Loading...
HomeMy WebLinkAboutPLANS & REVISION - 06-00400 - Premier Performance - RemodelSO'4' 41'-0" 22'-11/4" IN - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - IN II 8 z OFFICE NI I I NI !n IY I NI � `� m EXISTING SECOND FLOOR OFFICE IN L - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - pl � . �1 fY - - - - - - - - - - - - - - - - - - - - - - - r - - - - - - - - - - - - - I - - - - - - - - - - - - - - - il pl II II II II 0-s IY I I I i I I NI � O � U4 X u- WORKSPACE IY NOTES z \Q Q� IY 41 1, ALL BATHROOMS SHALL HAVE A CEILING VENTILATION Z Q PAN WITH A MINIMUM CAPACITY OF 50 CFM, p OFFICE N I -1 IY II II II p uJ IN II II II 11 � ^ � IN II II II pl x IN II ------ I F -I r IN IL ----- - ----- JI Iq II II - 1 1 ------ it ul ------ I r Y II I L ----- - N II ----- jL ------ 11 N i t II II II 3 ii O – – – – – — – – – – – IY II -oil 4 i t IN II ul I - -1 L r - - - - - - - - - - 3 1 -0 11 IR II II II I- BATH cf) NI 3 1 1 31 II N Q lu I I II I I I I � 2' -6" 2' -�" � �i F- Q IY ' I i t I I I I Q p � O STAIR WELL Ni � � � I I I I I � I � � 14- O uj O c G%� rc 45'-2!/4" CJO'-4" 0 10 ; 01 14468 ::3 ca '�t� OF Ifl� x U4 A. sp Q CONTACTORS RESPONS151LITY LEGEND // � IT 15 THE CONTRACTOR'S RESPONSIBILITY TO REVIEW ALL ASPECTS OF THESE DRAWINGS, SEC:OND f f ■ -S C7 TRUCTURAL POST THIS DRAWING 16 FOR THIS LOCATION AND CUSTOMER ARCHITECTURAL AND STRUCTURAL, PRIOR TO CONSTRUCTION. ANY CONFLICTS SHALL BE ONLY AND 15 NOT TO BE REPORTED TO THE ENGINEER FOR CORRECTION. CHANGES MAY BE PROPOSED BY THE 1/4 ll x it-oil COMMERCIAL SPACE * 581I9 REUSED IN ANY MANNER CONTRACTOR IF HE FEELS THE CHANGE IS IN THE BEST INTEREST OF THE OWNER. CHANGES WITHOUT THE WRITTEN CONSENT SHALL BE FORWARDED TO THE ENGINEER IN WRITING FOR APPROVAL PRIOR TO CONSTRUCTION. OF DESIGN INTELLIGENCE.LLC, GENERAL STRUCTURAL NOTES CODES AND SPECIFICATIONS A. international Building Code - 2003 Edition B. ACI 318 -02 Building Code Requirements for Reinforced Concrete GENERAL STRUCTURAL NOTES 1, The Structural drawing shall be used in conjuction with the drawings of all other disciplines and the project specificatione, The contractor shall veriFiy the requirements of the other trades as to sleeves, chases, hangers, Inserts, anchors, holes and other items to be placed or set in the structural work, 2, The contactor shall be responsible for complying with all safety precautions and regulations during the work. The engineer will not advise on nor Issue direction as to safety precautions and programs, 3. The structural drawings herein represent the finished structure. The contractor shall provide all temporary guying and bracing required to erect and hold the structure in proper alignment until all structural work and connections have been completed. The investigation, design, safety, adequacy and inspection of erection bracing, shoring, temporary supports, etc, is the sole responsibility of the contractor. 4. The engineer shall not be responsible for the methods, techniq n qua a sequences of procedures to perform the work. The supervielon of the work Is the sole reeponof- bllity of the contractor, 5. Drawings indicate general and typical details of construction, Where conditions are not specifically shown, similar details of construction shall be used, subject to approval by the ongineer, 6, All structural systems which are to be composed or components to be field erected shall be supervised by the supplier during manufacturing, delivery, handling, storage and erection in accordance with the supplier instructions and requirements, 1. Loading applied to the structure during the process of construction shall not exceed the safe load- carrying capacity of the structural members. The live loadings used in the design of the structure are Indicated in the "Design Criteria Notes ". Do not apply any construction loads until structural framing is properly connected together and until all temporary bracing is in place, 8. All ASTM and other references are per the latest editions of these standards, unless otherwise noted. S. Shop drawings and other items shall be submitted to the engineer for review prior to fabrication , All shop drawings shall be reviewed by the general contractor before submittal. The engineers review 16 to be for conformance with the design concept and general compliance with the relevant contract documents. The engineer's review does not relieve the contractor of the sole respoeibility to review, check and coordinate the shop drawings prior to submission, The contractor remains soley responsible for errors and ommissions associated with the preparation of the shop drawings as they pertain to member sizes, details, dimensions, etc, 10. Submit shop drawings in the form of two bivaline prints, In no case shall reproduction of the contract drawings be used as shop drawings. Submit the following items for review: A. Concrete mix deelgn(s) - NOT REQUIRED, B, Reinforcing steel shop drawings - NOT REQUIRED C. Structural steel shop drawings - NOT REQUIRED D, Steel Joist / Girder shop drawings - NOT REQUIRED E, Metal decking shop drawings - NOT REQUIRED F. Pre- manuf. wood sysam / truss shop drawings - NOT REQUIRED G. Pre - engineered metal building system - NOT REQUIRED Other submittals may be rquired per the "Schedule of Special Inspection &" or the separate notes contained herein, 11. Special inspections will be required for this project as noted below: A. Concrete - NOT REQUIRED B. Bolts installed in Concrete - NOT REQUIRED C. Structural Welding - Field Welds - NOT REQUIRED D, High Strength Bolting - NOT REQUIRED E, Structural Masonry - NOT REQUIRED 12, Unless otherwise indicated, all Items noted to be demolished shall become the contractor's property and be removed from the site, 13. Contractors shall visit the site prior to bid to ascertain conditions which may adversely affect the work or cost thereof. DESIGN CRITERIA Design Gravity Loads: Roof DL - 15 per Floor DL - 15 psi Design Live Loads: Roof LL - 20 pat min Snow - SEE COVER SHEET Commerical Floor LL - 50 per + 20 psf Partition Residential LL - 40 par Lateral Live Loads: Wind - SEE COVER SHEET Seismic - SEE COVER SHEET Equivalent Fluid Pressure - 55 per Bearing pressure assumed to be 1500 PSF for column and wall footings as per UBC Table 29 -8 based upon a sandy gravel and /or gravel soil. Any variations encountered, differant from the oil type assumed, shall be brought to the attention OF the Engineer before proceeding, FOUNDATION NOTES I, All Footings shal g a I bear on undisturbed, firm natural soil or compacted fill capable of supporting a design bearing pressure of 1500 par. All foundation excavations shall be evaluated by a qualified geotechical engineer /tasting agency prior to pouring foundation concrete if required by the Structural Engineeer, 2, Top of footing elevations shall be as shown on the foundation plan. These elevations are a maximum and shall be lowered as required to obtain the required design bearing pressure, Unless noted otherwise, the bottom of all exterior footings shall be placed 6" below local frost depth; the bottom of all interior footings shall be placed 12" minimum below interior finished grade, 3. All foundation concrete shall obtain a 28 day compressive strength of 2500 psi. All concrete to be parmanentaly exposed to the weather shall be air - entrained to 5% ( +/- 190) with an admixture that conforms to ASTM C -260, 4, All concrete work shall conform to the requirements of ACI 30, "Specification for Structural Concrete Bulldings", Hot weather concreting shall be in accordance with ACI 305, Cold weather concreting shall be in accordance with ACI 306, 5, All reinforcing steel shall conform to ASTM A -615, Grade 60 For 0 5 and larger and Grade 40 for 0 4 and smaller, 6, Unless noted otherwise, the Following concrete cover shall be provided for reinforcement, A, Concrete cast against t permanently exposed to earth - 3" B. Concrete exposed to earth or weather, 0 6 through 0 18 bare - 2" 0 5 bar, W31 or D31 wire t smaller - 1 1/2" 1. All reinforcing marked continuous (Cont.) on the plans and details shall be lapped 36 X bar diameters at splices unless noted otherwise. S. No unbalanced backFillfng shall be done against foundation walls unless walls are securely braced against overtruning, either by temporary bracing or by permanent construction, S. Prior to commencing any foundation work, coordinate work with any existing utilities. Foundations shall be lowered where required to avoid utilities, II. Unless noted otherwise, the centerlines of column foundations shall be located on column centerlines, 10. All retaining walls shall have at least 12" of Free draining granular backfill, full height of wall. Provide control joints in retaining walls at approximately equal intervals not to exceed 25 feet nor 3 times the wall height, Provide expansion joints at every fourth control joint, uniees otherwise indicated. SiTE PREPARATiON NOTES 1, Withn an area a minimum of 5 feet beyond the building limits, excavate a minimum of 4" of existing soft, Remove all organics, pavement, roots, debris and otherwise unsuitable material, 2. The surface of the exposed subgrade shall be inspected by probing or testing to check for pockets of soft or unsuitable maerial. Excavate unsuitable soil as directed by the engineer, 3. Proof roll the surface of the exposed subgade with a loaded tandem axle dump truck. Remove all soils which pump or does not compact properly as directed by the engineer. 4. Fill all excavated areas with approved controlled fill. Place In 8" loose lifts and compact to a minimum of SE,% of the maximum dry density In accordance with ASTM D -6S8, 5, All controlled fill material shall be a select granular material free from all organics or otherwise deleterious material with not more than 20% by weight passing a no, 200 sieve and with a plactfclty index not to exceed CONTACTORS RESPONSIBILITY 6. Provide field density tests For each 3,000 SF of IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW ALL ASPECTS OF THESE DRAWINGS, building area for each lift of controlled fill, ARCHITECTURAL AND STRUCTURAL, PRIOR TO CONSTRUCTION, ANY CONFLICTS SHALL BE REPORTED TO THE ENGINEER FOR CORRECTION. CHANGES MAY BE PROPOSED BY THE CONTRACTOR IF HE FEELS THE CHANGE IS IN THE BEST INTEREST OF THE OWNER. CHANGES SHALL BE FORWARDED TO THE ENGINEER IN WRITING FOR APPROVAL PRiOR TO CONSTRUCTION, PRE - ENGINEERED TRUSS NOTES I. Wood trusses shall be designed by the manufacturer to support the loads dictated by the governing jurisdiction, 2. Wood trusses shall be designed by the maufacturer in accordance with the applicable provisions of the latest edition of the National Design Specification of the National Forest Products Association and the design specification for metal plate connected wood trusses of the Truss Plate Institute, 3, Wood materials shall be Douglas Fir and shall be kiln dried and used at IS% maximum moisture content. Provide grade required to meet stress requirements, 4. Connector plates shall be not less than 0,036 Inches (20 gage) in coated thickness, shall most or exceed ASTM Grade A or higher and shall be hot dipped galvanized according to ASTM A -525 (coating G60), Minimum steel yield stress shall be 33,000 psi, 5. Trusses shall be fabricated in a properly equipped manufacturing facility of a permanent nature. Trusses shall be manufacture b e workmen u sing p recision d y p d - • gp Ion • cutting, ,jigging and pressing equipment under the requirements In quality control standard QST -88 of the Truss Plate Institute, 6. Secondary bending stresses in truss top and bottom chords due to dead, live and wind laode shall be considered in the design. Load duration factors shall be per the "National Design Specification for Wood Construction" latest edition, 1. Wood trusses shall be erected in accordance with the truss manufacturer's requirements, This work shall be done by a q ualified and exp erienced co ntractor. q p d co r. 0 8, The Contractor shall provide all temporary and permanent bracing as required for safe erection and performance of the trusses. The guidelines set forth by the Truss Plate Institute publication "H15-91, Commentary and Recommendations for Handling, Installing and Bracing Metal Plate Connected Wood Trusses" shall be a minimum requirement, S. Truss member and components shall not be cut, notched drilled nor otherwise altered in any way without the written approval of the Engineer, 10. Submit complete shop drawings for all wood trusses showing member sizes, species, grade, moisture content, span, camber, dimensions, chord pitch, bracing requirements and loadings, Shop drawing shall be submitted to the Engineer and shall bear the seal of a Professional Engineer registered in Idaho, WOOD FRAMiNG NOTES I. All wood framing material shall be surfaced dry and used at IS% maximumu moisture content, 2, All stud and wall framing shall be No. 2 grade Doug Fir. 3, All ,Joist, rafter E mist. framing shall be No, 1 grade Doug Fir, Provide full depth or metal bridging at midspan and at a maxmimum spacing of 8 ft o.c, between, 4. All framing exposed to the weather or in contact with masonry or concrete shall be pressure treated In accordance with the American Wood Preservers Aesocicatfon Specifications where possible. All cuts and holes should be completed before treatment, Cuts and holes due to on -site fabrication shall be brushed with 2 coats of copper naphthenate solution containing a minimum of 2% metallic copper in solution (per AWPA STD. M4), 1, Provide double ,Joists under all partitions which run parallel with ,Joists and under all concentrated loads from framing above, 8. Provide header beams of the same size as joists or rafters to frame around openings in the plywood dock unless otherwise indicated, S. Structural steel plate connectors shall conform to ASTM A -36 specifications and be 1/4" thick unless noted otherwise. Bolts connecting wood members shall be ASTM A -301 and be 3/4" diameter unless otherwise Indicated. Provide washers for all bolt heads and nuts in contact with wood surfaces, 10, Bolt holes shall be carefully centered and drilled not more than 1/16" larger than the bolt diameter. Bolted connections shall be snugged tight but not to the extent OF crushing wood under washers, 11. Prefabricated metal joist hangers, hurricane clips, hold -down anchors and other accessories shall be as manufactured by "Simpson Strong -Tia Company ", or approved equal. Install all accessories per the manufacturers requirements. All steel shall have a minimum thickness of 0,04 inches (per ASTM A446, Grade A) and be galvanized (coating G(O0). 12. Holes and notches drilled or cut into wood framing shall not exceed the requirements of 2003 International Building Code Section 23. 13, All plates, anchors, nails, bolts, washers and other miscellaneous hardware permanentaly exposed to weather shall be hot dip galvanized, SLAE3 ON GRADE NOTES 1, Provide concrete slabs over a 6 mil polyethylene vapor barrier and 4" of porous fill, Maximum slump for concrete slabs shall be 5 ", using Type II cement. 2. All porus fill material shall be a clean granular material with 100% passing a i -1/2" slave and no more than 590 passing a No, 4 sieve, Porous fill shall be compacted to 95% max, dry density per ASTM D-6 3. Slab joints shall be filled with approved material. This should take place as late as possible preferably 4 to 6 weeks after the slab has been cast. Prior to filling, remove all debris from the Joints, then fill in accordance with the manufacturers recommendations as follows: 6" slabs - fill with Epoxy resin Other slabs - fill with field molded of slastomoric sealant, 5. Unless approved otherwise, all reinforcing shall be blocked Into the center of the slab with precast concrete blocks having a compressive strength equal to that of the slab, 6. Walk ways and other exterior slabs are not shown on the structrual drawings, Sao the site plan and architectural drawings for location, dimensions, elevations, ,Jointing details and finish details. Provide 4" walks reinforced with 6x6 - W1,4W1,4 WWF unless otherwise noted, 1, Slabs to be permanently exposed to weather shall be air entrained to 5% ( +/- 1%) with an admixture that conforms to ASTM C -260, 8, All concrete work shall conform to the requirements ACI 301, "Specification for Structural Concrete Buildings ". Hot weather concreting shall be In accordance with ACI 305, Cold weather concreting shall be in accordance with ACI 306. S, In order to avoid concrete shrinkage cracking, place concrete slabs In an alternating lane (or checker board) pattern, The maximum length of slab cast In in any one continuous pour 16 recommended to be less than 100 feet. The maximum spacing of joints shall be 25 feet, 10. See architectural drawings for exact locations of depressed slab areas and drains. Slope slab to drains where shown, 11, The finish tolerance of all slabs shall be In accordance with ACI 301 Type A. 12, Slabs shall be constructed in accordance with the following flatness /levelness requirements: Slab Category Specified Local Minimum Bull - Floated Ff • 15 , FI • 13 Ff ■ 13 , FI ■ 10 Straight Edged FF . 15 , FI • 13 FF • 13 , FI • 10 Flat Ff ■ 15 , FI ■ 13 FF s 13 , F1 • 10 Very Fiat Ff . 15 , FI . 13 Ff • 13 , FI . 10 Super Flat Ff ■ 15 , FI ■ 13 FF . 13 , FI • 10 Floor flatness and levelness tests shall be conducted if deemed necessary by the owner in accordance with ASTM E 1155, Results, including acceptance or rejection of the work will be provided to the contractor within 48 hours after data collection, Remedies for out of tolerance work may include removal and reconstruction at the contractors expense. Any other remadlation require& the approval of the owner. PLYWOOD /GYPBOARD SHEATHING NOTES i, All plywood construction shall be in accordance with the American Plywood Association (APA) specifications, 2. All roof panel sheathing shall be 5/8" (nom,) OSB 1 APA rated sheathing. Suitable edga support shall be provided by us* of panel clips or blocking between framing, Unless otherwise noted connect roof sheathing with 8d common nails at 6" o.c. at supported panel edges and 6" o,c, at intermediate supports. 3. All floor sheathing shall be 3/4" (nom,) APa rated STURD -i -FLOOR Exp. 1, with tongue and groove edge, Unless noted otherwise contact floor sheathing with IOd common nails spaced 6" o.c, supported edges and 12" o,c. at intermediate supports. Field glue using adhesives meeting APA specification AFG -01, applied in accordance with the manufacturer's recommendations. 4, All wall sheathing shall be 1/2" (nom,) OSB APA rated sheathing. Unless noted otherwise, connect wall sheathing with 8d common nails spaced at 6" o.c. at supported panel edges and 12" o,c at intermediate supports. 5. Install all plywood sheathing with the long dimensions of the panel across supports and with panel continuous over two or more spans, stagger panel and joints. Allow 1/8" spacing at panel ends and edges unless otherwise recommended by the sheathing manufacturer, 6. All nailing shall be carefully driven and not over - driven, 1, Provide 2x blocking at all unsupported panel edges, CAST -IN - PLACE CONCRETE NOTES STRUCTURAL STEEL NOTES 1, Concrete mixes shall be designed per ACI 301, using Portland Cement conforming to ASTM C -150 or C -595, aggregate conforming to ASTM C -33, and admixtures conforming to ASTM C -494, C -1011, C -618, C -989 and C -260. Concrete shall be ready -mixed in accordance with ASTM C -S4. 2. Concrete shall conform to the following compressive strength, slump and water /cement ratio requirements unless specifically approved by the Engineer in writing: Concrete Min f'c (28 days) Slump W/C Ratio Columns 4000 psi 2 - 4 0,46 Elevated Slabs 3000 psi 2 - 4 " 0,46 Concrete not Noted 3000 psi 2 - 4 0150 Foundations 2500 psi 2" - 4 0.50 Slabs on Grade 4000 psi 2 - 4 0150 3. All concrete work shall conform to the requirements of ACI 301, "Specification for Structural Concrete Buildings Hot weather concreting shall be in accordance with ACI 305, Cold weather concreting shall be in accordance with ACI 306. 4. All reinforcing steel shall conform to ASTM A -615, Grade 60 For 0 5 and larger bars and Grade 40 for 0 4 and smaller. All welding of reinforcing steel shall be in accordance with AWS D1,4, Epoxy coated reinforcing shall conform to ASTM A -115. 5. All welded wire fabric (WWF) shall conform to ASTM A -185, 61 All reinforcing steel shall be set and tied in place prior to pouring of concrete, except that vertical dowels for masonry wall reinforcing may be "floated" in place, Do not field band bars partially embedded in hardened concrete unless specifically indicated or approved by the Engineer, i, Reinforcing steel, including hooks and bends, shall be detailed in accordance with ACI 315, All reinforcing steel indicated as bein continuous (Cont.) shall be l with 9 t'1' a Type 2 splice unless noted otherwise. 8. Unless noted otherwise, the following minimum concrete cover shall be provided for reinforcement: A, Concrete exposed to earth or weather: "6 through 0 18 bars - 2" 0 5 bar, W31, D31 wire t smaller - 1 1/2" B, Concrete not exposed to earth or weather: Walls, elevated slabs [t ,joists] - 3/4" Beams and columns - 1 1/2" C, Foundation concrete - Sae Foundation Notes, S, Bar supports and holding bars shall be provided for all reinforcing steel to insure minimum concrete cover. Bar supports shall be plastic tipped or stainless steel, 10. Unless noted otherwise, all one way slabs shall be reinforced as follows: Bottom reinforcing 0 4 a 16" o,c, (Between Supports) Top Reinforcing 0 4 6 12" o.c. (Centered on Supports) Temp, Reinforcing 0 4 m 18" o.c. (Transverse Bottom) 11, Unless noted otherwise, all concrete walls (other than retaining walls) shall be reinforced as follows: Well Thickness Horizontal Vertical Location 4 -(o 0 4 a 16" o,c, "4 a 18" o.c. Centered 8" 0 4 12" o.c. 0 4 c 18" o,c. Centered 10" 0 4 9 18" o.c. 0 4 a 18" o,c Each Face 12" 0 4 0 16" o.c, 0 4 a 18" o.c. Each Face 1. All structrrai steel shall conform to the latest edition of the "Manual of Steel Construction" of the AISC, 2, Unless noted otherwise, all materials shall be in conformance with the following ASTM specifications: MEMBER ASTM MIN. STRENGTH Structural Tubing A500 Grade B 46 ksi Steel Pipe A53 (Type E or Grade B) 35 ket Other Roiled Shapes and Plates A36 36 ksi Connection Bolts A325 S2 ksi Anchor Bolts A301 - -- Threaded Rods A36 36 ksi Non - Shrink Grout C1101 5000 051 3. Minimum bolt diameter shall be 3/4" unless noted otherwise. All bolts shall be shear /bearing type bolts and be snug - tight. 4, All welding shall be in accordance with AWS D1.1 using EiOXX electrodes. Unless noted otherwise, provide Cont. min, sized fillet welds per AISC requirements. All filler material shall have a minimum yield strength of 58 ksi. 5, Where "Continuous Chord" angles are indicated, provide a continuous butt weld or full penetration weld at the splice connection detail for approval, 6. Moment connections are denoted thus ( ) on the plan, See typical details, 1, Where steel beams bare across building expansion ,Joints or at wall control ,Joints, provide a "slip" connection as shown in the typical details. 8, Holes In steel shall be drilled or punched. All slotted holes shall be provided with smooth edges. Burning of holes and torch cutting at the site is not permitted. S, Unless otherwise noted, all structural steel permanently exposed to view shall be shop painted with one coat of SSPC 15 - 68 , Type 1 (Red Oxide) paint. 10. The structural steel erector shall provide all temporary guying and bracing, 11. Columns, anchor bolts, base plates, etc, have bean designed For the loading encountered during steel erection and construction, Any investigation of the columns, anchor bolts, base plates, etc, to the sole responsibility of the contractor. 12, Steel fabricators shall be an AISC certified shop for Category 1 steel structures and maintain detailed quality control procedures as required to satisfy the special inspection requirements of the 2003 International Building Code, 13, Provide guts with a slight downward "bow" at midepan, 14, Unless otherwise noted, all structural steel permanently exposed to the weather, including all brick shelf angles shall be hot - dipped galvanized in accordance with ASTM A153, 15. Protective coatings damaged during tho transporting, erecting and field welding processes shall be repaired in the field to match the shop applied coating, 16, The contractor shall hire an independent testing agency to provide special inspections of bolting, welding and other items in accordance with 2003 International Building Code. 11, Provide angle frames at all roof openings and mechanical roof top units per typical details. 12. All edges of permanently exposed concrete surfaces shall be chamfered 3/4" unless otherwise noted. 13, in order to avoid concrete shrinkage cracking, place concrete slabs in an alternating lane pattern, The maximum length of slab cast in any one continuous pour shall be limited to 80 feet, 14. Formwork shall remain in place until concrete has obtained at least SO% of Its 28 day compressive strength. The Contractor shall provide all shoring and reshoring, THIS DRAWING IS FOR THIS LOCATION AND CUSTOMER ONLY AND IS NOT TO BE REUSED IN ANY MANNER WITHOUT THE WRITTEN CONSENT OF DESIGN INTELLIGENGE,LLC, D n s Z 9 w Q Q z � N U] O w � O d � Q N U r � 4 Cq c�1 co O "Q H U_ 0 ED � W Q 0 UJ Q O w C� U Q° O a 0 n z iJ- o O UJ ca 4 L � 1 0 SO'-4" v' 45' -10" 22'-8 21' -10" 21C 11 a - -D��� � ° - -Da ��- � ° - - Dd -�- ° s - -DQ _ °- ° s - -D - a r - - °- - - - - -O- - - - - - - -a- - - - - - - - - - - Ic a ID I I d ° f I I ° I I ,I I '1 I I a l to J I 'I .v ID I I od r I I ° I D ' I REMOVE CONCRETE AS ' REQUIRED FOR PLACEMENT a OF NEW FOOTING. F2 I TS 4X4X1/4 ------- - - - - -, D STEEL POST od WITH IOXIOXI /2 r BASE PLATE ' I � •� Ial `------- - - - - -, to a I •I .v ■ ID I I 'd i I ° I D • EXISTING 6" CONCRETE FLOOR WITH REBAR AT i9 I 24" O.C. PER OWNER I ° FOOTING SCHEDULE rl ° •a F1 - ro(o xro(ox12 FTC- WITH (8) *4 EACH WA Y o at F2 — 51x51x12 FTGc WITH (1) * 4 EACH WAY I •I Ip I I 'd r ° I ID • ,I REMOVE EXISTING CONCRETE ' a FLOOR AND REPLACE WITH NEW a PROVIDE 1/2" JOINT FILLER BETWEEN i° POST AND NEW CONCRETE I •I D 5/8" WEDGE ANCHORS STEEL POST (4) REQUIRED - 4" EMBED r WELD ALL AROUND TO BASE PLATE •a 6" EXISTING CONCRETE FLOC V A A > A A S>� 'd SEE FTG SCHEDULE BASE PLATE MIN ON I" NON — SHRINK GROUT I •1 •a l � STEEL POST CONNECTIONS I .I I'4 I N ° I I I'I a I I I .I I'� I I ' b ° I I •'I I J I'I a I I — p — . — �. T . — p — �a — v .— o T . —p— �4 — P .— r v T p �4 p . v T p �4 p . � . p �4 p • r _ �� p �4 p . �� , p �4 p . _ 0 � • v �G v . - ° a c - - g• - - - -° •- - - - - - - - - - - - - - -° - - - - - - -° - - - - - - - ° - �-' - - - - - ° - �- ° - - - - - ' - �- ' - - - - - ° - - - - - - ° - i- - - - a - ' - '- - - - - - - 90' -4" CONTACTOR'S RESPONSIBILITY IT 15 THE CONTRACTOR'S RESPONSIBILITY TO REVIEW ALL ASPECTS OF THESE DRAWINGS, ARCHITECTURAL AND STRUCTURAL, PRIOR TO CONSTRUCTION. ANY CONFLICTS SHALL BE REPORTED TO THE ENGINEER FOR CORRECTION. CHANGES MAY BE PROPOSED BY THE CONTRACTOR IF HE FEELS THE CHANGE IS IN THE BEST INTEREST OF THE OWNER. CHANGES SHALL BE FORWARDED TO THE ENGINEER IN WRITING FOR APPROVAL PRIOR TO CONSTRUCTION. FOUNDATION PL N 1/4 = 1' —O" FOUNDATION — LEGEND ■ STRUCTURAL POST T i �i d � nl u► � 4 Q! ni z � ul � � 4 4 u ui u z N w cl ui Q O w m N i O O N Q ctl � 0 X �u L ii oil Q� X Q r cal � 9 Qt' N U Q° OQ � Z 0 U n� z A 11.1 a �a to'o l�3 z Q THIS DRAWING IS FOR THIS LOCATION AND CUSTOMER ONLY AND IS NOT TO BE REUSED IN ANY MANNER WITHOUT THE WRITTEN CONSENT OF DESIGN INTELLIGENCE.LLC. CONTACTORS RESPONSIBILITY IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW ALL ASPECTS OF THESE DRAWINGS, ARCHITECTURAL AND STRUCTURAL, PRIOR TO CONSTRUCTION. ANY CONFLICTS SHALL BE REPORTED TO THE ENGINEER FOR CORRECTION. CHANGES MAY BE PROPOSED BY THE CONTRACTOR IF HE FEELS THE CHANGE IS IN THE BEST INTEREST OF THE OWNER, CHANGES SHALL BE FORWARDED TO THE ENGINEER IN WRITING FOR APPROVAL PRIOR TO CONSTRUCTION. AAI AAi 1 ] S ECOND FLOOR FRAMINCz 114" s I' -0" LEGEND ■ STRUCTURAL POST FLOOR FRAMING NOTES: 1. INSTALL TJI'S PER MANUFACTURER'S RECOMMENDATIONS INCLUDING ALL BRIDGING AND BRACING. 2, PROVIDE DBL JOISTS UNDER ALL BEARING WALLS THAT RUN PARALLEL TO FLOOR JOISTS, 3, FRAME AROUND STAIRS USING (2) 1.15x14 LVL, 4. ALL BEARING WALL HEADERS SHALL BE (2) DF 2x10 UNLESS NOTED OTHERWISE, 5, JOIST COUNT SHOULD BE DETERMINED FROM JOIST SPACING NOT FROM DRAWING LAYOUT. 6, SEE SHEET 52 FOR STRUCTURAL POST SIZES. BEAM SCHEDULE WB1 — 6.15X22.5 GLB (24F —V4) WB2 — 6.15X16.5 GLB (24F —V4) WB3 — 6,15XI6,5 GLB (24F —V4) WB4 — 6,15X13.5 GLB (24F —V4) WB5 — 6.15X13.5 GLB (24F —V4) f �� 4y4- � z , ( `� - W O O N ^ � n W t+ c� w Q Q N m S2 w w t z_ Q U lU U uj z z 0 N w cl lu D O TL Lu ff N u a 0 a OL ff w w A r �cq m � 4 04 r`�, ►r KA Q o zA O� O Q O U Z O Q m OL LOCATION AND CUSTOMER ONLY AND IS NOT TO BE REUSED IN ANY MANNER THIS DRAWING IS FOR THIS WITHOUT THE WRITTEN CONSENT OF DESIGN INTELLIGENCE.LLC. m Z � N 1 'Q �o � a o � Q N U lU U uj z z 0 N w cl lu D O TL Lu ff N u a 0 a OL ff w w A r �cq m � 4 04 r`�, ►r KA Q o zA O� O Q O U Z O Q m OL LOCATION AND CUSTOMER ONLY AND IS NOT TO BE REUSED IN ANY MANNER THIS DRAWING IS FOR THIS WITHOUT THE WRITTEN CONSENT OF DESIGN INTELLIGENCE.LLC. THIS DRAWING IS FOR THIS WITHOUT THE WRITTEN CONSENT OF DESIGN INTELLIGENCE.LLC. N ti) CONTACTOR'S RESPONSIBILITY IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW ALL ASPECTS OF THESE DRAWINGS, ARCHITECTURAL AND STRUCTURAL, PRIOR TO CONSTRUCTION, ANY CONFLICTS SHALL BE REPORTED TO THE ENGINEER FOR CORRECTION. CHANGES MAY BE PROPOSED BY THE CONTRACTOR IF HE FEELS THE CHANGE IS IN THE BEST INTEREST OF THE OWNER. CHANGES SHALL BE FORWARDED TO THE ENGINEER IN WRITING FOR APPROVAL PRIOR TO CONSTRUCTION, 1/4" = 1'-O" ■ STRUCTURAL POST WE31 - 10 0 GLB (24F -V4) WE32 - 0 GLB (24F-V4) WB3 0 GL5 (24F -V4) W54 - 5,125Xi6.5 GL5 (24F -V4) W55 - 5.125X16.5 e z Were Q C z v N m 0 FLOOR FRAMING NOTES: Q z Q o O N 1. INSTALL TJI'S PER MANUFACTURERS RECOMMENDATIONS INCLUDING ALL BRIDGING AND BRACING, 2, PROVIDE DBL JOISTS UNDER ALL c CA BEARING WALLS THAT RUN PARALLEL JU TO FLOOR JOISTS, 0 k 0 3, FRAME AROUND STAIRS USING Z x (2) 1,15x14 LVL, lu .4 4. ALL SEARING WALL HEADERS SHALL BE (2) DF 2x10 UNLESS NOTED OTHERWISE. 5, JOIST COUNT SHOULD BE DETERMINED FROM JOIST SPACING NOT FROM lu DRAWING LAYOUT, 6. SEE SHEET 52 FOR STRUCTURAL POST pLi 0 SIZES, Q ' Al uj O� BE AM SCHEDULE- CONTACTOR'S RESPONSIBILITY IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW ALL ASPECTS OF THESE DRAWINGS, ARCHITECTURAL AND STRUCTURAL, PRIOR TO CONSTRUCTION, ANY CONFLICTS SHALL BE REPORTED TO THE ENGINEER FOR CORRECTION. CHANGES MAY BE PROPOSED BY THE CONTRACTOR IF HE FEELS THE CHANGE IS IN THE BEST INTEREST OF THE OWNER. CHANGES SHALL BE FORWARDED TO THE ENGINEER IN WRITING FOR APPROVAL PRIOR TO CONSTRUCTION, 1/4" = 1'-O" ■ STRUCTURAL POST WE31 - 5.125X16.5 GLB (24F -V4) WE32 - 5.125X 16.5 GLB (24F-V4) WB3 - 5.125X16.5 GL5 (24F -V4) W54 - 5,125Xi6.5 GL5 (24F -V4) W55 - 5.125X16.5 GLIB (24F -V4) Were - TRIPLE 2X8 OCT _ 3 �ONNL 4 4 u or Nr tV` z /=3 (a (P THIS DRAWING IS FOR THIS LOCATION AND CUSTOMER ONLY AND IS NOT TO BE REUSED IN ANY MANNER WITHOUT THE WRITTEN CONSENT OF DESIGN INTELLIGENCE.LLC, w Q O w u a 0 a a w- ui w Q 0 Z Q l� Ul v N