HomeMy WebLinkAboutCO & DOCS - 02-00033 - Legacy Cove Apartments - Club House Bldg #11Building Permit No. R- o2 -o7 -o5
Building Street Address: 700 South 200 East
Building Owner: Triton Investments
Contractor: Mark Bergeson Construction, Inc.
Description of building or portion of building for which this certificate is
issued:
Commercial — Club House Building n
Occupancy:
This Certificate issue() rsuant to the requirements of Section 109 of tbe Uniform Buil()ing
Co()c certifies at, at t e time of issuance, this buil()ing or that portion of the builli
f ng that
was inspecte() on tbe ()ate liste() was f oun() to he in compliance with the requirements of the
co ()e for the group an ()ivision of occupancN an() the use for which tbe propose() occupancN
was c [assifia
Date: August 25, 2003 (9 :4
Ge,
Building Official
There shall be no future change in the existing occupancy classification of the building nor shall
any structural changes, modifications or additions be made to the building or any portion thereof
until the Bui1 ' g 0 cial has rere d and approved said future change .
C.O. Issued by:
State of Idaho Electrical De
Merlin Webster
CERTIFICATE OF OCCUPANCY
City of Rexburg
Department of Building Inspection
Full
Water Department [. �,-- /'�iC Department
P
- (208 -356 -4830) ❑
VALUE
FEE PAID
BUILDING
INSPECTOR
DEPARTMENT OF BUILDING & ZONING
APPLICANT
DATE a /' ADDRESS
JUL 092002
BUILDING PERMIT APPLICATION REXBURG,ID DATE NO.
THE UNDERSIGNED HEREBY APPLIES FOR A PERMIT FOR THE WORK HEREIN INDICATED
OR AS SHOWN AND APPROVED IN THE ACCOMPANYING PLANS AND SPECIFICATIONS.
OWNER l & let : 73'n rr
BUILDER 144
STRUCTURE:
R ESIDENCE
FOOTINGS
te CONCRETE
MASONRY
O OTHER
REMARKS:
JOB ADDRESS S 2 L
aIr"!' tt tl144 r - „ ARCHITECT ;p, ik, t' l ft ,r
O ADDITION O REPAIR
0 M. 0 O GOV'T O RELIGIOUS U FENCE 0 PATIO CI CARPORT Q GARAGE O AWNING
N ❑ REMODEL
EDUCATIONAL
PHONE 9. +' T. 4 ? C/
DESIGNER
0 RENEWAL
❑ FIRE DAMAGE
FOUNDATION
CONCRETE
MASONRY
❑ OTHER
BASEMENT
p PARTIAL
O FULL
ANo
FLOORS
O WOOD
CONCRETE
al OTHER
EXT. WALLS
lit U WOOD
MASONRY
0 CONCRETE
O VENEER
p METAL
j� STUCCO
INT. WALLS
II WOOD
MASONRY
O CONCRETE
DRYWALL
PLASTER
0 TILE
CEILING
❑ WOOD
O PLASTER
p TILE
O ACOUSTIC
O OPEN
ROOF
0 BUNT UP.
COMP. SH.
LE
O ROLL ROOF.
O METAL
HEAT
IF GAS
ON
O COAL
PLACE
O ELECTRIC
INSULATED
OFIWALLS
CEILING
0 FLOORS
PERIMETER
This permit is issued subject to the regulations contained in the Uniform Building tie and Toning Regulations of Rexburg, and it is hereby agreed
that the work to be done as shown in the plans and specifications will be comp1ed in accordance with the regulations
pertaining and applicable thereto: The issuance of the permit does not waive restrictive covenants..,
i/ r PAID
0,44 knot
Date of Application 5-Z2 Z—
OWNER T r h n- Name � i1V ✓es Th ,7 f
APPLICATION FOR BUILDING PERMIT
CITY OF REXBURG, IDAHO
Site Address 70 So . act .
Mailing Address 4 437(e 5o • 7o0 E G �O
City /State /Zip 5 i9'Lj c. { G j }-.r , Uf f ' 1' -1 107
Telephone/Fax/Mobile DW c e, /01 &2.72 _ " 1:31 3/1 --266 -1793
CONTRACTOR
Name
Mailing Address 2- I AO • ,rl f`i✓
PROJECT INFORMATION
Permit No. 1- - 0 7 — () 5
ek.
City /State /Zip /. e 1J /5 r oh't (f t .1 Z o
Telephone/Fax/Mobile Ce ( - ' f3S 7c7 - of 7qf - ` 5 23T21 •T) - dale y 3.S nr- 2
DEPARTMENT APPROVAL
Property Zone: PR Is existing use compatible with zoning, (screening parking, etc)
When was this building last occupied
Architect/ Engineer Firm til (frr t 5OC - Plan Name Le a c
Subdivision Q cr CfYe
Circle One
Circle One
Circle One Basement: None/ Finished / Unfinished
Lot Square Footage (0 ACYeS Lot Width
Square Feet_g*__ Garage Square Feet "' Number of Stories 7— Height of Building
What will structure be used for: Home Home Business Cpartmen Commercial Other
Will there be an apartment? If so, how many units
Total Estimated Cost 750, Ord .. Are you in a flood plain •
Signature of Applicant
71( � �
* * * * * * **
of
Commercial Educational Govemmen Remodel
New House
er
B +c
Addition/Remodel to House New Commercial Commercial Remodel
Other: None/ Patio/ Carport/ Awning N/A
** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** * * * * * * * * * * ** ** ** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Code /997 48 C Building Permit Fees /g 3
�/
Zone � Y � _ � . �.' __. �..... r_ '' Plan Check Fees � S 3
Building Type V j Plumbing Permit Fees 336.
JUL 0 ` ' 2002 Digging Permit Fees
'�' OF REXBURG Water & Sewer Fees
Front Footage Fee
1 Q t
TOTAL S / j � �j i . i
Signature of Inspector GZ-2'
Issued by
t' 4
Rough Plumbing
Septic Tank
Fixtures
Water Piping
Complete
Sewer
Bath Tubs
Urinal
Showers
Sink Trap
Laundry Trays
Water Heater
Wash Basin
A
Other
Toilet
.
Slop Sinks
Kitcherr, Sinks
Floor Drain
Drinking Fountains
Lawn Sprinklers
Water Softeners
Dish Washing Mach.
2.
Clothes Washer
i Li
OWNER
Iii 4
Address o0 Tel.
Lotbk4 /1 Blk. Add.
Name
PLUMBER
Name
-
4--
Addressirc 7q z 14 : '-Tel. ."/ -
NATURE OF INSTALLATION
Use
DESCRIPTION OF WORK
CITY OF REXBURG
APPLICATION FOR PLUMBING PERMIT
k S t
FEES
Plumbing Permit
ti Sewer Inspection
Inspection of Pipe
Inspection of Fixtures
$ /0
k tel*. Ow;
TOTAL $
Received: Date
Rough Plumbing
Sewer
Other
Finish Plumbing
INSPECTOR'S RECORD
A --- 1
JUL 0 9 2002
7171,
OF REXBURG
s
INSP. NAME
Excavation &
7 =- thwork:
Concrete: C r7 -%
Masonry: nI f fn j4/1SCA /
Roofing: f2 1 11 ) 7-'1/vSPv /Z'v
J
Insulation: Y Q -S v/41%dsi
. Drywall:
Painting: - IWpS K,474-6pt) yi 7
1
Floor Coverings:
P lumb ing :
Heating;
Electrical:
Roof Trusses:
V nv(.w tie
Floor / Ceiling Joists:
Cabinets:
SidinQ1. xter?.o: Tr±z
G oa
SUBCONTRACTOR LT ST
aerS
SPECIAL CONSTRUCTION
(MANUFACTURER OR SUPPLIER)
Desnrn
intelligence, LLC
Siructurel Engineering
3683 WHwy 33
Rexburg, lithe $341n
Date: September 13, 2002
To: Val Christensen
Building Inspector
City of Rexburg
Subject: Legacy Cove Apartments — Shear Wall Anchor Bolts
Dear Mr. Christensen,
The drawings call for 5 /8" anchors bolts spaced at 24" o.c. in the shear walls. These anchors were not
installed.
By this letter the contractor is instructed to install 5/8" Hilti HVA anchors at 24" o.c.. The HVA anchors
shall be installed as specified by the manufacturer and have an embedment of at least 5" into the concrete.
Please call me if you have any questions.
Respectfully,
Scott A Spaulding, P.E
Design Intelligence, LL
Call: (208) 359 -1461
FAX: (208) 3.59 -0740
JUL -15 -2002 MON 11:21 AM MoNEIL ENGINEERING
July 15, 2002
Mr. Brent Hilton
Hilton and Associates
6895 S. 900 East
Midvale, UT 8404
Fax: (801) 568 -9764
RE: Legacy Cove Apartments, Rexburg, ID (MES Project No. 220053.1)
Revisions to Plan
Dear Mr. Hilton:
At the request of the builder, we are writing to pr the fo lowing odifications to s the structural
requirements on the above- referenced project. We have
e
• The exterior footings (F1) do not need cross -wise reinforcemaentn in
int addition
d to th e
horizontal bends on the footing dowels. The interior footings (F2) schedule info
reinforcing at all. In other words, omit the with foundation dowels at e o c ) omit the
for footing F1 (exterior gearing walls
reinforcing entirely for footing F2 (interior bearing wall footings placed monolithically with
the floor slab).
We appreciate the opportunity to address this issue rus at this meets n th your needs.
o for Please contact this office with any further questions or y�
Reviewed ' •`
11) OVA
Si l Y y'
i l= j
FAX NO, 8012558071
1VIcNEIL ENGINEERING
STRUCTURAL, L.C.
6895 SOUTH 900 EAST
MIDVALE, UTAH 84047
(801) 255 -7700
s taff Engi =er
cc: Val Christen = y of Rexburg, 208 -359 -3022
Mark Berg - • , 435 -258 -0711
Mark Ber en, 208- 356 -36
Scott F. MCNeiP.E.
Project Er1 ! -- ,•:
J � h" Ic 4
P. 01/01
4/24/2002
Brent Hilton
Hilton Architects
6895 South 900 East
Salt Lake City, UT 84047
ay lextury
STATE OF IDAHO
www.ci.rexburg.id.us
P.O. Box 280
12 North Center Street
Rexburg, Idaho 83440
Phone (208) 359 -3020
Fax (208) 359 -3022
e -mail rexburg @ci.rexburg.id.us
Dear Brent,
I have reviewed the plans for Legacy Cove and have identified the following
discrepancies or questions:
1. Please provide storm water calculations and detention facility details
2. Catch basins for storm water are spaced so that the far edges of the parking lot
are almost 1000' away. Additional catch basins should be provided that are
piped to main basins.
3. Identify Right -Of -Way on site plan. Has a development agreement with the
City of Rexburg been completed?
4. Identify utility easements on site plan.
5. Compact parking spaces are to be signed. Please identify signage on plans.
6. Please provide literature on stucco for 1 -hr rating.
7. Exterior guardrails are identified as 36 ", please change to 42" as per 1997
Uniform Building Code (UBC) Section 509.2.
8. The shear wall schedule on page A04 identifies construction requirements.
Are all of the walls highlighted on the framing details shear walls?
9. The shear wall schedule identifies MST 60 straps, what is there spacing?
10. Provide details showing requirements of the second paragraph of shear wall
notes from page A04.
11. Where shear walls are sheethed with long side of structural panels in the
horizontal direction (as per shear wall notes on page A04) is blocking required
at the joints that will be created?
12. On page A04, -a footing schedule is provided, and then all footings are
identified as one size. Please identify which is valid. If the schedule is to be
used, please identify which footings are which.
13. If footings are place directly on bedrock but are located above the frost line,
the rock surface must be cleaned of any soil or loose surface. Please identify
this on the plans if this construction method is to be used.
14. Please provide truss details as soon as you can.
15. Provide details of transition from parking lot to sidewalk at the handicap
spaces.
16. The upper level managers apartment is not accessible.
Sincerely, d ",
C.C.
17. The large room in the Community Center building requires 2 exits. One exit
must be directly to the outside or to a properly constructed corridor. The exits
should be '/2 the diagonal distance of the area served from each other.
18. Please identify what will be stored in the equipment room of the Community
Center building.
19. Identify shear walls for the Community Center building.
20. What is above the exercise room in the Community Center building
21. What is the purpose of the shaft that has been created between floors in the
managers unit and the area below?
22. Provide copies of the plan to the State of Idaho Electrical Division for review.
23. I have attached a copy of the Fire Department review top the back of this
document.
Please provide me with 2 new stamped copies of the corrected plans. If you have
any questions, please give me a call at 359 -3020 ext. 324.
Val Christensen
Building Official
John Millar
Chris Huskinson
REXBURG MADISON COUNTY FIRE DEPARTMENT
P.O. Box 280
26 North Center
Rexburg, Idaho 83440
(208) 359 -3010
1997 Uniform Fire Code Plan Date: 3 -01 -02
Plan Review Review Date: 4 -15 -02
Building Name: LEGACY COVE STUDENT HOUSING
Building Address: SEVENTH SOUTH AND SECOND EAST
Stories: 2.5 Type of Construction: V - ONE HOUR
Occupancy Classification: R1 Existing Floor Area: N/A
New Construction Floor Area: APPROXIMATELY 23,160 SQUARE
FEET /BUILDING
1).Required Fire Flow (Appendix III - A): 1,500 GPM /TWO HOURS
Comments: FIRE FLOW REQUIREMENTS BASED ON BUILDINGS BEING FULLY
SPRINRLERED. CLUBHOUSE FIRE FLOW IS 1500 GPM /TWO SOURS.
2).Water Supply (Article 9, Section 903) Required: YES
Fire Hydrant Location: B - 56
Fire Hydrant Flows: UNKNOWN
Other Approved Water Source: NONE
Water Supply Acceptable: YES
Fire Hydrant Location Acceptable: YES
Water Supply Comments: PLANS SUBMITTED SHOW A HYDRANT ON NORTH SIDE
OF WENS HOUSING ADJACENT TO WOMEN'S HOUSING. THIS HYDRANT COULD BE
ELIMINATED IF EXISTING HYDRANT ON ASPEN VILLAGE PROPERTY IS
UTILIZED. ALL HYDRANTS WITHIN 500 FEET.
3.)Fire Apparatus Access Roads (Article 9 Section 902)
Required: YES
Acceptable: Width: YES Length: YES Surface: YES
Turning Radius: YES Grade: YES
Clearance: YES Turn Arounds: YES
Complete Road Acceptable: YES
4).Access Roads and Water Supply, Including Fire Hydrants Are
Required To Be Installed And Made Serviceable Prior To And During
Time Of Construction (Article 9 Section 901.3): YES
Comments: IF NOT INSTALLED PRIOR TO CONSTRUCTION A STOP WORK ORDER
WILL BE ISSUED.
5),Installation Of Portable Fire Extinguisher (Article 10 Section
1002) Required: YES Location Acceptable: NOT SHOWN
Type Provided Acceptable: NOT SHOWN
Comments: MINIMUM OF 2A1OBC EXTINGUISHER REQUIRED IN EACH UNIT IN
ADDITION TO COMMON AREAS, LAUNDRIES, COMPUTER ROOMS, ETC.
6).Automatic Fire Extinguishing Systems: (Article 10 Section 1003
Required: TO BE INSTALLED Type Of System Being Installed: 13R
Sprinkler System Monitoring Required (Article 10 Section 1003.3)
Required: TO BE INSTALLED Comments:
8).Fire Alarm Systems (Article 10 Section 1007)Required: YES
Type Of System Required: Manual: Automatic: Both: YES
Type Of System Being Provided: Manual: Automatic: Both: YES
Components Of System Shown: Smoke Detectors: YES Heat Detectors:
Manual Pull Station: YES Sounding Devices: YES Visual Devices:
YES
Door Holders: NO Duct Detectors: NO
Fire Alarm System Acceptable: NO DRAWINGS PROVIDED FOR ALARM
SYSTEM. HANDICAPPED UNITS (TYPE "A ") UNITS MUST BE EQUIPPED WITH
HORN /STROBES. PLANS ARE VAGUE IN REGARD TO PULL STATIONS,
MANUAL PULL STATIONS TO BE PROVIDED AT EVERY EXIT FROM EVERY LEVEL.
HEAT AND SMOKE DETECTORS TO BE PROVIDED IN COMMON AREAS. SYSTEM TO
BE SUPERVISED. NEW PLANS NEED TO INCLUDE THE FOLLOWING ITEMS:
LOCATIONS OF ALARM - INITIATING AND NOTIFICATION APPLIANCES, ALARM
CONTROL AND TROUBLE SIGNALING EQUIPMENT, ANNUNCIATION, POWER
CONNECTION, BATTERY CALCULATIONS, CONDUCTOR TYPE AND SIZES, VOLTAGE
DROP CALCULATIONS, MANUFACTURERS MODEL NUMBERS AND LISTING
INFORMATION FOR EQUIPMENT, DEVICES AND MATERIALS, ETC. PLEASE
SUBMIT PLANS.
10).Other Corrections That Are Required By Special Occupancy Or
Conditions /Comments: Plans As Submitted Are Acceptable: YES
Plans Checked By: CHRIS HUSKINSON Date: 4 -15 - 02
Please furnish comments back to the plan reviewer in the following
manner:
Written Comments: YES New Plans: YES
606 FR
, 2. C McNOL ENGINEERING STRUCTURAL. L C McNEIL CONSULT/244G ENGINEERING, L C McNEIL ENGINEERING STR1 , '7URAL, L C
•
1
so.
WOOER
NEW SSW
r
SSW
0 20 40 60 80
LEGEND
PROPERTY LIRE
WOUNEW LW
—11— (1213 615(0
— P POWP
TELEFWJW LW
• 60J06 LINE
— NW ROM LPIE
SLIER UNE
WW SNOWY SOPER UME
— STERSI OFPw LIRE
POP 5101111 OFew L444
— 0— LP(
RRIER wit
•
rift !WNW
1"PP PURER PME
▪ GER
0
56060 (06* *wax
O sEw.• ~OLE
o TELIFIRNE *40(
NORTH
. < ] 0
SCALE: I = 40
120
McNEIL ENGINEERING & LAND SURVEYING, L C McNEIL ENGINEERING STRUCTURAL, L C McNEIL CONSULTING ENGINEERING, 1 C. McNEIL ENGINEERING STRUCTURAL 1 C
•
5(C124261 60*6*02
• /MO imam
(M] WOW
NM ASPHALT k ROM WS(
ROI MICRO(
- WWI LWOW
MOO COMA
EV{ FUSil OWE
/4 Wawa OFECION
s6 0260 *401
590.1 wookr SEIER
ORE PROW
LEGAL DESCRIPTION
60(6*404416100 044654060 161551 1151 PtOW 11( SEMI tut I6650
160 0444 Tal 1/01 ft SELMAN COPPER CR SEC11311 21. renew
6 IOW awl 11 E 8W 140E WOW, OWN OW& WOW 1•0 WNW
NOW NAV e54116 r ••• 6051. MICE IOW 4*51 %OCR OCT.
IOW 4016 temItr EAST PAW REL. ROW SOW 12015601 COI 92760 6EL1
PFE 4016 OW-W-ou LW CR TR Salt ma KOK SW ORM
16344-16-6* 064416 7. KWH PRO RE 6153 4044-01-401 LW CP PR L61 111
FOFLO■K TRW (3) 55(405 SOP 11/44WIESF Mr) WI 10 A MO Or
caw ow A wow or 2090 REY PO 000 EMIL ROW 4515 WO
Mt NW 10 WO KONG vie as* 6112 MEI %FOAL WOW ROI
16 9219645.6401(0 4 01115•1" 6020 2176$ TES 10 ME PC•• 8EGNIOL
PARIONG
04E6*1 PARK 66050115
RwriPPE• SOLLS 14 WELS
SOMME CCOTAGES
%OWL 606* ROW 441.302 pk•
091111/00E 16*760 t F452)
13.612 WC WO
WCSCAPC ilemo LIM
STAMP SEAL
94052
SITE
PLAN
C-1
'T 1