CERTIFICATE OF OCCUPANCY
Community Development
Department of Building Inspection
Building Permit No: R
Applicable edition of code: ❑ International Building Code 2000
❑ International Residential Code 2000
❑ Uniform Building Code 1997
Site address: 525 S Center
Use and occupancy: Student Health & Counseling
Type of construction: Masonry
Design occupant load:
Sprinkler System required: ❑ Yes ❑ No
Name and address of owner: BYU Idaho
525 S. Center
Rexburg, Idaho 8246o
Contractor: L & R Construction
Special conditions:
Occupancy: $4 Full ❑ Partial ❑ Temporary
This Certificate, issued pursuant to the requirements of Section log of the International
Building Code, certifies that, at the time of issuance, this building or that portion of the building
that was inspected on the date listed was found to be in compliance with the requirements of the
code for the group and division of occupancy and the use for which the proposed occupancy was
classified.
Date: May 13, 2004 (3:o8PM)
C.O. Issued by:
Official
There shall be no fufure change in the existi occupancy classification of the building nor shall
any structural changes, modifications or additions be made to the building or any portion thereof
until the Building Official h reviewed and approved said future changes
Water Department 4 1 ' ire Department
State of Idaho Electrical Departme t - (208- 356-4830 ) ❑ Merlin Webster
BUIL PERMIT APPLICA ` N REXBURG, ID DATE _ NO. � -nj p
THE UNDERSIGNED HEREBY APPLIES FOR A PERMIT FOR THE WORK HEREIN INDICATED
OR AS SHOWN AND APPROVED IN THE ACCOMPANYING PLANS AND SPECIFICATIONS.
OWNER { > JOB ADDRESS '� PHONE
� A _1 a
BUILDER s r ARCHITECTa{, DESIGNE
STRUCTU EW ❑ REMODEL ❑ ADD ❑ R EPAIR ❑ RENEWAL ❑ FIRE DAMA
❑ RESIDENCE ❑ COMM. `WDUCATIONAL ❑ GOVT ❑ RELIGIOUS ❑ FENCE ❑ PATIO ❑ CARPORT ❑ GARAGE (2 AWNING
FOOTINGS FOUNDATION BASEMENT FLOORS EXTT, WALLS INT. WALLS CEILING ROOF HEAT INSULATED
)WKQONCRETE NCRETE PARTIAL ❑ WOOD L) WOOD ❑ WOOD ❑ WOOD ❑ BUILT UP. ❑ GAS WALLS
L1 MASONRY ASONRY FULL NCRETE MASONRY ❑ MASONRY L) DRYWALL ❑ WOOD SH. ❑ OIL CEILING
❑ OTHER ❑ OTHER ❑ NO ❑ 7HER o 'U ❑ CONCRETE ❑ PLASTER ❑ COMP. SH. - COAL ❑ FLOORS
• VENEER UtPRYWALL U TILE ❑ TILE MfIREPLACE ❑ PERIMETER
• METAL PLASTER ACOUSTIC ❑ ROLL ROOF. ❑ ELECTRIC
This permit is issued subject to the regulations contained in the Uniform Building Code and Zoning Re6ulations of Rexburg, and it is hereby agreed
that the work to be done as shown in the plans and specifications will be completed in accordance with the regulations
pertaining and applicable thereto: The issuance of the permit does not waive restrictive covenants.
REMARKS:
DEPARTMENT OF BUILDING & ZONING
VALUE 101 /1
FEE PAID ❑CASH APPLICANT
HECK
BUILDING DATE ADDRESS
INSPECTOR
Copy CANARY — Building Department copy PINK - Assessors Copy
OWNER
Name e; U - I MHO
Site Address � �7
Mailing
City /Star
Telephoi
CONTRACTOR
Name Qn k &L
Mailing Address Flo W X i (�
When was this built
Architect/ Engineer
Subdivision Lot Block
Circle One Residential Commercial ducational . Government Remodel Other
Circle One New House Addition/Remodel to House New Commercial Commercial Remodel
-
Circle One Basement: None/ Finishe nishe Othe < None / atio/ Carport/ Awning N/A
Lot Square Footage Lot Width Cc`
Square Feet n�5 Gana a 5 rxanT a- — 7 is ` �. - "�G
q g quare eet Number of Stories Height of Building
What will structure be used for: Home Home Business Apartment Commercial Other
Will there be an apartment _ If so, how many units --�
Total Estirnated Cost ��� Are you in a uood plain
Meter 9 � �
Signature of Applicant
Code
Zone
Building Type
JAN 2 3 2003
PAID CASH $ ----
CHECK
Signature of Inspector
Issued by
Building Permit Fees
Plan Check Fees
Plumbing Permit Fees
Digging Permit
Water & Sewer Fees
Front Footage Fee
TOTAL $
PROJECT INFORUATION DEPARTMENT APPROVAL
Property Zone: _ Is existing use compatible with zoning, (screening parking, etc)
CITY OF REXBURG
APPLICATION FOR PLUMBING PERMIT
Rough Plumbing
OWNER
FEES
Urinal
Name
T "/
Plumbing Permit .................. • •
$
e {.
Address . :° Tel. f : > -° C
Sewer In ....................
p
$
Lot
131k. Add.
Inspection of Pipe ............... • • • .
$
Other
I nspection of Fixtures • • • . • • • • • • • • • • • •
$
PLUMBER
fir.; 'tip rrj t i�x'
Name
` t
Kitchen Sinks.
$
Address
Tel.
Floor Drain
$
NATURE OF INSTALLATION
TOTAL
$
Use
�`' -::
Received: Date
Rough Plumbing
Bath Tubs
Septic Tank
Urinal
Fixtures
Showers
Water Piping
Sink Trap
Complete
Laundry Trays
Sewer
Water Heater
DESCRIPTION OF WORK
Bath Tubs
Urinal
'
Showers
Sink Trap
Laundry Trays
Water Heater
Wash Basin
Other
Toilet
Slop Sinks
Kitchen Sinks.
Floor Drain
`K
Drinking Fountains
"
Lawn Sprinklers
Water Softeners
Dish Washing Mach.
Clothes Washer
By
INSP'ECTOR'S RECORD
4 N
JAN 2 3 M3
It
ARID CASH $
0
S
I ' l INSP. NAME
Rough Plumbing
Sewer
Other
Finish Plumbing
SPECIAL CONSTRUCTION
(MANUFACTURER OR SUPPLIER)
loc
? ccz / Cai1; *zg c
J; sto
-. : ��e�' Lc9eS�
( n /j ,y .
,. t ry p l c5 1 C l rri r /I LD 1D.- A
(- TOR
-
��
D_ywali
-
rO
Floor Cov =zings a - • � S
�O�»t rys �r� Gu e(^Ji e S
F 3 usnh 1-n9
seat; ng:
SPECIAL CONSTRUCTION
(MANUFACTURER OR SUPPLIER)
loc
? ccz / Cai1; *zg c
J; sto
-. : ��e�' Lc9eS�
( n /j ,y .
,. t ry p l c5 1 C l rri r /I LD 1D.- A
ROM
:JHS ARCHITECTS
FAX NO. :208 232 1226 Dec. 23 2002 01:09PM P1
FAX MEMO
Date: 23 December 2002
To: Val Christenson, Building Official
Fax #: 359 -3022
From; Randy Hayes
Fax #: 232 -1226
I missed you on Friday afternoon. I wanted to make sure that you understood that we
could not get all of your comments incorporated into the plans and specs, for the ZYU -I
Student Family Housing project before we had to be out for bids. Just after the first of the
year we will begin putting together addendums for the revisions that need to be made.
Those addendums will take care of the comments from you and Chris Huskinson.
Please note that the structural calculations are based on an 80 mph wind load. When our
structural engineer came on board, the 90 mph that we were using caused some flags to
be raised on his part, He talked to a Blair Kay and received the 80 mph wind loading
requirement.
Please destroy the sets of plans and specs that you used for your review and utilize the
ones that I delivered last Friday for the construction phase of the project. Again, the
addenda that are issued in early January 2003 will take care of the issues that were
raised by you and Chris.
Thanks for your cooperation in these matters.
.IENSF5N 9HAYES•SHROPSF-IITiR
ARCI,11'rECTS, P.A.
125 North Garfield NPocatc11o,1daho 83204
208/232 -1223 Fax 208/232 -1226
i
Architecture
Planning
Interior Design
Jensen Haslem
A Professional Corporation
December 11, 2002
Val Christensen
Building Official
P.O. Box 280
12 North Center Street
Rexburg, Idaho 83440
RE: Plan Review Comment Responses
Val,
1 have read through all the comments and have the following responses.
1. The parking plan includes two handicapped accessible spaces, one with
an aisle along side and ............
response:
Please turn to the "overall" site plan SP1. Note that the handicapped stalls are
13' -0" (8' -0" for auto and 6 -0" for accessible aisle). I'm sorry that the Site Plan
does not graphically show an aisle but there is space allocated for each
handicapped stall.
We would also like to add a handicapped stall West of the clinic as seen in the
attachment SK -1. We want to locate it here to provide multiple locations for
students, faculty and /or employees.
2. The waiting area is of a size that will require 2 exits as per Table 1004.2.1.
of the 2000 International Building Code (IBC). Exit signs will need to be
added the other entrance(s) that connects to the exit hallway.
response:
Two exit signs will be added above doors 121 & 169. See SK -2 and letter from
Thomas C Jenseu, AIA
BNA Consulting Engineering.
Bruce D Harlem, AIA
Brent Hardcostle, AIA
Donald T Finlayson, AIA
Jon AErdmonn
3. Please provide cut sheets for all HVAC Units.
Salt Lake City
Logan
response:
2180 South 1300 East
Suite 300
Please note that is my understanding that Double E Construction has been in
Salt Lake Cit Utah 84106
contact with the City of Rexburg and responded regarding this request.
Voice 801474.1400
Fax 801474.1100
Email slc @jensenhaslem.com
4. The Fire Department has reviewed the drawings and I have attached a
copy of their report to the back of this document. Please address their concerns.
response:
All fire alarm /horn strobes that the City of Rexburg Fire Department has requested
will be installed as per the letter from BNA Consulting Engineering. See
attachment.
All added equipment has been forwarded to Double E Construction for a Change
Order.
If you have any questions regarding our responses, please contact myself at
Jensen Haslem Architects.
Thank you Val,
Mike Condie
jhtph Architects
STATE OF IDAHO
www.d.rexburg.id.us
P.O. Box 280
12 North Center Street
Rexburg, Idaho 83440
Phone(208)359 -3020
Fax(208)359 -3022
e -mail rexburg @d.rexburg.id.us
10/21/2002
Mike Condie
Jensen Haslem Architects
2180 South 1300 East, Suite 300
Salt Lake City, UT 84106
Dear Mike,
I have reviewed the drawings for the BYU Idaho Student Health and Counseling Center
and have identified the following discrepancies:
1 The parking plan includes two handicapped accessible spaces, one with an aisle along
side and one without. The ADA guidelines for Accessible Design requires that a 5
foot aisle be included along side each handicapped accessible space. Additionally, the
amount of required handicapped spaces (by my calculations) should be 3, not 2. If we
identify the number of required parking spaces using the Rexburg Zoning Ordinance
requirement of 3' spaces per 1000 sq. ft. of building space, the result is 61 required
spaces for the 20296 sq. ft. building. The ADA Standard for Accessible design
identifies that 3 handicapped spaces are to be provided. I feel that these numbers are
conservative for a building that will have an occupancy of over 200 people.
2 The waiting area is of a size that will require 2 exits as per Table 1004.2.1 of the 2000
International Building Code (IBC). Exit signs will need to be added to the other
entrance(s) that connects to the exit hallway.
3 Please provide cut sheets for all HVAC Units.
4 The Fire Department has reviewed the drawings and I have attached a copy of their
repor? to the back of this document. Please address their concerns.
Please address the above items and return two copies of any changes to me at City Hall.
Thank you for your cooperation in this matter. If you have any questions please give me a call at
359 -3020 ext. 324.
Sincerely,
WMA
Val Christensen
Building Official
cc: John Millar
Chris Huskinson
Rulon Neilsen
REXBURG MADISON
P.O.
26 Noj
Rexburg,
(208)
(Zo8)
2000 INTERNATIONAL FIRE CODE
Plan Review
Building Name: BYU -I STUDENT HEALTH CENTER
Building Address: BYU -I CAMPUS, VIKING DRIVE
Stories: TWO
Plan Date: 9 -20 -02
Review Date: 10 -6-02
Type of Construction: 5 -A
Occupancy Classification: B Existing Floor Area: N/A
New Construction Floor Area: APPROXIMATELY 22,472 SQUARE FEET
1).Required Fire Flow (Appendix III -A): 2750 GPM /TWO HOURS
.Comments: FIRE FLOW REQUIREMENT SHALL BE 1500 GPM /TWO HOURS AS
BUILDING IS EQUIPPED WIT? AN AUTOMATIC FIRE SUPPRESSION SYSTEM.
2).Water Supply (Article 9, Section 903) Required: YES
Fire Hydrant Vocation: CLOSEST IS D -38 CENT HIGH SCHOOL AND BYU-
I CAMPUS (VIKING DRIVE)
Fire Hydrant Flows: OKAY
Fire Flow Test Location: SAME AS ABOVE
Fire Flow Supplied By: FD AND BYU -I
Other Approved Water Source: NONE
Water Supply Acceptable: YES
Fire Hydrant Location Acceptable: YES
Water Supply Comments: NONE
3.)Fire Apparatus Access Roads (Article 9 Section 902)
Required: YES
Acceptable: Width: X Length: X Surface: X
Complete Road Acceptable: YES
Comments: NONE
COUNTY FIRE DEPARTMENT
Box 280
:th Center
Idaho 83440
359 -3010
3sn- 3oe(, IFA?�7
4).Access Roads and Water Supply, Including Fire Hydrants Are
Required To Be Installed And Made Serviceable Prior To And During
Time Of Construction (Article 9 Section 901.3): YES
Comments: IF NOT INSTALLED AND MADE OPERATIONAL PRIOR TO
CONSTRUCTION A STOP WORK ORDER WILL BE ISSUED.
5),Installation Of Portable Fire Extinguisher (Article 10 Section
1002) Required: YES Location Acceptable: NOT SHOWN
Type Provided Acceptable: NOT SHOWN
Comments: MINIMUM SIZE OF 2A10BC REQUIRED WITHIN TRAVEL DISTANCES
6).Automatic Fire Extinguishing Systems: (Article 10 Section 1003
Required: YES Type Of System Being Installed: WET, PLANS TO
STATE FIRE MARSHAL
Sprinkler System Monitoring Required (Article 10 Section 1003.3)
Required: YES Comments:
7).Standpipes (Article 10 Section 1004) Required: NO
Type Required: Comments:
8).Ventilating Hood And Duct Fire Extinguishing System (Article 10
Section 1006.2) Required: NO
Type Being Provided:
Automatic Fuel Shutoff Shown (Article 10 Section 1006.2.4):
Portable Fire Extinguisher Shown (Article 10 section 1006.2.7):
Comments:
9).Fire Alarm Systems (Article 10 Section 1007)Required: YES
Type Of System Required: Manual: Automatic: Both: X
Type Of System Being Provilfted: Manual: Automatic: Both: X
Components Of System Shown: Smoke Detectors: X Heat Detectors: X
Manual Pull Station: X Sounding Devices: X Visual Devices: X
Door Holders: Duct Detectors: Flow Alarm: X
Sprinkler Valve Monitoring: X Fire Alarm System Acceptable: SEE
COMMENTS.
10).Other Corrections That Are Required By Special Occupancy Or
Conditions: SEE COMMENTS
Comments: PLEASE PROVIDE THE FOLLOWING IN REGARDS TO THE ALARM
SYSTEM: ALARM CONTROL AND SIGNALLING EQUIPMENT, ANNUNCIATION, POWER
CONNECTION, BATTERY CALCULATIONS, CONDUCTOR TYPE AND SIZES, VOLTAGE
DROP CALCULATIONS, MANUFACTURERS, MODEL NUMBERS AND LISTING
INFORMATION FOR EQUIPMENT, DEVICES AND MATERIALS, AND THE INTERFACE
FOR SAFETY CONTROL FUNCTIONS. SEE BELOW FOR MISSING HORN /STROBES,
PULL STATIONS, ETC. THAT NEED TO BE ADDED TO SYSTEM. ARE MAGNETIC
DOOR HOLDERS GOING TO BE USED THROUGHOUT THE BUILDING? IF SO,
PLEASE ADDRESS.
Plans As Submitted Are Acceptable: NOy PLEASE ADDRESS NOTED ITEMS
Plans Checked By: CHRIS HUSRINSON Date: 10 -6-02
Please furnish comments back to the plan reviewer in the fclLDwing
manner: Written Comments: X New Plans: X
ALARM SYSTEM ITEMS•
FIRST FLOOR:
1. ADD PULL STATION AT REAR GARAGE DOOR EXIT
2. ADD HORN /STOBE UNIT IN ROOMS 136, 131, 134, 164, 172, 20TO
116.
3. MOVE HORN /STROBE IN ROOM 179 TO MORE CENTRAL LOCATION.
4. ADD HORN STROBE UNITS IN CORRIDOR 126.
SECOND FLW- R:
1. ADD HORN /STROBE UNIT IN ROOM 282.
BNA Consulting Engineers
To: Mike Condie
Jensen Haslem
From: Richard L. Wardle
Date: November 8, 2002
Subject: BYU Idaho Student Health
Please provide the following for the above referenced project.
Sheet E201
Memorandum
1. Provide exit sign type X1 above door leading from Waiting 102 to East Corridor 169. Connect to
local emergency lighting circuit EM -5.
2. Provide exit sign type X1 above door leading from Waiting 102 to West Corridor 121. Connect to
local emergency lighting circuit EM -3.
Sheet E301
1. Add fire alarm horn /strobe on south wall of Nurses Office 131. Tie to local fire alarm annunciation
loop.
2. Add fire alarm horn /strobe on south wall of X -Ray Room 134. Tie to local fire alarm annunciation
loop.
3. Add fire alarm horn /strobe on north wall of X- Ray /Orthopedic 136. Tie to local fire alarm
annunciation loop.
4. Add fire alarm horn /strobe on east wall of Procedure Room 164. Tie to local fire alarm
annunciation loop.
5. Add fire alarm horn /strobe on north wall of Blood Lab Office 1116c. Tie to local fire alarm
annunciation loop.
6. Relocate fire alarm horn /strobe in Pharmacy 179 to ceiling located at grid 3.0 and 12' -0" south of
grid B.
Sheet E302
1. Add fire alarm horn /strobe on west wall of Work Room 282. Tie to local fire alarm annunciation
loop.
635 South State Street Salt Lake City, Utah 84111 801 532.2196 Tel 801 532.2305 Fax
1704 West Sunset Blvd. St. George, Utah 84770 : 435. 628.3670 Tel 435. 628.3680 Fax
6'
64' -1 /4
2
HANDICAP ACCESS
RAMP
7zr
10' -0" VAN ACCESSIBLE
HANDICAPPED PARKING STALL
WITH 8' -0" ACCESSIBLE AISLE STAIRS (3)
.J
57' -6"
T . ' -0 . -- 10' -0"
16' -0"
9' -0" TYP.
TYP.
L
�t
c J
INSTALL FIRE \`\
HYDRANT `
EXISTING = —
LINES
EXISTING
19' PAM IC �-
S ��� PLAN
SCALE: 1/16' =1'-0'
ODMO
s 8
crummmAL
F. commucnmDmm m ASI #1
9
la
LEVEL 1 REFLECTED CEILING P LAN
SCALE: 10 m Vr
OYU Mmo
-8 F- STUDElff HEALTH& o
o UC ��S � Ste'
N o ° MM RG. t a) M AHO 1111iI
ADD A TOTAL OF TWO (2) EXIT SIGNS
AT THESE LOCATIONS
Pubphaditeas
associated architects
ADDENDUM #1
DATE: August 8, 2002
PROJECT #: 02003
PROJECT: BYU- Idaho: Student Health Center
200 East 400 South
Rexburg, Idaho 83460
ISSUED BY: jhtph architects
2180 South 1300 East
Salt Lake City, Utah 84106
ADDENDUM NO. 1
QUALIFIED BIDDERS
Fire Sprinkler Sub - contractors
1.
3 -D Fire Protection
6312 S. Yellowstone
Idaho Falls, Idaho 83402
Phone: (208) 525 -8377
Fax: (208) 525 -8381
2.
Firetrol Protection Systems Inc.
142 West 2260 South
Salt Lake City, Utah 84115
Phone: (208) 485 -6900
Fax: (208) 485 -6902
3.
Gem State Fire Protection
1105 E. Iona Road
Idaho Falls, Idaho 83401
Phone: (208) 524 -5230
Fax: (208) 524 -2119
4.
482 West �'440 Sant! i
9 62-949r&
5.
-Phone; 4208)
fax. (266) 262 9420
Western Automatic Sprinkler Corp.
2510 W. Temple
Salt Lake City, Utah 84115
Phone: (208) 487 -3531
Fax: (208) 466 -1777
QUALIFIED BIDDERS — address correction
Mechanical Sub - contractors
1. Bears Fabrication
240 N. Yellowstone Highway
Building E
Rigby, Idaho 83442
Phone: (208) 745 -1560
Fax: (208) 745 -1562
SPECIFICATION ITEMS
Architectural:
Section Page Line Amendment
00005 - - Revision of NOTICE TO BIDDERS (See Attachment)
00005 - - Revision of FORM OF PROPOSAL (See Attachment)
08411 4 A.1. Replacing Tri -Fab VG 451 system with Encore Front Loaded System.
(See Attachment)
Perimeter & Intermediate Horizontal Members -1 3/4" x 6 1/2"
Intermediate Vertical Members —1 3/4" x 4 1/2"
08800 13 3.9 Revision of Glass Types: (See Attachment)
TYPE 1: 1 inch insulated, tinted, tempered
TYPE 2: 1 inch insulated, tinted, non - tempered
TYPE 3: 114 inch insulated, tinted, tempered
TYPE 4: 114 inch insulated, tinted, non - tempered
TYPE 5: 1 inch insulated spandrel, tinted, tempered
TYPE 6: 1 inch insulated spandrel, tinted, non - tempered
TYPE 7. 114 inch wire glass (square)
TYPE 8: Leaded glass with 41b lead equivalency
TYPE 9: 112 inch tempered (stair only)
11500 1,4 - Owner will provide fluorescent tubes.
Contractor will install. (See Attachment)
DRAWING ITEMS
Page 2
Architectural:
Sheet Drawing Amendment
A101A 1 ST LEVEL FLOOR PLAN — AREA A Aluminum window type A.1 was created due to
glazing required in this location. See SK -1
A101 B 1 ST LEVEL FLOOR PLAN — AREA B Hollow metal window type GA was created due to lack
of information on drawings. See SK -2
A102 2" LEVEL FLOOR PLAN Window tag was changed to `Z'. See SK -3
A504 MISC. ARCHITECTURAL DETAILS Details changed. See SK -4 thru SK -6
A801 DOOR AND WINDOW SCHED. Doors 111 and 149b changed to 20 min rating,
Glazing Schedule revised and coordinated into various
door types. See SK -7 thru SK -11.
A802 WINDOW TYPES Glazing tags have been revised to coordinate with
Glazing Schedule. See SK -12 thru SK -28
Full 30x42 sheet available upon request.
Mechanical:
Sheet Drawing Amendment
Cover Sheet Information regarding VBFA will be as follows. DO NOT USE PUBLISHED MOBILE
NUMBER.
Contact: Dan Rollins E -MAIL: drollins(ab-vbfa.com MOBILE: none
M012 MECHANICAL AND PLUMBING DETAILS
1. Blue Brute chilled water pipes to be buried such that
the top of pipes shall be 5 feet below grade.
2. Pipes to be encased in sand. Pipes shall be 12" apart
with sand between them. Sand shall be filled in at
minimum of 12" around the pipes included below, on
the sides, and above pipes.
3. Gilsulate insulation is not to be used.
4. Backfill the trench from the sand up to grade. Backfill
material and slope of trench shall be per
requirements of the site conditions.
END OF ADDENDUM NO. 1
Page 3
Atphaditeas
associated architects
ADDENDUM #2
DATE: August 13, 2002
PROJECT #: 02003
PROJECT: BYU- Idaho: Student Health Center
200 East 400 South
Rexburg, Idaho 83460
ISSUED BY: jhtph architects
2180 South 1300 East
Salt Lake City, Utah 84106
ADDENDUM NO. 2
QUALIFIED BIDDERS
Pre - approved Sub - contractors List: (See Attachment)
SPECIFICATION ITEMS
Architectural:
Section Page Line
06200
09652 6 3.05
09950
Amendment
Add FINISH CARPENTRY to Specifications
(See Attachment)
Additional information on the SHEET FLOOR COVERING SCHEDULE.
(See Attachment)
Delete WALL COVERINGS from Specifications
No wall coverings are being used in this project.
Mechanical:
Section Page Line Amendment
13916 Revised Specification Section — FIRE- SUPPRESSION SPRINKLERS 8 PIPING.
(See Attachment)
DRAWING ITEMS
OWNER/CIVIL:
Sheet Drawing Amendment
ROCK PROFILE BYU -Idaho has provided the attached Forsgren drawing
for the use of all qualified contractors. Paper 30x42
drawing or the electronic file will be made available upon
request. (See Attachment)
Architectural:
Sheet Drawing Amendment
A601 ROOM FINISH SCHEDULE Wall base conditions and floor finishes in certain
locations have been revised. (See Attachment SK -1)
A601
A801
ROOM FINISH LEGEND The SCHEDULE LEGEND has been revised. Quarry Tile
will no longer be used in this project. Porcelain Tile will
be substituted for all schedules that call out for QT. The
Porcelain Tile being used is: 12x12 Dal Tile: 42 -78111
Cocoa. (See Attachment SK -2)
ROOM FINISH SCHEDULE Door Types in certain locations have been revised. (See
Attachment SK -3)
A402 ROOM #102 - WAITING
A702 STAIR DETAIL
Mechanical:
Sheet Drawing Amendment
M001 MECHANICAL SCHEDULES
END OF ADDENDUM NO. 1
Additional information has been provided to assist with
the sizing of oak trim. Also see added specification
section 06200. (See Attachment SK -4)
Additional information has been provided to assist with
the detailing of the stair oak guardrail. Also see added
specification section 06200. (See Attachment SK -5)
The Mechanical Equipment Schedules have been
revised. Note to General Contractors: Due to the
revisions of this sheet, the Architect will be sending
the Addendum directly to the Qualified Mechanical
Sub - Contractors.
Page 2
Pubphaditeas
associated architects
ADDENDUM #3
DATE: August 15, 2002
PROJECT #: 02003
PROJECT: BYU- Idaho: Student Health Center
200 East 400 South
Rexburg, Idaho 83460
ISSUED BY: jhtph architects
2180 South 1300 East
Salt Lake City, Utah 84106
ADDENDUM NO. 3
SPECIFICATION ITEMS
Unit Pricing Sheet: Apply to Excavation, Blasting, Structural Fill and Site Grouting
See Attached
Cost Bid Breakdown Sheets:
Architectural: Apply to all Specification Sections listed on the attached.
Mechanical: Apply to all Specification Sections listed on the attached.
Electrical: Apply to all Specification Sections listed on the attached.
Architectural:
Section Page Line Amendment
02300 3 3.3 Delete section 3.3 explosives
02820 Add Specification Section 02820 — CHAINLINK FENCES AND GATES
(See Attachment)
03450 Add Specification Section 03450 — PLANT - PRECAST
ARCHITECTURAL CONCRETE
(See Attachment)
04810 Add Article to Specification Section 04810 — CONCRETE MASONRY
UNITS — Trash Enclosure
(See Attachment)
06402 3 2. 1. A. Revise the following: Approved Fabricators: Open to general
bidding. (See Attachment)
07620 Add Specification Section 07620 - SHEET METAL FLASHING AND
TRIM (Rain Gutters and Downspouts)
(See Attachment)
08211 2 2.1 A. 1 Mohawk Flush Doors Inc shall be an approved equal to those listed in this section.
(See Attachment)
08331 2 2.1 A. 3 Cookson Company shall be an approved equal to those listed in this section.
(See Attachment)
09680 1 1.2 A. 1. NOTICE TO CONTRACTORS: Carpet will be Owner Provided and Contactor
Installed. (See Attachment)
10265 3 2.1 A. 2 Pawling Corporation shall be an approved equal to those listed in this section.
(See Attachment)
CLARIFICATION: 24 (3" leg x 36" high) Corner Guards used
16 (2" leg x 36" high) Corner Guards used
No Wall Guards used in project
No Door Edge Guards used in project
No Door Frame Guards used in project
No Sheet and Panel Wall Coverings used in project
Entrance Matt is provided and installed by owner
12484 1 1.2 A. 1. NOTICE TO CONTRACTORS: Carpet -type mats will be Owner Provided and
Contactor Installed. (See Attachment)
DRAWING ITEMS
Civil:
Sheet Drawing Amendment
1 TRENCH DETAIL
2 TRASH ENCLOSURE
Contractor shall add this Trench Detail for the
Steam /Condensate lines. The attached trench detail is
used on the line extension to the site, and will be suitable
for the lines running on -site. The Contractor should be
aware of the Gilsulate 500XR fill and 6" concrete cap
over the Gilsulate. (See Attachment:
STEAM /CONDENSATE INSUALTED ENVELOPE DETAIL)
Detail provide by Civil Engineer to further explain
construction of trash enclosure located North of bldg.
Page 2
Architectural:
Sheet Drawing Amendment
A101 a LEVEL 1 FLOOR PLAN AREA A Remove Note: HAND. DOOR OPENER (4) TOTAL -
Located near DOOR 100a. Handicap door sensors will
be located above door at ENTRY VESTIBULE 100a.
Refer to Specifications Section 8710 - Hardware
Schedule and Specification Section 08411.
A110 REFL. CEILING PLANS
Revise Ceiling Type Schedule. "LC2" is a 12 "x12"
ACOUSTICAL TILE - GLUED TO GYP.
(See Attachment - SK -1)
A404 & A406 INTERIOR ELEVATIONS
INTERIOR ELEVATIONS B5,C1/A404 and B3/A406 all
indicate that the baby changing station in (NIC). This is
not correct. All (4) Baby Changing Stations will be
contractor provided and installed. Please remove
the "(NIC)" from your Sheets A404 & A406 concerning the
baby changing stations.
A404, A405 & A406 INT. ELEVATIONS In all sheets indicated, a detail E6/A301 is called out in
various locations at the ceramic tiled wall. The detail
number is correct, but the referenced sheet number is
incorrect. The correct sheet number is A505. Thus,
E6/A301 should be substituted for E6 /A505
A407 INTERIOR ELEVATIONS INTERIOR ELEVATIONS B3/A407 and C4/A407 indicate
mop & broom holder locations. Refer to Specification
Section 10801 for additional information.
(See Attachment - SK -2 & SK -3)
Structural:
Sheet Drawing Amendment
S101 B F. & F. PLAN Due to Investigation regarding Lava Rock finish
elevations, the following structural columns require a
different support than originally shown. Braced Frame @
G.1 and Steel Column @ 7.0 & GA have been revised.
(See Attachment)
MECHANICAL ADDENDUM:
See Attachment:
ELECTRICAL ADDENDUM:
See Attachment:
END OF ADDENDUM NO. 3
Page 3
Pubphaditeas
associated architects
ADDENDUM #4
DATE: August 16, 2002
PROJECT #: 02003
PROJECT: BYU- Idaho: Student Health Center
200 East 400 South
Rexburg, Idaho 83460
ISSUED BY: jhtph architects
2180 South 1300 East
Salt Lake City, Utah 84106
ADDENDUM NO. 4
SPECIFICATION ITEMS
Architectural:
Section Page Line
06200
14240 4,7,8
DRAWING ITEMS
Amendment
Added article to FINISH CARPENTRY Specifications
(See Attachment)
HYDRALIC ELEVATORS — Revise type of elevator to a side of car dual
cylinder type. No hole excavation is required.
(See Attachment)
Mechanical:
Sheet Drawing Amendment
M101a LEVEL 1 MECH. PLAN
Clarification: The Chiller will not require a new enclosed fenced
area. The Chiller will be located in the existing fenced
area South of the Radio and Graphics Services Building.
Please remember that the Mechanical drawings call for a
6" concrete pad for the unit.
END OF ADDENDUM NO.4
Pubpharchitects
associated architects
ADDENDUM #5
DATE: August 19, 2002
PROJECT #: 02003
PROJECT: BYU- Idaho: Student Health Center
200 East 400 South
Rexburg, Idaho 83460
ISSUED BY: jhtph architects
2180 South 1300 East
Salt Lake City, Utah 84106
ADDENDUM NO. 5
SPECIFICATION ITEMS
Architectural:
Section Page Line Amendment
07210 CLARIFICATION: BUILDING INSULATION — R- VALUES LISTED BELOW
Roof Blanket Insulation = R -30 minimum
Wall Blanket Insulation = R -19 minimum
One Inch Rigid Insulation = R -5 minimum
Roof Sandwich Panel = R -5 minimum
END OF ADDENDUM NO. 5
Pubphaditeas
associated architects
ADDENDUM #6
DATE: August 20, 2002
PROJECT #: 02003
PROJECT: BYU- Idaho: Student Health Center
200 East 400 South
Rexburg, Idaho 83460
ISSUED BY: jhtph architects
2180 South 1300 East
Salt Lake City, Utah 84106
ADDENDUM NO. 6
CLARIFICATION ITEMS
Site Rock Blasting:
• The term Blasting is to include drilling, blasting and of removal of material.
• The Base Bid for blasting of rock is to include 2,040 c.y. of material as well as a unit cost for more or
less material. Trench Blasting consists of 600 c.y. and Mass Blasting consists of 14,040 c.y.
• Trenching is to be done along a "neat" line of 4' wide x 4' deep x length. Contractor is to remove all
loose material then fill back to "neat" line. Place utilities then backfill all trenching.
• Rock is to be cleaned before any footings are placed.
Site Rock Drilling and Grouting:
• Drill holes 3" diameter x 10' deep @ 10' o.c. along all footings and at each column location.
• All holes are then to be grouted to fill any voids.
• Base Bid to include 100 yds of grout and a unit cost for more or less material.
Fill Material:
• The material that has been removed from the site includes top soil only, therefore all fill for this project
will need to be obtained by the contractor and brought to the site.
SPECIFICATION ITEMS
Architectural:
Section
Page
Line
Amendment
02300
6
3.13 CA
Delete section 3.13 C. 4. Under footings and foundations, use engineered fill.
DRAWING ITEMS
Architectural:
Sheet Drawing Amendment
A601 FINISH SCHEDULE At each location where the floor material called out is V1 in the floor
schedule, the base called out shall be an integral coved base, CBV1. This
was documented in ADDENDUM #2.One additional room shall be added to
this list:
ELECTRICAL ROOM #158
A300's WALL SECTIONS Bidders are to use the following description for the 1.6" sandwich panels:
use one inch layer of Polystyrene Board Insulation (2 lb density)
(minimum of R -5) mechanical fastened to the metal deck and then overlaid
with 7/16" OSB board that is used as the nailable surface for the metal
shingles.
DRAWING ITEMS
Electrical:
Sheet Drawing Amendment
E301
E302
E303
E400
_.11
1. Add circuit MDP -12 to feed elevator. Route circuit from fused disconnect in Elevator
Equipment 104 to Main Distribution Panel and to elevator equipment cabinet.
2. Add circuit EM -33 to feed elevator car lights. Route circuit from breaker enclosure in
Elevator Equipment 104 to Panel EM and to elevator car.
1. Add fire alarm smoke detector to top of elevator shaft. Tie to fire alarm system.
1. Add fire alarm smoke detector to top of elevator shaft and tie to fire alarm system.
1. Revise circuit 12 in Main Distribution Panel MDP to shunt trip to feed elevator.
2. Revise circuit 13 in Main Distribution Panel MDP to spare.
3. Revise AIC Rating on ATS -1 Automatic Transfer switch to 22,000.
1. Panel MDP — Revise circuit 12 to feed elevator.
2. Panel MDP — Revise circuit 13 to a spare.
3. Panel EM —Revise circuit 33 to feed elevator car lights with #12 wire.
END OF ADDENDUM NO.6
Page 2
A
e d y
STATE OF IDAHO
www.ci.rexburg.id.us
P.O. Box 280
12 North Center Street
Rexburg, Idaho 83440
Phone (208) 359 -3020
Fax (208) 359 -3022
e -mail rexburg @ci.rexburg.id.us
10/21/2002
Mike Condie
Jensen Haslem Architects
2180 South 1300 East, Suite 300
Salt Lake City, UT 84106
Dear Mike,
I have reviewed the drawings for the BYU Idaho Student Health and Counseling Center
and have identified the following discrepancies:
1 The parking plan includes two handicapped accessible spaces, one with an aisle along
side and one without. The ADA guidelines for Accessible Design requires that a 5
foot aisle be included along side each handicapped accessible space. Additionally, the
amount of required handicapped spaces (by my calculations) should be 3, not 2. If we
identify the number of required parking spaces using the Rexburg Zoning Ordinance
requirement of spaces per 1000 sq. ft. of building space, the result is 61 required
spaces for the 20296 sq. ft. building. The ADA Standard for Accessible design
identifies that 3 handicapped spaces are to be provided. "I feel that these numbers are
conservative for a building that will have an occupancy of over 200 people.
2 The waiting area is of a size that will require 2 exits as per Table 1004.2.1 of the 2000
International Budding Code (IBC). Exit signs will need to be added to the other
entrance(s) that connects to the exit hallway.
3 Please provide cut sheets for all HVAC Units.
4 The Fire Department has reviewed the drawings and I have attached a copy of their
report to the back ofthis document. Please address their concerns.
Please address the above items and return two copies of any changes to me at City Hall.
Thank you for your cooperation in this matter. If you have any questions please give me a call at
359 -3020 ext. 324.
Sincerely,
� _.. �OAWW
'I qqq
I
%2
Val Christensen
Building Official
cc: John Millar
Chris Huskinson
Rulon Neilsen
REXBURG MADISON COUNTY FIRE DEPARTMENT
P.O. Box 280
26 North Center
Rexburg, Idaho 83440
(208) 359 -3 010
2000 INTERNATIONAL FIRE CODE Plan Date: 9 -20 -02
Plan Review Review Date: 10 -6 -02
Building Name: BYU -I STUDENT HEALTH CENTER
Building Address: BYU -I CAMPUS, VIKING DRIVE
Stories: TWO Type of Construction: 5 -A
Occupancy Classification: B Existing Floor Area: N/A
New Construction Floor Area: APPROXIMATELY 22,472 SQUARE FEET
1).Required Fire Flow (Appendix III -A): 2750 GPM /TWO HOURS
Comments: FIRE FLOW REQUIREMENT SHALL BE 1500 GPM /TWO HOURS AS
BUILDING IS EQUIPPED WITH AN AUTOMATIC FIRE SUPPRESSION SYSTEM.
2).Water Supply (Article 9, Section 903) Required: YES
Fire Hydrant Location: CLOSEST IS D -38 C ENTRAL HIGH SCHOOL AND BYU-
I CAMPUS (VIKING DRIVE)
Fire Hydrant Flows: OKAY
Fire Flow Test Location: SAME AS ABOVE
Fire Flow Supplied By: FD AND BYU -I
Other Approved Water Source: NONE
Water Supply Acceptable: YES
Fire Hydrant Location Acceptable: YES
Water Supply Comments: NONE
3.)Fire Apparatus Access Roads (Article 9 Section 902)
Required: YES
Acceptable: Width: X Length: X Surface: X
Complete Road Acceptable: YES
Comments: NONE
4).Access Roads and Water Supply, Including Fire Hydrants Are
Required To Be Installed And Made Serviceable Prior To And During
Time Of Construction (Article 9 Section 901.3): YES
Comments: IF NOT INSTALLED AND MADE OPERATIONAL PRIOR TO
CONSTRUCTION A STOP WORK ORDER WILL BE ISSUED.
5),Installation Of Portable Fire Extinguisher (Article 10 Section
1002) Required: YES Location Acceptable: NOT SHOWN
Type Provided Acceptable: NOT SHOWN
Comments: MINIMUM SIZE OF 2A10BC REQUIRED WITHIN TRAVEL DISTANCES
6).Automatic Fire Extinguishing Systems: (Article 10 Section 1003
Required: YES Type Of System Being Installed: WET, SUBMIT PLANS TO
STATE FIRE MARSHAL
Sprinkler System Monitoring Required (Article 10 Section 1003.3)
Required: YES
Comments:
7).Standpipes (Article 10 Section 1004) Required: NO
Type Required:
Comments:
8).Ventilating Hood And Duct Fire Extinguishing System (Article 10
Section 1006.2) Required: NO
Type Being Provided:
Automatic Fuel Shutoff Shown (Article 10 Section 1006.2.4):
Portable Fire Extinguisher Shown (Article 10 section 1006.2.7):
Comments:
9).Fire Alarm Systems (Article 10 Section 1007)Required: YES
Type Of System Required: Manual: Automatic: Both: X
Type Of System Being Provided: Manual: Automatic: Both: X
Components Of System Shown: Smoke Detectors: X Heat Detectors: X
Manual Pull Station: X Sounding Devices: X Visual Devices: X
Door Holders: Duct Detectors: Flow Alarm: X
Sprinkler Valve Monitoring: X Fire Alarm System Acceptable: SEE
COMMENTS.
10).Other Corrections That Are Required By Special Occupancy Or
Conditions: SEE COMMENTS
Comments: PLEASE PROVIDE THE FOLLOWING IN REGARDS TO THE ALARM
SYSTEM: ALARM CONTROL AND SIGNALLING EQUIPMENT, ANNUNCIATION, POWER
CONNECTION, BATTERY CALCULATIONS, CONDUCTOR TYPE AND SIZES, VOLTAGE
DROP CALCULATIONS, MANUFACTURERS, MODEL NUMBERS AND LISTING
INFORMATION FOR EQUIPMENT, DEVICES AND MATERIALS, AND THE INTERFACE
FOR SAFETY CONTROL FUNCTIONS. SEE BELOW FOR MISSING HORN /STROBES,
PULL STATIONS, ETC. THAT NEED TO BE ADDED TO SYSTEM. ARE MAGNETIC
DOOR HOLDERS GOING TO BE USED THROUGHOUT THE BUILDING? IF SO,
PLEASE ADDRESS.
Plans
As Submitted Are
Acceptable:
NO, PLEASE ADDRESS NOTED ITEMS
Plans
Checked By: CHRIS
HUSKINSON
Date: 10 -6 -02
Please
furnish comments
back to the
plan reviewer in the following
manner: Written Comments: X New Plans: X
ALARM SYSTEM ITEMS:
FIRST FLOOR:
1. ADD PULL STATION AT REAR GARAGE DOOR EXIT
2. ADD HORN /STOBE UNIT IN ROOMS 136, 131, 134, 164, 172, AND
116.
3. MOVE HORN /STROBE IN ROOM 179 TO MORE CENTRAL LOCATION.
4. ADD HORN STROBE UNITS IN CORRIDOR 126.
SECOND FLOOR:
1. ADD HORN /STROBE UNIT IN ROOM 282.
VAN SOERUM
a•® 11111111@ S FRANK
Ass, ASSOCIATES —
!re O71HS�TINO EMIRS
MEMORANDUM
DATE: 09/24/2002
TO: Mike Condie / JH/TPH
FROM: Dan Rollins / VBFA
PROJECT. 3420 - BYU Idaho Student Health Center
RE: Bid Document Re- design Items
J. HOWARO VAN BOERUM. P.E.
JOHN O. FRANK. P.E.
KIM P. HARRIS. P.E-
OAVIO P. SARANOWS1p. P.E.
RICHARD G. REEDER. P.E.
JOSEPH V. SIMMONS. P.E.
BYRON R. TORGERSEN. P.E.
JEFFREY S. WATKINS. P.E.
In reply to owner review comments, these are some of the mechanical and plumbing Items that
were re- designed and re- specified for the bid documents. All items are not necessarily listed.
M402, M100: Plans have been revised so that all heat exchangers have Automatic pump traps (APT) in
lieu of separate steam traps and pressure return condensate pumps. The vents from the APTs tie back
Into the condensate drains to recapture flash steam and create a closed loop system.
Pot feeder removed from Hot water heating loop. Chemical tank, pump, alarm, and water feed have
been designed and specified in lieu of pot feeder. Specified companies for water treatment now include
Chemtreat, Powers, and Water Tech in Section 15545.
M012: Buried Chilled water line detail has been revised, buried in sand, dimensions shown, and
gilsulate material not shown.
M001: All of the missing equipment schedules were added. The chiller is listed to have full lowered
sides for protection from weather.
M012: Mechanical cross section added to show ductwork coordination between structure, ceiling, and
cable trays.
M100: Mechanical basement plan rearranged to include APTs.
M101: Ductwork rearranged to avoid cable trays. Main ducts revised to be flat oval instead of
rectangular.
M102: Main ducts revised to be flat oval.
M103: DEF -1 and exhaust duct moved to avoid conflict with roof hatch.
MP101: Chiller re- positioned.
P100 and P101: South storm drains have been re- routed to tie into underground storm drains instead of
daylighting into the sidewalk curbs. Floor sink re- positioned in X Ray Darkroom.
Specifications revised per owners' review comments. Prior approval equipment manufacturers
incorporated into Specs.
=ALT LAKE CITY OFFICE
330 SOUTH 300 EAST SALT LAKE CITY UTAH 8.4111 801 330 -31 FAX BO1- 330 -3130
ST. OOORO■ OFFICE
.1704 WEST SUNSET BOULEVARD 03 . 87. GEORGE . UTAH 84770 . 435- 874 -2708 . MOB 435 - 880 - 3146
AMMIIICAN FORK OFFICE
'21515 EAST M A I N STREET AMERICAN F O R K UTAH B 400.3 801 —482-9 . FA X Gal 4 82 - 928 7
W
Mike Condie
From: Jeff Ambrose [JAmbrose _reaveley.com]
Senn Tuesday, September 24, 2002 11:01 AM
To: mcondie@tpha.com
Subject: SYU Idaho Student Health
Mike,
The major structural issues that have changed from the previous bid set to the current
bid set is that all Top of Footing elevations have been altered according to the site
survey of existing bedrock locations. These new elevations have caused that some of the
concrete stem wall heights have increased dramatically. Some other effects have caused
some of the steel columns too now require concrete piers. Some of the braced frames on
the north end of the building now require shear walls between them based on these new
footing elevations. The only other change, is the flat portion of the high roof has been
recessed to accept mechanical equipment. Refer to details C3 & C5 /SF513.
This encompasses the major structural changes in this current bid package. If you need
any information let me know.
Thanks,
Jeff Ambrose
Reaveley Engineers & Associates
1515 So. 1100 East
Salt Lake City, UT 84105
(801)486 -3883
jambrose @reaveley.com
Pa 1 of 1
Mike Condie
From: Richard Wardle [richard @bnaii.com]
Sent: Tuesday, September 24, 2002 3:50 PM
To: mcondie@tpha.com
Subject: BYU Idaho Student Health
Mike, the changes to the bid documents are as followings:
Cable Tray Size
Elevator Feed
Fire Alarm Specification
Fire Alarm Annunicator
All Addendum items included in documents
Richard L. Wardle
BHA Consulting Engineer's and
Lighting Design
635 South State Street
Salt Lake City, Utah 84111
rchard@bnaii.com
9/24/2002