HomeMy WebLinkAboutCO'S & DOCS - 02-00025 - BYUI Hart Bldg - Remodelr - C ERTIFICATE OF OCCUPANCY City of Rexburg Department of Building Inspection Building Permit No. R- o2 -o5 -18 Building Street Address: 30o South f West Building Owner: BYU -Idaho Contractor: Ormond Builders, Inc. Description of building or portion of building for which this certificate is issued: Occupancy: C.O. Issued by: Water Department Hart Fitness Center - Remodel Full This Certificate issued rsuant to the requirements of Section zog of the Uniform Bonding Coae, certifies t jat, at t e time of issuance, this builbin or that portion of the builain that � � f � was inspected on the bate listea was f ouna to be in compliance with the requirements of the cote for the group anb division of occupanc anb the use for which the propose() occupancj was classi f iea. Date: November 7, 2002 (io• Building Official There shall be no future change in the existing occupancy classification of the building nor shall any structural changes, modifications or additions be made to the building or any portion thereof until the Building Official has reviewe and approved said future changes. ..t, Fire Department State of Idaho Electrical Department - (208 - 356-4830) 0 Occupancy: C ERTIFICATE OF OCCUPANCY City of Rexburg Department of Building Inspection Building Permit No. R- o2 -o5 -18 Building Street Address: 30o South ist West Building Owner: BYU -Idaho Contractor: Ormond Builders, Inc. Description of building or portion of building for which this certificate is issued: Hart Fitness Center Remodel This Certificate issued rsuant to the requirements of Section 109 of the Uniform Building Code, certifies tbbat at the time of issuance, this building or that portion of the buildin that of g was inspected on the date fisted was f ouna to be in compliance with the requirements of the code for the group and division of occupanq and the use for which the proposed occupancN was classified. Full Date: November 7, 2002 (io• C.O. Issued by: gesi Building Official There shall be no future change in the existing occupancy classification of the building nor shall any structural changes, modifications or additions be made to the building or any portion thereof until the Building Official has reviewe and approved said future changes. Water Department , ✓.�_ „ .� Department State of Idaho Electrical Department - (208 -356 -4830) ❑ IIIIIINIMIOlnmn DEPARTMENT OF BUILDING & ZONING VALUE FEE PAID BUILDING INSPECTOR O CA6 r DATE ADDRESS WHITE- Owner's Copy CANARY - Building. Department's Copy PINK-Assessor's Copy t .DENROD- Inspector. . . BUILDING PERMIT APPLICATION REXBURG, ID DATE THE UNDERSIGNED HEREBY APPLIES FOR A PERMIT FOR THE WORT HEREIN INDICATED OR AS SHOWN AND APPROVED IN THE ACCOMPANYING PLANS AND SPECIFICATIONS. OWNER BUILDER STRUCTURE: 0 RESIDENCE FOOTINGS 0 CONCRETE O MASONRY O OTHER REMARKS: ARCHITECT O NEW 0 REMODEL 0 ADDITION O COMM. 0 EDUCATIONAL 0 GOVT O RELIGIOUS 0 FENCE 0 PATIO BASEMENT FLOORS 0 REPAIR • eior PHONE DESIGNER O RENEWAL 0 FIRE DAMAGE 0 CARPORT 0 GARAGE 0 AWNING FOUNDATION O CONCRETE O MASONRY 0 OTHER O PARTIAL O FULL ONO 0 WOOD O CONCRETE O OTHER EXT. WALLS Cl WOOD O MASONRY 0 CONCRETE O VENEER O METAL O STUCCO INT. WALLS CEILING O WOOD 0 WOOD 0 MASONRY O DRYWALL O CONCRETE 0 PLASTER .b RYwALL 0 TILE PLASTER ISiACOUSXIC 0 TILE 0 OPEN ROOF HEAT O GAS 0 OIL acoAL O FIREPLACE 0 ELECTRIC INSULATED O BUILT UP. O WOOD SH. O COMP SH. O TILE 0 ROLL ROOF. O METAL This permit is issued subject to the regulations contained in the Uniform Building Code and Zoni ;Regulations of Rexburg, and it is hereby agreda that the work to be done as shown in the plans and specifications will be completed in accorda with the regulations pertaining and applicable thereto: The issuance of the permit does not waive restrictive covenants. O WALLS ❑ CEILING O FLOORS O PERIMETER Date of Application 4 (i Moo°7-- OWNER Name 1, Site Address Mailing Address rLT Code /947 4'$C Zone u Building Type I' ( • Signature of Inspector APPLICATION FOR BUILDING PERMIT CITY OF REXBURG, IDAHO Permit No. 6 — 0 S _ 1 8 City /State /Zip '�- j w.. It .441. Telephone/Fax/Mobile CONTRACTOR Name Mailing Address City /State /Zip Telephone/Fax/Mobile PROJECT INFORMATION DEPARTMENT APPROVAL Property Zone:Q1D 1' Exbi 1 Is existing use compatible with zoning, (screening parking, etc) ' W.5 When was this building last occupied CO KM n N l nIASt i t 1 i 1 . i � Architect/ Engineer Firm GOO t 1 412111 I W Plan Name i f Z- FT7 J 6-, J'U J - VE,4. Subdivision Lot Block Circle One Residential Commercial ducational Government Remodel Other Circle One New House Addition/Remodel to House New Commercial mmerci em del Circle One BasementNone Finished / Unfinished Other one/ Patio/ Carport/ Awning N/A Lot Square Footage Lot Width Square Feet (p (YID Garage Square Feet Number of Stories Height of Building What will structure be used for: Home Home Business Apartment Co Other Will there be an apartment? Iv C9 Total Estimated Cost 9 CO (11,T Are you in a flood plain MAY 2 2002 toZet If so, how many units Signature of Applicant B "Ming Permit Fees PI Check Fees PI bing Permit Fees oTY OF REXBURG DI ging Permit Fees Water & Sewer Fees TOTAL $ 57 2,' Issued by Rough Plumbing Septic Tank Fixtures '�✓ Water Piping Complete Sewer Bath Tubs Urinal Showers Sink Trap Laundry Trays Water Heater Wash Basin Other Toilet i Slop Sinks Kitchen Sinks Floor Drain Drinking Fountains 4. Lawn Sprinklers Water Softeners Dish Washing Mach. Clothes Washer Name Address CITY OF REXBURG APPLICATION FOR PLUMBING PERMIT OWNER FEES Plumbing Permit $ 36. Sewer Inspection $ Inspection of Pipe $ Inspection of Fixtures •'f?4 *. $ if $ TOTAL $ 7 ef3. Q.► Received: Date ;..� Address`.. Lot Blk. Add. PLUMBER Name DESCRIPTION OF WORK Tel. NATURE OF INSTALLATION Use Rough Plumbing Sewer Other Finish Pl By C,- INSPECTOR'S RECORD N MAY 2 ^ 2002 CITY OF REX S 4/19/2002 Rulon Neilsen Ricks College Physical Plant Rexburg, ID 83440 Dear Rulon, Val Christensen Building Official c.c. John Millar Chris Huskinson Cr ofRe cedur7 STATE OF IDAHO www.ci.rexburg.id.us P.O. Box 280 12 North Center Street Rexburg, Idaho 83440 Phone (208) 359 -3020 Fax (208) 359 -3022 e -mail rexburg @ci.rexburg.id.us I have reviewed the drawings to the Hart Fitness Center Remodel and have identified the following discrepancies or questions: 1. List the type of building construction. Are there any structural elements that will be left exposed in the ceiling area? What do the columns hold up? Will there be any exposed steel beams? 2. A one -hour wall is needed to separate the mechanical room with the Aerobic Conditioning room. Please show fire /smoke dampers as needed for penetrating this walk 3. The mechanical room identifies "chemical treatment" units. Please provide a list of all chemicals and quantities that will be used and stored in this room. 4. The Fire Department has not yet provided me with their review. I will provide you with - a copy when I get one. Please look into these items. I see no need for new sets of plans. You can provide me with letters and drawings that I can attach to the plans I have now. If you have any questions please give me a call at 359 -3020 ext. 324. Bill Hamlin City of Rexburg Building Dept. Advisory Memo Date: 17 SEP 02 From: Bill Hamlin, Mech Inspector To: Val Christensen, CBO Re: Hart Fitness Center R02 -05 -18 Mechanical Systems This Inspector arrived on site at the Sub - Contractor's (Atlas Mechanical)request for a Mechanical Inspection (final on piping). Arrival time was 0950 hrs. All piping had been previously pressure tested per code and specifications. Subsequent to the pipe pressure testing, the connections were made to the Mfgr'd and existing units. All heat and cool piping was inspected. Additionally, the plumbing piping was inspected and approved for cover and fixture installation. Several corrections regarding strapping etc. have been performed over the last two months, and inspected and approved over the construction duration. At this time only a handicapped bathroom has been covered, but it was found to conform during previous and on -going inspection. The vinyl pipe insulation covers remain to be installed as well as the required labeling for direction and containment. Some eight locations require additional or improved seismic bracing before building final. It is noted that this Sub - contractor to Ormond Construction has been outstandingly cooperative with the City and timely in regard to his requests for inspection. 1 Nielson /Bodily & Associates PA 9A h rc iect L t s 90 John Adams Parkway • P.O. Box 2212 • Idaho Falls, ID 83403 -2212 • Telephone 208/522 -8779 • Fax 208/522 -8785 April 25, 2002 Val Christensen, Building Official City Of Rexburg P.O. Box 280 Rexburg, ID 83440 RE: Plan Review Comments Hart Building Fitness Center BYU -Idaho Dear Val, We have received a copy of your letter of 4/19/2002 to Rulon Nielson of BYU -I containing your plan review comments for the referenced project. Rulon forwarded it to us for resolution and since we are the architects for the project we will respond directly to you as follows: Response to Comment No. 1: Construction Type - II -N, Occupancy Group - B. There will be structural elements that will be left exposed in the ceiling area. The existing columns support existing steel beams that support exposed steel deck and concrete floor above. There will be steel beams that will be exposed in the finished space. The existing structure in the building is not currently fire rated nor protected. The existing lay -in ceiling is not a rated ceiling. The construction as it exists now is non - combustible type but not rated construction. We have therefore classified the building as Type II -N construction. The occupant load for the existing uses in the area of the Aerobic Conditioning space is 82 occupants and is derived from the UBC occupant load factor for the various existing spaces that include classrooms, exercise rooms, storage rooms, and offices. The occupant load for the newly configured space is 92. The occupant load and use of the space will not appreciably change from its current use and occupancy. Response to Comment No. 2: The Mechanical Room contains no boilers or fuel fired equipment and does not meet the defmition of "cental heating plant" so does not require a 1 -hour occupancy separation wall. See attached response from Heath Engineering. Response to Comment No. 3: The "chemical treatment" units are supplied by BYU -Idaho and are for the building heating water and chilled water systems. See attached response from Heath Engineering. Response to Comment No. 4: We will respond to the Fire Department comments when received. Scott L. Nielson, A.I.A. Kevin R. Bodily, A.I.A Members of The American Institute of Architects Val Christensen, Building Official Page 2 April 25, 2002 We appreciate your comments and review of the project documents. Should you have any additional comments or questions, please feel free to contact us directly so that we may resolve any issues as quickly as possible. Sincerely, Kevin R. Bodily, A.I.A. Architect attachment cc: Rulon Nielsen, Campus Architect APR -25 -2002 THU 02 :44 PM HEATH ENGINEERING April 23, 2002 Mr. Kevin Bodily NIELSON BODILY & ASSOCIATES PO Box 2212 Idaho Falls, ID 83401 RE: BYTJ -IDAHO HART FITNESS CENTER REMODEL Dear Kevin_ In response to the City of Rexburg comments numbers 2 & 3 that relates to mechanical we respond as follows: Comment No. 2: A one-hour wall is needed to separate the mechanical room with the Aerobic Conditioning room. Please show fire /smoke dampers as needed for penetrating this wall_ Response: The mechanical room houses fans and pumps, and does not house any fuel burning equipment. If it weren't for noise and safety issues this equipment could be exposed in the exercise room. Unless there is another reason to rate the room, the equipment located in the room should not require the room to be rated_ Comment No. 3: The mechanical room identifies "chemical treatment" units. Please provide a list of all chemicals and quantities that will be used and stored in this room_ Response: These units are owner furnished and I understand that they will use propylene glycol (25 gal. 40% mix), sodium nitrite both with phenopfhelien (25 gal.). These are the common chemical treatments used in building heating water and chilled water systems. I would hope this answers the mechanical related questions, should additional information be needed please let me know. Sincerely, HEATH ENGINEERING COMPANY 4 e ) DA/ Larry D. Veigel, P.E. LDV /ab J: 1WorkV obs13Sb91Wordpruc: essing1CarrespnedenceslResponsa Letter 4- 23- 0Z•10c FAX NO. 8013220490 P. 02 EATH Rowing [ornWIng Medenid /Uectical [tr sult int5 377 West 800 North s Salt Lake City, Utah 84103 • Tel: 901.322.048? • Fax: 801.322.049 • Emabi: neathWeathenq.corn C. Lewis Wilson • Larry D. Ve,ttee • Victor S. Wines • Randall T. Valle' • Jaffrey S. Andersen • B. Bryce Garone:r Nolan E..lohnson • William 1. Gaertsen . Dow W. Richardson • I -tOCert 1. Kesler May 30, 2002 Mr. Kevin Bodily NIELSON BODILY & ASSOCIATES 990 John Adams Parkway, PO Box 2212 Idaho Falls, ID 83401 HEATH Engineering Company Mechanical / Electrical Consultants RE: BYU -IDAHO HART ATHLETIC BUILDING AIR HANDLING UNIT SUBMITTAL Dear Kevin: We have reviewed the above referenced submittal and have the following comments: (AHU -1) AIR HANDLING UNIT: Temtrol Inc. Model No. ITF -DH2O. EXCEPTIONS AS NOTED. 1. Contractor to coordinate shipment of unit in pieces capable of fitting into the building. 2. Since the chilled water has glycol, eliminate the drainable headers on the chilled water coil and circuit the coil to have 10 passes (serpentine 0.800) with a water pressure drop of 9.12 ft. and a total capacity of 306,300 btuh. Submission of information by the Contractor is taken as evidences that the contractor has prepared the information for the specific application and has verified that adequate and complete conditions for installation and subsequent operation and maintenance will exist. Engineers review is for general conformance with the design concepts of the project and for general compliance with the information given in the contract documents. Contractor is responsible for access and clearance code compliance, work methods and conditions, coordination of trades, safety, all in satisfactory performance of the work. We have retained one copy for our files and are returning the remainder to you. Sincerely yours, HEATH ENGINEERING CO ANY 0 Larry D. Veigel, P.E. LDV /ab J: \Work\Jobs\ 3569 \Wordprocessing \Submittals\Air Handling Unit Submittal 5- 29- 02.doc 377 West 800 North • Salt Lake City, Utah 84103 • Tel: 801.322.0487 • Fax: 801.322.0490 • Email: heath @heatheng.com C. Lewis Wilson • Larry D. Veigel • Victor S. Willes • Randall T. Veigel • Jeffrey S. Anderson • B. Bryce Gardner Nolan E. Johnson • William J. Geertsen • Dow W. Richardson • Robert J. Kesler JOB: BYU Idaho Hart Fitness Center TEMTROL REP: Mechanical Products Utah Inc UNIT MARK: AHU -1 SERIAL NUMBER: 25 -86175 GENERAL: • Factory fabricated ITF indoor air handling unit. (One piece construction unless noted by a demount on unit drawing). Units exceeding maximum shipping capacities may be factory demounted • Multiple section units ship as a single factory assembled piece (except where shipping limitations prevent), field demountable into modular sections by OTHERS. Units ship with sufficient gasket and bolts for field reassembly by OTHERS. • Multiple piece units with factory furnished lights or electrical conduit will require flex connections at each demount. Field furnished electrical connections will be required after the unit is reassembled and set in place. • Right and left determined by facing in the direction of air flow with air hitting the back of your neck • All dimensions in inches. • ETL listed • Steel grating provided over all floor penetrations where access is provided. • The Air Handling Unit schedule indicates total static pressure only. All internal losses and available external static pressure are shown on the static pressure summary sheet in this submittal. Verify external static pressure prior to release for production to prevent improper fan selection. UNIT BASE /FLOOR: Temtrol, Inc. Phone -405- 263.7286 Fax - 405-263-4924 • Unit base frame manufactured with rectangular structural steel tubing and welded C- Channel cross support members. Base frame is painted with a lacquer resisting gray phenolic, corrosion inhibitive primer. Minimum 4" thick insulated G -90 galvanized floor BYU Idaho Hart Fitness Center 1 25 -86175 Temtrol, Inc. Phone - 405- 263.7286 Fax - 403. 263 -0924 features true "Double Bottom" construction. Base rails are fitted with lifting lugs at the unit (or section, if demounted) corners. Floor Casing: G - 90 galvanized 20 - ga. outer and 14 - ga. inner. EXTERIOR PANEL • Exterior panels are fabricated from 16 gauge G -60 galvanized steel. The 21/2 -inch thick panels are turned inward and secured to a 14 gauge galvanized steel top and bottom structural support to form an integrated frame around the entire perimeter. All panels are sealed to form an airtight unit. See unit drawings for applicable inner liner. Exterior panel /Finish: 16 -gauge exterior panels are mill coated on both sides with a Polyceram 3200 coating system. Polyester resin paint is designed for long term corrosion resistance. The complete exterior is painted with a finish coat of textured sterling gray industrial air dried (alkyd) enamel. (ASTM B -117) Salt Spray Resistance 5% salt fog at 95 degrees F. Passes 1,000 hrs. (ASTM D -2247) Humidity Resistance 100% salt fog at 95 degrees F. Passes 1,000 hrs. INSULATION LINERS (DOUBLE WALL CONSTRUCTION: ACCESS DOORS • The dual density fiberglass insulation has an effective thermal conductivity (C) of .24 (BTU in. /hr sq.ft. ° F) and a noise reduction coefficient (NRC) of 0.70 /per inch thick (based on a type "A" mounting). Coefficients meet or exceed a 3.0 P.C.F. density material rating. Insulation meets erosion requirements of UL 181 facing the air stream and fire hazard classification of 25/50 (per ASTM -84 and UL 723 and CAN /ULC S102 -M88). See unit performance data and accessories sheet for optional type, density or facing for single wall units if applicable. • Perforated: 22 perf galvanized steel liner, see unit drawings for perforated sections. • Access doors are 2 -inch thick double wall construction with extruded aluminum frames. Doorframe features built -in thermal break barrier and perimeter gasket. Heavy duty Ventlok or equal, handles are standard. BYU Idaho Hart Fitness Center 2 25 -86175 FANS MOTORS 260 handles. Temtrol, Inc. Phone - 405-263.7286 Fax - 405 - 263 -4924 Tool operated safety latch furnished on the fan section access door. The latch complies with Title 8 CAL -OSHA, ETL and the mechanical protection requirements of UL 1995. (See detail CD- 0066). • Type AF (Airfoil Fan) DWDI arrangement three housed fans are equipped with 200,000 hours L-50 life pillow block ball bearings (roller bearings for all 33 " diameter and greater fans). Fan shaft is turned, ground and polished solid steel rated at maximum RPM below critical speed. Fan wheel and sheaves are keyed to the shaft. Fan wheels, housings and bearing supports are fabricated of heavy gauge steel and painted with a lacquer resisting gray phenolic, corrosion inhibitive primer. (15" and smaller are aluminum). Prior to shipment, fan is IRD balanced (per ANSI /AMCA 204 -96 fan application category BV -3) at design RPM with belts and drives in place to a vibration velocity less than or equal to .157 inches per second measured at each bearing pad. Fans are AMCA 210 Certified for performance and rated in accordance with AMCA 300 for sound. See individual fan selection for performance and sound. Airfoil wheels are manufactured by Mechanovent Corp., the OEM Wheel division of New York Blower Corp. See performance data and accessories sheet for class of construction. High pressure lube lines internally located on drive side. Fans, motors and drives are internally spring isolated on a phenolic coated, structural steel base complete with flex connections. Isolators are Amber /Booth seismically restrained type with ( 2 ) inch deflection. (Suitable for Zone 4 applications). • NEMA Design B T -FRAME motors are mounted on an adjustable base. The motors are tested to IEEE standard 112 test method B and NEMA MG 12.58.2 and 12.59 table 12 -10. • See performance data and accessories sheet for voltage, rpm, and efficiencies. Make: Standard: Baldor motors feature ISR (Inverter spike resistant) magnetic wire. All motors meet energy policy act (EPAct) regulations. OR A.O. Smith speed engineered motors are designed, tested and warranted to be Corona free — compatible for inverter duty. All motors meet or exceed the Energy Act of 1992. BYU Idaho Hart Fitness Center 3 25 -86175 DRIVES: COILS 5/8" o.d. x .035" wall tube. .010" aluminum fins 16 ga galvanized G -90 steel casing 1/8" vent and drain. Intermediate Drain Headers on cooling coil CONDENSATE PAN: Temtrol, Inc. Phonc - 405-263-7286 Fax - 405-263-4924 • VP "Variable Pitch" drive sheaves furnished on motors up to 10 HP and fixed pitch on 15 HP and above. "Fixed Pitch" sheaves provided on all fans in excess of 2,000 RPM. See air unit performance data and accessories sheet for motor / fan sheave model numbers. V- Belt drives are selected at 150% of motor nameplate horsepower. • All coil assemblies are leak tested under water at 315 PSIG. PERFORMANCE is CERTIFIED under ARI Standard 410. Coils exceeding the range of ARI standard rating conditions will be as noted on the coil computer printout. Temtrol coils are constructed of seamless copper tubing mechanically expanded into fin collars. Fins are die formed plate type. Headers are seamless copper with die formed tube holes. Intermediate tube supports supplied on coils over 44" fin length with an additional support every 42" multiple thereafter. • Type WC (water coils) - Connections are male pipe thread (MPT) Schedule 40 Red Brass. Vents and drains are provided for complete coil drainage. Coils are suitable for 250 PSIG working pressure. • The entire condensate pan / coil support assembly is fabricated from 16 gauge 304 stainless steel. The pan is recessed into the insulated - double bottom base and completely sealed. See unit drawings for drain connections. FILTERS: • See unit performance data and accessories sheet for filter quantities, sizes, and types. Filter frames, media and holding clips are furnished by TEMTROL. FILTER GAGE: • Filter gage furnished by TEMTROL See unit performance data and accessories sheet for filter gage requirements. B YU Idaho Hart Fitness Center 4 25 -86175 DAMPERS: ELECTRICAL Temtrol, Inc. Phone - 405 -261 -7286 Fax - 405-263-4924 Tenrtrol: • Low leakage dampers have extruded aluminum airfoil blades, zinc plated tubular steel square shafting, heavy duty nylon shaft bearings, santoprene rubber edge seals, stainless steel jamb seals, a 16 ga galvanized steel frame and concealed linkage. Actuators are both furnished and mounted by OTHERS. • All electrical and automatic control devices not previously called out or listed below are to be furnished and installed in the field by OTHERS. Each motor wired to a junction box mounted on unit exterior. BYUIdaho Hart Fitness Center 5 25 -86175 Job Name: Unit Tag: Serial No: Purchaser: Representative: Date / Engineer: BYU Idaho Hart Fitness Center AHU -1 86175 MECHANICAL PRODUCTS UTAH INC MECHANICAL PRODUCTS UTAH INC 05/17/2002 JT Shop Order Number: P.O. Number: Approx. Weight: Overall Unit Size: Base Height: 25 -86175 020202 -1 5,600 Lbs. 63 "H x 77 "W x 176.5 "L 5 in. S/A Fan - AF01 -22 Fan Size / Class: Total Static: Mtr Shv / Bushing / Shaft: VAC /PH /HZ: Rpm / Casing: Comment: Chilled Water Coil - (Qty. 1) 5WC - 8 - 51 x 62 x 8 - 8 AL Construction: Face Area (FP) / FV (fpm) (Qty) Supply Connection: Comment: Hot Water Coil - (Qty. 1)5WC -6 -51 x62x2 -8AL Construction: Face Area (FP) / FV (fpm) (Qty) Supply Connection: Comment: Pre - Filter - 2" Pleated Flat Filter Section (Type): Filter Type(s): Face Area (FT=) / FV (fpm) Air Pressure Drop: Comment: Filter Section (Type): Filter Type(s): Face Area (FT') / FV (fpm) Air Pressure Drop: Comment: Mastro! www.temtrol.com AF01 -22 / CL II 3.00 2VP60 / -/ 1.375 208/3/60 1,750 - ODP 5/8 / 0.010F / 0.035T / Galvanized 22.0 / 455.4 (1) 2" MPT Per Coil 5/8 / 0.010F / 0.035T / Galvanized 22.0 / 455.4 (1) 1-1/2" MPT Per Coil Flat Filter Rack 2" Pleated Flat - 30% 24.0 / 417 0.50 Flat Filter Rack 15" Non -Supp. Bag - 65% 24.0 /417 0.65 Fan CFM ® Altitude: RPM / BHP Fan Shv / Bushing / Shaft: Motor HP / Frame / EFF: Speed Range / Qty - Belts: ACFM / SCFM @ Alt.: Air Pressure Drop: (Qty) Return Connection: ACFM / SCFM @ Alt.: Air Pressure Drop: (Qty) Return Connection: (Qty) Filter Size: Filter Gage: Supplied Media: Loading: Access: (Qty) Filter Size: Filter Gage: Supplied Media: Loading: Access: Unit Data Summary Page 1 of 2 Model Number: ITF -DH20 10,000 @ 5,000 ft. 1,571 / 6.1 2B5V52 / B / 2 3/16 10.00 / 215T / Premium 1,750 / 2 - BX72 10,000 / 8,018 @ 5,000 ft. 0.39 (1) 2" MPT Per Coil 10,000 / 9,000 @ 5,000 ft. 0.12 (1) 1 -1/2" MPT Per Coil (6)24x24 Dwyer Model 2002 2 Sets Face Up Stream Final - Filter - 15" Non -Supp. Bag (6)24x24 2 Sets Face Up Stream Temtrol, Inc. P.O. Box 409 Okarche, OK 73762 Phone: 405- 263 -7286 Fax: 405- 263 -4924 fl Temtroi www.temtrol.com Job Name: Unit Tag: Serial No: Purchaser: Representative: Date / Engineer: BYU Idaho Hart Fitness Center AHU -I 86175 MECHANICAL PRODUCTS UTAH INC MECHANICAL PRODUCTS UTAH INC 05/17/2002 IT Shop Order Number: P.O. Number: Approx. Weight: Overall Unit Size: Base Height: 25 -86175 020202 -1 5,600 Lbs. 63 "H x 77 "W x 176.5 "L 5 in. Static Pressure Summary Supply Description HEATING5WC -6 -51 X62X2 -8AL COOLING SWC -8 -51 X 62 X 8 -8 AL 2" PLEATED FLAT 30% 15" NON -SUPP. BAG 65% Cabinet Internal Static Pressure Avaliable External Static Pressure Total Supply Static Pressure Comment: ,Static 0.12 0.39 0.50 0.65 0.10 1.76 1.24 3.00 Model Number: Unit Comments Temtrol, Inc. P.O. Box 409 Okarche, OK 73762 Phone: 405- 263 -7286 Fax: 405- 263 -4924 Unit Data Summary Page 2 of 2 ITF -DH2O N n 2002.200.0 1 AIR ‘ACCES,S--DOOR V..24W X 54H 24 30 / 24 0 0 C7 Z F J S 0 Z 0 0 0 Z a. 2 0 COIL PULL CESOOR COIL PULL J BOX �8W X 54H PLAN VIEW UNIT LENGTH = 176 1/2 22ga Per( GaIv = 176 1/2 30 Q7�E 7�E IACCES$.000R L24W X 54H /4 r 1 RIGHT ELEVATION 90 r--24 7/8 - -21 1/2 CCESs LEFT SIDE co O co Indoor 1 Piece Unit RIGHT SIDE 0 0 1— z t niogy@il 15 EAST OIO.AHOMA AVENUE OKAROIE. OK 73762 REP: MECHANICAL PRODUCTS UTAH INC .106 NAME BYU Idaho Hart Fitness Center PURCHASER: JECHANICAL PRODUCTS UTAH PREPARER: JT PURCHASE ORDER: NC 020202 -1 ENGINEER: UNIT TAG AHU -1 SERIAL NO.: I DAIS 86175 I 05 -20 -2002 SHOP ORDER H0.: 25 -86175 5 4 T 3 P 2 1 iiTemtrot AF01 -22 NYB DWDI Housed Airfoil JOB INFORMATION: Job Name: BYU Idaho Hart Fitness Center Job Tag: AHU -1 Rep Firm: MECHANICAL PRODUCTS UTAH INC Serial No: 86175 Date: 05 -17 -2002 OPERATING CONDITIONS: Required Air Flow: Static Pressure: Total Adjusted Static: Site Elevation: TSP @ Sea Level: FAN PERFORMANCE: RPM: BHP / BHP with Belt Loss: Static / Mech. Efficiency: Inlet / Outlet Velocity: 2 4 10,000 CFM 3.00 in. Wg. 3.00 in. Wg. 5,000 Ft. above SL 3.60 in. Wg. 1,571 6.10 / 6.32 77.4% / 83.5% 1656 / 1953 FPM 6 8 10 CFM x 1,000 WHEEL SPECIFICATIONS: Class / Max RPM: Diameter: Width: Tip Speed: Shaft / Bearing Dia.: inertia: Class II / 2,570 22.25 in. 100% 9,151 FPM 2 3/16 ", 2 3/16" 32 WR MOTOR SELECTION: Rated HP: 10.0 Frame Size: 215T Nominal RPM: 1750 VAC / PH / HZ: 208/3/60 Efficiency: Premium Enclosure Type: ODP Max Inertial Load: 82 WR SOUND POWER: (Inlet / Outlet) Octave Band: (Re 10 " -12 watts) 1 2 3 4 5 6 7 8 85 88 91 85 81 78 73 67 85 88 91 85 81 78 73 67 Sound Power A- Weighted: 88 / 88 db PM: 1571 Efficiency ystem Curve BHP 00% CO% 12 14 16 Version 2002.200 10 8 6 B P 4 2 t Comment: Comment: Temtrol. www.temtrol.com Job Name: Unit Tag: Serial No: Purchaser: Representitive: Date / Engineer: BYU Idaho Hart Fitness Center AHU- I 86175 MECHANICAL PRODUCTS UTAH INC MECHANICAL PRODUCTS UTAH INC 05/17/2002 JT Shop Order Number: P.O. Number: Approx. Weight: Overall Unit Size: Base Height: 25 -86175 020202 -1 5,600 Lbs. 63 "H x 77 "W x 176.5 "L 5 in. Chilled Water Coil - (Qty. 1) 5WC - 8 - 51 x 62 x 8 - 8 AL Total Face Area / FV : Coil FH x FL: Rows - FPI: Serpentine: Fin Thickness / Material: Tube O.D. / Wall: Tube Material: Case Material: Connection Location: Sup.Conn - Qty / Size: Ret.Conn - Qty / Size: 22.0 / 455.4 51.00 X 62.00 8 - 8 1.00 0.010" / AL 5/8" / 0.035" CU Galvanized RIGHT (1) 2" MPT Per Coil (1) 2" MPT Per Coil 1. (Glycol) falls outside the range of Standard Rating Conditions specified in 'ARI Standard 410'. 2. Rated in Compliance with ARI Standard 410 3. Air Temperature Correction for CFM not active 4. Chilled water velocity is below recommended minimum of 2.0 fps Hot Water Coil - (Qty. 1) 5WC -6 -51x 62x2 -8 AL Total Face Area / FV : Coil FH x FL: Rows - FPI: Serpentine: Fin Thickness / Material: Tube O.D. / Wall: Tube Material: Case Material: Connection Location: Sup.Conn - Qty / Size: Ret.Conn - Qty / Size: 22.0 / 455.4 51.00 X 62.00 2 - 8 0.33 0.010" /AL 5/8" / 0.035" CU Galvanized RIGHT (1) 1 -1/2" MPT Per Coil (1) 1 -1/2" MPT Per Coil ACFM / SCFM @ Alt.: EDB / EWB: LDB / LWB: Total Heat: Sensible Heat: Fluid - %: EFT / LFT: GPM: Fluid Velocity: FPD: APD: ACFM / SCFM ® Alt.: EDB: LDB: Sensible Heat: Fluid - %: EFT / LFT: GPM: Fluid Velocity: FPD: APD: 1. ARI CERTIFIED 'Rated in Accordance with ARI Standard 410' 2. Air Temperature Correction for CFM not active 3. A water - glycol mixture is required to protect coil if fluid flow is interrupted at the specified EDB. Coil Detail Data Sheet Page 1 of 1 ITF -DH2O Model Number: 636,386 Btu/Hr Water - 0 180 / 140.6 °F 33.00 3.62 ft/s 5.97 ft 0.12 in.WG Temtrol, Inc. P.O. Box 409 Okarche, OK 73762 Phone: 405- 263 -7286 Fax: 405- 263 -4924 10,000 / 8,018 @ 5,000 ft. 90 / 63 °F 55.4 / 47.2 °F 301,206 Btu/Hr 301,206 Btu/Hr Propylene - 40 46 / 57.7 °F 56.00 1.99 ft/s 6.50 ft 0.39 in.WG 10,000 / 9,000 @ 5,000 ft. 30 °F 95.2 °F 1 2401 Dur Rom Dur Earl• Stall Eay 1. Att.' sts141. Late F0 •1 f1), 06 13 20 27 03 10 JUN 17 24 01 08 JUL. 15 22 29 12 AUG 19 2002 26 02 09 16 30 07 r 14 21 26 04 25 9d 7c1 21MAY02 A 4d 18JUNO2 5d 5d 18JUNO2 5d Sd 18JUNO2 So Sd IEUIJNO2 10d 10d 18JUNO2 15d 15d 18JUNO2 10d 10d 24JUNO2 15d 15d 24JUNO2 4c1 41zi 25JUNO2 4d 4d 25JUNO2 15d 15d 25JUNO2 6d 6d 01JUL02 •10d 9d 7d 7d 09JUL02 10d 10d 09JUL02 ed 8d 10JUL02 10d 10d 16JUL02 2d 2d 22JUL02 5d 5c1 23JUL02 5d 5d 24JUL02 4d 4d 30JUL02 7d 7d 01AUGO2 Id Id 12AUGO2 3d 3d 12AUGO2 4d 4d 12AUGO2 4d 4d 12AUGO2 5d 5d I :AU G'02 sd 5d 12AUG02 10cl 10d 12AUGO2 10d , 10d 12AUGO2 10d 10d 12AUGO2 2d 5d 7d 9d 10d 10d 10d 4d 10d ed 4d 1 Oci 2d 9d 2d Sd 7d 10cl 10d 10d 10d 10d 10d od „uld 10cl 10c1 15d 10d 0 15MAY02 A 0 15MAY02 A 0 15MAY02 A 0 15MAY02 A 0 15MAY02 A 0 15MAY02 A 0 15MAY02 A 0 15MAY02 A 0 15MA YO2 A 0 15MAY02 A 0 15MAY02 A ArTI5MAY02 A jlerl 5MA YO2 A 6d 15MAY02 A 12d 15MAY02 A 21MY02 A 01JUL02 9d 03JUL02 Start date Finish date Data date Run date Page number c Primavera 2d 16AUGO2 5d 16AUGO2 7d 16A UGO2 9d 16AUGO2 10d 16AUGO2 10d 19AUGO2 10d 19AUG02 4d 23AUG02 10d 23AUG02 8d 27AUG02 4c1 29AUG02 10d 06SE PO2 2d 095E P02 9d 11SEPO2 1 5MAY02 23SEP02 18JUNO2 20JUNO2 1A Systems, Inc 16MAY02 A 21MAY02 A 23MAY02 A 29MAY02 A 29MAY02 A 29MAY02 A 29M4 Y02 A 29MAY02 A 29MAY02 A 29MAY02 A 29MAY02 A 21JUNO2 21JUNO2 25JUNO2 03JUIO2 273 U402 02JUL02 21JUNO2 24JUNO2 24JUNO2 24JUNO2 01JUL02 09JULD2 08JUL02 I 5JUL02 28JUNO2 28JUNO2 16JUL02 09JUL02 15JUL02 16JUL02 17JUL02 22JUL02 19JUL02 29JUL02 23JUL02 29JUL02 30JUL02 02AUGO2 09AUGO2 12A UGO2 14AUGO2 15AUGO2 15AUGO2 16AU0A2 16A U002 23AUG02 23AUG02 23A UGO2 19AUGO2 22AUG02 26A UGO2 28AUG02 29AUG02 30AUGO2 30AUGO2 28AUG02 06SEPO2 06SE PO2 04SEPO2 19SEPO2 10SE PO2 23SEP02 15MAY02 A 16MAY02 A 15MAY02 A 211V1AY02 15MAY02 A 23MAY02 A 15MAY02 A 29MAY02 15MAY02 A 29MAY02 A 15MAY02 A 29MAY02 A 15MAY02 A 29MAY02 A 15MA YO2 A 29MAY02 A 15MAY02 A 29MAY02 A 15A4AY02 A 29MAY02 A 15MAY02 A 29MAY02 A 15MAY02 A 27JUNO2 15MAY02 A 21JUNO2 15MAY02 A 31JUL02 15MAY02 A 31JULG2 21NtAY02 A 23SEP02 21MAY02 A 09JUL02 18SE PO2 23SEP02 25JUL02 31JUL02 01JULD2 08JUL02 11JUL02 17JULO2 O9JULD2 22JUL02 03SE PO2 23SEP02 24JUNO2 08JUL02 24JUNO2 15JUL02 18JUL02 23JUL02 18JUL02 23JUL02 11JUL02 31JUL02 24JUL02 31JUL02 05JUL02 18JUL02 10JUL02 22JUL02 12JUL02 22JUL02 09JUL02 22JUL02 16AUG02 27AUG02 10SEPO2 23SEP02 28AUG02 29AU002 23JUL02 29JUL02 30AUG02 O6SEPO2 30JUL02 02AUGO2 01AUGO2 09AUGO2 23SEP02 23SEP02 05SE PO2 09SEPO2 12AUG02 15AUG02 I 2A UGO2 15A UGO2 16A u G0.2 212A,1602 16AUGC2 22ALIG0 14AUGO2 27AU002 23AUG02 06SEPO2 10SEPO2 23SEP02 20SE PO2 23SEP02 16AUGO2 22AUG02 16AUGO2 26AUG02 26AUG02 06SE PO2 10SEPO2 23SEP02 23AUG02 06SE PO2 23AUG02 06SE PO2 27AUG02 30AUGO2 23AUG02 06SEPO2 27AUG02 06SE PO2 033E P02 06SEPO2 10SE PO2 23SEP02 09SE PO2 10SEPO2 11SEPO2 23SEP02 0 25d 19d 60d 4d 64d 26d 9d 16d 14d 53d 0 0 16d 16d 11 d 16d 3d 4d 3d 0 27d 39d 27d n 27d 0 0 29d 17d 0 0 4d 2d 9d 20d 24d 0 0 6d 16d 4d 4d 2d 0 0 2d 2d 0 0 .4111111 Mobtizatmn 0-11111111111111111111•11111111111111 Mech. - Toilet Room Demolition Asbestos Removal Contract Administration Mech - Submit Vendor Data Elec - Submit Vendor Data Wall/Ceiling Demolition Mach - Mechanical Demolition psi Elec. - Electnoal Demolition Fire Sprinkler Pipe Rerouting Fire Sprinkler Pipe Demolition to. 9.1 Nielson Bodily Approval Elec Submittals : Nielson Bodily Approval Mech. Submittals Efec - Communications Syst Rough-1n Efectncaf Equipment Installation Hollow Metal Frames CMU Patch 8. Repair Paint Exposed Structure Metal Stud Partitions Efec - Cable Tray Dec - Procure Equipment Mech - DDC Rough-In Elec Rough-1n at Columns Mech - Metal Stud Rough-In P C Piaster Walls Mech - Procure Material Mech - Procur Equipment BYU IDAHO HART FITNESS CENTER REMODEL Ormond Builders, Inc. Fire Sprin ; Piping Gyp Board Installation/Finish Nlech. - Hydron Piping Elec - O * Rough-In h. harm's' Insulation Mech - Overhead Rough-In Cer mic Tife Installation Mechanical Equipment Installation h. - Toilet Fixtures Paint Exposed Overhead Systems Toilet Accessones Open Grid Ceilings Ormond Builders, Inc. Hart Fitness Center Remodel Painting General Hospital Cubical Curtain Wire CeiliIng os• Acoustical Ceiling Grid '::af iass Wood Doors 111. Elec. - Electrical Plug Motd Glass Mirror Installation Cabinetry Installation Fire Sprinkler Trim Mech. - Griiles & Registers , Ceramic Tile Base Dec - Fire Alarm Equipment & Trim Elec. - Communications Devices & Trim VCT Installation Door Hardware Acoustical Tile :Mech 7.A.B./Systems Commissioning 1 Carpet Wainscot Rubber Flooring Final Clean Up Efec. - Fixtures & Trim Punchlist , Early bar MIMI Progress bar Critical bar Summary bar Start milestone Point Finish rniliastone point