HomeMy WebLinkAboutBP, CO & DOCS - 08-00040 - BYU-I Auditorium - Chiller Building Addition04 ZtEXB UDC
U � �
o
18 AA
��SHEO \e
CITY OF
REX
America's Family Community
Building
Permit
ISSUED TO:
PERMIT #: 0800040
NAME: Okland Construction
FOR THE CONSTRUCTION OF: Chiller Bldg Addition JOB ADDRESS:
GENERAL CONTRACTOR: Okland Construction Company
This permit is issued subject to the regulations contained in Building Code and Zoning Regulations of the
City of Rexbug. It is specifically understood that this Permit does not allow any Variance to the regulations
of the City of Rexburg or Zoning Codes unless specifically approved by the City Council and explained on
the Building Permit Application as approved bythe Building Inspector.
Date Approved
05/14/2008
Issued By
Building Inspector
THIS PERMIT MUST BE PROMINANTLY DISPLAYED AT THE BUILDING SITE
THE BUILDING MAY NOT BE OCCUPIED OR USED WITHOUT FIRST OBTAINING ACERTIFICATE OF OCCUPANCY
1) A complete set of approved drawings along with the permit must be kept No work shall be done on any part of
on the premises during construction. the building beyond the point indicated
2) The permit will become null and void in the event of any deviation from the in each successive inspection without
NOTICE!
accepted drawings. approval. No structural framework of
3) No foundation, structural, electrical, nor plumbing work shall be concealed any underground work shall be covered
without aooroval.
INSPECTION CARD
BUILDING
Date roved
1. Layout
2. Footing
3. Foundation
4. Framing
5. Insulation
6. Drywall
7. Sidewalk
8. Final
ELECTRICAL
Date roved
1. Rough -In
2. Final
OTHER
Date roved
1. Fire Department Fine
PLUMBING
Data Onnrnvnrl
1. Sewer Service Conn
2. Water Service Conn(
3. Rough -In
24 Hour Notice
and Permit Number required
to make inspection appointments
For Inspections Call 359 -3020 option 2
ACERTIFICATE OF OCCUPANCY CAN NOT
BE ISSUED PRIOR TO FINAL ELECTRICAL
& PLUMBING INSPECTION
U G
� �
CITY OP Certificate of Occupancy
RMURG
OW
Amerkaz Family Community
City of Rexburg
Department of Community Development
19 E. Main St. i Rexburg, ID. 83440
Building Permit No:
Applicable Edition of Code:
Site Address:
Use and Occupancy:
Type of Construction:
Design Occupant Load:
Sprinkler System Required:
Name and Address of Owner:
Contractor:
Special Conditions:
Occupancy:
International Building Code 2006
BYU -Idaho Central Plant Addition
Type II, non - rated, non- combustible
18
Yes
Brigham Young University -Idaho
525 S Center St
Rexburg, ID 83460
Okland Construction Company
General Utility
This Certificate, issued pursuant to the requirements of Section 109 of the International Building
Code, certifies that, at the time time of issuance, this building or that portion of the building that -
vvas inspected on the date-listed vies found to be in compliance vuth the requirements of the code
for the group and division of occupancy and the use for v►hich the proposed occupancy vies
classified.
Date C.O. Issued: May 04, 20 (12:08RM)
C.O Issued by:
Building Official
There shall be no further change in the ebsting occupancy classification of the building nor shall any structural changes,
modifications or additions be made to the building or any portion thereof until the Building Official has reviewed and approved
said future changes.
Plumbing Inspector* Fire Inspector
Electrical Inspector: PBZ Administrator:
CITY OF AEXBUAG
BUILDING PERMIT APPLICATION
19 E MAIN, REXBURG, ID. 83440
208 - 359 -3020 X326
Please
0 P RMTT #
0800040
PARCEL NUMBER: ftwgot - (c 1 0 B Chiller Bldg Addition
SUBDIVISION: UNITI# ISLVl 1L+F L\J I1t
is based on the information - must be
OWNER NAME. 6`W 12A�4 Q CONTACT PHONE # 4!1 -1138
PROPERTY ADDRESS: 50 w k =T V i r- I N s 0,f?y ', / F
PHONE #: Home (
Work (zoo) 4 -11 L5 Cell (
OWNER MAILING ADDRESS: E291;� S, CENT�4Z. CITY: l 9U;!-Ck STATE: ZIP: -800
EMAIL aLl ,� ,-_ u @ �Ut�� � FAX 411 Z 6 d
APPLICANT (If other than owner) 0 k LAN
(Applicant if other than owner, a statement authorizing applicant to act as agent for owner must accompany this application.)
APPLICANT INFORMATION: ADDRESS (q 7 b $ W LEST lrc/AP ,� CITY: St.L
STATE; Q r ZIP $4 1 S EMAIL ��NpTt`!NS@
PHONE #: Home ( ) Work (tea) 4 q G - 3 19 4 Cell (Qo ,) t L4 1 - o 4 (e 1
CONTRACTOR
MAILING ADDRESS:
PHONE: Cell#
CITY STATE ZIP
Fax#
EMAIL IDAHO REGISTRATION # & EXP. DATE
How mnnv hiii1din nrP lnrat,-rl nn thic 117fS '] 1 A
Did you recently purchase this property? (g Yes (If yes, list previous owner's name) .
Is this a lot split? NO YES (Please bring copy of new legal description of property)
PROPOSED USE: WA4\710
(i.e., Single Family Residence, Multi Family, Apartments, Remodel, Garage, Commercial, Addition, Etc.)
APPLICANT'S SIGNATURE, CERTIFICATION AND AUTHORIZATION: Under penalt of perjur I hereby certify that I
have read this application and state that the information herein is correct and I swear that any information which may hereafter be given by me in hearings before the
Planning and Zoning Commission or the City Council for the City of Rexburg shall be truthful and correct. I agree to comply with all City regulations and State laws relating
to the subject matter of this application and hereby authorized representatives of the City to enter upon the above - mentioned property for inspections purposes. NOTE:
The building official may revoke a permit on approval issued under the provisions of the 2003 International Code in cases of any false statement or misrepresentation of fact
in the ap licatieifax on th� plans w cj3 the permit or approval was based. Permit void if not started within 180 days. Permit void if work stops for 180 days.
Signature of Owner /Applicant DATE
Do you prefer to be contacted by fax, mail r phone? Circle One
WARNING - BUILD PERMIT MUST BE POSTED ON CONSTRUCTION SITE!
Plan fees are non - refundable and are paid in full at the time of application beginning fanuary 1, 2005.
City of Rexburg's Acceptance of the plan review fee does not constitute plan approval
* *Building Permit Fees are due at time of application** * *Building Permits are void if your check does not clear**
Work#
2
Build'ing Safety Department
City of Rexburg
19 E. Main ionellh@rexburg.org Phone: 208.359.3020 ext 326
Rexburg, ID 83440 www.rexburg.org Fox: 208.359.3024
O � g$XBLR
� r 0
o
CITY o F
REXBURG
Americas Family Community
Affidavit of Legal Interest
State of Idaho
County of Madison
I, GF�/> t f AFJV7t�4'L ,t �.:tt�t «�hF ±a 5ca �1?°� : s°.tic� PLAoJT VJA' -1
Name Address
)(1a00& , (DO
City State
Being first duly sworn upon oath, depose and say:
(If Applicant is also Owner of Record, skip to B)
A. That I am the record owner of the property described on the attached, and I grant my
permission to: dF=LAt k i e-',9M STry r1 Lei 7S S tv -r Pl�i�
Name Address
to submit the accompanying application pertaining to that property.
B. I agree to indemnify, defend and hold Rexburg City and its employees harmless from any
claim or liability resulting from any dispute as to the statements contained herin or as to the
ownership of the property which is the subject of the
Dated this .C day of , 20 D,8
Signature
Subscribed and sworn to before me the day and year first above written.
.•••
No •�'.��
Notary Pu lic of Idaho
' G �
�'�,'• 64 C Residing at:
C ' c �D AHC MY commission ex J
Pl'ease'complete the Wire Application! 0
NAME L3YU - I 17aq If the question does not apply fill in NA for non applicable
PROPERTY ADDRESS 5Q WJ �- Lo' " Permit#
SUBDIVISION
Dwelling Units: Parcel Acres:
SETBACKS
FRONT SIDE SIDE BACK
Remodeling Your Building /Home ( need Estimate $ ( (%1:A\ `4 --
SURFACE SQUARE FOOTAGE. • (Shall include the exterior wall measurements of the building)
First Floor Area S Unfinished Basement area
Second floor /loft area 7 DO 5 ` Finished basement area
Third floor /loft area Garage area
Shed or Barn Carport /Deck (30" above grade)Area
Water Meter Quantity:
Water Meter Size:
RequiredLY
PLUMBING
Plumbing Contractor's Name: Business Name:
Address City State Zip.
Contact Phone: ( ) Business Phone: ( )
Email
FIXTURE COUNT (including roughed fixtures)
Clothes Washing Machine
Sprinklers
Dishwasher
Tub /Showers
Floor Drain
Toilet /Urinal
Garbage Disposal
Water Heater
Hot Tub /Spa
Water Softener
Sinks
(Lavatories, kitchens, bar, mop)
Plumbing Estimate $
(Commercial Only)
Required! Signature of Licensed Contractor
The City of &
License number Date
s permit fee schedule is the same as required by the State of Idabo
4
Please complete the entfe Application! if the question doetot apply fill in NA for non
applicable
NAME k?H U ` 1 Q
PROPERTY ADDRESS 51'0 W k�SpT V jr , ,' ` '`' ,# Permit#
SUBDIVISION
RequiredLY
MECHANICAL
Mechanical Contractor's Name: n :9 Business Name:
Address City State zip
Contact Phone: ( ) Business Phone: ( )
Mechanical Estimate $ (Commercial /Multi Family Only)
FIXTURES & APPLIANCES COUNT (Single Family Dwelling Only)
Furnace Exhaust or Vent Ducts
Furnace /Air Conditioner Combo
Heat Pump
Air Conditioner
Evaporative Cooler
Unit Heater
Space Heater
Decorative gas -fired appliance
Incinerator System
Boiler
Pool Heater
Fuel Gas Pipe Outlets including stubbed in or future outlets
Inlet Pressure (Meter Supply) PSI
Dryer Vents
Range Hood Vents
Cook Stove Vents
Bath Fan Vents
other similar vents & ducts:
Heat (Circle all that apply) Gas Oil Coal Fireplace Electric Hydronic
Mechanical Sizing Calculations must be submitted with Plans & Application
Point of Delivery must be shown on plans.
Required! Signature of Licensed Contractor License number
The City of Rexburg's permit fee schedule is the same as
Date
the State of Idaho
5
Uct. 1D.- LVUi Ij. w4rin
Department
CRY of
..v. /L&& .. ,
CITY OF
19 a mah lam aro P►MW 0040 MO MS _.._...,,"
R+e , Ib OW WWV o aro lie JM ' "
OWNER NAME _ BVLJ T
PROPaR'1'YADDM 1 W Viking Or pamsit# ?
Sti18D1MON
PHASE '
Requiwdlll
LgeotdcdComsmamtef Wheeler Electric Inc jkWnmN=e Wheeler Electric, In c
69, W 16th Street q Ea11s_ Sam Id tie 83402
CoU phone { ) phone (Lae) ,522 -1906 _
gfm (206 )
$Iecci=l Bodmaae (am o(ti hbw at i b" $ (CO TI"Ah.Y 0MV)
22M OPMWALEAUUN
j1Ve�rJhddaQaidr■oi r owrfe oaaaded dwMw idM&w owrow ind bpied~ rt tie *s=s dM4
Husabat of mobs berg inouN d
Up to 200 MV Saeviw
201 to 400 amp Bowide*
--_. O W 400 amp Ste"
.,,.. Zdaft Rariden" (# ofSanch C "Iw
Tmpomy C a B Wm 2 � CC JOIN Me �fw * a po&a me fro g s
�Hot'Mb.Peml
)kle Ca ftA Sys a Haft Md/or Cooiiag to&= as poet of a Mw oo om pawk
od= .
�_ Mod�tla� ManD�awmd at Mob& Ham
C)&a buft4&W. Wi*g not sped&ek ooweied by wy of du above
Coat of Mft do Id ; 1 1
pmnp� (paaafic WON& I so"o)
�romp
Gr Irf�;D
I3aense ambw
Cdr �io�lr �E6r +�aar r.
4J2 . --
DM
r1
Bull
g Safety Department
City of Rexburg
19 E. Main
Rexburg, ID 83440
jonellh @rexburg.org Phone: 208.359.3020
www.rexburg.org Fax: 208.359.3024
o� ", ae
V x0
C I T Y O F
REXBU
Americas Family Community
APPLICATION: "CONSTRUCTION PERMIT"
CONSTRUCTION PERMIT #:
PERMIT APPROVED: YES/ NO $50.00 FEE PAID: YES /NO
- APPLICAN INFORMATION:
APPROVED BY:
Business Name: I04
Office Address: \Un 4 pL
—� City State Zip
Office Phone Number: ( -LOS ) 4't (P
Contractor Performing the Work:
Contact Person: Cell Phone # ( )
- LOCATION OF WORK TO BE DONE:
Street Address Where Work Will Be Done:
Business Name Where Work Will Be Done:
Dates For Work To Be Done: M�,?_64 2 , 00 'b To
Contact Person: 'Qre�\ \J &M, "k
Phone Number: ( ) y °I (� - 1 �I 4 Cell # ( 1 ) la � � - oy � �
PLEASE CHECK THE TYPE OF PERMITS) YOU ARE APPLYING FOR:
❑ AUTOMATIC FIRE- EXTINGUISHING SYSTEMS
❑ COMPRESSED GASES
❑ FIRE ALARM AND DETECTION SYSTEMS AND RELATED EQUIPMENT
❑ FIRE PUMPS AND RELATED EQUIPMENT
❑ FLAMMABLE AND COMMBUSTIBLE LIQUIDS
❑ HAZARDOUS MATERIALS
❑ INDUSTRIAL OVENS
❑ LP -GAS
❑ PRIVATE FIRE HYDRANTS
❑ SPRAYING OR DIPPING
❑ STANDPIPE SYSTEMS
❑ TEMPORARY MEMBRANE STRUCTURES, TENTS, AND CANOPIES
S l �Z� 7 Ld j
Applicant's Signature Date
VA
•
SUBCONTRACTOR LIST
Excavation & Earthwork:
Masonry:
Floor
Plumbing:
Electrical:
Special Construction
(Manufacturer or Supplier)
Roof T
Floor /Ceiling Joists:
Siding /Exterior Tri
Other:
8
EXEMPTIA�S FROM STATE REASTRATION
As of January 1, 2006, the City of Rexburg can no longer sell permits without having a copy of your State
registration number or your exemption from the State registration. Please send a copy of your state registration or
fill out this form showing your exemption and send it with your license renewal or your next permit application.
(This list is a summarization of Idaho Code Title 54 Chapter 5205, for full definitions of these exemptions please
see the State's website at www.ibol.idaho.gov /cont.htm
❑ Currently State licensed pursuant to Title 54 Idaho Code, Chapters:
3 Architects,
10 Electrical Contractors /Journeyman,
12 Engineers /Surveyors,
19 Public Works Contractors (exempt from fee only registration required),
26 Plumbing /Plumbers,
45 Public Works Construction Management Licensing Act (exempt from fee only registration required), or
50 Installation of heating, ventilation and air conditioning systems
❑ Employee or volunteer of a licensed contractor or part of an educational curriculum or nonprofit charitable
activity with no wages or salary
❑ Employee of a US Government agency (State, City, County, or other municipality)
❑ Public Utility doing construction, maintenance, or development to its own business
❑ Involved with gas, oil or mineral operations
❑ Supplier doing no installation or fabricating
❑ Contracting a project or projects with a total cost less than $2000
❑ Operation of a farm or ranch or construction of agriculture buildings exempt from Idaho Building Code
❑ Any type of water district operations
❑ Work in rural districts for fire prevention purposes
❑ Owner who performs work on own property or contracts with a registered contractor to do work as long as
the property is not for resale within 12 months
❑ Owner or lessee of commercial property performing maintenance, repair, alteration or construction on that
property
❑ Real estate licensee /property manager acting within Idaho Code
❑ Engaging in the logging industry
❑ Renter working on the property where they live with the property owners approval
❑ Construction of a building used for industrial chemical processing per Idaho Code
❑ Construction of a modular building (defined by Idaho Code) to be moved out of state
I hereby certify that the above information is true and correct to the best of my knowledge.
Signature
Print Name
Date
W
A T7,' .
y 2008' UE 1 D: 2? AM 0& T SHEET METAL
Aug, 14, 2008 8:32AM
Building Safety Department
My of RexboM
1951 /A& )eneflh& f& Aham 2J8SAX20
ReWwp,10 O www.Mxbutg ag FM =3a Aap
P. 002
No. W3 P, 2
4
CITY ov
ct °
RE
s •, nmat�.sAwe�Gb�rnnv(ry
NAME Permit 108 OOM
PROPEaTY ADDRM
SITBDIMON BYUI Chiller Building Addition
PHASE LOT BLOC & —
RequimdLY MECHANICAL
Mechmia ConttactoesName Lair $ ran g / ET 311BE"r /hfr
At—
Addnm S40 L (ono - ,-jk y 64:(.(
Cell Phone( ) Ensue+ Phoae( got) Z4 -8
FOX(
Mechanied Bathate 0 _ IX —t (Co "mewjd/Mvd F=D9 09)
FD=rRM * AMZ NM COZaVr {5 t 1�' r ,ftEug O ff)
Exhaus or Vent Dncts
Fuzftx /Aar ComWoaer Combo
HW Pump
Ait Cotulhtioner
Dryer Vents
Range Hood Vents
c ook Stave Vents
Evxpotative Cooler
Unit Halter
Spas Hcata
Dav mtirc ps-fmd appliaacc
kciastwor sysum
PAX 1`o, 1801',854
Bath Fan Vents
other similar vents & ductL.
DVAO pECEBYE
Pool Heat u
�cuP�°i&O i '"' 'nwf AUG i 9 n
h&t Poss= (Meter Supply) PSI
mitt Ade all that appl,) t. w Oil Coal Fireplace Ekc= Hydwm CITY OF R EXB U RG
o i'Iiam�edCo ae:o: L;ceae�nuenbex M
lk a& Oxu&,c�Pv**fvAk"k mm w
Building Safety Department
City of Rexburg
19 E Main jonellhCrexburg.org Phone: 208.359.3020 x326
Rexburg, ID 83440 www.rexburg.org Fax: 208.359.3 024
iO
tt V,"
REX
OWNER'S NAME _
PROPERTY ADDRES:
SUBDIVISION
PII.3SE
LOT
BLOCK
0300040
BYUI Chiller Building Addition
Required4Y
MECHANICAL
Mechanical Contractor's Name: Kim kt hee Business Name: KY. Akr_ wn ,,
:address 1164 V)nk Zlvo SdA City O9dCA State Uk-►� Zip 84
Contact Phone: (Sol ) 710 -4065 Business Phone: (beI ) S4?_ - 3t4 0
F.mail : � y mmc o ee kKftet". L ne.1c Fax ) WL - t
Mechanical Estimate $ t�Ln • (Commercial /Multi Family Only)
FIXTURES & APPLIANCES COUNT (Single Family Dwelling Only)
Furnace Exhaust or Vent Ducts
Furnace /_Air Conditioner Combo
Heat Pump
Air Conditioner
Evaporative Cooler
Unit Heater
Space Heater
Decorative gas -fired appliance
Incinerator System
Boiler
Pool Heater
Fuel Gas Pipe Outlets including stubbed in or future outlets
Inlet Pressure (Meter Supply) PSI
Heat (Circle all that apply) Gas Oil Coal Fireplace Electric Hydronic
R E C E � W E
CITY OF RIXBURG
zyy -a$_a�
R dl Sig* re of 1.411sed Contractor I..iccri e number / ) to
The City of Rexburg r penrtit fee schedule is the rame ne required G) the State of Idaho r -
Dryer Vents
Range Hood Vents
Cook Stove Vents
Bath Fan Vents
other similar vents & ducts:
5
• •
Building Safety Department
City of Rexburg
19 E Main janellh 4rexburg.org Phone: 208.359.3020 x326
Rexburg. ID 83440 www.rexburg.org Fax: 208.359.3024
r
RE ) U ('t
Remodeling Your Building /Home (need F stimate)
,i MM
BYUI Chiller Building Addition
SURFACE SQUARE FOOTAGE: (Shall include the eater:
First Floor Area Unfinished Basement area
Second floor /loft area Finished basement area
Third floor /loft area Garage area
Shed or Barn Caiport /Deck (30" above grade)Area
Water Meter Quantity: Water Meter Size:
Required!
PT UMBING
Plumbing Contractor's Name: K,M Y ,, JJce Business Name: KK Ac
Address I Wyk Zq°u -5o,►1r1% City 09,eA State Ukk Zip 94
Contact Phone: ($o%) })0 - (008'1 (Sep 4nt.� Business Phone: (foj ) 3hL -
Email �s wt.0 KV, (Ae�ln,. • r1¢,�c' Fax 1901) Sat-L`i$b
FIXTURE COUNT (including toughed fixtures)
Clothes Washing Machine
Dishwasher
Floor Drain
Garbage Disposal
Hot Tub /Spa
Sinks
(Lavatories, kitchens, bar, mop)
Plumbing Estimate $ 571,565 •00 (Commercial Only)
C -1y 5�
Rc �t�na _e �� I.iccn.e Ciu�rrschu i,icc��x �� a�-her
The City o% RexGnr�'s periwit fee erhednle it the ranee ar regx,
Sprinkle
Tub /Sh
ToiletA
Water f
Water S
log
v8
I�4i II'
ed by the State ofldaho
4
Gary Leikness
From: Roy Gale [Roy.Gale @okland.com]
Sent: Wednesday, May 13, 2009 8:09 AM
To: Gary Leikness
Subject: RE: Certificate of Occupancy
The landscaping and site improvements on the north side of the Central Plant Addition will be completed with the
landscaping and site improvements of the Auditorium project. The Auditorium project is scheduled to complete October
2010.
From: Gary Leikness [mailto:garyl @rexburg.org]
Sent: Tuesday, May 12, 2009 4:32 PM
To: Roy Gale
Subject: RE: Certificate of Occupancy
Roy,
I appreciate the e-mail below. You may have intended for it, but I do not see an actual commitment that the landscaping
and site improvements will be installed. Please just state the proposed timing. If it is shortly after the road is completed,
please just state so, and give a date that we can shoot for following up with the University, i.e. weeks after road
construction is completed.
Thank you,
Gary
-----------------------------
Gary Leikness
P &Z Administrator
19 E Main
PO Box 280
Rexburg, Idaho 83440
E -mail- garyl @rexburg.org
Phone- (208)359 -3020 Ext. 314
From: Roy Gale [ma i Ito: Roy.Gale@okla nd.com]
Sent: Tuesday, May 12, 2009 10:31 AM
To: Gary Leikness
Cc: Mike G. Shatzer; johnsona @byui.edu
Subject: Certificate of Occupancy
The Central Plant Addition, Permit #08- 00040, is ready for the final inspection for the certicate of occupancy. Brad will be
inspecting the refrigerant monitoring system this afternoon. The landscaping on the north end of the addition will not be
completed at this time as the Viking Drive roadway must be raised and reconstructed before the addition sidewalks and
driveway can be extended to the reconstructed Viking Drive. Without the hardscape areas being completed the irrigation,
grass and shrubbery can not completed this year. The Viking Drive reconstruction will be completed next summer to
coincide with the completion of the Auditorium. I hope this does not prevent the issuing of the C of 0 for the Addition.
Ray Gale
Superintendent
Okland Construction Company
BYU -Idaho Projects
525 South Center St., 1 Mobile Annex
Rexburg, ID 83460 -9000
Cell: 208 - 351 -2461
email: roy.gale @okland.com
Privileged and Confidential Information
This electronic transmission, and any documents attached hereto, may contain confidential and /or legally
privileged information. The information is for the sole use of the intended recipient named above. If you
have received this electronic message in error, please notify the sender and delete the electronic message.
Any disclosure, copying, distribution, or use of the contents of the information received in error is strictly
prohibited.
Privileged and Confidential Information
This electronic transmission, and any documents attached hereto, may contain confidential and /or legally
privileged information. The information is for the sole use of the intended recipient named above. If you
have received this electronic message in error, please notify the sender and delete the electronic message.
Any disclosure, copying, distribution, or use of the contents of the information received in error is strictly
prohibited.
- F e f-rwi+
Roy Gale
W i
From: WILLIAMSK @byui.edu
Sent: Tuesday, July 22, 2008 7:40 AM
To: Roy Gale
Cc: t2mllc @msn.com; quintono @rexburg.org; Mike G. Shatzer; conrade @byui.edu
Subject: RE: Pressure Test
Page 1 of 2
I concur with Roy that the test was sufficient. Pressure was actually on the steam line all weekend and the BYU1
employees were watching the pressure, and it did not lose pressure all weekend. Because the condensate line
will almost never see pressure above 30 psi operating pressure, I am confident that the test performed was
more than adequate.
Kyle R Williams
Mechanical Operations Supervisor
From: Roy Gale [mailto:Roy.Gale @okland.com]
Sent: Monday, July 21, 2008 4:40 PM
To: Williams, Kyle
Cc: t2mllc ; quintono @rexburg.org; Mike G. Shatzer
Subject: Pressure Test
The City (Quinton Owens) and T2M (Bret McGowan) want some verification that BYU -I and specifically you are
OK with the testing performed on the new 12" steam and 6" condensate piping. I will attempt to explain what and
why we did as we did for the testing. The pressure testing stared at 10:30AM.
The steam pipe is new pipe material from the fill location in the basement, around the perimeter of the basement,
through the tunnel area, through the expansion loop and to the connection to the existing pipe south of the new
building (expansion loop). The existing 10" pipe extends to the valve pit near the phyiscal plant building. In the
pit there is a pancake between the existing 10" valve and the 10" pipe flange. Other smaller valves in the pit have
been plugged. The pipe system was filled with water and pumped to 175 psig. No leaks were observed in the
piping sytem. The pressure within the pipe actually raised: 1) due to live steam on the opposite side of the
pancake and 2) the sun on the exposed pipe. At 1:05PM we dropped the steam pipe pressure from 225psi to
175psi by letting water from the system. By 2:OOPM the sun had clouded over and the pressure dropped to
170psi. By 2:40PM it was still cloudy and the pressure was 160psi. No leaks were observed for any on the new
12" pipe welds. At this point we stopped the test feeling we had complied with the intent of specification 32 0800,
para 3.06.
The 6" condensate piping system is more dificult to test as we had to use the existing piping in the basement.
The new piping welds to the existing piping near the basement wall (near the 'tunnel') and runs back to the
existing 6" valve before the condensate tank. From this connection new piping extends through the tunnel,
through the expansion loop and is terminated at the interface with the existing condensate pipe. Here a blank is
welded to the new condensate pipe. The existing 6" valve at the condensate tank started a small drip between
the valve body and the bonnet soon after the test pressure of 130psig was reached. The 3/4" valve on the drip
leg also started to leak as water was dripping from the drain valve immediately down stream of the drip leg valve.
The valves seemed to hold well until a little over 2 hours into the test. At 12:20PM, the pressure was still
130psig. By 1:05PM the pipe pressure had dropped to 90psig. We decided to pump up the pipe pressure to
125psig to maintain the test pressure on the welded sections of pipe. This required us to pump up the pressure 3
times before 2:40PM. At this point we terminated the test as there were no leaks in the new piping for the 4 hour
period.
Do you concur that we have a valid test for the new piping system? Please respond to the distribution above with
any thoughts you have.
7/22/2008
Page 2 of 2
mm
Superintendent
Okland Construction Company
BYU -Idaho Projects
525 South Center St., 1 Mobile Annex
Rexburg, ID 83460 -9000
Cell: 208 - 351 -2461
email: roy.gale @okland.com
Privileged a nd. Confidential Information
This electronic transmission, and any documents attached hereto, may contain confidential and /or
legally privileged information. The information is for the sole use of the intended recipient named
above. If you have received this electronic message in error, please notify the sender and delete
the electronic message. Any disclosure, copying, distribution, or use of the contents of the
information received in error is strictly prohibited.
7/22/2008
From: Lew Wilson [J.wiIson@haatheng.con]
Sent: Thursday, July 17.2OO87:21 PM
To: TakenohKomatsu
Cm: Roy Gale; Mike G. Shotzer; jjonen@kknnochonica|.net; Charles Andersen; LUGKp@byui.edu;
Subject: RE: Condensate Testing
Takenori — letter reamed to you with copies to others to keep all informed, a work item discussion, an
attempt to help the contnaotor, not a change in scope or coat, not a change order.
Roy has asked aKy{ question for which there ioe probable answer.
Regarding the steam and condensate piping being replaced at the Central Heating Plant, what are
reasonable test pressures?
Answer: Steam 175psi, Condensate 125psi.
Discussion:
For the steam where we have a 125 operating pressure system, the test pressure should be at least 1.5
times the working pressure, nominally 175 — 200 psi, established, sustained, and observed over time,
as specified. This works because all of the new joints are open for inspection. We are interested, but
not concerned for the old piping, we just want to observe the new.
For the condensate line, working with new system elements, the same test pressure would be fine
because all of the piping components (traps valved out of the test) would take the pressure and the
pressure serves to express any defects. Roy wonders if the condensate piping at this point isnot
going to see any pressure to speak of going forward, to which there is exception. !f the condensate line
headed south is at some time valved off in the plant, there is the potential to back water up the hill to
the south, in the future as far as the Thomas Ricks building before it might come back through the north
side of the loop. The back pressure under pumping could beODthe order of5O-75psi.
| conclude that if175 psi seems a stretch for the condensate line test pressure, 125 psi is probably not
unreasonable, and the same setup used to test the steam line can probably be used to test the
condensate line, maybe at the same time and at the lower 125 psi, or if KK wants, at the higher 175 psi
pressure.
Were it |. | vvoU|d v8|V8 or block both StgeD1 and condensate piping off iO the plant, block them Sinn\|ady
at the vault over by Physical Plant /protecting the steam traps) put the hydrostatic test pressure to
them, (probably needs a 1 " coupling on the pipe which can be plugged and left 3ma drain going
forward) let what air remains, remain, hold the pressure for 4-8 hours, observe all Of the new joints,
soap them if air is involved, observe them, (although any air will probably move to the higher end) and
lacking any isoue, drain and prepare for service.
This begs the question of cleaning the new piping which is not easy tO do. Since the FUDS are na|odV81y
short, K>{ might consider running a long cabled plumbers rooter up the line with @ full diameter brush On
the end and then sending a hose with spray to flush downhill in similar fashion, or, who has a better
idea? [)h|and/KK has the lead. BYU-| has the right to relieve any of the above, ifitdesires.
Good question. Thanks
Lew Wilson
Page 2 of 2
From: Roy Gale [mailto:Roy.Gale @okland.com]
Sent: Thursday, July 17, 2008 4:02 PM
To: LUSKP @byui.edu; ANDERSENC @BYUI.EDU; Lew Wilson; Larry Veigel
Cc: WILLIAMSK @byui.edu; Mike G. Shatzer; jjones @kkmechanical.net
Subject: Condensate Testing
Per discussions with Kyle Williams, the condensate piping dumps into an 'open -to- atmosphere' storage tank.
Pressure testing the condensate piping to 175 psig as identified by specification section 32 0800, para 3.06 does
not seem to be prudent, particularly as the new condesate piping ties into the existing condensate piping system
that is scheduled for replacement next year because of its poor condition. The heat plant water pressure in 75
psi. We recommend using the plant water pressure as the condensate pipe test pressure. Please review and let
me know if this proposal is acceptable. Testing is scheduled for Monday, July 21, so time is of the essense.
am
Superintendent
Okland Construction Company
BYU -Idaho Projects
525 South Center St., 1 Mobile Annex
Rexburg, ID 83460 -9000
Cell: 208 - 351 -2461
email: rgy.gnle@..okland.com
Privileged and Confidential Information
This electronic transmission, and any documents attached hereto, may contain confidential and /or
legally privileged information. The information is for the sole use of the intended recipient named
above. If you have received this electronic message in error, please notify the sender and delete
the electronic message. Any disclosure, copying, distribution, or use of the contents of the
information received in error is strictly prohibited.
7/18/2008
FFKR
A r c h i t e c t s
Bogue Building
730 Pacific Avenue
Salt Lake City
Utah 84104
801.521.6186 t
801.539.1916 f
www.ffkr.com
f- �� X06 000
TRANSMITTAL
Project:
BYU Idaho Chiller Expansion
Date:
7/1/2008 #: 39
Brigham Young University -
Idaho
To:
Jeremy Inskeep
Rexburg, Idaho .
Okland Construcion
525 South Center Street
Arch Project #:
06087
Rexburg, Idaho 83460
Contractor:
Okland Construction
Phone:
208 - 496 -3194
Fax:
208 - 496 -3197
Alt:
Sent by:
email
From:
Jackson Ferguson, AIA
Enclosed:
Date # of
Description
copies / pages
01- Jun -08 1 8
PR #CP -003 - North wall brick recess & rigid insulation
height
Remarks: -T,,4�
cc: ��Q Q�S UA�t `D'
Alb �„�S s A s P ,�P° �-C
s� GAS
Q ALL
Design Standards Review Complete
see conditions
Signature
Z Z cc it
ate
Other department approvals may be required
Printed: Tuesday, July 01, 2008
FFKR
A r c h i t e c t s
Bogue Building
730 Pacific Avenue
Salt Lake City
Utah 84104
801.521.6186 t
801.539.1916 f
www.ffkr.com
Project: BYU Idaho Chiller Expansion
Brigham Young University - Idaho
Rexburg, Idaho .
Arch Project #: 06087
Contractor: Okland Construction
INFORMATION BULLETIN
CP -003
Date: 7/11/2008
PR: Proposal Request
THIS PROPOSAL REQUEST IS NOT A CHANGE ORDER NOR A DIRECTIVE TO PROCEED WITH THE WORK
DESCRIBED HEREIN. Please submit an itemized quotation, complete with back -up documents signed by the
subcontractors and the material suppliers. Indicate all labor, equipment, materials quantities, costs and/or time
associated with the proposed modifications to the Contract Documents described herein.
Description: C4/A201
Two wall recesses added, see ASD 009.
Masonry wall control joint is moved.
A501
Detail Al, 131, C1 are added, see ASD's 010 -012.
Reference notes 11 "RIGID ROOF INSULATION" is changed to "RIGID ROOF
INSULATION W/ VAPOR BARRIER ON WARM SIDE, R -30 MIN ".
Reference notes 48, 19, 50, 51 are added. See attached ASD -015.
Approved by:
Owner
Date
Acknowledged by:
Architects
Jackson Ferguson
AIA
2008.07.0123:04:21 -
06'00'
Architect
Date
Accepted by:
Okland Construction
Contractor
Date
Page 1 of 1
C3/A501
Top of insulation is modified, see ASD -013.
C5/A501
Top of insulation is modified, see ASD -014.
Roof rigid insulation added in space between CMU wall and stud.
Reason for
Instruction:
Supporting
Ref. Dwg. Description
Documents:
SD # ASD 009 C4/A201 Elevation with wall recess
SD # ASD 010 Al /A501 Detail
SD # ASD 011 B1/A501 Detail
SD # ASD 012 C1 /A501 Detail
SD # ASD 013 C3/A501 Detail
SD # ASD 014 C5 /A501 Detail
SD # ASD 015 A501 Reference notes
Approved by:
Owner
Date
Acknowledged by:
Architects
Jackson Ferguson
AIA
2008.07.0123:04:21 -
06'00'
Architect
Date
Accepted by:
Okland Construction
Contractor
Date
Page 1 of 1
Design Standards Review Complete
/ 2 1/4"
2 BEYOND 21
C l
3/4" 48
49 50
21
B.O. RECESS 51
EL: 120' -8"
20
9
T.O. INSULATION
EL: 120' -0"
4
DETAI L
Al SCALE: 1 1/? =1'0 0 1'
So
730 PadflcA�
5dl lalealy
udna 105
911.531.6166 Ed
M.S3Si9.1916 fax
CENTRAL PLANT ADDITION I ASD - 010
Brigham Young University - Idaho Rexburg, Idaho
DATE: May 15, 2008
PR CP-001 I A501
2
51
21
49 48 T.O. RECESS
EL: 128' -W - - 50
48
20
3/4"
2 1/4"
BEYOND 21
9
D ETAI L
B SCALE:1 1/2' =1T 0 1'
,YMCA- CENTRAL PLANT ADDITION ASD -011
Brigham Young University - Idaho Re >burg, Idaho
801.511.6186 td
801.539.1916 (,x
6h.mn DATE: May 15, 2008 PR CP-001 =A501
Mvw.
2 9 C4 21 21
BELOW BELOW m
v
N
13
DETAIL
C l SCALE: 1 11? =1 0 1
it °°a clficA % CENTRAL PLANT ADDITION
kw.
& ' ASD -012
� th"I'' Brigham Young University - Idaho Rexburg, Idaho
UYh B�iM
401.521.6186 W
40 DATE: May 15, 2008 PR CP-001 A501
. v.cam
0>-�A
D
COORDINATE W/ o ,2 EYOND
MANUFACTURE FOR
HORIZONTAL SUPPORT 30
LOCATION
0
33 8
B.O. VISION
0
BARRIER
EL: 121'-6" 17
15 I
11/2" SLOPE T.O. PARAPET
T.O.CMU - - � -- -- - - --
T.O. MASONRY EL: 121' -0"
EL: 12(Y-8 5 O 14
12
T.O. INSULATION_
I
EL. 12a -0" $ EYOND
2 4 i I 1
21
13
DETAI L
P*.&A''� CENTRAL PLANT ADDITION
��� ASD -013
Ufth"104 Brigham Young University - Idaho Rexburg, Idaho
4M.521.61 td
801.53 fax
- .ft. - DATE: May 15, 2008 PR CP-001 A501
2
DETAIL
SCALE: 1' =1'-0' 0 1' 2'
ft @ .5Wkfi. S
M ftc 8c Ar
s.w.cjk
Uoh "104
801.521.6186 bd
801.519.1916 fa
—ffl
CENTRAL PLANT ADDITION I ASD -014
Brigham Young University - Idaho Rexburg, Idaho
DATE: May 15, 2008
PR CP-001 I A501
Urj. v 1 L-L - L)L-1 v 1 1 e..rl L- r r llLL Ul v \L l \—_ cti v.v.
40. STEEL BAR @ 12" O.C.
41. EXPANSION BOLT
42. METAL ROOF DECK, RE: STRUCTURAL
43. METAL CAP FLASHING FOR EQUIPMENT CURB,
ANCHOR w/ CONTINUOUS CLEAT
44, WEATHER SEAL AS REQUIRED
45. MECHANICAL EQUIPMENT, RE: MECHANICAL
46, METAL CURB A
48. 5/16"X 7"X 61/2" BENT PLATE (7 HORIZONTAL) W/ 5/8"
BOLTS @ 16" O.C., EMBED BOLTS 5' PLUS 3" HOOK.
EXTEND PLATE MIN 6" PAST OPENING ON EITHER SIDE,
49. CONTINUOUS FLASHING TO MATCH BRICK COLOR AND
WEEP HOLE
50. #5 CONTINUOUS REBAR, EXTEND MIN 6" PAST
OPENING ON EITHER SIDE.
51, GROUT, RE: STRUCTURAL GENERAL NOTES FOR
REQUIRED STRENGTH
52, 5/16"X 5" X 61/2" BENT PLATE (5' HORIZONTAL) W/ 5/8"
BOLTS @ 16" O.C., EMBED BOLTS 5 PLUS 3" HOOK.
EXTEND BENT PLATE MIN 6" BEYOND OPENING ON
EITHER SIDE.
8-9-DWWIM
730ftdfieA�
SA W. Ck
Udh 98188
901.511.6186 eel
8"1.539.1916 fax
— ffi_
CENTRAL PLANT ADDITION I ASD -015
Brigham Young University - Idaho Rexburg, Idaho
DATE: May 15, 2008
PR CP-001 I A501