HomeMy WebLinkAboutDRAWINGS & CALCS - 04-00329 - The Village Apartments - Bldg 134b 4,32-1
1� , 6
MC SQUARED
INCORPORATED
February 14, 2005
Glenn Wells, AIA
Fax: (360) 352 -7867
Re: The Village Apartments Phase 2 in Rexburg, Idaho
Buildings 8, 9, 10, 11, 12 & 13
Project #24214.03
Dear Mr. Wells,
1235 EAST 4TH AVE
SUITE 101
OLYMPIA, WA 98506
(360) 754 -9339
FAX (360) 352 -2044
E -mail: eng@mc2-inc.com
We were asked to revise the drawings and calculations for Phase 2 buildings 8, 9, 10, 11,
12 and 13 to reflect a gyperete topping on all the floors in this phase of the
apartments. I have revised the calculations for the increased dead load on the floors and
found that all units in phase 2 can handle the increase in dead load with only a few minor
changes in unit types A & B. All buildings that have a unit A & B will need to be revised
per the attached plans.
If you have any questions please call me at (360) 754 -9339.
Sincerely,
MC Squared, Inc.
6lotQ .�
Chalese Smartt
Senior Ass NO
ate Engineer
Mike Szram6k, P. .
Principal Engineer
HAL F
Al
y ®tat ,9�Q,
STRUCTURAL • FOUNDATION • CrVIL ENGINEERS
qb
•
PT /2 HF 4x4
W/ SIMPSON EPC44 PT /2 HF
SIMPSON HTT16 IN i PT 02 HF
DB
I L 2x TO FDN I e 'fi• n
TYP.
I I I 2 ' ' '
_ 02 H_F 4x6 2 3
���� � 10F
I III I I I I I I I I T
I I I UNIT I I I I I I I I I I I
SIMPSON HTT22 IN DBL 2x
JJI I I I I I I I I I I I I I I I
I SfUOSNDAnON
I �
_ I I IiI I 12 I I I I I I II I
u I I `ILI -�
L
M I I S I S L I I I I I I 1 31¢ _x, t %•
I Y UNR B I I
TYP. sae - III
I 10
II _ se.2 TYP. o o�• — _ w /(4)'•6Zxstuos �..,.,, , :•II I I I
III 1 es$�.6 I I I AT EACH END a I II I I
EXT 1A'ry
wws 1 I p I 1 4 0 I
I ,,� I I W T �I I I ,� -1-rt —�
R T 1 I ry- -� I I II E W
I I I I I TYP 14 I I I I m I I I
SL2 „� i t I 1 I I I I
II I I ( C JII xt1_3fi F5
I
J �� I I ( 4)
C= s _ II
SIMPSON HTT22 FF
IN DBL 2x I I I I W -
STUDS T
T FOUNDAT 11 I AT EACH D III 1 I I TYp, I I I
ON
11 SIMPSON HTT22 IN DOL I I I I I I 1
I I I I I I la = I I I I STUDS TO FOUNDATION I I III I -
e I I I UNR A L
I -
I I I
2
I I I I I II IIIT 2 - -� 2
J L J HF L — I� F7 /2 6x6
MPSON I _
'' 2x STUDS TO�FOUNDATKON
SECOND FLOOR FRAMING PLAN
vg•• • ro-
NOTES:
USE /2 OF 6x6 HEADER W/ OBL 2x6 TRIMMERS &
DBL 2x6 KING STUDS AT ALL EXTERIOR OPENINGS.
UNLESS NOTED OTHERWISE.
USE /2 OF 4x8 HEADER W /(2) TRIMMERS AT ALL
INTERIOR BEARING WALL OPENINGS. UNLESS NOTED
OTHERWISE.
Q - TYPICAL SHEARWALL CALLOUT. SEE SHEARWALLL
NOTES NNUNG SCHEDULE. 0
THIS BUILDING IS DESIGNED FOR A 3/4 GYPCRETE
R TOPPING SLAB. e
FOR TYPICAL BRICK NTAL SEE DETAIL -
FOR TYPICAL SHEARWALL ELEVATION, SEE DETAIL - 11
Sl.2
f1 n ,
_ SIMPSON MST37 IN
DBL 2x. SEE — 3
O s0.x
1 TYP. S&2
I I I
_PT /2 H
�IIII I �i I I
I I I I I I I l i l III �I ✓M1
II I I a6
I
I I I
UNIT A I.. I �IIi I I I I III I I I
u
II �I III I 12 I 1 �j
I MPSON wsi� JJJppp�� I se.2 �� I I I
�BL 2x. SEE �,/ 3 \ I IL
PT 12 HF 2x8
O 16' O.C.
PT /2 HF 4x4
W/ SIMPSON EPC44 _ _
�Pf T2
.x8
I I
I I I I
_ I
I I I I
I I I III I I
I I II I
I I I I
UNIT a I I I III I 11 1 1 311_x1
IiT 50.4 1 TYP.
I I —
I L. I � I
I
AT x STU05
I I �;` IL_I = I I _
b I I, Fes
I I W
ui CmiR wgLL� I � � � J
W
o
I o c III �
Lr I I I
_RI _4x19
II _ I I�I I I I I
� �
-.J I -- ' I— = = III I I I
APSON WST37 GLB W/
IN DBL 2x
SEE TP.
I II II "T I ° —II T
See 'II
II
I I I I I� — III I I III II
UNIT A
I I I I I s16xe Gle `t
I I I I I I I 2 -�- -- 2
.GLB
— J L — SIMPSON 2 UST377 IN SEE
W/ CAP ��..// 50.2
DBL 2x. SEE - 3
THIRD FLOOR FRAMING PLAN
116' • 1'-0"
The Vi ,5e. Ncose, d
NOTES:
USE 1 2 OF 6x8 HEADER W/ DBL 2x6 TRIMMERS k
DBL x6 KING STUDS AT ALL E%TERIOR OPENINGS.
UNLESS NOTED OTHERWISE.
USE #2 OF 4x8 HEADER W /(2) TRIMMERS AT ALL
INTERIOR BEARING WALL OPENINGS. UNLESS NOTED
OTHERWISE.
— TYPICAL W CN.L�
NOTES FOR NNUNG SCHEDULE OUT. SEE SHEARW
THIC BULLING 13 DESIGNm FORA :S/4' GYPCRET>-
FLOOR TOPPING SLAB. _
/ 1 \ n
•
GLE C
•
EL LS AIA
A R C H I T E C T
March 31, 2005
Val Christensen, City Official
City of Rexburg
P. O. Box 280
12 North Center Street
Rexburg, ID 83440
Re: The Village Apartments Phase II
Dear Val:
The enclosed new kitchen design has been added to the contract documents for all first floor Unit -A
apartments. Please place a red line void through the existing kitchen design on the field and office set and
staple this 8 1 /2 inch by 11 inch revised drawing to the appropriate sheets.
If you have any questions, please do not hesitate to call.
Yours truly,
Glenn C. Wells
Principal
GCW:Ijw
Enclosure
324 WEST BAY DRIVE NW, SUITE 102 • OLYMPIA, WASHINGTON • 98502 -4926
PHONE: (360) 352 -4553 • FAX: (360) 352 -7867 • E- MAIL:GLENN.WELLS @COMCAST.NET
� r
• •Y
REVISED FIRST FLOOR KITCHEN