Loading...
HomeMy WebLinkAboutALL DOCS - 05-00391 - 3090 W Hwy 33 - MechanicalCity of Rexburg/ Mad County BUILDING PERMIT APPLI TION l f l~~at~ 05 0039 ~ 19 E MAIN, REXBURG, ID. 83440 ~ ~' ~;~=i ; 208-359-3020 X322 Furnace Installation - 3090 W Hwy 33 PARCEL NUMBER: _ SUBDIVISION: UNIT# BLOCK# LOT# (Addressing is based on the information -must be accurate) ~~~~. PROPERTY ADDRESS: ~~~ l~J __ ___~ PHONE #: Home ( ) (taSlD- l~a~ Work Cell ( ) 3 i ~-151aS OWNER MAILING ADDRESS: ~o..nn ~__ CITY: STATE: ZIP:, EMAIL FAX APPLICANT: (If other than owner) (Applicant if other than owner, a statement authorizing applicant to act as agent for owner must accompany this application.) APPLICANT INFORMATION: ADDRESS CITY: STATE; ZIP EMAIL FAX PHONE #: Home ( ) Work ( ) Cell ( ) CONTRACTOR: MAILING ADDRESS: CITY STATE ZIP PHONE: Home# EMAIL Work# Cell# FAX How many buildings are located on this property? ~ Did you recently purchase this property? No es f yes give owner's name) ~ Is this a lot split? NO YES (Please bring copy of new legal description of property) PROPOSED USE: ~ Keme~l-e.l' (i.e., Single Family Residence, Multi Family, Apartments, Remodel, Garage, Etc.) APPLICANT'S SIGNATURE, CERTIFICATION AND AUTHORIZATION: Under penalty of pequry, l hereby certify that I have read this application and state that the information herein is correct and I swear that any infomuufon which may hereafter be given by me in hearings before the Planning and Zoning Commission or the Cuy Council for the City of Rexbrug shall be truthful amt copeck I agree to ~PIY with all City regulations and Stye laws relating to the subject matte of this application and hereby authorized represartatives of rho City to enter upon the move-marooned property for inspectiars purposes. NOTE: The building official may revoke a permit on approval issued under the provisions of the 2000 intexnaoionat Code incases of any false statematt or misrepresentation of fact in the application or on the plans on which the permit or approval was based. Permit void if not started within 180 days. Permit void if work stops for 180 da Signattue of ow erlApplicant -. DATE Do yoll prefer to be contacted by fax, email o hone? Circle One WARNING -BUILDING BE POSTED ON CONSTRUCTION SITEi Plan fees are non-refundable and are paid in fnl! at the time of application beginning January 1.2005. City of Rezburg's Acceptance of the plan review fee does not constitute plan approval. CONTACT PHONE # 1 ~-151n 2 ~~)t',i1S~ t;tD[i!i~)~~~~ t~le t'I~~ .E~O(J~IICatlOil~ If the ~ uestion not at~~pi~~ lill its t'1A for uc~u applicable NAME _~~ ~~sJ2 ~ I PROPERTY ADDRESS 3©9O ~,J ~~~ 33 Permit# SUBDIVISION Re~ruir~cl r t ~ MECHANICAL Mechanical Contractor's Name: Eck `~ t ~ 1 1 Business Name: Address City State Zip Contact Phone: ( ) (r~~ ln- D~ 3~ Business Phone: ( ) Email Fax Mechanical Estimate S (CommerciaUMnlti Family Only) FIXTURES & APPLIANCES COUNT (Single Family Dwelling Only) D~ Furnace Exhaust or Vent Ducts Furnace/Air Conditioner Combo Heat Pump Air Conditioner Evaporative Cooler Unit Heater Space Heater Decorative gas-fired appliance Incinerator System Boiler Pool Heater other similar vents & ducts: -- Similar fixtures or Appliances Fuel Gas Pipe Outlets including stubbed in or future outlets Inlet Pressure (Meter Supply) PSI Heat (Circle all that apply) Gas Oil Coal Fireplace Mechanical Sizing Calculations mast be submitted with Plans & Application Point of Delivery must be shown on plans. ~;ign~iture oi' Lice~ised Cc~nU-actor License number Required! Dryer Vents Range Hood Vents Cook Stove Vents Bath Fan Vents Date The City of Rexburg s permit fee schedule is the same as required by the State of Idaho 05 00391 3090 W Hwy 33-Mad. Co. Mech. Powell HVAC Load Calculations for Julie Powell 3090 West Hwy. 33 Rexburg, Idaho Prepared By: Steve Holley United Plumbing & Heating Rexburg, Idaho 356-4111 Monday, October 31, 2005 tthvac - t~stdeM~tl 8 Light AC L,o~s Elite S~rare Development, Mc. United t~lumtung & Healing Inc.. Pow~l Rexbu ,tD 83440 P 2 Pro'ect Report ~ General Project In#otmation -- Project Title: Powell Designed By: D.Cummings Project Date: Monday, October 31, 2005 Project Comment: Design by :Sheet Metal Workers Local # 60 SMWIA member Client Name: Julie Powell Client Address: 3090 West Hwy. 33 Client City: Rexburg, Idaho Client Phone: 313-1565 or 656-0234 Company Name: United Plumbing & Heating Company Representative: Steve Holley Company City: Rexburg, Idaho Company Phone: 356-4111 -- f Design Data Reference City: Idaho Falls, Idaho Daily Temperature Range: High Latitude: 43 Degrees Elevation: 4741 ft. Altitude Factor: 0.840 Elevation Sensible Adj. Factor: 1.000 Elevation Total Adj. Factor: 1.000 Elevation Heating Adj. Factor: 1.000 Elevation Heating Adj. Factor: 1.000 Outdoor Outdoor Indoor Indoor Grains D ulb Wet Bulb Rel.Hum Drv Bulb Difference Winter: -6 0 30 72 38 Summer: $7 61 50 75 -23 L Check-F~~--- _ _ __ --- -- -- - ..w_ ~_. Total Building Supply CFM: 900 CFM Per Square ft.: 0.374 Square ft. of Room Area: 2,406 Square ft. Per Ton: 1,299 Volume (ft~) of Cond. Space: 19,235 Air Turnover Rate (per hour): 2.8 - Buldtng Lcaads -._ _ -__ - - - - - - Total Heating Required With Outside Air: 51,978 Btuh 51.978 MBH Total Sensible Gain: 16,666 Btuh 92 °~ Total Latent Gain: 1,390 Btuh 8 Total Cooling Required With Outside Air: 18,056 Btuh 1.50 Tons (Based On Sensible + Latent) 1.85 Tons (Based On 75% Sensible Capac ity) __ . ~- - -- Notes - - -- - - J - --- Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. I_ I I Rhvac - R~sideMial & Light. AG Ltsat~ ENAe Software Devsbpment, inc. PoweN United Plwntmrg & Fleatirg Ina P 3 Rexbu ,ID 83440 Load Preview Report -- - ~Sc~pe roma ~ Sena ~ ;Gam ~ i.at ~ Gain . ~# Gain _ _ Lois ~~ ~~ _ CFM ~ -.~wm GFM _ ~ CFM im T _ - ___ [Building: 1.54 Net Tons, ~ _ 51:98 MBH Heating: 4.85 Recommend~acf Tons, 1,299 ft.$lTon, _ ~ _ _ _- _ _ _ Building 2,406 16,666 1,390 18,056 51,978 735 865 900 S r~stem 1: 1.50 Net Tons. [ .. 1.85 R~ctti~ci Tons, 1,298 tt.y/'i`on, _~ 59.38 MBtt_1fe9 _ _- _ System 1 2,406 16,666 1,390 18,056 51,978 735 865 900 20x8 Ventilation 676 -810 -133 4,397 AED Excursion 916 916 Zone 1 2,406 15,074 2,200 17,274 47,581 735 865 900 1-Master Bedroom 215 2,461 400 2,861 5,393 83 141 147 2-6 2-Bedroom 1 155 879 200 1,079 2,677 41 50 52 1-6 3-Living Rim 251 1,338 0 1,338 4,968 77 77 80 1-6 4-Kitchen 222 694 0 694 3,266 50 40 41 1-6 5-Laundry/Bath 120 295 0 295 1,650 26 17 18 1-6 6-Family Room 720 3,015 0 3,015 13,282 205 173 180 2-6 7-Dining Room 98 1,486 0 1,486 3,468 54 85 89 2-6 8-Entry 88 1,512 1,000 2,512 2,093 32 87 90 1-6 9-Bedroom 1 179 1,560 400 1,960 4,209 65 90 93 1-6 10-Bedroom 2 142 1,244 200 1,444 3,750 58 71 74 1-6 11-Bath 1 60 196 0 196 1, 258 19 11 12 1-6 12-Bath 2 60 236 0 236 940 15 14 14 1-6 13-Hall 96 158 0 158 627 10 9 9 0-0* { F Rhvac - ResideMiAl S Commerc AC toads Elie Software iDevebPment, tnc. United Pfumt~ing 8 Heating Inc. Powell ,ID 83440 P 4 S stem 7 -Whole House -Adequate Exposure Diversit Test Test For Adequate Exposure Diversity 15,00 42.0% Diff. from Avg. (916 Btuh Excursion) s m 10,00 , ~.,.~~~~ ,... .>:,_ ti ~ ...:. ..........-.~.,s.A~..~,.~ ~:,.. , ., _ .~_ ._.;.~ ~.~:.~.a~:~~: c .~ a~ .~ .N c a~ N 5,00 ca 0 8 am 9 am 10 am 11 am 12 pm 1 pm 2 pm 3 pm 4 pm 5 pm 6 pm 7 pm /Average Glass Load 1.3 x Average /Hourly Glass Load Over 12 Hours __ Al D Calculation Surnm I~ _T-~ -- -- ~Y __ __ _ __ -_ _-- _ _ __ _._._. --- SYSTEM DOES NOT HAVE ADEQUATE EXPOSURE DIVERSITY. --- System is on N, E, S, W rosette. Peak load exceeds 12-hour average load by 42.0%. AED Excursion (amount by which peak exceeds 1.3 x average): 916 Btuh Definition: A system has adequate exposure diversity if the peak-hour glass load for the entire conditioned space does not exceed the average glass load for the entire conditioned space by more than 30 percent. Rhvac - ~! >!i Light: GorrurMa AC Loads Elite Software pevsiop~r-errt, Inc... Unites Plumbing & Heating. tnc. PoweN Rexbu ,ID 83440 P 5 Duct Static Pressure Loss Calculations Path 1, SA, Ups.Path: 0, Up s.Item: 0, Up s Loss: 0.000 -- -- - -- Tit P'a#h SP Loss: 0.3 --_ _---_ -- _ Type - - - -Flow Length: Sizing OPf _ Rough. Calc.Qia Cate.Ve! Item lion FitlNtisc t?es.Loss Alin.Hei Ma~.Hei Ca1c.1N~! Lo~sf100 ~'' 1~oss Duct Re€ - Shame--_-- Mn:Vel _ _Max_.Vel Calc.Wei__ .Len Sew Misc 1 0.3 0.300 Above 0.300 Duct 900 10 Inch 0.0003 14.1 834 2 SA1 0.080 8 8 22 0.058 0.006 Rect 650 900 8 0.306 Fitting 834 3 Fitting 1-P 1-P 0.058 0.014 Above 23.70 0.320 Fitting 887 4 Fitting 12-H2 12-H2 0.072 0.012 Below 16.10 0.331 Duct 800 15 Inch 0.0003 12.9 887 5 SA2 0.080 8 8 18 0.072 0.011 Rest 650 900 8 0.342 Duct 700 15 Inch 0.0003 12.2 864 6 SA3 0.080 8 8 16 0.075 0.011 Rect 650 900 8 0.353 Duct 500 15 Inch 0.0003 10.7 807 7 SA4 0.080 8 $ 12 0.079 0.012 Rect 650 900 8 0.365 Duct 700 10 Inch 0.0003 12.2 864 8 SA5 0.080 8 8 16 0.080 0.008 Rect 650 900 8 0.373 Duct 500 10 Inch 0.0003 10.7 807 9 SA6 0.080 8 8 12 0.083 0.008 Rect 650 900 8 0.381 Fitting 807 10 Fitting 12-H1 12-H1 0.083 0.013 Above 15.54 0.394 .Path 2, RA, Ups,Path: 0, U~rs.item: 0, Up _ -_ s.Lc~s: 0.000 - - _ -- -.-- - _ Tc~ Pew SP_t;17.'` Misc 1 filter 0.3 0.300 Below 0.300 Fitting 649 2 Fitting 5-L 5-L 0.040 0.052 Below 130.35 0.352 Duct 700 25 Inch 0.0003 14.1 649 3 RA1 0.080 8 8 22 0.040 0.010 Rest 700 700 8 0.361 Fitting 649 4 Fitting 7-E3 7-E3 0.040 0.041 Above 104.28 0.403 Duct 700 15 Inch 0.0003 14.1 649 5 RA2 0.080 8 8 22 0.040 0.006 Rect 700 700 8 0.409 Fitting 649 6 Fitting 7-C4 7-C4 0.040 0.076 ~ Above 191.18 0.484 Duct Static Pressure Loss Calculations (cont'd) Type - - -- --- iFtovv Ler-gth Sizing Opt Rough..-- Ca1c.Dia Gelc,Vel_ Item Description FittMisc Des:Los~ bAin.Hei AA~x.H~ei C~c.V4rt~! Lossf100 &~ Loss fh+ct_Ret___ 5h&~.----__-__Min.Ve4 _ Ma~.Ve.1 -- --- - --- - ~alc.Net~ ,_ `I~q~sivaet~ _~~ Fitting 649 7 Fitting 7-C3 7-C3 0.040 0.041 Above 104.28 0.525 _. __ __ __ Summa of Data for A!1 Paths C~!Y- ------ - --_. ~. _-- - Path With Highest Loss: Path 2, SP Loss = 0.525 Largest Duct Diameter: Item 2 in Path 1, Diameter = 14.1 Smallest Duct Diameter. Item 7 in Path 1, Diameter = 10.7 RM-ac - Rte! & Light AC L:oa~ Ellbe software Deirotopmerrt, Inc. United Plumbing & Heating lnc. Powell Rexbu ID 83440 P ~ Total Building Summa Loads C~iimponent -- ___ -- Aria Sen T Lit .Sere Total DeasCriptittn Quan _- Loss _ Gain ~ Gain _Ga~i~ ___ -- 1 D-cb-o: Glazing-Double pane, operable window, clear, -_- 127.2 6,451 0 4,446 4,446 metal frame with break, outdoor insect screen with 50°!° coverage, u-value 0.65 1 D-cb-o: Glazing-Double pane, operable window, clear, 25.2 1,277 0 663 663 metal frame with break, u-value 0.65 1 D-cb-d: Glazing-Double pane, sliding glass door, clear, 44.4 2,254 0 822 822 metal frame with break, outdoor insect screen with 50% coverage, u-value 0.65 11F: Door-Solid Core With Metal Storm 84 1,836 0 424 424 12C-Osw: Wall-Frame, R-13 insulation in 2 x 4 stud 1707.1 12,117 0 2,098 2,098 cavity, no board insulation, siding finish, wood studs 16C-30-a1: Roof/Ceiling-Under attic or knee wall, vented 2488.5 6,211 0 2,547 2,547 attic, no radiant barrier, R-30 insulation, light asphalt 19A-11p-c: Floor-Over enclosed unconditioned crawl 2206.5 8,901 0 1,369 1,369 space, No insulation on exposed walls, sealed or vented space, passive, R-11 blanket, carpet covering 19A-11p-v: Floor-Over enclosed unconditioned crawl 282.1 1,138 0 175 175 space, No insulation on exposed walls, sealed or vented space, passive, R-11 blanket, vinyl covering Subtotals for structure: 40,185 0 12,544 12,544 People: 11 2,200 2,530 4,730 Equipment: 0 0 0 Lighting: 0 0 0 Ductwork: 0 0 0 0 Infiltration: Winter CFM: 103, Summer CFM: 0 7,396 0 0 0 Ventilation: Winter CFM: 61, Summer CFM: 61 4,397 -810 676 -133 AED Excursion: 0 0 916 916 Total Building Load Totals: 51,978 1,390 16,666 18,056 ---- - - ~heclc Figures _---- --- --__---- ` Total Building Supply CFM: 900 CFM Per Square ft.: 0.374 Square ft. of Room Area: 2,406 Square ft. Per Ton: 1,299 Volume (ft~) of Cond. Space: 19,235 Air Turnover Rate (per hour): 2.8 Building Loads _ -- Total Heating Required With Outside Air: 51,978 Btuh 51.978 MBH Total Sensible Gain: 16,666 Btuh 92 Total Latent Gain: 1,390 Btuh 8 °k Total Cooling Required With Outside Air: 18,056 Btuh 1.50 Tons (Based On Sensible + Latent) 1.85 Tons (Based On 75% Sensible Capacity) Nt2tl~s -- - ~ ----- --- _ - -- ___ _ _ _ -__ Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. i I_- I i i umbing & Heating Inc. ID 83440 - _ __ __ ~nq Pie Chart Floor 19% Ventilation 8% Infiltration 14% -' Building Loss Roof 12% 51, 978 Btuh 4% Glass 19% Floor 8 Roof 14% Building Gain 18,056 -- Btuh Wall 12% Excursion 5% Glass 33~ le 26% 2% Plumbing & Heating Inc. Building Bar Graph 15, 000 10,000 Building Loss 51, 978 Btuh 5,000 0 Floor 19% Wall 23% Door 4% Ventilation 8% Roof 12% Glass 19% Infiltration 14% 6,000 5,000 4,000 Building 3,000 Gain 18,056 Btuh 2,000 1,000 0 Floor 8% Wall 12% Door 2% AED Excursion 5% Roof 14% Glass 33% People 26%