HomeMy WebLinkAboutBP, CO & DOCS - 08-00040 - BYU-I Auditorium - Chiller Building Addition04 ZtEXB UDC U � � o 18 AA ��SHEO \e CITY OF REX America's Family Community Building Permit ISSUED TO: PERMIT #: 0800040 NAME: Okland Construction FOR THE CONSTRUCTION OF: Chiller Bldg Addition JOB ADDRESS: GENERAL CONTRACTOR: Okland Construction Company This permit is issued subject to the regulations contained in Building Code and Zoning Regulations of the City of Rexbug. It is specifically understood that this Permit does not allow any Variance to the regulations of the City of Rexburg or Zoning Codes unless specifically approved by the City Council and explained on the Building Permit Application as approved bythe Building Inspector. Date Approved 05/14/2008 Issued By Building Inspector THIS PERMIT MUST BE PROMINANTLY DISPLAYED AT THE BUILDING SITE THE BUILDING MAY NOT BE OCCUPIED OR USED WITHOUT FIRST OBTAINING ACERTIFICATE OF OCCUPANCY 1) A complete set of approved drawings along with the permit must be kept No work shall be done on any part of on the premises during construction. the building beyond the point indicated 2) The permit will become null and void in the event of any deviation from the in each successive inspection without NOTICE! accepted drawings. approval. No structural framework of 3) No foundation, structural, electrical, nor plumbing work shall be concealed any underground work shall be covered without aooroval. INSPECTION CARD BUILDING Date roved 1. Layout 2. Footing 3. Foundation 4. Framing 5. Insulation 6. Drywall 7. Sidewalk 8. Final ELECTRICAL Date roved 1. Rough -In 2. Final OTHER Date roved 1. Fire Department Fine PLUMBING Data Onnrnvnrl 1. Sewer Service Conn 2. Water Service Conn( 3. Rough -In 24 Hour Notice and Permit Number required to make inspection appointments For Inspections Call 359 -3020 option 2 ACERTIFICATE OF OCCUPANCY CAN NOT BE ISSUED PRIOR TO FINAL ELECTRICAL & PLUMBING INSPECTION U G � � CITY OP Certificate of Occupancy RMURG OW Amerkaz Family Community City of Rexburg Department of Community Development 19 E. Main St. i Rexburg, ID. 83440 Building Permit No: Applicable Edition of Code: Site Address: Use and Occupancy: Type of Construction: Design Occupant Load: Sprinkler System Required: Name and Address of Owner: Contractor: Special Conditions: Occupancy: International Building Code 2006 BYU -Idaho Central Plant Addition Type II, non - rated, non- combustible 18 Yes Brigham Young University -Idaho 525 S Center St Rexburg, ID 83460 Okland Construction Company General Utility This Certificate, issued pursuant to the requirements of Section 109 of the International Building Code, certifies that, at the time time of issuance, this building or that portion of the building that - vvas inspected on the date-listed vies found to be in compliance vuth the requirements of the code for the group and division of occupancy and the use for v►hich the proposed occupancy vies classified. Date C.O. Issued: May 04, 20 (12:08RM) C.O Issued by: Building Official There shall be no further change in the ebsting occupancy classification of the building nor shall any structural changes, modifications or additions be made to the building or any portion thereof until the Building Official has reviewed and approved said future changes. Plumbing Inspector* Fire Inspector Electrical Inspector: PBZ Administrator: CITY OF AEXBUAG BUILDING PERMIT APPLICATION 19 E MAIN, REXBURG, ID. 83440 208 - 359 -3020 X326 Please 0 P RMTT # 0800040 PARCEL NUMBER: ftwgot - (c 1 0 B Chiller Bldg Addition SUBDIVISION: UNITI# ISLVl 1L+F L\J I1t is based on the information - must be OWNER NAME. 6`W 12A�4 Q CONTACT PHONE # 4!1 -1138 PROPERTY ADDRESS: 50 w k =T V i r- I N s 0,f?y ', / F PHONE #: Home ( Work (zoo) 4 -11 L5 Cell ( OWNER MAILING ADDRESS: E291;� S, CENT�4Z. CITY: l 9U;!-Ck STATE: ZIP: -800 EMAIL aLl ,� ,-_ u @ �Ut�� � FAX 411 Z 6 d APPLICANT (If other than owner) 0 k LAN (Applicant if other than owner, a statement authorizing applicant to act as agent for owner must accompany this application.) APPLICANT INFORMATION: ADDRESS (q 7 b $ W LEST lrc/AP ,� CITY: St.L STATE; Q r ZIP $4 1 S EMAIL ��NpTt`!NS@ PHONE #: Home ( ) Work (tea) 4 q G - 3 19 4 Cell (Qo ,) t L4 1 - o 4 (e 1 CONTRACTOR MAILING ADDRESS: PHONE: Cell# CITY STATE ZIP Fax# EMAIL IDAHO REGISTRATION # & EXP. DATE How mnnv hiii1din nrP lnrat,-rl nn thic 117fS '] 1 A Did you recently purchase this property? (g Yes (If yes, list previous owner's name) . Is this a lot split? NO YES (Please bring copy of new legal description of property) PROPOSED USE: WA4\710 (i.e., Single Family Residence, Multi Family, Apartments, Remodel, Garage, Commercial, Addition, Etc.) APPLICANT'S SIGNATURE, CERTIFICATION AND AUTHORIZATION: Under penalt of perjur I hereby certify that I have read this application and state that the information herein is correct and I swear that any information which may hereafter be given by me in hearings before the Planning and Zoning Commission or the City Council for the City of Rexburg shall be truthful and correct. I agree to comply with all City regulations and State laws relating to the subject matter of this application and hereby authorized representatives of the City to enter upon the above - mentioned property for inspections purposes. NOTE: The building official may revoke a permit on approval issued under the provisions of the 2003 International Code in cases of any false statement or misrepresentation of fact in the ap licatieifax on th� plans w cj3 the permit or approval was based. Permit void if not started within 180 days. Permit void if work stops for 180 days. Signature of Owner /Applicant DATE Do you prefer to be contacted by fax, mail r phone? Circle One WARNING - BUILD PERMIT MUST BE POSTED ON CONSTRUCTION SITE! Plan fees are non - refundable and are paid in full at the time of application beginning fanuary 1, 2005. City of Rexburg's Acceptance of the plan review fee does not constitute plan approval * *Building Permit Fees are due at time of application** * *Building Permits are void if your check does not clear** Work# 2 Build'ing Safety Department City of Rexburg 19 E. Main ionellh@rexburg.org Phone: 208.359.3020 ext 326 Rexburg, ID 83440 www.rexburg.org Fox: 208.359.3024 O � g$XBLR � r 0 o CITY o F REXBURG Americas Family Community Affidavit of Legal Interest State of Idaho County of Madison I, GF�/> t f AFJV7t�4'L ,t �.:tt�t «�hF ±a 5ca �1?°� : s°.tic� PLAoJT VJA' -1 Name Address )(1a00& , (DO City State Being first duly sworn upon oath, depose and say: (If Applicant is also Owner of Record, skip to B) A. That I am the record owner of the property described on the attached, and I grant my permission to: dF=LAt k i e-',9M STry r1 Lei 7S S tv -r Pl�i� Name Address to submit the accompanying application pertaining to that property. B. I agree to indemnify, defend and hold Rexburg City and its employees harmless from any claim or liability resulting from any dispute as to the statements contained herin or as to the ownership of the property which is the subject of the Dated this .C day of , 20 D,8 Signature Subscribed and sworn to before me the day and year first above written. .••• No •�'.�� Notary Pu lic of Idaho ' G � �'�,'• 64 C Residing at: C ' c �D AHC MY commission ex J Pl'ease'complete the Wire Application! 0 NAME L3YU - I 17aq If the question does not apply fill in NA for non applicable PROPERTY ADDRESS 5Q WJ �- Lo' " Permit# SUBDIVISION Dwelling Units: Parcel Acres: SETBACKS FRONT SIDE SIDE BACK Remodeling Your Building /Home ( need Estimate $ ( (%1:A\ `4 -- SURFACE SQUARE FOOTAGE. • (Shall include the exterior wall measurements of the building) First Floor Area S Unfinished Basement area Second floor /loft area 7 DO 5 ` Finished basement area Third floor /loft area Garage area Shed or Barn Carport /Deck (30" above grade)Area Water Meter Quantity: Water Meter Size: RequiredLY PLUMBING Plumbing Contractor's Name: Business Name: Address City State Zip. Contact Phone: ( ) Business Phone: ( ) Email FIXTURE COUNT (including roughed fixtures) Clothes Washing Machine Sprinklers Dishwasher Tub /Showers Floor Drain Toilet /Urinal Garbage Disposal Water Heater Hot Tub /Spa Water Softener Sinks (Lavatories, kitchens, bar, mop) Plumbing Estimate $ (Commercial Only) Required! Signature of Licensed Contractor The City of & License number Date s permit fee schedule is the same as required by the State of Idabo 4 Please complete the entfe Application! if the question doetot apply fill in NA for non applicable NAME k?H U ` 1 Q PROPERTY ADDRESS 51'0 W k�SpT V jr , ,' ` '`' ,# Permit# SUBDIVISION RequiredLY MECHANICAL Mechanical Contractor's Name: n :9 Business Name: Address City State zip Contact Phone: ( ) Business Phone: ( ) Mechanical Estimate $ (Commercial /Multi Family Only) FIXTURES & APPLIANCES COUNT (Single Family Dwelling Only) Furnace Exhaust or Vent Ducts Furnace /Air Conditioner Combo Heat Pump Air Conditioner Evaporative Cooler Unit Heater Space Heater Decorative gas -fired appliance Incinerator System Boiler Pool Heater Fuel Gas Pipe Outlets including stubbed in or future outlets Inlet Pressure (Meter Supply) PSI Dryer Vents Range Hood Vents Cook Stove Vents Bath Fan Vents other similar vents & ducts: Heat (Circle all that apply) Gas Oil Coal Fireplace Electric Hydronic Mechanical Sizing Calculations must be submitted with Plans & Application Point of Delivery must be shown on plans. Required! Signature of Licensed Contractor License number The City of Rexburg's permit fee schedule is the same as Date the State of Idaho 5 Uct. 1D.- LVUi Ij. w4rin Department CRY of ..v. /L&& .. , CITY OF 19 a mah lam aro P►MW 0040 MO MS _.._...,," R+e , Ib OW WWV o aro lie JM ' " OWNER NAME _ BVLJ T PROPaR'1'YADDM 1 W Viking Or pamsit# ? Sti18D1MON PHASE ' Requiwdlll LgeotdcdComsmamtef Wheeler Electric Inc jkWnmN=e Wheeler Electric, In c 69, W 16th Street q Ea11s_ Sam Id tie 83402 CoU phone { ) phone (Lae) ,522 -1906 _ gfm (206 ) $Iecci=l Bodmaae (am o(ti hbw at i b" $ (CO TI"Ah.Y 0MV) 22M OPMWALEAUUN j1Ve�rJhddaQaidr■oi r owrfe oaaaded dwMw idM&w owrow ind bpied~ rt tie *s=s dM4 Husabat of mobs berg inouN d Up to 200 MV Saeviw 201 to 400 amp Bowide* --_. O W 400 amp Ste" .,,.. Zdaft Rariden" (# ofSanch C "Iw Tmpomy C a B Wm 2 � CC JOIN Me �fw * a po&a me fro g s �Hot'Mb.Peml )kle Ca ftA Sys a Haft Md/or Cooiiag to&= as poet of a Mw oo om pawk od= . �_ Mod�tla� ManD�awmd at Mob& Ham C)&a buft4&W. Wi*g not sped&ek ooweied by wy of du above Coat of Mft do Id ; 1 1 pmnp� (paaafic WON& I so"o) �romp Gr Irf�;D I3aense ambw Cdr �io�lr �E6r +�aar r. 4J2 . -- DM r1 Bull g Safety Department City of Rexburg 19 E. Main Rexburg, ID 83440 jonellh @rexburg.org Phone: 208.359.3020 www.rexburg.org Fax: 208.359.3024 o� ", ae V x0 C I T Y O F REXBU Americas Family Community APPLICATION: "CONSTRUCTION PERMIT" CONSTRUCTION PERMIT #: PERMIT APPROVED: YES/ NO $50.00 FEE PAID: YES /NO - APPLICAN INFORMATION: APPROVED BY: Business Name: I04 Office Address: \Un 4 pL —� City State Zip Office Phone Number: ( -LOS ) 4't (P Contractor Performing the Work: Contact Person: Cell Phone # ( ) - LOCATION OF WORK TO BE DONE: Street Address Where Work Will Be Done: Business Name Where Work Will Be Done: Dates For Work To Be Done: M�,?_64 2 , 00 'b To Contact Person: 'Qre�\ \J &M, "k Phone Number: ( ) y °I (� - 1 �I 4 Cell # ( 1 ) la � � - oy � � PLEASE CHECK THE TYPE OF PERMITS) YOU ARE APPLYING FOR: ❑ AUTOMATIC FIRE- EXTINGUISHING SYSTEMS ❑ COMPRESSED GASES ❑ FIRE ALARM AND DETECTION SYSTEMS AND RELATED EQUIPMENT ❑ FIRE PUMPS AND RELATED EQUIPMENT ❑ FLAMMABLE AND COMMBUSTIBLE LIQUIDS ❑ HAZARDOUS MATERIALS ❑ INDUSTRIAL OVENS ❑ LP -GAS ❑ PRIVATE FIRE HYDRANTS ❑ SPRAYING OR DIPPING ❑ STANDPIPE SYSTEMS ❑ TEMPORARY MEMBRANE STRUCTURES, TENTS, AND CANOPIES S l �Z� 7 Ld j Applicant's Signature Date VA • SUBCONTRACTOR LIST Excavation & Earthwork: Masonry: Floor Plumbing: Electrical: Special Construction (Manufacturer or Supplier) Roof T Floor /Ceiling Joists: Siding /Exterior Tri Other: 8 EXEMPTIA�S FROM STATE REASTRATION As of January 1, 2006, the City of Rexburg can no longer sell permits without having a copy of your State registration number or your exemption from the State registration. Please send a copy of your state registration or fill out this form showing your exemption and send it with your license renewal or your next permit application. (This list is a summarization of Idaho Code Title 54 Chapter 5205, for full definitions of these exemptions please see the State's website at www.ibol.idaho.gov /cont.htm ❑ Currently State licensed pursuant to Title 54 Idaho Code, Chapters: 3 Architects, 10 Electrical Contractors /Journeyman, 12 Engineers /Surveyors, 19 Public Works Contractors (exempt from fee only registration required), 26 Plumbing /Plumbers, 45 Public Works Construction Management Licensing Act (exempt from fee only registration required), or 50 Installation of heating, ventilation and air conditioning systems ❑ Employee or volunteer of a licensed contractor or part of an educational curriculum or nonprofit charitable activity with no wages or salary ❑ Employee of a US Government agency (State, City, County, or other municipality) ❑ Public Utility doing construction, maintenance, or development to its own business ❑ Involved with gas, oil or mineral operations ❑ Supplier doing no installation or fabricating ❑ Contracting a project or projects with a total cost less than $2000 ❑ Operation of a farm or ranch or construction of agriculture buildings exempt from Idaho Building Code ❑ Any type of water district operations ❑ Work in rural districts for fire prevention purposes ❑ Owner who performs work on own property or contracts with a registered contractor to do work as long as the property is not for resale within 12 months ❑ Owner or lessee of commercial property performing maintenance, repair, alteration or construction on that property ❑ Real estate licensee /property manager acting within Idaho Code ❑ Engaging in the logging industry ❑ Renter working on the property where they live with the property owners approval ❑ Construction of a building used for industrial chemical processing per Idaho Code ❑ Construction of a modular building (defined by Idaho Code) to be moved out of state I hereby certify that the above information is true and correct to the best of my knowledge. Signature Print Name Date W A T7,' . y 2008' UE 1 D: 2? AM 0& T SHEET METAL Aug, 14, 2008 8:32AM Building Safety Department My of RexboM 1951 /A& )eneflh& f& Aham 2J8SAX20 ReWwp,10 O www.Mxbutg ag FM =3a Aap P. 002 No. W3 P, 2 4 CITY ov ct ° RE s •, nmat�.sAwe�Gb�rnnv(ry NAME Permit 108 OOM PROPEaTY ADDRM SITBDIMON BYUI Chiller Building Addition PHASE LOT BLOC & — RequimdLY MECHANICAL Mechmia ConttactoesName Lair $ ran g / ET 311BE"r /hfr At— Addnm S40 L (ono - ,-jk y 64:(.( Cell Phone( ) Ensue+ Phoae( got) Z4 -8 FOX( Mechanied Bathate 0 _ IX —t (Co "mewjd/Mvd F=D9 09) FD=rRM * AMZ NM COZaVr {5 t 1�' r ,ftEug O ff) Exhaus or Vent Dncts Fuzftx /Aar ComWoaer Combo HW Pump Ait Cotulhtioner Dryer Vents Range Hood Vents c ook Stave Vents Evxpotative Cooler Unit Halter Spas Hcata Dav mtirc ps-fmd appliaacc kciastwor sysum PAX 1`o, 1801',854 Bath Fan Vents other similar vents & ductL. DVAO pECEBYE Pool Heat u �cuP�°i&O i '"' 'nwf AUG i 9 n h&t Poss= (Meter Supply) PSI mitt Ade all that appl,) t. w Oil Coal Fireplace Ekc= Hydwm CITY OF R EXB U RG o i'Iiam�edCo ae:o: L;ceae�nuenbex M lk a& Oxu&,c�Pv**fvAk"k mm w Building Safety Department City of Rexburg 19 E Main jonellhCrexburg.org Phone: 208.359.3020 x326 Rexburg, ID 83440 www.rexburg.org Fax: 208.359.3 024 iO tt V," REX OWNER'S NAME _ PROPERTY ADDRES: SUBDIVISION PII.3SE LOT BLOCK 0300040 BYUI Chiller Building Addition Required4Y MECHANICAL Mechanical Contractor's Name: Kim kt hee Business Name: KY. Akr_ wn ,, :address 1164 V)nk Zlvo SdA City O9dCA State Uk-►� Zip 84 Contact Phone: (Sol ) 710 -4065 Business Phone: (beI ) S4?_ - 3t4 0 F.mail : � y mmc o ee kKftet". L ne.1c Fax ) WL - t Mechanical Estimate $ t�Ln • (Commercial /Multi Family Only) FIXTURES & APPLIANCES COUNT (Single Family Dwelling Only) Furnace Exhaust or Vent Ducts Furnace /_Air Conditioner Combo Heat Pump Air Conditioner Evaporative Cooler Unit Heater Space Heater Decorative gas -fired appliance Incinerator System Boiler Pool Heater Fuel Gas Pipe Outlets including stubbed in or future outlets Inlet Pressure (Meter Supply) PSI Heat (Circle all that apply) Gas Oil Coal Fireplace Electric Hydronic R E C E � W E CITY OF RIXBURG zyy -a$_a� R dl Sig* re of 1.411sed Contractor I..iccri e number / ) to The City of Rexburg r penrtit fee schedule is the rame ne required G) the State of Idaho r - Dryer Vents Range Hood Vents Cook Stove Vents Bath Fan Vents other similar vents & ducts: 5 • • Building Safety Department City of Rexburg 19 E Main janellh 4rexburg.org Phone: 208.359.3020 x326 Rexburg. ID 83440 www.rexburg.org Fax: 208.359.3024 r RE ) U ('t Remodeling Your Building /Home (need F stimate) ,i MM BYUI Chiller Building Addition SURFACE SQUARE FOOTAGE: (Shall include the eater: First Floor Area Unfinished Basement area Second floor /loft area Finished basement area Third floor /loft area Garage area Shed or Barn Caiport /Deck (30" above grade)Area Water Meter Quantity: Water Meter Size: Required! PT UMBING Plumbing Contractor's Name: K,M Y ,, JJce Business Name: KK Ac Address I Wyk Zq°u -5o,►1r1% City 09,eA State Ukk Zip 94 Contact Phone: ($o%) })0 - (008'1 (Sep 4nt.� Business Phone: (foj ) 3hL - Email �s wt.0 KV, (Ae�ln,. • r1¢,�c' Fax 1901) Sat-L`i$b FIXTURE COUNT (including toughed fixtures) Clothes Washing Machine Dishwasher Floor Drain Garbage Disposal Hot Tub /Spa Sinks (Lavatories, kitchens, bar, mop) Plumbing Estimate $ 571,565 •00 (Commercial Only) C -1y 5� Rc �t�na _e �� I.iccn.e Ciu�rrschu i,icc��x �� a�-her The City o% RexGnr�'s periwit fee erhednle it the ranee ar regx, Sprinkle Tub /Sh ToiletA Water f Water S log v8 I�4i II' ed by the State ofldaho 4 Gary Leikness From: Roy Gale [Roy.Gale @okland.com] Sent: Wednesday, May 13, 2009 8:09 AM To: Gary Leikness Subject: RE: Certificate of Occupancy The landscaping and site improvements on the north side of the Central Plant Addition will be completed with the landscaping and site improvements of the Auditorium project. The Auditorium project is scheduled to complete October 2010. From: Gary Leikness [mailto:garyl @rexburg.org] Sent: Tuesday, May 12, 2009 4:32 PM To: Roy Gale Subject: RE: Certificate of Occupancy Roy, I appreciate the e-mail below. You may have intended for it, but I do not see an actual commitment that the landscaping and site improvements will be installed. Please just state the proposed timing. If it is shortly after the road is completed, please just state so, and give a date that we can shoot for following up with the University, i.e. weeks after road construction is completed. Thank you, Gary ----------------------------- Gary Leikness P &Z Administrator 19 E Main PO Box 280 Rexburg, Idaho 83440 E -mail- garyl @rexburg.org Phone- (208)359 -3020 Ext. 314 From: Roy Gale [ma i Ito: Roy.Gale@okla nd.com] Sent: Tuesday, May 12, 2009 10:31 AM To: Gary Leikness Cc: Mike G. Shatzer; johnsona @byui.edu Subject: Certificate of Occupancy The Central Plant Addition, Permit #08- 00040, is ready for the final inspection for the certicate of occupancy. Brad will be inspecting the refrigerant monitoring system this afternoon. The landscaping on the north end of the addition will not be completed at this time as the Viking Drive roadway must be raised and reconstructed before the addition sidewalks and driveway can be extended to the reconstructed Viking Drive. Without the hardscape areas being completed the irrigation, grass and shrubbery can not completed this year. The Viking Drive reconstruction will be completed next summer to coincide with the completion of the Auditorium. I hope this does not prevent the issuing of the C of 0 for the Addition. Ray Gale Superintendent Okland Construction Company BYU -Idaho Projects 525 South Center St., 1 Mobile Annex Rexburg, ID 83460 -9000 Cell: 208 - 351 -2461 email: roy.gale @okland.com Privileged and Confidential Information This electronic transmission, and any documents attached hereto, may contain confidential and /or legally privileged information. The information is for the sole use of the intended recipient named above. If you have received this electronic message in error, please notify the sender and delete the electronic message. Any disclosure, copying, distribution, or use of the contents of the information received in error is strictly prohibited. Privileged and Confidential Information This electronic transmission, and any documents attached hereto, may contain confidential and /or legally privileged information. The information is for the sole use of the intended recipient named above. If you have received this electronic message in error, please notify the sender and delete the electronic message. Any disclosure, copying, distribution, or use of the contents of the information received in error is strictly prohibited. - F e f-rwi+ Roy Gale W i From: WILLIAMSK @byui.edu Sent: Tuesday, July 22, 2008 7:40 AM To: Roy Gale Cc: t2mllc @msn.com; quintono @rexburg.org; Mike G. Shatzer; conrade @byui.edu Subject: RE: Pressure Test Page 1 of 2 I concur with Roy that the test was sufficient. Pressure was actually on the steam line all weekend and the BYU1 employees were watching the pressure, and it did not lose pressure all weekend. Because the condensate line will almost never see pressure above 30 psi operating pressure, I am confident that the test performed was more than adequate. Kyle R Williams Mechanical Operations Supervisor From: Roy Gale [mailto:Roy.Gale @okland.com] Sent: Monday, July 21, 2008 4:40 PM To: Williams, Kyle Cc: t2mllc ; quintono @rexburg.org; Mike G. Shatzer Subject: Pressure Test The City (Quinton Owens) and T2M (Bret McGowan) want some verification that BYU -I and specifically you are OK with the testing performed on the new 12" steam and 6" condensate piping. I will attempt to explain what and why we did as we did for the testing. The pressure testing stared at 10:30AM. The steam pipe is new pipe material from the fill location in the basement, around the perimeter of the basement, through the tunnel area, through the expansion loop and to the connection to the existing pipe south of the new building (expansion loop). The existing 10" pipe extends to the valve pit near the phyiscal plant building. In the pit there is a pancake between the existing 10" valve and the 10" pipe flange. Other smaller valves in the pit have been plugged. The pipe system was filled with water and pumped to 175 psig. No leaks were observed in the piping sytem. The pressure within the pipe actually raised: 1) due to live steam on the opposite side of the pancake and 2) the sun on the exposed pipe. At 1:05PM we dropped the steam pipe pressure from 225psi to 175psi by letting water from the system. By 2:OOPM the sun had clouded over and the pressure dropped to 170psi. By 2:40PM it was still cloudy and the pressure was 160psi. No leaks were observed for any on the new 12" pipe welds. At this point we stopped the test feeling we had complied with the intent of specification 32 0800, para 3.06. The 6" condensate piping system is more dificult to test as we had to use the existing piping in the basement. The new piping welds to the existing piping near the basement wall (near the 'tunnel') and runs back to the existing 6" valve before the condensate tank. From this connection new piping extends through the tunnel, through the expansion loop and is terminated at the interface with the existing condensate pipe. Here a blank is welded to the new condensate pipe. The existing 6" valve at the condensate tank started a small drip between the valve body and the bonnet soon after the test pressure of 130psig was reached. The 3/4" valve on the drip leg also started to leak as water was dripping from the drain valve immediately down stream of the drip leg valve. The valves seemed to hold well until a little over 2 hours into the test. At 12:20PM, the pressure was still 130psig. By 1:05PM the pipe pressure had dropped to 90psig. We decided to pump up the pipe pressure to 125psig to maintain the test pressure on the welded sections of pipe. This required us to pump up the pressure 3 times before 2:40PM. At this point we terminated the test as there were no leaks in the new piping for the 4 hour period. Do you concur that we have a valid test for the new piping system? Please respond to the distribution above with any thoughts you have. 7/22/2008 Page 2 of 2 mm Superintendent Okland Construction Company BYU -Idaho Projects 525 South Center St., 1 Mobile Annex Rexburg, ID 83460 -9000 Cell: 208 - 351 -2461 email: roy.gale @okland.com Privileged a nd. Confidential Information This electronic transmission, and any documents attached hereto, may contain confidential and /or legally privileged information. The information is for the sole use of the intended recipient named above. If you have received this electronic message in error, please notify the sender and delete the electronic message. Any disclosure, copying, distribution, or use of the contents of the information received in error is strictly prohibited. 7/22/2008 From: Lew Wilson [J.wiIson@haatheng.con] Sent: Thursday, July 17.2OO87:21 PM To: TakenohKomatsu Cm: Roy Gale; Mike G. Shotzer; jjonen@kknnochonica|.net; Charles Andersen; LUGKp@byui.edu; Subject: RE: Condensate Testing Takenori — letter reamed to you with copies to others to keep all informed, a work item discussion, an attempt to help the contnaotor, not a change in scope or coat, not a change order. Roy has asked aKy{ question for which there ioe probable answer. Regarding the steam and condensate piping being replaced at the Central Heating Plant, what are reasonable test pressures? Answer: Steam 175psi, Condensate 125psi. Discussion: For the steam where we have a 125 operating pressure system, the test pressure should be at least 1.5 times the working pressure, nominally 175 — 200 psi, established, sustained, and observed over time, as specified. This works because all of the new joints are open for inspection. We are interested, but not concerned for the old piping, we just want to observe the new. For the condensate line, working with new system elements, the same test pressure would be fine because all of the piping components (traps valved out of the test) would take the pressure and the pressure serves to express any defects. Roy wonders if the condensate piping at this point isnot going to see any pressure to speak of going forward, to which there is exception. !f the condensate line headed south is at some time valved off in the plant, there is the potential to back water up the hill to the south, in the future as far as the Thomas Ricks building before it might come back through the north side of the loop. The back pressure under pumping could beODthe order of5O-75psi. | conclude that if175 psi seems a stretch for the condensate line test pressure, 125 psi is probably not unreasonable, and the same setup used to test the steam line can probably be used to test the condensate line, maybe at the same time and at the lower 125 psi, or if KK wants, at the higher 175 psi pressure. Were it |. | vvoU|d v8|V8 or block both StgeD1 and condensate piping off iO the plant, block them Sinn\|ady at the vault over by Physical Plant /protecting the steam traps) put the hydrostatic test pressure to them, (probably needs a 1 " coupling on the pipe which can be plugged and left 3ma drain going forward) let what air remains, remain, hold the pressure for 4-8 hours, observe all Of the new joints, soap them if air is involved, observe them, (although any air will probably move to the higher end) and lacking any isoue, drain and prepare for service. This begs the question of cleaning the new piping which is not easy tO do. Since the FUDS are na|odV81y short, K>{ might consider running a long cabled plumbers rooter up the line with @ full diameter brush On the end and then sending a hose with spray to flush downhill in similar fashion, or, who has a better idea? [)h|and/KK has the lead. BYU-| has the right to relieve any of the above, ifitdesires. Good question. Thanks Lew Wilson Page 2 of 2 From: Roy Gale [mailto:Roy.Gale @okland.com] Sent: Thursday, July 17, 2008 4:02 PM To: LUSKP @byui.edu; ANDERSENC @BYUI.EDU; Lew Wilson; Larry Veigel Cc: WILLIAMSK @byui.edu; Mike G. Shatzer; jjones @kkmechanical.net Subject: Condensate Testing Per discussions with Kyle Williams, the condensate piping dumps into an 'open -to- atmosphere' storage tank. Pressure testing the condensate piping to 175 psig as identified by specification section 32 0800, para 3.06 does not seem to be prudent, particularly as the new condesate piping ties into the existing condensate piping system that is scheduled for replacement next year because of its poor condition. The heat plant water pressure in 75 psi. We recommend using the plant water pressure as the condensate pipe test pressure. Please review and let me know if this proposal is acceptable. Testing is scheduled for Monday, July 21, so time is of the essense. am Superintendent Okland Construction Company BYU -Idaho Projects 525 South Center St., 1 Mobile Annex Rexburg, ID 83460 -9000 Cell: 208 - 351 -2461 email: rgy.gnle@..okland.com Privileged and Confidential Information This electronic transmission, and any documents attached hereto, may contain confidential and /or legally privileged information. The information is for the sole use of the intended recipient named above. If you have received this electronic message in error, please notify the sender and delete the electronic message. Any disclosure, copying, distribution, or use of the contents of the information received in error is strictly prohibited. 7/18/2008 FFKR A r c h i t e c t s Bogue Building 730 Pacific Avenue Salt Lake City Utah 84104 801.521.6186 t 801.539.1916 f www.ffkr.com f- �� X06 000 TRANSMITTAL Project: BYU Idaho Chiller Expansion Date: 7/1/2008 #: 39 Brigham Young University - Idaho To: Jeremy Inskeep Rexburg, Idaho . Okland Construcion 525 South Center Street Arch Project #: 06087 Rexburg, Idaho 83460 Contractor: Okland Construction Phone: 208 - 496 -3194 Fax: 208 - 496 -3197 Alt: Sent by: email From: Jackson Ferguson, AIA Enclosed: Date # of Description copies / pages 01- Jun -08 1 8 PR #CP -003 - North wall brick recess & rigid insulation height Remarks: -T,,4� cc: ��Q Q�S UA�t `D' Alb �„�S s A s P ,�P° �-C s� GAS Q ALL Design Standards Review Complete see conditions Signature Z Z cc it ate Other department approvals may be required Printed: Tuesday, July 01, 2008 FFKR A r c h i t e c t s Bogue Building 730 Pacific Avenue Salt Lake City Utah 84104 801.521.6186 t 801.539.1916 f www.ffkr.com Project: BYU Idaho Chiller Expansion Brigham Young University - Idaho Rexburg, Idaho . Arch Project #: 06087 Contractor: Okland Construction INFORMATION BULLETIN CP -003 Date: 7/11/2008 PR: Proposal Request THIS PROPOSAL REQUEST IS NOT A CHANGE ORDER NOR A DIRECTIVE TO PROCEED WITH THE WORK DESCRIBED HEREIN. Please submit an itemized quotation, complete with back -up documents signed by the subcontractors and the material suppliers. Indicate all labor, equipment, materials quantities, costs and/or time associated with the proposed modifications to the Contract Documents described herein. Description: C4/A201 Two wall recesses added, see ASD 009. Masonry wall control joint is moved. A501 Detail Al, 131, C1 are added, see ASD's 010 -012. Reference notes 11 "RIGID ROOF INSULATION" is changed to "RIGID ROOF INSULATION W/ VAPOR BARRIER ON WARM SIDE, R -30 MIN ". Reference notes 48, 19, 50, 51 are added. See attached ASD -015. Approved by: Owner Date Acknowledged by: Architects Jackson Ferguson AIA 2008.07.0123:04:21 - 06'00' Architect Date Accepted by: Okland Construction Contractor Date Page 1 of 1 C3/A501 Top of insulation is modified, see ASD -013. C5/A501 Top of insulation is modified, see ASD -014. Roof rigid insulation added in space between CMU wall and stud. Reason for Instruction: Supporting Ref. Dwg. Description Documents: SD # ASD 009 C4/A201 Elevation with wall recess SD # ASD 010 Al /A501 Detail SD # ASD 011 B1/A501 Detail SD # ASD 012 C1 /A501 Detail SD # ASD 013 C3/A501 Detail SD # ASD 014 C5 /A501 Detail SD # ASD 015 A501 Reference notes Approved by: Owner Date Acknowledged by: Architects Jackson Ferguson AIA 2008.07.0123:04:21 - 06'00' Architect Date Accepted by: Okland Construction Contractor Date Page 1 of 1 Design Standards Review Complete / 2 1/4" 2 BEYOND 21 C l 3/4" 48 49 50 21 B.O. RECESS 51 EL: 120' -8" 20 9 T.O. INSULATION EL: 120' -0" 4 DETAI L Al SCALE: 1 1/? =1'0 0 1' So 730 PadflcA� 5dl lalealy udna 105 911.531.6166 Ed M.S3Si9.1916 fax CENTRAL PLANT ADDITION I ASD - 010 Brigham Young University - Idaho Rexburg, Idaho DATE: May 15, 2008 PR CP-001 I A501 2 51 21 49 48 T.O. RECESS EL: 128' -W - - 50 48 20 3/4" 2 1/4" BEYOND 21 9 D ETAI L B SCALE:1 1/2' =1T 0 1' ,YMCA- CENTRAL PLANT ADDITION ASD -011 Brigham Young University - Idaho Re >burg, Idaho 801.511.6186 td 801.539.1916 (,x 6h.mn DATE: May 15, 2008 PR CP-001 =A501 Mvw. 2 9 C4 21 21 BELOW BELOW m v N 13 DETAIL C l SCALE: 1 11? =1 0 1 it °°a clficA % CENTRAL PLANT ADDITION kw. & ' ASD -012 � th"I'' Brigham Young University - Idaho Rexburg, Idaho UYh B�iM 401.521.6186 W 40 DATE: May 15, 2008 PR CP-001 A501 . v.cam 0>-�A D COORDINATE W/ o ,2 EYOND MANUFACTURE FOR HORIZONTAL SUPPORT 30 LOCATION 0 33 8 B.O. VISION 0 BARRIER EL: 121'-6" 17 15 I 11/2" SLOPE T.O. PARAPET T.O.CMU - - � -- -- - - -- T.O. MASONRY EL: 121' -0" EL: 12(Y-8 5 O 14 12 T.O. INSULATION_ I EL. 12a -0" $ EYOND 2 4 i I 1 21 13 DETAI L P*.&A''� CENTRAL PLANT ADDITION ��� ASD -013 Ufth"104 Brigham Young University - Idaho Rexburg, Idaho 4M.521.61 td 801.53 fax - .ft. - DATE: May 15, 2008 PR CP-001 A501 2 DETAIL SCALE: 1' =1'-0' 0 1' 2' ft @ .5Wkfi. S M ftc 8c Ar s.w.cjk Uoh "104 801.521.6186 bd 801.519.1916 fa —ffl CENTRAL PLANT ADDITION I ASD -014 Brigham Young University - Idaho Rexburg, Idaho DATE: May 15, 2008 PR CP-001 I A501 Urj. v 1 L-L - L)L-1 v 1 1 e..rl L- r r llLL Ul v \L l \—_ cti v.v. 40. STEEL BAR @ 12" O.C. 41. EXPANSION BOLT 42. METAL ROOF DECK, RE: STRUCTURAL 43. METAL CAP FLASHING FOR EQUIPMENT CURB, ANCHOR w/ CONTINUOUS CLEAT 44, WEATHER SEAL AS REQUIRED 45. MECHANICAL EQUIPMENT, RE: MECHANICAL 46, METAL CURB A 48. 5/16"X 7"X 61/2" BENT PLATE (7 HORIZONTAL) W/ 5/8" BOLTS @ 16" O.C., EMBED BOLTS 5' PLUS 3" HOOK. EXTEND PLATE MIN 6" PAST OPENING ON EITHER SIDE, 49. CONTINUOUS FLASHING TO MATCH BRICK COLOR AND WEEP HOLE 50. #5 CONTINUOUS REBAR, EXTEND MIN 6" PAST OPENING ON EITHER SIDE. 51, GROUT, RE: STRUCTURAL GENERAL NOTES FOR REQUIRED STRENGTH 52, 5/16"X 5" X 61/2" BENT PLATE (5' HORIZONTAL) W/ 5/8" BOLTS @ 16" O.C., EMBED BOLTS 5 PLUS 3" HOOK. EXTEND BENT PLATE MIN 6" BEYOND OPENING ON EITHER SIDE. 8-9-DWWIM 730ftdfieA� SA W. Ck Udh 98188 901.511.6186 eel 8"1.539.1916 fax — ffi_ CENTRAL PLANT ADDITION I ASD -015 Brigham Young University - Idaho Rexburg, Idaho DATE: May 15, 2008 PR CP-001 I A501