHORD Sheathed or 6 -0 -0 oc purlins. BOT CHORD 2 X 4 SPF No.2 BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing. OTHERS 2 X 4 SPF Stud /Std REACTIONS (lb /size) 1= 145/22 -10 -0, 11= 145/22 -10 -0, 17= 165/22 -10 -0, 18= 200/22 -10 -0, 19= 214/22 -10 -0, 20= 166/22 -10 -0, 21= 311/22 -10 -0, 16= 196/22 -10 -0, 14= 212/22 -10 -0, 13= 167/22 -10 -0, 12= 311/22 -10 -0 Max Horz 1= 191(load case 7) Max Upliftl=- 27(load case 5), 11=- 6(load case 6), 18=- 75(load case 7), 19=- 88(load case 7), 20=- 66(load case 7), 21=- 125(load case 7), 16=- 78(load case 8), 14=-91 (load case 8), 13=- 66(load case 8), 12=- 125(load case 8) Max Grav 1 = 1 99(load case 2), 11= 199(load case 3), 17= 165(load case 1), 18= 305(load case 2), 19= 310(load case 2), 20= 243(load case 2), 21= 454(load case 2), 16=301 (load case 3), 14= 308(load case 3), 13= 243(load case 3), 12= 454(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1 -2= -105, 2- 3 = -97, 3- 4 = -84, 4- 5 = -87, 5- 6 = -86, 6- 7 = -86, 7- 8 = -87, 8- 9 = -84, 9- 10 = -97, 10 -11= -105 BOT CHORD 1 -21 =0, 20 -21 =0, 19 -20 =0, 18 -19 =0, 17 -18 =0, 16 -17 =0, 15- 16 = -0, 14- 15 =32, 13- 14 =32, 12- 13 =32, 11 -12 =32 WEBS 6-17=-132,5-18=-169,4-19=-178,3-20=-149, 2 -21= -241, 7 -16= -169, 8 -14= -178, 9 -13= -149, 10- 12 = -241 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see MiTek "Standard Gable End Detail' 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 4) Gable requires continuous bottom chord bearing. 5) Gable studs spaced at 2 -0 -0 oc. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 27 lb uplift at joint 1, 6 lb uplift at joint 11 75 lb uplift at joint 18, 88 lb uplift at joint 19, 66 lb uplift at joint 20, 125 lb uplift at joint 21, 78 lb uplift at joint 16, 91 lb uplift at joint 1 66 lb uplift at joint 13 and 125 lb uplift at joint 12. LOAD CASE(S) Standard 1.5x4 II 1.5x4 II 1.5x4 II 1.5x4 II 1.5x4 II 3x4 = 1.5x4 II 1.5x4 11 1.5x4 11 -- J Truss Truss Type Qty ply DRf JEAGL EW60D78= 207JR(!D)R Q39441 Gt F TRUSS -_ - 2 y 2 I (optional) _ g g Job model stint hehts - `o Fal>s ID 83 OD -1�� s May 30 2003 M Tek n us nes; In�i Aug 2 08 4 58 2a6 a e i IF, IdaK 2 -7 -7 4 -2 -9 7 -3 -0 2 -7 -7 1 -7 -2 3 -0 -7 10 -3 -7 11 -10 -9 14 -6 -0 3 -0 -7 1 -7 -2 2 -7 -7 Scale: 112 " =1' 2 -7 -7 4 -2 -9 7 -3 -0 10 -3 -7 11 -10 -9 14 -6 -0 2 -7 -7 1 -7 -2 3 -0 -7 3 -0 -7 1 -7 -2 2 -7 -7 Pra Off (Xl') F1 0-4- 13 - , [30��0 =3 =4]; [5:0- 4 -0;0�] j7 64 -T 3; Edge], [8 [ 9 -- 0-2-4,0-5 -01, J1 -4 - LOADING (psf) SPACING 1 -0 -0 CSI DEFL in (loc) I /deft Ud PLATES GRIP TCLL 35.0 Plates Increase 1.15 TC 0.97 Vert(LL) -0.26 10 >636 240 M1120 197/144 TCDL 8.0 Lumber Increase 1.15 BC 0.90 Vert(TQ -0.34 10 >493 180 M1120H 148/108 BCLL 0.0 Rep Stress Incr NO WB 0.65 Horz(TL) 0.08 7 n/a n/a BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) Weight: 149 lb LUMBER BRACING TOP CHORD 2 X 6 SPF No.2 'Except` TOP CHORD Sheathed or 1 -6 -15 oc purlins. T4 2 X 4 SPF 2100F 1.8E, T5 2 X 4 SPF 2100F 1.8E BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing. BOT CHORD 2 X 6 OF 2400F 2.0E WEBS 2 X 4 SPF Stud /Std `Except' W3 2 X 4 SPF No.2, W5 2 X 4 SPF No.2, W7 2 X 4 SPF No.2 WEDGE Left: 2 X 6 SPF No.2, Right: 2 X 6 SPF No.2 REACTIONS (lb /size) 1=8783/0-6-4,7=8380/0-6-4 Max Horz 1=- 14(load case 8) Max Upliftl=- 1446(load case 7), 7=- 1385(load case 8) Max Grav 1= 8844(load case 2), 7= 8442(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1 -2 =- 16984, 2 -3 =- 16826, 3 -4 =- 16327, 4 -5 =- 15979, 5 -6 =- 16466, 6 -7= -16378 BOT CHORD 1 -12= 15599, 11 -12= 15498, 11 -13= 18358, 10-13=18358,9-10=18358,8-9=14972,7-8=15040 WEBS 2 -12 =732, 2 -11 =415, 3 -11 =5298, 4 -11= -2325, 4 -10 =2994, 4 -9= -2723, 5 -9 =5167, 6 -9 =642, 6 -8 =497 NOTES 1) 2 -ply truss to be connected together with 0.131 "x3" Nails as follows: Top chords connected as follows: 2 X 4 - 1 row at 0 -9 -0 oc, 2 X 6 - 2 rows at 0 -9 -0 oc. Bottom chords connected as follows: 2 X 6 - 3 rows at 0 -5 -0 oc. Webs connected as follows: 2 X 4 - 1 row at 0 -9 -0 oc. 2) Wind: ASCE 7 -98; 90mph, h =25ft; TCDL= 4.8psf, BCDL= 4.8psf; Category II; Exp C; enclosed;MWFRS gable end zone,Lumber DOL =1.33 plate grip DOL =1.33. 3) TCLL: ASCE 7 -98, Pf =35.0 psf (roof snow); Exp C; Fully Exp. 4) Provide adequate drainage to prevent water ponding. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 6) All plates are M1120 plates unless otherwise indicated. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 1446 lb uplift at joint 1 and 1385 lb uplift at joint 7. 8) Girder carries tie -in span(s): 33 -9 -0 from 0 -0 -0 to 5 -0 -0; 30 -3 -8 from 5 -0 -0 to 14 -6 -0 9) Girder carries hip end with 4 -2 -9 end setback 10) Special hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 248.1 lb down and 99.61b up at 10 -3 -7, and 248.1lb down and 99.61b up at 4 -2 -9 on bottom chord. The design /selection of such special connection device(s) is the responsibility of others. LOAD CASE(S) Standard 1) Snow: Lumber Increase =1.15, Plate Increase =1.15 Uniform Loads (plf) Vert: 1 -3= -43.0, 3 -5= -21.5, 5 -7= -43.0, 1 -11 =- 1205.8, 11 -13 =- 1297.6, 9 -13 =- 1169.1, 7 -9 =- 1077.3 Concentrated Loads (lb) Vert: 11= -248.1 9= -248.1 4.87 rTT 6x6 II 3x8 - 6x6 II 8x12 M1120Ho 3 4 5 av» M1190H 7qb - -' Truss - Truss Type DRTGGSIEAGLEWi70678- 207JR�ID)F� -- — 43 30 de—r p IF,ldaho�alls, ID 83403, - JERO� -5 T00 s May 1 Iek J ob �003 - Mi ln us n� Fri'7�ug 22 08��58 200 Page 1 An erso�oriehts ! 1 3 -11 -12 7 -11 -8 3 -11 -12 3 -11 -12 44 - �o 0 7 -11 -8 Iaii�] v 0 0 Scale = 1:25.2 - Plate -- LOADING (psf) SPACING 2 -0 -0 CSI DEFL in (loc) I /deft L/d PLATES GRIP TCLL 35.0 Plates Increase 1.15 TC 0.12 Vert(LL) n/a n/a 999 M1120 197/144 TCDL 8.0 Lumber Increase 1.15 BC 0.03 Vert(TL) n/a n/a 999 BCLL 0.0 Rep Stress Incr YES WB 0.11 Horz(TL) 0.00 5 n/a n/a BCDL 8.0 Code IRC2000 /ANS195 (Matrix) Weight: 31 lb LUMBER BRACING TOP CHORD 2 X 4 SPF No.2 TOP CHORD Sheathed or 6 -0 -0 oc purlins. BOT CHORD 2 X 4 SPF No.2 BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing. OTHERS 2 X 4 SPF Stud /Std REACTIONS (lb /size) 1= 92/7 -11 -8, 5= 92/7 -11 -8, 7= 106/7 -11 -8, 8= 231/7 -11 -8, 6= 231/7 -11 -8 Max Horz 1=- 146(load case 5) Max Uplift1=- 45(load case 5), 5=- 25(load case 6), 8=- 190(load case 7), 6=- 190(load case 8) Max Grav1= 116(load case 2), 5= 116(load case 3), 7= 106(load case 1), 8= 338(load case 2), 6= 338(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1-2=32,2-3=-120,3-4=-120,4-5=-69 BOT CHORD 1-8=26,7-8=26,6-7=26,5-6=26 WEBS 3-7=-74,2-8=-198,4-6=-198 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C; enclosed,MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see MiTek "Standard Gable End Detail' 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 4) Gable requires continuous bottom chord bearing. 5) Gable studs spaced at 2 -0 -0 oc. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 45 lb uplift at joint 1, 25 lb uplift at joint 5 , 190 lb uplift at joint 8 and 190 lb uplift at joint 6. LOAD CASE(S) Standard - - - �DR1i;GS7EAGLEWDOD78 207JR(IDN 1 Jq�>r • Truss Truss Type Qty PIy Q39441 HF -E1 MOD. QUEEN 1 1 Job Reference (optional) An erson Components - IF, Idaho Falls, 83403, JEROD $.100 sTTay 30 2003 M I ek indi striesTnc. r� i Aug 22 43 :599 2003 P�ag 10 -11 -8 16 -11 -8 22 -11 -8 33 -11 -0 10 -11 -8 6 -0 -0 6 -0 -0 10 -11 -8 5x5 // v v 0 33 -11 -0 33 -11 -0 5x5 14 21 a a Scale = 1:69.0 Fal to OffseFs (X,Y): [9�= 2- 0�0:j =0]; [1 -1 -0], [14 :0 -2 -5, Edge] [15:0- 4- 2,0= 1= 0], 4=2,61- 0]; 118:0- 4- 2,0- 1- 01,T1J 0 -0]; [20:0-4-2,00 - [ 21:0 - 3- 7,0 -0- 4],[22.0 2- 0,0 -1- 0],(23:0- 2- 0,0 -1- 0 ],[24:0-2-0 , 0-1-0], [25 0- 2- 0,0 -1- 0], [26:0-2-0,0-1-0], [32:0-2- 0,0-1-0], [33 [34 0 -2 -0,0 1 -0] LOADING (psf) SPACING 2 -0 -0 CSI DEFL in (loc) I /deft Ud PLATES GRIP TCLL 35.0 Plates Increase 1.15 TC 0.11 Vert(LL) n/a n/a 999 M1120 197/144 TCDL 8.0 Lumber Increase 1.15 BC 0.09 Vert(TL) n/a n/a 999 BCLL 0.0 Rep Stress Incr YES WB 0.35 Horz(TL) 0.01 21 n/a n/a BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) Weight: 2531b LUMBER BRACING TOP CHORD 2 X 4 SPF No.2 TOP CHORD Sheathed or 6 -0 -0 oc purlins. BOT CHORD 2 X 4 SPF No.2 BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing. OTHERS 2 X 4 SPF Stud /Std WEBS 1 Row at midpt 14 -27, 8 -34, 7 -35, 15 -26 2 Rows at 113 pts 13 -28, 12 -29, 11 -31, 10 -32, 9 -33 REACTIONS (lb /size) 1= 46/33 -11 -0, 21= 46/33 -11 -0, 27= 157/33 -11 -0, 28= 200/33 -11 -0, 29= 201/33 -11 -0, 31= 199/33 -11 -0, 32= 206/33 -11 -0, 33= 199/33 -11 -0, 34= 158/33 -11 -0, 35= 201/33 -11 -0, 36= 206/33 -11 -0, 37= 202/33 -11 -0, 38= 210/33 -11 -0, 39= 171/33 -11 -0, 26= 201/33 -11 -0, 25= 206/33 -11 -0, 24= 202/33 -11 -0, 23= 210/33 -11 -0, 22= 171/33 -11 -0 Max Horz 1= 366(load case 7) Max Uplift1=- 196(load case 5), 21=- 142(load case 6), 28=- 59(load case 6), 29=- 65(load case 5), 31=- 62(load case 6), 32=- 62(load case 5), 33=- 54(load case 5), 34=- 30(load case 6), 35=- 158(load case 7), 36=- 171(load case 7), 37=- 163(load case 7), 38=- 170(load case 7), 39=- 138(load case 7), 26=- 156(load case 8), 25=- 171(load case 8), 24=- 163(load case 8), 23=- 170(load case 8), 22=- 138(load case 8) Max Grav 1 =444(load case 7), 21= 415(load case 8), 27=241 (load case 3), 28= 303(load case 2), 29= 295(load case 2), 31= 292(load case 3), 32= 300(load case 3), 33= 302(load case 3), 34=241 (load case 2), 35= 294(load case 2), 36= 299(load case 2), 37= 295(load case 2), 38= 306(load case 2), 39= 249(load case 2), 26= 294(load case 3), 25= 299(load case 3), 24= 295(load case 3), 23= 306(load case 3), 22= 249(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1- 2 = -61, 2 -3= -130, 3 -4= -134, 4 -5= -133, 5- 6 = -14, 6 -7= -134, 7 -8= -132, 14 -15= -132, 15 -16= -134, 16- 17 = -14, 17- 18 = -133, 18- 19 = -134, 19- 20 = -130, 20- 21 = -61, 8- 9 = -45, 9- 10 = -43, 10- 11 = -43, 11- 12 = -43, 12- 13 = -43, 13- 14 = -45 BOT CHORD 1- 39 = -0, 38- 39 = -0, 37- 38 = -0, 36- 37 = -0, 35- 36 = -0, 34- 35 = -0, 33 -34 =0, 32 -33 =0, 31 -32 =0, 30 -31 =0, 29- 30 =43, 28- 29 =43, 27- 28 =43, 26- 27 =43, 25- 26 =43, 24- 25 =43, 23- 24 =43, 22- 23 =43, 21 -22 =43 WEBS 14- 27 = -126, 13- 28 = -167, 12- 29 = -173, 11- 31 = -172, 10- 32 = -173, 9- 33 = -167, 8 -34= -126, 7 -35= -169, 6 -36= -174, 4- 37 = -171, 3- 38 = -177, 2- 39 = -147, 15 -26= -169, 16 -25= -174, 18- 24 = -171, 19- 23 = -177, 20- 22 = -147 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C, enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see MiTek "Standard Gable End Detail" 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 5) All plates are 1.5x4 M1120 unless otherwise indicated. 6) Gable requires continuous bottom chord bearing. 7) Gable studs spaced at 2 -0 -0 oc. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 196 lb uplift at joint 1, 142 lb uplift at joint 21, 59 lb uplift at joint 28, 65 lb uplift at joint 29, 62 lb uplift at joint 31, 62 lb uplift at joint 32, 54 lb uplift at joint 33, 30 lb uplift at joint 34, 158 lb uplift at joint 35, 171 lb uplift at joint 36, 163 lb uplift at joint 37, 170 lb uplift at joint 38, 138 lb uplift at joint 39, 156 lb uplift at joint 26, 171 lb uplift at joint 25, 163 lb uplift at joint 24, 170 lb uplift at joint 23 and 138 lb uplift at joint 22. LOAD CASE(S) Standard 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 3x4 // 3x4 = 3x4 �� Jr 4 1 Truss -- Truss Type - -- - - - TQty Ply DRIGGS7EAGLEW0D678- 207JR(ID)K - - I Q39441 HF -EI -CP PIGGYBACK 1 1 1 Job An ! IF, Idaho FaITs_, M_nA 3�EROD - 5 s May 303003 Mi usopes i (optional) nKug 2208:43:552003 Page -2 -0 -0 , 6 -0 -0 12 -0 -0 , 14 -0 -0 , 2 -0 -0 6 -0 -0 6 -0 -0 2 -0 -0 44 - 5 LUMBER BRACING rr 0 Scale = 1:36.1 PLATES GRIP M1120 197/144 Weight: 54 lb TOP CHORD 2 X 4 SPF No.2 TOP CHORD Sheathed or 6 -0 -0 oc purlins. BOT CHORD 2 X 4 SPF No.2 BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing. OTHERS 2 X 4 SPF Stud /Std REACTIONS (lb /size) 1 =- 19/12 -0 -0, 9 =- 19/12 -0 -0, 2= 157/12 -0 -0, 8= 157/12 -0 -0, 12= 124/12 -0 -0, 13= 205/12 -0 -0, 14= 187/12 -0 -0, 11= 205/12 -0 -0, 10= 187/12 -0 -0 Max Horz 1=- 231(load case 5) Max Upliftl=- 199(load case 5), 9=- 29(load case 3), 2=- 35(load case 6), 8=- 30(load case 6), 13=- 163(load case 7), 14=- 167(load case 7), 11=- 162(load case 8), 10=- 164(load case 8) Max Gravl= 210(load case 6), 9= 31(load case 8), 2= 207(load case 2), 8= 207(load case 3), 12= 130(load case 8), 13= 314(load case 2), 14= 270(load case 2), 11= 314(load case 3), 10= 270(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1-2=33,2-3=-99.3-4=-118,4-5=13,5-6=-119,6-7=-118,7-8=-99,8-9=33 BOT CHORD 2- 14 =34, 13- 14 =34, 12- 13 =34, 11- 12 =34, 10- 11 =34, 8 -10 =34 WEBS 5- 12 = -92, 4 -13= -173, 3 -14= -155, 6 -11= -173, 7 -10= -155 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C; enclosed,MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see MiTek "Standard Gable End Detail' 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 4) Gable requires continuous bottom chord bearing. 5) Gable studs spaced at 2 -0 -0 oc. 6) Bearing at joint(s) 1, 9, 2, 8 considers parallel to grain value using ANSI/TPI 1 -1995 angle to grain formula. Building designer should verify capacity of bearing surface. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 199 lb uplift at joint 1, 29 lb uplift at joint 9, 35 lb uplift at joint 2, 30 lb uplift at joint 8, 163 lb uplift at joint 13, 167 lb uplift at joint 14, 162 lb uplift at joint 11 and 164 lb uplift at joint 10. 8) SEE MiTek STANDARD PIGGYBACK TRUSS CONNECTION DETAIL FOR CONNECTION TO BASE TRUSS LOAD CASE(S) Standard 12 -0 -0 , 12 -0 -0 PIa1e 0ffs_eTs_(X,Y)'. [6:0-4- 2,0 -1 -01, [7:0-4-2,0-1-01 [8�O- 3 -6,O - -0;0 1 0], [1 t 0- 2- 0,0 -1 - LOADING (psf) SPACING 2 -0 -0 CSI DEFL in (loc) I /deft L/d TCLL 35.0 Plates Increase 1.15 TC 0.09 Vert(LL) n/a n/a 999 TCDL 8.0 Lumber Increase 1.15 BC 0.05 Vert(TL) n/a - n/a 999 BCLL 0.0 Rep Stress Incr YES WB 0.12 Horz(TL) 0.00 8 n/a n/a BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) LUMBER BRACING rr 0 Scale = 1:36.1 PLATES GRIP M1120 197/144 Weight: 54 lb TOP CHORD 2 X 4 SPF No.2 TOP CHORD Sheathed or 6 -0 -0 oc purlins. BOT CHORD 2 X 4 SPF No.2 BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing. OTHERS 2 X 4 SPF Stud /Std REACTIONS (lb /size) 1 =- 19/12 -0 -0, 9 =- 19/12 -0 -0, 2= 157/12 -0 -0, 8= 157/12 -0 -0, 12= 124/12 -0 -0, 13= 205/12 -0 -0, 14= 187/12 -0 -0, 11= 205/12 -0 -0, 10= 187/12 -0 -0 Max Horz 1=- 231(load case 5) Max Upliftl=- 199(load case 5), 9=- 29(load case 3), 2=- 35(load case 6), 8=- 30(load case 6), 13=- 163(load case 7), 14=- 167(load case 7), 11=- 162(load case 8), 10=- 164(load case 8) Max Gravl= 210(load case 6), 9= 31(load case 8), 2= 207(load case 2), 8= 207(load case 3), 12= 130(load case 8), 13= 314(load case 2), 14= 270(load case 2), 11= 314(load case 3), 10= 270(load case 3) FORCES (lb) - First Load Case Only TOP CHORD 1-2=33,2-3=-99.3-4=-118,4-5=13,5-6=-119,6-7=-118,7-8=-99,8-9=33 BOT CHORD 2- 14 =34, 13- 14 =34, 12- 13 =34, 11- 12 =34, 10- 11 =34, 8 -10 =34 WEBS 5- 12 = -92, 4 -13= -173, 3 -14= -155, 6 -11= -173, 7 -10= -155 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C; enclosed,MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see MiTek "Standard Gable End Detail' 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 4) Gable requires continuous bottom chord bearing. 5) Gable studs spaced at 2 -0 -0 oc. 6) Bearing at joint(s) 1, 9, 2, 8 considers parallel to grain value using ANSI/TPI 1 -1995 angle to grain formula. Building designer should verify capacity of bearing surface. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 199 lb uplift at joint 1, 29 lb uplift at joint 9, 35 lb uplift at joint 2, 30 lb uplift at joint 8, 163 lb uplift at joint 13, 167 lb uplift at joint 14, 162 lb uplift at joint 11 and 164 lb uplift at joint 10. 8) SEE MiTek STANDARD PIGGYBACK TRUSS CONNECTION DETAIL FOR CONNECTION TO BASE TRUSS LOAD CASE(S) Standard 12 -0 -0 , Q39441 P ♦ Truss j Truss Type 3 it ROOF TRUSS n erson Compone _- Flaaho Falls MM403; XR0D — Qty Ply DRTGGS7EAGLEWOODB= 2D1JR(ID)K -- - 8 1' Job Reference (optional) 5 s 30 2003 MiTe n us nes, nc. Fn` uA g 22 08:43:59 -003 - Page 1 Scale = 1:9.8 v 0 1 LOADING (psf) SPACING 2 -0 -0 CSI TCLL 35.0 Plates Increase 1.15 TC 0.22 TCDL 8.0 Lumber Increase 1.15 BC 0.03 BCLL 0.0 Rep Stress Incr YES WB 0.00 BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) LUMBER TOP CHORD 2 X 4 SPF No.2 BOT CHORD 2 X 4 SPF No.2 REACTIONS (lb /size) 3 =32 /Mechanical, 2= 270/0 -5 -8, 4 =15 /Mechanical Max Horz 2= 1 08(load case 5) Max Uplift3=- 34(load case 7), 2=- 112(load case 5) Max Grav3= 32(load case 1), 2= 270(load case 1), 4= 34(load case 2) FORCES (lb) - First Load Case Only TOP CHORD 1-2=65,2-3=-75 BOT CHORD 2 -4 =0 DEFL in (loc) I /deft Ud Vert(LL) -0.00 2 >999 240 Vert(TL) -0.04 1 >498 180 Horz(TL) -0.00 3 n/a n/a BRACING TOPCHORD BOT CHORD PLATES GRIP M1120 197/144 Weight: 7 lb Sheathed or 1 -11 -11 oc purlins. Rigid ceiling directly applied or 10 -0 -0 oc bracing. NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf, Category II; Exp C; enclosed;MWFRS gable end zone,Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 34 lb uplift at joint 3 and 112 lb uplift at joint 2. 1 -11 -11 1 -11 -11 LOAD CASE(S) Standard -1 -4 -0 1 -11 -11 3 � 1 -4 -0 1 -11 -11 Jab -Truss - Tru Type - -Qty Ply DRTGGS7EAGl Q39441 J1A i ROOFTRUSS 2 1 And erson om onen s -_ iF Ida o Is, ID 83W03, JEROD 5.100 s May 30 26 Job Reference P y 031 TekInd 5 -9 -11 5 -9 -11 nc. Scale = 1:19.6 LUMBER TOP CHORD 2 X 4 SPF No.2 BOT CHORD 2 X 4 SPF No.2 5 -9 -11 5 - 9 -1 2x4 - DEFL LOADING(psf) (loc) SPACING Vert(LL) CSI 2 -0 -0 TCLL 35.0 Plates Increase 1.15 TC 0.72 TCDL 8.0 Lumber Increase 1.15 BC 0.28 BCLL 0.0 Rep Stress Incr YES WB 0.00 BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) LUMBER TOP CHORD 2 X 4 SPF No.2 BOT CHORD 2 X 4 SPF No.2 5 -9 -11 5 - 9 -1 DEFL in (loc) I /deft Vert(LL) -0.06 1 -3 >999 Vert(TL) -0.10 1 -3 >662 Horz(TL) -0.00 2 n/a Weight: 15 lb BRACING TOP CHORD Sheathed or 5 -9 -11 oc purlins. BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing. REACTIONS (lb /size) 1= 278/0 -3 -8, 2= 234 /Mechanical, 3 =44 /Mechanical Max Horz 1= 162(load case 5) Max Uplift1=- 3(load case 5), 2=- 145(load case 5) Max Grav 1 =278(load case 1), 2= 234(load case 1), 3= 99(load case 2) FORCES (lb) - First Load Case Only TOP CHORD 1 -2 =109 BOT CHORD 1 -3 =0 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf, Category II; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp, 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 3 lb uplift at joint 1 and 145 lb uplift at joint 2. LOAD CASE(S) Standard Ud T PLATES 240 M1120 180 n/a GRIP 197/144 Jai V i Truss - Truss Type — — FQty TPIy DR TGZ;S/EAGLEW0GD78 _Z07JRM) Q39441 J2 ROOF TRUSS 8 1 Job Reference (optional) j An e� rson Components - IF Idaho Falls, ID83403, JLHUU — . - f00 s Way 210 MiTe lnaus nes, Inc. Fri Aug - 2 4 00 26D3 Page 1 -1 -4 -0 3 -11 -11 1 -4 -0 3 -11 -11 1 Scale = 1:14.9 REACTIONS (lb /size) 3= 118 /Mechanical, 2= 354/0 -5 -8, 4 =29 /Mechanical Max Horz2= 158(load case 5) Max Uplift3=- 69(load case 5), 2=- 106(load case 5) Max Grav3= 118(load case 1), 2= 354(load case 1), 4= 65(load case 2) FORCES (lb) - First Load Case Only TOP CHORD 1-2=67,2-3=52 BOT CHORD 2 -4 =0 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category 11; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) This truss has been designed for 1.00 times Flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 69 lb uplift at joint 3 and 106 lb uplift at joint 2. LOAD CASE(S) Standard 3 -11 -11 r 3 -11 -11 LOADING (psf) SPACING 2 -0 -0 CSI DEFL in (loc) I /deft L/d PLATES GRIP TCLL 35.0 Plates Increase 1.15 TC 0.28 Vert(LL) -0.01 2 -4 >999 240 M1120 197/144 TCDL 8.0 Lumber Increase 1.15 BC 0.12 Vert(TL) -0.07 1 >279 180 BCLL 0.0 Rep Stress Incr YES WB 0.00 Horz(TL) -0.00 3 n/a n/a BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) Weight: 12 lb LUMBER BRACING TOP CHORD 2 X 4 SPF No.2 TOP CHORD Sheathed or 3 -11 -11 oc purlins. BOT CHORD 2 X 4 SPF No.2 BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing. REACTIONS (lb /size) 3= 118 /Mechanical, 2= 354/0 -5 -8, 4 =29 /Mechanical Max Horz2= 158(load case 5) Max Uplift3=- 69(load case 5), 2=- 106(load case 5) Max Grav3= 118(load case 1), 2= 354(load case 1), 4= 65(load case 2) FORCES (lb) - First Load Case Only TOP CHORD 1-2=67,2-3=52 BOT CHORD 2 -4 =0 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category 11; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) This truss has been designed for 1.00 times Flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 69 lb uplift at joint 3 and 106 lb uplift at joint 2. LOAD CASE(S) Standard h +1 Truss I Truss Type Qty Ply Q39441 J3 ROOF TRUSS 6 1 Job Reference (optional) �derso�onents �, a Fir, ID 83403, �E}�0� - - — — 3 100 s hay 3� E6 i e n us nes, nc. r'i Aug 22 08 4:0 2003 - Page 1 -1 -4 -0 5 -11 -11 1 -4 -0 5 -11 -11 Scale = 1:20.1 5 -11 -11 5 -11 -11 LOADING (psf) SPACING 2 -0 -0 CSI DEFL in (loc) I /deft L/d TCLL 35.0 Plates Increase 1.15 TC 0.61 Vert(LL) -0.06 2-4 >999 240 TCDL 8.0 Lumber Increase 1.15 BC 0.29 Vert(TL) 0.16 1 >124 180 BCLL 0.0 Rep Stress Incr YES WB 0.00 Horz(TL) -0.00 3 n/a n/a BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) LUMBER TOP CHORD 2 X 4 SPF No.2 BOT CHORD 2 X 4 SPF No.2 REACTIONS (lb /size) 3= 216 /Mechanical, 2= 444/0 -5 -8, 4 =45 /Mechanical Max Horz 2= 214(load case 5) Max Uplift3=- 129(load case 5), 2=-101 (load case 5) Max Grav3= 216(load case 1), 2= 444(load case 1), 4=101 (load case 2) FORCES (lb) - First Load Case Only TOP CHORD 1-2=67,2-3=97 BOT CHORD 2 -4 =0 PLATES M1120 Weight: 17 lb BRACING TOP CHORD Sheathed or 5 -11 -11 oc purlins. BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing. NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C, enclosed,MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C, Fully Exp. 3) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 129 lb uplift at joint 3 and 101 lb uplift at joint 2. GRIP 197/144 LOAD CASE(S) Standard �Q394 i` Truss t �Truss Type - y Tly DRIGGS /EAGLEW00D7&207JR(lD)K__ 41 - M1 :ROOFTRUSS - 22 .T i - a T Qt III Job Reference (optional) Anderson Compone� Fldaho al1� _&3403,7EROD - -- - 5TWs -lay 3D_ZU9S_MiT nes, Inc. ri uugg 22 08:44:61 2003 a�e -1 -4 -0 4 -0 -11 1 -4 -0 4 -0 -11 1.5x4 II 4 8 -0 -0 3 -11 -5 t Scale = 1:28.2 REACTIONS (lb /size) 2=541/0-3-8,5=380/Mechanical Max Horz 2= 272(load case 5) Max Uplift2=- 98(load case 5), 5=-151 (load case 5) FORCES (lb) - First Load Case Only TOP CHORD 1-2=67,2-3=-418,3-4=57 BOT CHORD 2 -5 =268 WEBS 3 -5= -324, 4 -5= -136 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 98 lb uplift at joint 2 and 151 lb uplift at joint 5. LOAD CASE(S) Standard 8-0-0 8-0-0 LOADING (psf) SPACING 2 -0 -0 CSI DEFL in (loc) I /deft Ud PLATES GRIP TCLL 35.0 Plates Increase 1.15 TC 0.29 Vert(LL) -0.21 2 -5 >437 240 M1120 197/144 TCDL 8.0 Lumber Increase 1.15 BC 0.57 Vert(TL) -0.38 2 -5 >243 180 BCLL 0.0 Rep Stress Incr YES WB 0.16 Horz(TL) 0.00 5 n/a n/a BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) Weight: 33 lb LUMBER BRACING TOP CHORD 2 X 4 SPF No.2 TOP CHORD Sheathed or 6 -0 -0 oc purlins. BOT CHORD 2 X 4 SPF No.2 BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing. WEBS 2 X 4 SPF Stud /Std REACTIONS (lb /size) 2=541/0-3-8,5=380/Mechanical Max Horz 2= 272(load case 5) Max Uplift2=- 98(load case 5), 5=-151 (load case 5) FORCES (lb) - First Load Case Only TOP CHORD 1-2=67,2-3=-418,3-4=57 BOT CHORD 2 -5 =268 WEBS 3 -5= -324, 4 -5= -136 NOTES 1) Wind: ASCE 7 -98; 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98; Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of IBC -00. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 98 lb uplift at joint 2 and 151 lb uplift at joint 5. LOAD CASE(S) Standard - -T - - f Tor r- r � Truss 'Truss Type Q39441 I M2 ROOF TRUSS - Anders�ompo»n�s -'11= _1dah_oFaVs,_ID 83403 n i 0 1 Qty i Ply DRIC;GSIEAGLEWOOD DIJR�� - -- - - 1, 8 1 Job Reference (optional) 5 s May 30 2063 IM "Tek Industries, Fn FiAug 22 os -44 1 2665 a e r NOTES 1) Wind: ASCE 7 -98, 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98, Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of I BC -00. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 119 lb uplift at joint 2 and 19 lb uplift at joint 4. Scale= 1:11.3 GRIP 197/144 LOAD CASE(S) Standard -1 -4 -0 2 -6 -8 1.5X4 I 1 -4 -0 2 -6 -8 3 2 -6 -8 2 -6 -8 LOADING (psf) SPACING 2 -0 -0 CSI DEFL in (loc) I /defl Ud PLATES TCLL 35.0 Plates Increase 1.15 TC 0.28 Vert(LL) -0.00 2 -4 >999 240 M1120 TCDL 8.0 Lumber Increase 1.15 BC 0.04 Vert(TL) -0.06 1 >344 180 BCLL 0.0 Rep Stress Incr YES WB 0.02 Horz(TL) 0.00 n/a n/a BCDL 8.0 Code IRC2000 /ANSI95 (Matrix) Weight: 10 lb LUMBER BRACING TOP CHORD 2 X 4 SPF No.2 TOP CHORD Sheathed or 2 -6 -8 oc purlins. BOT CHORD 2 X 4 SPF No.2 BOT CHORD Rigid ceiling directly applied or 10 -0 -0 oc bracing. WEBS 2 X 4 SPF Stud /Std REACTIONS (lb /size) 2= 305/0 -5 -8, 4 =57 /Mechanical Max Horz 2= 121(load case 5) Max Uplift2=- 119(load case 5), 4=- 19(load case 7) FORCES (lb) - First Load Case Only TOP CHORD 1-2=67,2-3=-89 BOT CHORD 2 -4 =0 WEBS 34=40 NOTES 1) Wind: ASCE 7 -98, 90mph; h =25ft; TCDL= 4.8psf; BCDL= 4.8psf; Category II; Exp C; enclosed;MWFRS gable end zone;Lumber DOL =1.33 plate grip DOL =1.33. 2) TCLL: ASCE 7 -98, Pf =35.0 psf (roof snow); Exp C; Fully Exp. 3) This truss has been designed for 1.00 times flat roof load of 35.0 psf on overhangs non - concurrent with other live loads. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads per Table 1607.1 of I BC -00. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 119 lb uplift at joint 2 and 19 lb uplift at joint 4. Scale= 1:11.3 GRIP 197/144 LOAD CASE(S) Standard -1 -4 -0 2 -6 -8 1.5X4 I 1 -4 -0 2 -6 -8 3