Loading...
HomeMy WebLinkAboutLETTER - 04-00054 - 2nd N - Traffic SignalOctober 29, 2003 John Millar PE /LS Public Facilities Coordinator PO Box 280 Rexburg, Idaho 83440 Re: Proposed traffic signal at Technology Way Dear Mr. Millar: I have been contacted by Tom O'Toole in regard to a proposed subdivision east of SH -33, increased traffic and the need for a traffic signal at Technology Way. Back in 1998 ITD was working with the City of Rexburg and had a traffic signal planned for this location with construction to be in 2001. The City of Rexburg requested the location be changed to 2nd north and it was constructed there ITD had approved construction of the traffic signal at Technology Way based on the warrant studies at that time. We had not resolved the configuration, needed lanes or right of way needs at Technology way or the needs for the access into the shopping center before the location was changed. I reviewed the accident history for this location and it does not presently meet the warrant for accidents. There are a high number associated with the two driveways just north of the intersection, which probably would be alleviated with a signal. ITD would not require a Transportation Impact Study be made based on the previous warrants. I would assume that an arrangement could be made similar to the new signal provided by the developer just north of this location. I would like to meet some time with the City and Mr. O'Toole to discuss this matter, particularly the time line. Sincerely, it W. Becker PE District Traffic Engineer cc: Brent Jennings, ADE Tom O'Toole Bill Shaw - An Equal Opportunity Employer - TRA DEPART DISTRIC 6 • P.O. BOX 97 • RIG BY, ID • 834 -0097 • (20 745 -7781