Loading...
HomeMy WebLinkAboutLETTERS - 04-00342 - Henry's Fork Plaza - Site Plan11/02/2004 13:53 3077334302 DUBBE MOULDER ARCHIT PAGE 02/02 4._110 DUBBE -- MOULDER ARCHITECTS, PC ARCHITECTURE - HISTORIC PRESER-VATION - INTFILIC&S November 1. 1, 2004 Rick Hancock Rocky Mountain Contractors 560 West 19t North Rigby, 19) 83442 RE: Professional Office Building Rexburg, Idaho Dear Rick, -* S zvt'n T As requested by the. Owner, please delete the 2" rigid insulation that has bew specified under the concrete slab on grade for the Professional Office Building in Rexburg, Idaho. To the best of our Imowledge, this is not necessarily required. The rigid insulation specified to extend down the inside face of the Perimeter foundation waIls to the top Of footings shall be unaffected and shall ,remain. Please do not hesitate to contact me at 307- 733 -9551 if you have any questions. Sincerely, Kurt Dubbe, AIA, Dubhe- Moulder Architects, PC P. O, SOX 9227 - 1180 AI,PINF.. LANE - SUITE 2A - JACKSON ROLE, WYOMING: 83002 P. G). SOX 169 - 37 N. KIRST EAST - SUITS 1 a DRIGGS, IDAHO 83422 Oct 15 04 01:31p SCHIESS a ASSOC. (208)522 -9232 p.2 S S Schiess & Associates ENGINEERING • PLANNING • LAND SURVEYING 7103 SOUTH 45TH WEST, IDAHO FALLS, ID 83402 REXBURG. ID OFFICE: (208) 522 -1244 • FAX: (208) 522 -9232 OFFICE: (208) 356 -6092 • FAX: (208) 356-6468 October 15, 2004 John Millar City of Rexburg 12 North Center Rexburg, ID 83440 RE: Pioneer Village / South Fork Plaza — Estimated Fire Flow Schiess Project No.: 04084 / 04028 Mr. Millar: The City of Rexburg has requested flow and pressure measurements for the proposed developments named below. We have also been asked to estimate the expected fire flows inside the developments. The expected pressures are lower than the measured pressured due to head loss in the pipe that separates the mainline where we measured and the proposed hydrant on the Ion I est pipe in the subdivision. We have assumed that the conditions recorded on Oct 4can be expected at the entrances of the proposed projects. Pioneer Village — On Pioneer Road, east of Gold Gyro Estimated flow inside development Measured flow on Pioneer Road — Oct 4 Proposed hydrant in NE corner Flow — 1385 gpm Flow — 1385 gpm Pressure — 81 psi Pressure — 53 psi Taylor Property — 2:45 pm — On Highway 33, south of Taylor Chevrolet Estimated flow inside development Measured flow on Hwy 33 — Oct 4 " Proposed hydrant in SE corner Flow - 1301 gpm Flow 1301 gpm Pressure — 81 psi Pressure — 48 psi It is evident that from our head loss calculations that pressure during a fire event far exceeds the required pressure o , EN Sincerely, 8842 1 Paul H. Scoresby, PE Chris A. Park